HomeMy WebLinkAbout18-7-434 (06-28-18) steel.pdf H P Ku mAR 5020 County Road 154
Glenwood Springs, CO 81601
Geotecnn cai Engineering I Engineering Geology Phone: (970)945-7988
Materials Testing I Environmental Fax: (970)945-8454
Email: hpkaIenwoodc kumarusa.com
Office Locations: Parker, Glenwood Springs, and Silverthorne, Colorado
REINFORCEMENT STEEL INSPECTION REPORT
Client: Howard Rapson Construction Project No.: 18-7-434 Day: Thursday
Attn: Howard Rapson Date: 6/28/18
P. O. Box 5664 Page: 1 of 1
Vail, Colorado 81658
Project: Proposed Deck Addition to Hanson Residence, Unit 15, 770 Potato Patch Drive, Vail,
Colorado
Area of Inspection: Epoxied Dowels for Retaining Wall and Footings.
Reference Documents Structural Drawings provided by the contractor.
Used:
Inspection Notes: Holes were a minimum of 4" deep and blown free of debris with
compressed air, prior to application of HILTI HIT-HY 200A Epoxy, as per
manufacture's instructions.
Inspection Status: ❑ Preliminary ® Final
® Concrete reinforcement as noted above was judged to be in reasonable conformance with
the referenced construction documents.
❑ Exceptions Noted:
Verbal Gilbert with Vasquez Concrete and Howad Rapson were informed of our
Communication: inspection results.
Distribution:
Howard Rapson Construction -Howard Rapson(Hrapski7Agmail.com)
Town of Vail—CJ Jarecki (cjareckiavailgov.com)
/ljf Justin Orgill David A. Young, P.E.
Field Technician Reviewed By