HomeMy WebLinkAboutSoil NailReport(18-6523.SoilNail.0017).pdf Client: Chad Salli
Town of Vail
GROUND 1309 El 81rn Drive
ENGINEERING
Red Sandstone Parking Garage
Report Date: Jul 12,2018 Work Order No.: 18-6523.SoilNaiI.0017;ver: 1
Work Order Date: Jul 12,2018 Reviewed by: Chris Hutto
Soil Nail Wall
Installation Contractor: Schnabel Performed by: Chris Leeper
No. of Soil Nails Installed: 2
Location, Elevation(s): Row(3)Nails 54 and 55,8209'
Materials
Conforms Does Not Conform Not Applicable Not Observed
Soil Nail Reinforcement: LI LI ❑ ❑
WalersNertical Reinforcement: ❑ LI LI LI
Hardware: ❑ ❑ LI LI
Drainage Mat: ❑ ❑ LI El
Excavation and Soil Nail Placement
Wall Excavation:
❑ ❑ LI ❑
Soil Nail Diameter and Condition: [J ❑ LI ❑
Soil Nail Length: LI LI LI ❑
Soil Nail Inclination or Batter: LI ❑ ❑ ❑
Soil Nail Spacing and Layout: LI ❑ ❑ ❑
Grout Placement: [J LI ❑ ❑
Proof Nail Testing: 111 ❑ Ll ID
Shotcrete Placement
Welded Wire Mesh: ❑ ❑ ❑ El
Shotcrete Thickness: ❑ El ❑ El
Shotcrete Placement: ❑ 0 ❑ 0
Wall Batter: ❑ LI ❑ 0
Protection of Shotcrete: ❑ ❑I ❑ 0
On-Site Notifications
Name Company
Nick Schnabel
Results apply only to the specific items and locations referenced and at the time of testing, observations or special inspections.This report should not
be reproduced,except in full,without the written permission of GROUND Engineering Consultants, Inc.
www.groundeng.com
Englewood I Commerce City I Loveland I Granby I Gypsum Page 1 of 2
Client: Chad Salli
Town of Vail
GROUND 1309 El 81rn Drive
ENGINEERING
Red Sandstone Parking Garage
Report Date: Jul 12,2018 Work Order No.: 18-6523.SoiINail.0017;ver: 1
Work Order Date: Jul 12,2018 Reviewed by: Chris Hutto
Soil Nail Wall
Photos
1 ' l..
• r •
L
: ___
. : 14 \
lid'iki
.+._.•�, Y= ten-- - - `-^ .. - ' .71n
, o: -.1F.6•-,‘--,-,..• .
r - ►: moi.
iii ..ii4i,___
Soil Nail Soil Nail
•
\h,,P1A -.
•
1
S .t A
moi- �1� �
-47.11.11(104...0,14-- . ---
Soil Nail
Results apply only to the specific items and locations referenced and at the time of testing, observations or special inspections.This report should not
be reproduced,except in full,without the written permission of GROUND Engineering Consultants, Inc.
www.groundeng.com
Englewood I Commerce City I Loveland I Granby I Gypsum Page 2 of 2