Loading...
HomeMy WebLinkAbout18-7-434 (07-26-18) steel.pdf H P z Ku mAR5020 County Road 154 Glenwood Springs, CO 81601 u otG'Crnu ai ciiyine�nny i tnyui��nny Geology Phone: (970)945-7988 Materials Testing I Environmental Fax: (970) 945-8454 Email: hpkglenwoodkumarusa.com Office Locations: Parker, Glenwood Springs, and Silverthorne, Colorado REINFORCEMENT STEEL INSPECTION REPORT Client: Howard Rapson Construction Project No.: 18-7-434 Day: Thursday Attn: Howard Rapson Date: 7/26/18 P. O. Box 5664 Page: 1 of 1 Vail, Colorado 81658 Project: Proposed Deck Addition to Hanson Residence, Unit 15, 770 Potato Patch Drive, Vail, Colorado Area of Inspection: Epoxied Dowels for Patio Bench Wall. Reference Documents Structural Drawings provided by the contractor. Used: Inspection Notes: Dowel holes were brushed with a wire brush and blown free of debris with compressed air, prior to application of HILTI HIT-HY 200A Epoxy, as per manufacture's instructions. Inspection Status: ❑ Preliminary ® Final ® Concrete reinforcement as noted above was judged to be in reasonable conformance with the referenced construction documents. ❑ Exceptions Noted: Verbal Gilbert with Vasquez Concrete and Howad Rapson were informed of our Communication: inspection results. Distribution: Howard Rapson Construction -Howard Rapson(Hrapski7(a.gmail.com) Town of Vail—CJ Jarecki (ciarecki a vailgov.com) nif Justin Orgill David A. Young, P.E. Field Technician Reviewed By