HomeMy WebLinkAbout1116 Sandstone Dr. Permit worksheet.pdf Permit Fee Worksheet
ROW Use(min$50)
Construction Season(as defined by Town of Vail Municipal Code)
Fee Days LN of Closure
Single Lane $ 0.15 x x = $ -
Two Lane $ 0.45 x x = $ -
Three Lane $ 1.50 x x = $ -
Sidewalk/Bike Path $ 0.15 x x = $ -
Fee Months Sqft of Closure
Paved Surface $ 0.25 x 2 x 400 = $ 200.00
Non-Paved Surface $ 0.05 x 2 x 400 = $ 40.00
r
Fee Weeks Sqft of Closure
Core Areas Heated Streetscape $ 0.25 x x I = $ -
Non-Construction Season(as defined by Town of Vail Municipal Code)
Fee Days lit of Closure
Single Lane $ 1.00 x x = $ -
Two Lane $ 3.00 x x = $ -
^
Three Lane $ 8.00 x x = $ -
Sidewalk/Bike Path $ 0.50 x x = $ -
Fee Months Sqft of Closure
Paved Surface $ 1.00 x x = $ -
Non-Paved Surface $ 0.20 x x = $ -
Fee Das Sqft of Closure
Core Areas Heated Streetscape I$ 0.50 x x = $ -
Sub-total $ 240.00
Street Cut(min$50)
Non-Moratorium Streets
Surface Fee Sqft of Cut
ACC/PCC $ 0.30 x - $ -
Brick Paver $ 1.00 x = $ -
Pothole(each) $ 50.00 x = $ -
Non-Paved Surface $ 0.05 = $ -
Moratorium Streets
Surface Fee Sqft of Cut
ACC/PCC $ 8.00 x $ -
Brick Paver $ 15.00 x = $ -
Pothole(each) $ 200.00 x = $ -
Non-Paved Surface $ 0.25 = $ -
Sub-Total $ -
Application/Inspection Fee S 100.00
Total Permit Fee S 340.00
1 I d fv 01AK e•V__ t. .
0^-(C- e 'l Pi/1-4 ill
F.SPWISpecdicationslRnwr StandardslPemrif Fee worksheetxls