HomeMy WebLinkAbout4273 Columbine Dr. Spruce Way Street cut permit worksheet.pdf Permit Fee Worksheet
ROW Use(min$50)
Construction Season(as defined by Town of Vail Municipal Code)
Fee Days Lft of Closure
Single Lane $ 0.15 x 3 x 150 = $ 67.50
Two Lane $ 0.45 x x = $ -
Three Lane $ 1.50 x x = $ -
SidewalklBike Path $ 0.15 x x1 _ $ -
Fee Months Sqft of Closure
Paved Surface $ 0.25 x x = $ -
Non-Paved Surface $ 0.05 x x = $ -
Fee Weeks Sqft of Closure
Core Areas Heated Streetscape $ 0.25 x x = $ -
Non-Construction Season(as defined by Town of Vail Municipal Code)
Fee Das Lft of Closure
Single Lane $ 1.00 x x = $ -
Two Lane S 3.00 x x = $ -
Three Lane $ 6.00 x x = $ -
SidewalklBike Path $ 0.50 x x = $ -
Fee Months Sqft of Closure
Paved Surface $ 1.00 x x = $ -
Non-Paved Surface $ 0.20 x x = $ -
_
Fee Das Sqft of Closure
Core Areas Heated Streetscape $ 0.50 x x = $ -
Sub-total $ 67.501
Street Cut(min$50)
Non-Moratorium Streets
Surface Fee Sqft of Cut
ACC/PCC $ 0.30 x 64 = $ 19.20
Brick Paver $ 1.00 x = $ -
Pothole(each) $ 50.00 x = $ -
Non-Paved Surface $ 0.05 = $ -
Moratorium Streets
Surface Fee Sqft of Cut _
ACC/PCC $ 8.00 x = $ -
Brick Paver $ 15.00 x = $ -
Pothole(each) $ 200.00 x = $ -
Non-Paved Surface $ 0.25 = $ -
Sub-Total $ 50.00
Appficationllnspection Fee $ 100.00
Total Permit Fee --j,(e{2 4 e" $ 217.50
,, -I- Y (at gai\)
CG1f-
4- I&tif- to ry ; o �
F:1PWISpecifrcelionslRDWYSfandardstPermitFee Worksheet. C 1 ,e