Loading...
HomeMy WebLinkAboutShotcreteReport(18-6523.Shotcrete.0023).pdf Client: Chad Salli Town of Vail GROUND 1309 El 81rn Drive ENGINEERING Red Sandstone Parking Garage Report Date: Jul 30,2018 Work Order No.: 18-6523.Shotcrete.0023;ver:2 Work Order Date: Jul 23,2018 Reviewed by: Shane Sorensen Shotcrete Placement Contractor: Coggins&Sons Performed by: Matt Raczewski Nozzleman: Abraham Quantity Placed: 25 yd' Structure Type, Thickness: Soil Nail Shotcrete Retaining Wall,8 in Weather: Partly Cloudy Finish, Curing Methods: Gun Finished, None Placement Location: Soil Nail Shotcrete Retaining Wall: Row#1,Gridlines: 1.25-5.25 Comments: We arrived on-site for the scheduled 11:30am appointment to inspect reinforcing steel and to test shotcrete. Upon arriving to the site we were notified by the contractor that the placement has been rescheduled to 2pm.We returned to the site for the 2pm shotcrete,the placement began at approximately 2:40pm. After the initial air content test of the first load the supplier added one air pack to the load prior to performing a retest. Placement Area Conforms Does Not Conform Not Applicable Not Observed Surface/Substrate Condition: 0 LJ LJ LJ Reinforcing Steel Condition: Means and Methods Placement Method: DI Reinforcing Encasement: DI Presence of Voids: DI Sand Pockets or Lamination: DI Finish and Curing Finish Methods: 0 U UJ Curing Methods: On-Site Notifications Name Company Tom Highsmith Haselden Construction Nick Schnabel Shotcrete Specifications Fresh Properties Hardened Properties 717-Shotcrete Air Content 5 to 9% Average Compressive 4000 min. Shotcrete Strength 717-Shotcrete Slump 2 to 4 inches Conformance Test Age 28 min. Shotcrete Material Material Property Target Casey,8.5 Sack Shotcrete Results apply only to the specific items and locations referenced and at the time of testing,observations or special inspections.This report should not be reproduced,except in full,without the written permission of GROUND Engineering Consultants,Inc. www.groundeng.com Englewood I Commerce City I Loveland I Granby I Gypsum Page 1 of 2 Client: Chad Salli Town of Vail GROUND 1309 El 81rn Drive ENGINEERING Red Sandstone Parking Garage Report Date: Jul 30,2018 Work Order No.: 18-6523.Shotcrete.0023;ver:2 Work Order Date: Jul 23,2018 Reviewed by: Shane Sorensen Shotcrete Shotcrete Sampling Quantity Truck Ticket Air Temp Water Sample No. Location (yd') Number Number Batch Time Test Time (°F) Added (gal) 13 Row#1,Gridline:5.0 10.00 149 317115 12:51 PM 2:53 PM 80 5 13.1 Row#1,Gridline:5.0(Retest) 10.00 149 317115 12:51 PM 3:06 PM 80 - Physical Properties of Shotcrete Sample No. Concrete Temp. (°F) Slump(in) Air Cont. (%) Meas. Vol. (ft3) Empty Meas. (Ib) Full Meas. (/b) Unit Wt. (pcf) Panels Cast 13 90 2.75 4.5 .250 8.58 43.87 141.2 13.1 90 2.75 5.1 .250 8.58 43.78 140.8 Yes Compressive Strength of Shotcrete Cores (ASTM C42 / AASHTO T24) Sample No.: 13.1 Laboratory ID: Shotcrete67 Age(d) Conformance Diameter(in) Area(int) Length(in) L/D Ratio Correction Maximum Corrected Core Factor Load(lb-f) Strength(psi) 7 Yes 2.01 3.17 4.05 2.0 1.00 17,260 5,450 7 Yes 2.01 3.16 4.05 2.0 1.00 17,940 5,680 Average Conformance Compressive Strength(psi) 5,570 Photos • • Y �" ��'�r� '� r,�;Y� i ..i - _ v - 0.4,. . Aur.49-tr . : ;°'k' '.. • - • _ ' ,_ - '.. Placement of the first load Results apply only to the specific items and locations referenced and at the time of testing,observations or special inspections.This report should not be reproduced,except in full,without the written permission of GROUND Engineering Consultants,Inc. www.groundeng.com Englewood I Commerce City I Loveland I Granby I Gypsum Page 2 of 2