Loading...
HomeMy WebLinkAbout4273 Columbine Street Permit worksheet cut bond for both water and sewer, seperate cuts_1.pdf Permit Fee Worksheet ROW Use(min$50) Construction Season(as defined by Town of Vail Municipal Code) Fee Days Lft of Closure Single Lane $ 0.15 x 6 x 150 = $ 135.00 Two Lane $ 0.45 x x = $ - Three Lane $ 1.50 x x = $ - Sidewalk/Bike Path $ 0.15 x x = $ - Fee Months Sqft of Closure Paved Surface $ 0.25 x x _ = $ - Non-Paved Surface $ 0.05 x x = $ • Fee Weeks Sqft of Closure Core Areas Heated Streetscape $ 0.25 x x = $ - Non-Construction Season(as defined by Town of Vail Municipal Code) Fee Days Lft of Closure Single Lane $ 1.00 x x = $ - Two Lane $ 3.00 x x = $ - Three Lane $ 6.00 x x = $ - Sidewalk/Bike Path $ 0.50 x x = $ - Fee Months Sqft of Closure Paved Surface $ 1.00 x _ x = $ - Non-Paved Surface $ 0.20 x x = $ - Foe Days Sqft of Closure Core Areas Heated Streetscape $ 0.50 x I x I = $ - Sub-total $ 135.00 Street Cut(min$50) Non-Moratorium Streets Surface Fee Sqft of Cut ACC/PCC $ 0.30 x 85 = $ 25.50 Brick Paver $ 1.00 x = $ - Pothole(each) $ 50.00 x = $ - Non-Paved Surface $ 0.05 = $ • Moratorium Streets Surface Fee Sqft of Cut ACC/PCC $ 8.00 1 x = $ - Brick Paver $ 15.00 x - $ - Pothole(each) $ 200.00 x • $ - Non-Paved Surface $ 0.25 • $ - Sub-Total $ 50.00 Application/Inspection Fee $ 100.00 Total Permit Fee $ 285.00 New water service lines I Columbine Dr. bond far both sewer and water street cul. 0 v )_5 )1f f= .2 2C f' 1" 'Pt i)p)(7 ),c--4- -I- aSf9 = GvXI 0 . 6 , F 4PlMSpecifrcadortslRDWY Slandards4Permil Fee Worksheet.xisO�] 4 X-1 0, V P)0/40