Loading...
HomeMy WebLinkAboutprint_page_09-19-2017_59c13af95002f-0.pdfPermits Management (B14-0391) Fee Charges (9) Contacts (1) Contractors (1) Properties (1) Inspections (3) PERMITS MANAGEMENT PROJECT Case Name: PROPERTY INFORMATION Properties:Primary: 1750 S FRONTAGE RD W B2 (210312317006) DESCRIPTION Status:Issued Permit #:B14-0391 Submittal Date:10/02/2014 Issue Date:10/02/2014 Last Inspection:Expiration Date: Permit Type:Construction Permit Subcases :Multi-Family Project Valuation:0.00 Date Closed: PROJECT DESCRIPTION Description of Work: Remodel two bathrooms. Work includes replace fixtures. Tubs to be cnverted to showers. Remove sauna in master bathroom. New electrical swtiches in entire unit. ADDITIONAL INFORMATION PARCEL DATA Residential Cluster Medium Density Residential No Data SPRUCE CREEK TOWNHOMES AT VAIL SPRUCE CREEK TOWNHOMES PHASE I 90,175.5 No Data PROJECT CRITERIA Standard Building Building Plumbing Addition Zoning:Land Use: Block:Legal Subdivision: Subdivision:Lot Area: Lot #:View Corridor Easements: Route Type:Route To: Permit Type:Plan Check Type: 3 Stories or Less?:Submittal Type: Type: Construction Multi-Family Start Date: 10/02/2014 Status: Issued Issued Date: 10/02/2014 Scope of Work: Remodel two bathrooms. Work includes replace fixtures. Tubs to be cnverted to showers. Remove sauna in master bathroom. New electrical swtiches in entire unit. Show all 9 Fee Charges Item: BUILDING PERMIT FEES Amount: $321.25 Fee Assessed By: Item: PLUMBING PERMIT FEES Amount: $150.00 Fee Assessed By: Item: ELECTRICAL PERMIT FEES Amount: $86.25 Fee Assessed By: Item: ELEC PLAN REVIEW Amount: $56.06 Fee Assessed By: Item: PLAN CHECK FEES Amount: $246.31 Fee Assessed By: Total Amount: $1,074.87 Amount Paid: $1,074.87 Amount Due: $0.00 Property Owner of 210312317006 ACSM LLC PO BOX 8485 B-2 SPRING, TX 77387-8485 Email: EDIT Dgn Inc. Date Exp: 04/30/2017 Status: Active Contractor #: C000003929 State License #: Contractor Type: [210312317006] B2 1750 S FRONTAGE RD W B2 Land use Medium Density Residential Zone District Designation Residential Cluster TOV Subdivision SPRUCE CREEK TOWNHOMES PHASE I Legal Subdivision SPRUCE CREEK TOWNHOMES AT VAIL TOV Block No Data Lot Area 90,175.5 Lot #No Data Building Final Date: Status: Unscheduled Inspector: Results: Uninspected Plumbing Final Date: Status: Unscheduled Inspector: Results: Uninspected ELEC-Rough Date: 11/25/2014 12:00 AM Status: Completed Inspector: shane Results: Pass View Documents (0) Tagged Cases (0) Activities (7) Add Tag PROJECT DATA BUILDING USES Condominium 434 Dwelling Addition/Alteration BUILDING DESCRIPTION PLUMBING DATA TOTAL VALUATION 0 0 PERMIT FEES Number of Uses (#): Use: Occupancy Class: Occupant Load:Construction Class: Construction Type: New Floor Area (S.F.): Total Floor Area (s.f.): Number of Basement Levels (#): Total Occupant Load (#): Existing Number of Units (#): Number of Units Added (#): Total Number of Units (#): Existing Number of Guest Rooms (#): Number of Guest Rooms Added (#): Total Number Of Guest Rooms (#): Total Occupant Load (#): Number of Stories (#): Fire Sprinklers:Number of Basement Levels (#): Code Edition:Valuation: Total New Floor Area, Added (s.f.): Plumbing Description: Valuation: Total Current Valuation: Total Project Valuation: There are no Documents at this time. There are no Tagged Cases at this time. Inspection Added. cgodfrey has added the inspection Plumbing Final (39458). 09:42:04 AM / Tue, Sep 19th, 2017 Carolyn Godfrey Inspection Added. cgodfrey has added the inspection Building Final (39457). 09:42:03 AM / Tue, Sep 19th, 2017 Carolyn Godfrey Fee Charged. Magnet has charged the fee Recreation Fee in the amount of $0 09:39:59 AM / Tue, Sep 19th, 2017 Carolyn Godfrey Fee Charged. Magnet has charged the fee Building Permit Fee in the amount of $0 09:39:59 AM / Tue, Sep 19th, 2017 Carolyn Godfrey Permits Management Case Updated. Carolyn Godfrey has updated permits management case #B14-0391. 09:39:58 AM / Tue, Sep 19th, 2017 Carolyn Godfrey Show all 7 Activities CONDITIONS Original Building Fee: Current Building Fee: Original Mechanical Fee: Current Mechanical Fee: Original Plumbing Fee: Current Plumbing Fee: Original Construction Fee: Current Construction Fee: Original Mechanical PR Fee: Current Mechanical PR Fee: Original Plumbing PR Fee: Current Plumbing PR Fee: Current Building PR Fee: Number of Conditions: