Loading...
HomeMy WebLinkAbout5044 Main Gore Dr. Permit worksheet.pdf Permit Fee Worksheet ROW Use(min$50) Construction Season(as defined by Town of Vail Municipal Code) Fee Days Lft of Closure Single Lane $ 0.15 x 3 x 100 = $ 45.00 Two Lane $ 0.45 x x = $ - Three Lane 5 1.50^ x x = $ - Sidewalk/Bike Path $ 0.1.5 x x = $ - Fee Months $ ft of Closure Paved Surface $ 0.25 x x = $ - Non-Paved Surface $ 0.05 x x = $ - Fee Weeks Sqft of Closure Core Areas Heated Streetscape $ 0.25 x x I = $ - I Non-Construction Season(as defined by Town of Vail Municipal Code) Fee Days Lft of Closure Single Lane $ 1.00 x x = $ - Two Lane $ 3.00 x x = $ - Three Lane $ 6.00 x x = S - Sidewalk/Bike Path $ 0.50 x x = $ - Fee Months Sqft of Closure Paved Surface $ 1.00 x x = $ - Non-Paved Surface $ 0.20 x x = $ - Fee Da Sqft of Closure Core Areas Heated Streetscape $ 0.50 x II x I = $ - Sub-total $ 50.00 Street Cut(min$50) Non-Moratorium Streets Surface Fee Sqft of Cut ACC/PCC $ 0.30 x 80 = $ 24.00 Brick Paver $ 1.00 x = $ - Pothole(each) $ 50.00 x = $ - Non-Paved Surface $ 0.05I = $ - Moratorium Streets Surface Fee Sqft of Cut ACC/PCC $ 8.00 x - $ - Brick Paver $ 15.00 x - $ - Pothole(each) $ 200.00 x = $ - Non-Paved Surface $ 0.25 = 5 - Sub-Total S 50.00 Application/Inspection Fee $ 100.00 Total Permit Fee 5 200.00 C/-24 `f = ( x11) = Lft(Q 12-÷2-2---t%A- v -Z Lo 0 F.IPWISpecifta ionsIRDWY StandanislPermit Fee Worksheet.x!s