HomeMy WebLinkAbout5185 Main Gore Dr. Permit Fee Worksheet.xlsROW Use (min $50)
Street Cut (min $50)
Application/Inspection Fee
Total Permit Fee
F:\PW\Specifications\RDWY Standards\Permit Fee Worksheet.xls
Construction Season (as defined by Town of Vail Municipal Code)
Single Lane
Two Lane
Three Lane
Sidewalk/Bike Path
Paved Surface
Non-Paved Surface
Core Areas Heated Streetscape
Non-Construction Season (as defined by Town of Vail Municipal Code)
Single Lane
Two Lane
Three Lane
Sidewalk/Bike Path
Paved Surface
Non-Paved Surface
Core Areas Heated Streetscape
Sub-total
Non-Moratorium Streets
Surface
ACC/PCC
Brick Paver
Pothole (each)
Non-Paved Surface
Moratorium Streets
Surface
ACC/PCC
Brick Paver
Pothole (each)
Non-Paved Surface
Sub-Total
Permit Fee Worksheet
Fee
0.15
0.45
1.5
0.15
Fee
0.25
0.05
Fee
0.25
Fee
1
3
6
0.5
Fee
1
0.2
Fee
0.5
Fee
0.3
1
50
0.05
Fee
8
15
200
0.25
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
Days
5
Months
Weeks
Days
Months
Days
Sqft of Cut
60
Sqft of Cut
x
x
x
x
x
x
x
x
x
x
x
x
x
x
Lft of Closure
100
Sqft of Closure
Sqft of Closure
Lft of Closure
Sqft of Closure
Sqft of Closure
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
75
0
0
0
0
0
0
0
0
0
0
0
0
0
75
18
0
0
0
0
0
0
0
50
100
225