HomeMy WebLinkAbout5044 Main Gore Dr. Permit worksheet.pdf Permit Fee Worksheet
ROW Use(min$50)
Construction Season(as defined by Town of Vail Municipal Code)
Fee Days Lft of Closure
Single Lane $ 0.15 x 3 x 100 = $ 45.00
Two Lane $ 0.45 x x = $ -
Three Lane 5 1.50^ x x = $ -
Sidewalk/Bike Path $ 0.1.5 x x = $ -
Fee Months $ ft of Closure
Paved Surface $ 0.25 x x = $ -
Non-Paved Surface $ 0.05 x x = $ -
Fee Weeks Sqft of Closure
Core Areas Heated Streetscape $ 0.25 x x I = $ - I
Non-Construction Season(as defined by Town of Vail Municipal Code)
Fee Days Lft of Closure
Single Lane $ 1.00 x x = $ -
Two Lane $ 3.00 x x = $ -
Three Lane $ 6.00 x x = S -
Sidewalk/Bike Path $ 0.50 x x = $ -
Fee Months Sqft of Closure
Paved Surface $ 1.00 x x = $ -
Non-Paved Surface $ 0.20 x x = $ -
Fee Da Sqft of Closure
Core Areas Heated Streetscape $ 0.50 x II x I = $ -
Sub-total $ 50.00
Street Cut(min$50)
Non-Moratorium Streets
Surface Fee Sqft of Cut
ACC/PCC $ 0.30 x 80 = $ 24.00
Brick Paver $ 1.00 x = $ -
Pothole(each) $ 50.00 x = $ -
Non-Paved Surface $ 0.05I = $ -
Moratorium Streets
Surface Fee Sqft of Cut
ACC/PCC $ 8.00 x - $ -
Brick Paver $ 15.00 x - $ -
Pothole(each) $ 200.00 x = $ -
Non-Paved Surface $ 0.25 = 5 -
Sub-Total S 50.00
Application/Inspection Fee $ 100.00
Total Permit Fee 5 200.00
C/-24 `f = ( x11) = Lft(Q
12-÷2-2---t%A- v -Z Lo 0
F.IPWISpecifta ionsIRDWY StandanislPermit Fee Worksheet.x!s