HomeMy WebLinkAbout2794 Snowberry Permit worksheet.pdf Permit Fee Worksheet
ROW Use(min$50)
Construction Season(as defined by Town of Vail Municipal Code)
Fee Da Lft of Closure
Single Lane $ 0.15 x 7 x 100 = $ 105.00
Two Lane $ 0.45 x - x = $ -
Three Lane $ 1.50 x x = $ -
Sidewalk/Bike Path $ 0.15 x x = $ -
Fee Months Sqft of Closure
Paved Surface $ 0.25 x x = $ -
Non-Paved Surface $ 0.05 x 1 x 500 = $ 25.00
Fee Weeks Sqft of Closure
Core Areas Heated Streetscape $ 0.25 x x = $ -
Non-Construction Season(as defined by Town of Vail Municipal Code)
Fee Days Lft of Closure
Single Lane $ 1.00 x x = $ -
Two Lane S 3.00 x x = $ -
Three Lane $ 6.00 x x = $ -
Sidewalk/Bike Path $ 0.50 x x = $ -
Fee Months Sqft of Closure
Paved Surface $ 1.00 x x = $ -
Non-Paved Surface $ 0.20 x x = $ -
Fee Days Sqft of Closure
Core Areas Heated Streetscape $ 0.50 x x = $ -
Sub-total $ 130.00
Street Cut(min$50)
Non-Moratorium Streets
Surface Fee Sqft of Cut
ACC/PCC $ 0.30 x 48 x $ 14.40
Brick Paver $ 1.00 x = $ -
Pothole(each) $ 50.00 x = $ -
Non-Paved Surface $ 0.05 40 = $ 2.00
Moratorium Streets
Surface Fee Sqft of Cut
ACC/PCC $ 8.00 x = $ -
Brick Paver $ 15.00 x = $ -
Pothole(each) $ 200.00 x - $ -
Non-Paved Surface $ 0.25 = $ -
Sub Total $ 50.00
Appticationlinspection Fee $ 100.00
Total Permit Fee 911'1 SA -a. $ 280.00
r
15(1(41°-'1.‘ l . x if; 48 ' to -7- L(-0a
[Z4- (fftZft-(= 5Z / to r4'30t:7 �dtiro
&4 D 0a °0 o0
F tPIMSpecificaffonsl.D WY StandardstPermtt Fee Worksheet.xfs O a 0•
r 170 0- Mb 1 r?t }�
l ,..4? ( `
!n A `{ fio Za >< (0 .2 2g5.0