HomeMy WebLinkAbout18-7-434 (07-26-18) steel.pdf H P z Ku mAR5020 County Road 154
Glenwood Springs, CO 81601
u otG'Crnu ai ciiyine�nny i tnyui��nny Geology Phone: (970)945-7988
Materials Testing I Environmental Fax: (970) 945-8454
Email: hpkglenwoodkumarusa.com
Office Locations: Parker, Glenwood Springs, and Silverthorne, Colorado
REINFORCEMENT STEEL INSPECTION REPORT
Client: Howard Rapson Construction Project No.: 18-7-434 Day: Thursday
Attn: Howard Rapson Date: 7/26/18
P. O. Box 5664 Page: 1 of 1
Vail, Colorado 81658
Project: Proposed Deck Addition to Hanson Residence, Unit 15, 770 Potato Patch Drive, Vail,
Colorado
Area of Inspection: Epoxied Dowels for Patio Bench Wall.
Reference Documents Structural Drawings provided by the contractor.
Used:
Inspection Notes: Dowel holes were brushed with a wire brush and blown free of debris
with compressed air, prior to application of HILTI HIT-HY 200A Epoxy, as
per manufacture's instructions.
Inspection Status: ❑ Preliminary ® Final
® Concrete reinforcement as noted above was judged to be in reasonable conformance with
the referenced construction documents.
❑ Exceptions Noted:
Verbal Gilbert with Vasquez Concrete and Howad Rapson were informed of our
Communication: inspection results.
Distribution:
Howard Rapson Construction -Howard Rapson(Hrapski7(a.gmail.com)
Town of Vail—CJ Jarecki (ciarecki a vailgov.com)
nif Justin Orgill David A. Young, P.E.
Field Technician Reviewed By