HomeMy WebLinkAboutVail Marriott Rough-in Building 3- 3rd Floor 8-15-18.pdf Fire Protection Architecture
RONDINELLI LIFE SAFETY
15272 West Warren Drive—Lakewood,Colorado,80228
Phone 303.807.3321—Email rondolRLS@gmail.com
August 15, 2018
Mike Vaughan
Fire Marshall —Town of Vail
2399 North Frontage Road West
Vail, CO 81657
RE: Marriott—Vail, CO
Fire Protection System --3rd Floor—West— ROUGH-IN INSPECTION
Mr. Vaughan:
Due to scheduling issues, RLS was requested and permitted by the Town of Vail Fire Rescue
Services to provide rough-in inspection of the Fire Alarm installation on the 3rd Floor.
Rondinelli Life Safety was on-site on August 15, 2018, to provide rough-in inspection of fire
alarm devices on the 3`d floor—West Building 3. This inspection began with Alarm Specialists at
approximately 10:30a m and ended at 11:00pm. Below you find my comments and
observations from today.
1. It appeared that wiring, electrical boxes and support brackets were in the process of
being installed in the corridor and would be completed once the corridor ceiling was
installed. Smoke detector bases were not installed in the corridors.
2. The smoke detector bases located in the guest rooms were all installed properly and in
acceptable locations. Patch and paint around the smoke detector bases was still
required.
Based upon our observations, the `rough-in' of the fire alarm system on the 3rd floor -West
Building is installed in accordance the permit documents and should be permitted to proceed
with final trim and programming. If you have any questionsOn€Cems., pie se feel free to
contact me at 303.748.5846. ,�� 0Ao
Report Prepared By: �O
ft" 1,ipe
`0 4®
Stephe Rondineili, AIA Rondinelli Life Safety C4�
SED A R Gam\