HomeMy WebLinkAbout4273 Columbine Street Permit worksheet cut bond for both water and sewer, seperate cuts_1.pdf Permit Fee Worksheet
ROW Use(min$50)
Construction Season(as defined by Town of Vail Municipal Code)
Fee Days Lft of Closure
Single Lane $ 0.15 x 6 x 150 = $ 135.00
Two Lane $ 0.45 x x = $ -
Three Lane $ 1.50 x x = $ -
Sidewalk/Bike Path $ 0.15 x x = $ -
Fee Months Sqft of Closure
Paved Surface $ 0.25 x x _ = $ -
Non-Paved Surface $ 0.05 x x = $ •
Fee Weeks Sqft of Closure
Core Areas Heated Streetscape $ 0.25 x x = $ -
Non-Construction Season(as defined by Town of Vail Municipal Code)
Fee Days Lft of Closure
Single Lane $ 1.00 x x = $ -
Two Lane $ 3.00 x x = $ -
Three Lane $ 6.00 x x = $ -
Sidewalk/Bike Path $ 0.50 x x = $ -
Fee Months Sqft of Closure
Paved Surface $ 1.00 x _ x = $ -
Non-Paved Surface $ 0.20 x x = $ -
Foe Days Sqft of Closure
Core Areas Heated Streetscape $ 0.50 x I x I = $ -
Sub-total $ 135.00
Street Cut(min$50)
Non-Moratorium Streets
Surface Fee Sqft of Cut
ACC/PCC $ 0.30 x 85 = $ 25.50
Brick Paver $ 1.00 x = $ -
Pothole(each) $ 50.00 x = $ -
Non-Paved Surface $ 0.05 = $ •
Moratorium Streets
Surface Fee Sqft of Cut
ACC/PCC $ 8.00 1 x = $ -
Brick Paver $ 15.00 x - $ -
Pothole(each) $ 200.00 x • $ -
Non-Paved Surface $ 0.25 • $ -
Sub-Total $ 50.00
Application/Inspection Fee $ 100.00
Total Permit Fee $ 285.00
New water service lines I Columbine Dr.
bond far both sewer and water street cul.
0
v
)_5 )1f f= .2 2C f' 1" 'Pt
i)p)(7
),c--4- -I- aSf9 = GvXI
0 . 6 ,
F 4PlMSpecifrcadortslRDWY Slandards4Permil Fee Worksheet.xisO�]
4 X-1 0, V P)0/40