HomeMy WebLinkAboutB08-0293 PLANS' architects
rrrrrrrrrrrrrrr•rrrrrrrrarrr•
ENERAL NOTES:
A. GENERAL
I. NOTIFY ARCHITECT IMMEDIATELY OF ANY
CONFLICTS BETWEEN ANY CONTRACT DOCUMENTS
PRIOR TO THE START OF WORK.
2, IN THE EVENT OF ANY CONFLICTS BETWEEN THE
DOCUMENTS, THE ITEM OF MOST OR 6REATE5T
EXTENT OF WORK AS DETERMINED BY THE
ARCHITECT SHALL APPLY AND BE PERFORMED BY
THE CONTRACTOR AT NO ADDITIONAL COST.
5. ALL TRADES SHALL PERFORM THEIR WORK
WITHIN THE RECOGNIZED STANDARDS OF THE
APPLICABLE INDUSTRY,
4. ANY DEVIATION OR CHANGE IN THE WORK FROM
THE CONTRACT DOCUMENTS WITHOUT PERMISSION
OF THE ARCHITECT PLACES ALL RESPONSIBILITY
FOR THE DEVIATION OR CHANGE ON THE
CONTRACTOR,
5. THESE DOCUMENTS WERE PREPARED WITHOUT
REGARD FOR THE DIVISION OF WORK AMONG
TRADES. GENERAL CONTRACTOR 15 TO
COORDINATE AND PROVIDE ALL WORK SHOWN ON
THESE DOCUMENTS WITH ALL TRADES REGARDLE55
OF WHICH DRAWING WORK 15 5HOWN ON.
6. TH15 PROJECT 15 GOVERNED BY THE 2005
INTERNATIONAL RESIDENTIAL CODE AS ADOPTED
BY THE TOWN of VAIL, COLORADO. THE DRAWIN65
DO NOT ALLOW WORK THAT DOES NOT COMPLY
WITH THESE CODES. GENERAL CONTRACTOR AND
H15 SUB - CONTRACTORS ARE RESPONSIBLE FOR
COMPLYING WITH ALL APPLICABLE CODES,
ORDNANCE5, RULES REGULATIONS, ETC., BY ALL
AUTHORITIES HAVING JURISDICTION. GENERAL
CONTRACTOR 15 RESPONSIBLE FOR OBTAINING AND
PAYING FOR ALL REQUIRED PERMITS.
"7, ALTHOUGH TrD orchltects HAS PERFORMEND ITS
SERVICE WITH DUE DILIGENOE AND CARE, IT DOES
NOT GUARANTEE PERFECTION, EVERY EFFORT 15
MADE TO PROVIDE A COMPLETE AND CLEAR SET
OF CONSTRUCTION DOCUMENTS, HOWEVER,
DISCREPANCIES OR OMISSIONS MAY OCCUR.
RELEASE OF THESE DOCUMENTS ANTICIPATES
COOPERATION BETWEEN THE CONTRACTOR, OWNER
AND ARCHITECT TO PROVIDE THE BEST POSSIBLE
PROJECT. THESE DRAWIN65 HAVE BEEN PREPARED
FOR THE USE OF A QUALIFIED CONTRACTOR
EXPERIENCED IN THE CONSTRUCTION TECHNIQUES
AND SYSTEMS 5HOWN.
5. GENERAL CONTRACTOR AND HI5
5UB- CONTACTOR5 ARE TO FIELD VERIFY ALL
DIMENSIONS, EXISTING CONDITIONS, UTILITY
LOCATIONS, ETC., PRIOR TO BEGINNING ANY WORK
OR ORDERING ANY MATERIALS, NOTIFY ARCHITECT
OF DISCREPANCIES OR INCONSISTENCIES IN THESE
DRAWING IMMEDIATELY.
B. SCOPE of WORK
I. THE INTENT OF THE CONTRACT DOCUMENTS IS
THAT EACH CONTRACTOR SHALL PERFORM ALL
ACTIONS NECESSARY AND REQUIRED TO PROVIDE
ALL LABOR, MATERIALS, SUPPLIES, EQUIPMENT,
TRANSPORTATION, FACILITIES AND
APPURTENANCES WHICH ARE INDICATED OR
REA50NA5LY IMPLIED BY EACH DRAWING AND
SPECIFICATION SECTION, ALL OF WHICH 15
COLLECTIVELY NECESSARY AND REQUIRED FOR
THE EXECUTION OF THE WORK AS SHOWN ON THE
CONTRACT DOCUMENTS.
2, WRITTEN DIMENSIONS ON DRAWINGS GOVERN. DO
NOT SCALE DRAWING5, DETAILS TAKE
PRECEDENCE OVER SMALLER SCALE DRAWIN65.
DRAWINGS AND 5PECIFICATIONS ARE INTENDED TO
AGREE. GENERALLY, SPECIFICATIONS WILL TAKE
PRECEDENCE OVER DRAWIN65, SHOULD ANY
D 15CREPANC I E5 OCCUR, CONTRACTOR SHALL NOT
PERFORM ANY WORK UNTIL RESOLVED BY THE
ARCHITECT. WORK SHOWN ON DRAWINGS BUT NOT IN
SPECIFICATION OR SHOWN IN SPECIFICATIONS BUT
NOT ON THE DRAWIN65 SHALL BE PROVIDED AS IF
5HOWN ON BOTH, NO DEVIATIONS, CHANGES,
SUBSTITUTIONS, ETC IN THE DOCUMENTS SHALL BE
MADE WITHOUT WRITTEN APPROVAL FROM THE
ARCHITECT. IN THE CASE OF CONFLICTS BETWEEN
OR WITHIN THE DRAWINGS AND 5PECIFICATION5,,
THE GREATER QUANTITY, HIGHER QUALITY, ETC
WORK SHALL BE PROVIDED AT NO ADDITIONAL
COST.
G. PROJECT COORDINAT
1. ALL CONTRACTORS AND SUBCONTRACTORS
RESPONSIBLE FOR FOR WORK SHOWN IN THE
SPECIFICATIONS AND ON THE DRAWIN65 SHALL
JOINTLY AND SEPARATELY COORDINATE THEIR
WORK WITH REGARD TO 50HEDULIN6, INSTALLATION
PROCEDURE5, SHOP DRAWIN655 AND INSTALLATION
OF ALL RELATED MATERIALS.
2. PRIOR TO THE START OF ANY WORK, THE
CONTRACTOR AND SUBCONTRACTORS
RESPONSIBLE FOR THE WORK SHOWN IN THESE
DOCUMENTS SHALL INSPECT AND APPROVE ALL
PREFATORY WORK THAT HAS BEEN COMPLETED TO
RECEIVE HIS WORK. HE 15 TO ENSURE THAT H15
WORK AND ADJACENT WORK W1LL FINISH TO
PROPER CONTOURS, PLANES AND LEVELS.
PROMPTLY NOTIFY GENERAL CONTRACTOR OF ANY
DEFECTS IN THE PREP WORK THAT WILL
ADVERSELY AFFECT OR PREVENT THE
SATISFACTORY COMPLETION OF H15 WORK.
FAILURE TO NOTIFY GENERAL CONTRACTOR SHALL
INDICATE ACCEPTANCE OF THE PREP WORK AND
ANY 5U55EQUENT CLAIMS OF DEFECTS SHALL NOT
BE RECOGNIZED.
5. NO WORK SHALL BE PERFORMED UNTIL ALL
PREP WORK HAS BEEN COMPLETED, CURED, DRIED,
ETC AND READY TO RECEIVE THE WORK. GENERAL
CONTRACTOR 15 RESPONSIBLE FOR THE TIMELY
COORDINATION AND INSTALLATION OF ALL
MATERIALS.
ST CEILING -NO WORK
6" MTL
D5 6 16" OC
5/8" TYPE 'X" DW
FL.U�-IS I NCa � �-IEGHAN I GAL
I. INSTALLATION OF ALL PLUMBING
5. DOMESTIC WATER SYSTEM:
AND MECHANICAL WORK SHALL
PROVIDE COPPER PIPING
COMPLY WITH ALL LOCAL CODE5,
THROUGHOUT. PROVIDE ARMAFLEX
RULES AND REGULATION5 AND THE
INSULATION ON HOT WATER PIPING,
2005 INTERNATION MECHANICAL AND
COVERS THROUGHOUT THE PROJECT
PLUMBING CODES AS ADOPTED BY
6, PROVIDE SCHEDULE 40 PVC
THE TOWN OF \/AIL.
SANITARY 5EWER PIPING WITH
CLEANOUTS AS REQUIRED, FIELD
2. FIELD VERIFY ALL EXISTING
VERIFY AND CONNECT TO EXISTTNG
PLUMBING FROM ABOVE AND
kNITARY SEWER SYSTEM
RELOCATE AS READ- NOTIFY OWNER
AT LEAST 72 HOURS IN ADVANCE OF
7. ROVIDE EXHAUST DUCTWORK FOR
ANY P15RUPTION TO 5ERVICE5 ABOVE
W KITCHEN HOOD -VENT TO
START OF WORK.
EXTERIOR - PROVIDE SMOKE DAMPERS
5. RE -U5E ALL EXI5TN6 5TACK5,
AS REQD
VENTS, ETC AS FAR AS
PRACTICAL - PROVIDE NEW AS REQD
ROVIDE NEW EXHAUST FAN
ex
MOKE DAMPER IN ALL
4. PROVIDE 5U5MITTAL5 FOR ALL
BATHROOMS - CONNECT TO EXIST
PLUMBING WORK PRIOR TO THE START
SYSTEM
OF ANY WORK..
A
1. INSTALLATION OF ALL ELECTRICAL 4. ELECTRICAL CONTRACTOR TO
WORK SHALL COMPLY WITH ALL
COORDINATE NEW AND EXISTING
LOCAL CODES, RULES AND
5WITCHIN6 WITH OWNER.
REGULATIONS AND THE NATIONAL
ELECTRICAL CODE, CURRENT EDITION.
S. OUTLETS, SWITCHES AND PLATE
INSTALL TELEPHONE AND CABLE TV
COVERS THROUGHOUT THE PROJECT
PER RESPECTIVE COMPANIES'
TO BE 'DECORA' -COLOR AS
REQUIREMENTS.
5ELECTED. PROVIDE IC RATED
RECESSED CANS IN ALL
2. THE ELECTRICAL CONTRACTOR
CEILIIN65 -JUNO OR EQUIVALENT. ALL
SHALL PROVIDE PANEL 50HEDULE5,
FIXTURES TO BE U,L. L15TED.
EQUIPMENT INFORMATION, AND
COMPLETE SUBMITTALS, INCLUDING
6, SMOKE DETECTORS SHALL BE
LIGHTING, WITHIN 50 DAYS OF THE
INSTALLED AS SHOWN AND /OR IN
START OF WORK.
ACCORDANCE WITH LOCAL FIRE
DEPARTMENT. DETECTORS SHALL BE
5. THE ELECTRICAL CONTRACTOR WIRED INTO THE BUILDING ELECTRICAL
SHALL PAY THE ELECTRICAL PERMIT SYSTEM, INTER - CONNECTED AND WITH
FEE AND ANY OTHER REQUIRED FEES BATTERY BACK -UP.
AND PERMITS. PROVIDE COPPER
CIRCUIT WIRING THROUGHOUT.. a I ,
' DEMENTITIOU5 BACKER BOARD
=LIED PARALLEL OR AT R16HT ANGLES
STUDS W 1 1/4" TYPE S WAFER 5CREW5
>" OC- VERTICAL JOINTS STAGGERED 16"
OFF051TE SIDES
BATT I NSUL
ST CEILING -NO WORK
6" L MTL
IDS ® 1(o" 00
5 /5" TYPE 'X' DW
RRIDOR 51DE
TYPE 'X' DW AT RIGHT ANGLE
EA SIDE OF STUDS ATTACHED w/ I"
'E 5 DW SCREWS @ 8 "00 ® VERT JOINTS
OPPOSITE SIDES
BATT I NSUL
5/4 = Ii _ 0ii
5T WALL TO REMAIN
N===UN I T #6 9
EXIST CONSTR TO BE REMOVED
NEW WALL
6"ENERAL. DOTES:
I/411 = 11 _ Oil
1. DIMENSIONS ARE FROM FADE OF DRYWALL TO FACE
OF DRYWALL OR EXT SHEATHING UNLESS NOTED OTHERWISE -TYP
2. PROVIDE SOUND BATTS IN ALL PARTITIONS, FURRING
FLOOR AND CEILING SPACES -TYP
5.. ALL INTERIOR PARTITIONS TO BE 5 5/8" MTL STUDS w/
5/S" TYPE 'X' GYP BD EACH SIDE UNLESS NOTED OTHERWISE
62ENERAL E;)EMOL I T Oil NOTES:
1. ALL DEMOLITION WORK TO COMPLY WITH ALL CODES,
ORDINANCES, RULES, REGULATION5 ETC, AS REQD BY
ALL AUTHORITIES HAVING JURISDICTION.
2. GC TO COORDINATE N015Y AND /OR D15RUPTIVE
DEMOLITION WORK WITH OWNER PRIOR TO START OF
WORK
5. GENERAL CONTRACTOR 15 TO FIELD VERIFY ALL
EX15T CONDITIONS AND COORDINATE WITH ORIGINAL
BUILDING DRAWING5 AND FIELD CONDITIONS.
4. GENERAL CONTRACTOR 15 TO FIELD VERIFY ALL
EX151TN6 PLUMBING, ELECTRICAL, ETC FROM ABOVE
AND RELOCATE AS READ FOR NEW CONSTRUCTION-60
15 TO NOTIFY OWNER 72 HOURS IN ADVANCE OF ANY
SERVICE DISRUPTIONS.
5. GENERAL CONTRACTOR I5 RESPONSIBLE FOR ALL
5HORIN6 INCLUDING DEVGN, INSTALLATION AND
REMOVAL.
io
k
k
■ i
1,) REMOVE EXIST KITCHEN COMPLETE AND
PROVIDE NEW AS SHOWN- RELOCATE EX15T
UTILITIES AS READ -PATCH AS REQD TO MATCH
EXIST CONSTR
2. EX15T 5HOWER TO REMAIN - REMOVE EXIST TILE
SURROUND- PROVIDE NEW CEMENT BACKER BOARD
AND NEW TILE SURROUND
3, EX15T BATHTUB TO REMAIN- REMOVE EXIST TILE
SURROUND - PROVIDE NEW CEMENT BACKER BOARD
AND NEW TILE SURROUND
4. REMOVE EXIST BATHTUB, TILE ADN GYP BD TO
STUDS - PROVIDE NEW CEMENT BACKER BD ON
EXIST STUDS WITH NEW TILE SURROUND
5. NEW SHOWER -TIE INTO EXIST DRAIN- PROVIDE
TEMP GLASS DOOR AND ENCLOSURE
JUR1517IGTION:
BUILDIN6 CODE:
CONSTRUCTION TYPE
OOCUPANC'r:
FULLY 5PRINKLf=17
TOWN of VAIL
2005 150 AS ADOPTEED
5Y THf= TOWN of VAIL
11 A
R2
Y1=5
PO Box 1492 tel: 970 -479 -7387
Vail, CO 81658 fax: 970 - 476 -0077
0 2008 4'rD architects, krc, All rights reserved
CONSULTANTS:
155UE:
AUG 12, 2008
-BLDG PERMIT
im
I�1
V 4
EN E.. * m■iI MM
% �mm , 00