HomeMy WebLinkAboutB17-0393_CENTERLINE_DN13XC415_2.5 100% CDs_09.12.17 stamped 1_1507756500.pdfREVIEWERS SHALL CLEARLY PLACE INITIALS ADJACENT TO EACH
REDLINE NOTE AS DRAWINGS ARE BEING REVIEWED. ACKNOWLEDGEMENT
OR "SIGN-OFF" BY PARTIES TO THE CONSTRUCTION DRAWINGS DOES NOT
CONSTITUTE ALTERATION OF THE LEASE TERMS.
TITLE
SHEET
T1.0
PROJECT CONTACTS
THE INFORMATION CONTAINED IN THIS SET
OF DOCUMENTS IS PROPRIETARY BY
NATURE. ANY USE OR DISCLOSURE OTHER
THAN THAT WHICH RELATES TO SPRINT
SERVICES IS STRICTLY PROHIBITED.
DESCRIPTION
R
Call before you dig.
Know what's below.
SHEET
ENGINEER OF RECORD
CENTERLINE SOLUTIONS
16035 TABLE MOUNTAIN PARKWAY
GOLDEN, CO 80403
KHRISTOPHER SCOTT, P.E.
PH: 303.993.3293
PROPERTY OWNER
QWEST COMMUNICATIONS
11780 E 53RD AVE
DENVER, CO 80239
APPLICANT
SPRINT
6100 SPRINT PARKWAY
OVERLAND PARK, KS 66251
SITE ACQUISITION CONSULTANT
CENTERLINE SOLUTIONS
16035 TABLE MOUNTAIN PARKWAY
GOLDEN, CO 80403
DAWN SMITH
PH: 303.993.3293, EXT. #1449
SHEET NO.
SITE ADDRESS:
SITE NAME:
169 N. FRONTAGE RD
VAIL, CO 81657
US WEST COMM
TOWER
DN13XC415
SUBMITTAL
NO.
PRELIMINARY
DATE
DESCRIPTION
D/C
SG/ML
0
1
90% CD REVIEW
07-14-17
NO. DATE DESCRIPTION
D/C
SG/ML 90% CD REV B
08-28-17 2
SG/ML 100% CONST.
09-12-17 3
SG/ML 90% CD REV A
08-04-17
SHEET TITLE
TM
R
TM
R
SITE ACQUISITION
GOVERNING CODES
SIGN OFF OF FINAL CONSTRUCTION DRAWINGS
CONSULTANT
PROJECT MANAGER
CONSTRUCTION MANAGER
OWNER
PERMITTING CONSULTANT
RF ENGINEER
REGULATORY REV.
DEV. MANAGER
DATE
SIGNATURE
OPS MANAGER
PROJECT SUMMARY
FROM THE INTERSECTION OF I-25 & I-70:
1. MERGE EAST I-70 TO VAIL (96 MI)
2. TAKE EXIT 176
3. PROCEED WEST PAST ROUND ABOUT ON N. FRONTAGE RD
4. SITE IS ON RIGHT
ESTIMATED DISTANCE: 96.7 MILES
ESTIMATED TIME: 1 HOUR 42 MINUTES
SITE NAME: US WEST COMM TOWER
SITE ADDRESS: 169 N. FRONTAGE RD
VAIL, CO 81657
TOWER LATITUDE: 39.64619166°
TOWER LONGITUDE: -106.3807417°
JURISDICTION: TOWN OF VAIL
TOP OF (E) STRUCTURE: 137' AGL
OCCUPANCY GROUP: U (SHELTER)
CONSTRUCTION TYPE: V-B (SHELTER)
FULLY SPRINKLERED: NO (SHELTER)
NO. OF STORIES: ONE (SHELTER)
PROJECT VICINITY MAP
SITE INFORMATION
DRIVING DIRECTIONS
PROJECT
LOCATION
DRAWING INDEX
PROPOSED MODIFICATION OF AN EXISTING TELECOMMUNICATIONS
SITE TO INCLUDE-
(3) NEW 2.5 ANTENNAS (1) PER SECTOR
(3) NEW REMOTE RADIO UNITS (RRU'S)
(1) NEW 2.5 BBU KIT INSIDE MMBS CABINET
(3) NEW FIBER JUNCTION CYLINDERS (1) PER SECTOR
(3) NEW POWER JUNCTION CYLINDERS (1) PER SECTOR
THIS PROJECT INCLUDES THE FOLLOWING SCOPE OF WORK:
CONSTRUCTION MANAGER
SPRINT
TIMOTHY LEUCH
TIMOTHY.2.LEUCH@SPRINT.COM
PH: 303.505.9415
PROJECT MANAGER
SPRINT
DANIELE L. HUXTABLE
DANIELE.HUXTABLE@SPRINT.COM
PH: 720.420.6915
PROJECT MANAGER
CENTERLINE SOLUTIONS
16035 TABLE MOUNTAIN PARKWAY
GOLDEN, CO 80403
MICHAEL LASITER
PH: 303.993.3293 X1465
169 N FRONTAGE RD
VAIL, CO 81657
LATITUDE: 39.64619166°
LONGITUDE: -106.3807417°
VERTICAL BRIDGE #: US-CO-8050
CONSTRUCTION DRAWINGS
US WEST COMM TOWER
DN13XC415
GOVERNING CODES, AS APPLICABLE:
IBC-2015, INTERNATIONAL BUILDING CODE W/ LOCAL AMENDMENTS
IBC-2015, INTERNATIONAL STRUCTURAL CODE
IMC-2015, INTERNATIONAL MECHANICAL CODE
NEC-2014, NATIONAL ELECTRICAL CODE
IFC-2015, INTERNATIONAL FIRE CODE
A.D.A. COMPLIANCE:
INSTALLATION IS UNMANNED AND NOT FOR HUMAN HABITATION.
HANDICAP ACCESS IS NOT REQUIRED PER A.D.A. AND IBC 1103.2.9.
DESIGN WIND SPEED:
90 MPH - 3 SECOND GUST
2.5 EQUIPMENT DEPLOYMENT
T1.0 TITLE SHEET
SP1 SPRINT SPECIFICATIONS
SP2 SPRINT SPECIFICATIONS
A1.0 OVERALL SITE PLAN
A2.0 EQUIPMENT PLAN
A3.0 ELEVATIONS
A3.1 ELEVATIONS
A3.2 ELEVATIONS
A4.0 ANTENNA PLAN AND DETAILS
A5.0 EQUIPMENT DETAILS
A5.1 EQUIPMENT DETAILS
A6.0 COLOR CODING
RF1.0 RF DETAILS
E1.0 ONE-LINE DIAGRAM AND NOTES
E1.1 DC DISTRIBUTION
E2.0 GROUNDING DETAILS
TOWER OWNER
VERTICAL BRIDGE
750 PARK OF COMMERCE DR, SUITE 200
BOCA RATON, FL 33487
09/20/2017
10/11/17