Loading...
HomeMy WebLinkAboutB18-0096_Mech & Plumb Approved Plans_1537562903.pdfSINGLE LINE DESCRIPTION DOUBLE LINE D D SPLIT BRANCH TAKE-OFF WITH SQUARE ELBOW & SPLITTER DAMPER SPLIT BRANCH TAKE-OFF WITH RADIUS ELBOW & SPLITTER DAMPER POSITIVE PRESSURE RISER, TYPICALLY SUPPLY NEGATIVE PRESSURE RISER, TYPICALLY RETURN, EXHAUST OR OUTSIDE AIR F/S COMBINATION FIRE & SMOKE DAMPER F/S FIRE DAMPER MOTOR OPERATED DAMPER (MOD) MANUAL VOLUME DAMPER, SINGLE BLADE DAMPER (SBD) FOR ROUND OR <10" TALL, OPPOSED BLADE DAMPER (OBD) >10" TALL BACKDRAFT DAMPER BDD BDD SMOKE DAMPER SMOKE DETECTOR DUCT SIZE: FIRST NUMBER IS PLAN WIDTH, SECOND NUMBER IS DEPTH. 24x36 24x36 DUCTWORK LEGEND SDSD PRESSURE REDUCING VALVE SHOCK ABSORBER STRAINER W/ BLOW-OFF VALVE SAFETY RELIEF VALVE VACUUM BREAKER PRESSURE GAUGE W/ PIG TAIL & COCK THERMOMETER PRESSURE - TEMP. TAP AIR VENT PIPE ANCHOR FLEXIBLE CONNECTOR PIPE EXPANSION JOINT PIPE UNION DOUBLE CHECK BACKFLOW PREVENTER PUMP & EQUIPMENT CONNECTOR TEMPERATURE CONTROL VALVE (2-WAY) DRAIN VALVE W/ HOSE END PLUG VALVE IN RISER FLOW BALANCING VALVE GATE OR GLOBE VALVE IN RISER FLOW CONTROL VALVE BALL VALVE PLUG OR BALANCING VALVE CHECK VALVE GLOBE VALVE BUTTERFLY VALVE VENTURI/FLOW INDICATOR TEMPERATURE CONTROL VALVE (3-WAY) SOLENOID VALVE 90° ELBOW UP TEE UP TEE DOWN SHUT OFF (BALL, GATE, BUTTERFLY) PIPING SYMBOLS 90° ELBOW DN S DUCT/PIPE RISER DESIGNATION KEY CH DW HW G W V PR ST S2 FLOW SWITCH HOSE BIBB WALL HYDRANT TEMPERATURE CONTROLLER OR SENSOR STEAM TRAP TEST CHAMBER STEAM TRAP: FT-FLOAT & THERMOSTATIC TD-THERMODYNAMIC IB-INVERTED BUCKET TS-THERMOSTATIC BP-BALANCED PRESSURE BAR SINK BS 1/2" 1/2" 1-1/2"1-1/2" FIXTURE CONNECTION SCHEDULE HW CW WASTE VENT NOTES: 1. SIZES SHOWN ARE MINIMUM PIPE SIZES TO A SINGLE FIXTURE. LARGER SIZES MAY BE INDICATED ON PLANS WHERE REQUIRED. 2. MINIMUM DOMESTIC PIPE SIZE TO (2) OR MORE FIXTURES IS 3/4". 3. RE: MANUFACTURER'S INSTALLATION INSTRUCTIONS FOR INDIRECT WASTE SIZES. 4. WASTE AND VENT SIZES SHOWN ABOVE APPLY TO INDIVIDUAL VENTING ONLY. WHERE ALLOWED, INDIVIDUAL VENT CONNECTIONS MAY BE OMITTED OR SIZES MAY VARY WHEN CIRCUIT VENTS, COMMON VENTS, WASTE STACK VENTS, WET VENTS, OR COMBINATION DRAIN AND VENT SYSTEMS ARE USED. PRIOR APPROVAL FROM THE ENGINEER IS REQUIRED TO USE THESE ALTERNATIVE VENTING METHODS. 5. PROVIDE TRAP PRIMER FOR ALL FLOOR DRAINS AND FLOOR SINKS NOT LOCATED IN FOOD SERVICE AREAS. 6. MINIMUM SIZE FOR WASTE AND VENT PIPING BENEATH SLAB IS 2". 7. ALL FIXTURES LISTED ARE NOT NECESSARILY USED ON THIS PROJECT. 8. REFER TO APPLIANCE SCHEDULES (BY OTHERS) FOR ADDITIONAL PLUMBING FIXTURE CONNECTIONS SUCH AS INST-HOTS, COFFEE MAKERS, AND GARBAGE DISPOSALS. 9. PROVIDE ICE MAKER BOX ROUGH IN W/ 1/2"CW CONNECTION FOR ALL REFRIGERATOR LOCATIONS. ABBREV. CS CLOTHES WASHER ROUGH-IN 1/2" 1/2" 2" 1-1/2" DRINKING FOUNTAIN / E.W.C. DF - 1/2" 1-1/2" 1-1/2" DISH MACHINE ROUGH-IN DM 3/4" 3/4" 2" 1-1/2" DW DISHWASHER ROUGH-IN - 1/2" 2" 1-1/2" FD FLOOR DRAIN - - 2" 1-1/2" FS FLOOR SINK - - 3" 2" HOSE BIB HB - - -3/4" HAND SINK HS 1-1/2" 1-1/2"1/2" 1/2" KITCHEN SINK W/ OR W/O DISPOSER KS 1/2" 1/2" 2" 1-1/2" LAVATORY LAV 1/2" 1-1/2" 1-1/2"1/2" MOP SERVICE BASIN MSB 3/4" 3" 2"3/4" SHOWER / BATHTUB SH 3/4" 3/4" 2" 1-1/2" SERVICE SINK SS 3" 2"1/2" 1/2" TROUGH DRAIN TD - - 3" 2" URINAL (BLOWOUT) UR 1" 2" 1-1/2"- URINAL (WASHDOWN) UR UR URINAL (WATERLESS) 3/4" 2" 1-1/2" - 2" 1-1/2" - - WATER CLOSET (FLUSH VALVE) WC WATER CLOSET (FLUSH TANK) WCT - 1" 3" 2" - 1/2" 3" 2" WS 3/4" 3/4" 2" 1-1/2"WORK SINK EQUIPMENT ABBREVIATIONS AIR HANDLING UNITAHU AIR SEPARATORAS BOILER (HOT WATER)B BASE BOARDBB BUFFER TANKBT CONSTANT VOLUME BOXCV DISHWASHER EXHAUST FANDEF ELECTRIC BASEBOARD HEATEREBH FURNACEF FAN COILFC FAN POWERED BOXFP GLYCOL FEEDERGF HUMIDIFIER HC HEATING COIL HP HEAT PUMP HX HEAT EXCHANGER KITCHEN EXHAUST FANKEF MAKE-UP AIR UNITMAU MOTOR CONTROL CENTERMCC MIXING VALVEMV PUMPP RETURN (OR RELIEF) AIR FANRF RADIANT ZONERZ SNOWMELT AREASA SUMP BASINSB SUPPLY FANSF STORAGE TANKST THERMOSTATIC MIXING VALVETMV UNIT HEATERUH VARIABLE VOLUME BOXVV WATER HEATERWH H CHILLERCH COOLING COILCC CIRC PUMPCP CABINET UNIT HEATERCUH COOLING TOWERCT DUCT COILDC ELECTRIC WATER HEATEREWH EVAPORATIVE COOLING UNITECU ENERGY RECOVERY UNITERU EXHAUST FANEF EXPANSION TANKET VARIABLE VOLUME BOX W/ REHEATVR TYPE OF AIR DEVICE RE: GRD SCHEDULE. AIR DEVICE DESIGNATION KEY # CA EXH OSA RA XFR SIZE (INCHES) OR MINIMUM FREE AREA REQUIRED IN SQUARE FEET. NOTE: FOR STANDARD MODULE SIZE REGISTERS, SIZE GIVEN IS NECK SIZE. REFER TO GRD SCHEDULE FOR MODULE SIZE. INDICATES AIR INLET DEVICE. = = = = = = AIR QUANTITY (CFM) COMBUSTION AIR EXHAUST OUTSIDE AIR RETURN TRANSFER B XFR 12x6 A 150 12x6 REFERENCE SAMPLE FFI = FOR FURTHER INFORMATION FCT = FOR CONTINUATION RE: B/M400 FFI REFER TO: DRAWING NUMBER OR DIAGRAM LETTER SHEET NUMBER PLAN ABBREVIATIONS ABOVE FINISHED FLOOR AIR ADMITTANCE VALVE ABOVE FINISHED GRADE AUTOMATIC BUILDING CONTROL SYSTEM BACK DRAFT DAMPER BUILDING AAV AFF AFG AUTO BCS BDD BLDG BETWEEN COMMON (OR CLOSED) COMBUSTION AIR CONTROLS CONTRACTOR CONTINUATION DESIGN BUILD B/N C CA CC CDBBC CUBIC FEET PER MINUTE (AIR FLOW RATE) CAST IN PLACE CEILING (OR COOLING) CONCRETE CONDENSATE CONNECT (OR CONNECTION) CONTRACTOR CFM CIP CLG CONC COND CONN CONTR'R CLEANOUT TO GRADECOTG DOMESTIC HOT WATER RECIRC EXISTING DWR (E) EXHAUST AIREA ENTERING AIR TEMPERATURE ELECTRICAL CONTRACTOR ENTERING WATER TEMPERATURE EAT EC EXH EXHAUST EWT GENERAL CONTRACTOR GROUND HEAT EXCHANGER GC GHX GALLONS PER MINUTE (WATER FLOW RATE)GPM HORSEPOWER HOT WATER IN LIEU OF HP HW ILO KILOWATTSKW LEAVING AIR TEMPERATURE LINEAR FOOT LEAVING WATER TEMPERATURE LAT LF LWT MECHANICAL CONTRACTORMC MANUFACTURER MOTOR OPERATED DAMPER NEW MFR MOD (N) NORMALLY CLOSEDNC NATIONAL ELECTRIC CODE NOT IN CONTRACT NORMALLY OPEN NEC NIC NO OUTSIDE AIROA OPPOSED BLADE VOLUME DAMPER ON CENTER OBD OC OUTSIDE AIROSA RETURN AIR REQUIRED RA REQ'D REQUIREMENTSREQ'MTS SUPPLY AIR SQUARE FOOT (FEET) SA SF STATIC PRESSURESP STAINLESS STEEL THROW-AWAY (TRANSFER AIR) TYPICAL SS TA TYP UNLESS NOTED OTHERWISEUNO WALL CLEANOUTWCO WITH REGARD TO WATER COOLED TRANSFER WRT W/C XFR DIAMETERØ BY CONTRACTOR COLD WATERCW HOT WATER RECIRCHWC ABOVEABV BELOW FINISHED GRADEBFG DOMESTIC WATER DOMESTIC HOT WATER DW DHW DOWNDN DOMESTIC HOT WATER RECIRCDHR COMBINATION FIRE/SMOKE DAMPER FURNISHED BY OWNER FSD FBO FLOOR CLEANOUTFCO FOR CONTINUATIONFCT FD FIRE DAMPER REFER TO:RE: WITHW/ CLEANOUTCO FUTURE(F) FREE AREAFA FFI FOR FURTHER INFORMATION WITHOUTW/O VENT THRU ROOFVTR NOTES 1. ALL SYMBOLS, ABBREVIATIONS, AND DESIGNATIONS ON LEGEND SHEET ARE NOT NECESSARILY USED ON THIS PROJECT. 2. THIS DRAWING SET CONSISTS OF DATA GENERATED, IN PART, BY OTHER PARTIES. NOT ALL SYMBOLOGIES AND NOTATION CONVENTIONS OCCURRING IN THIS DRAWING SET ARE NECESSARILY DEFINED ON THESE LEGENDS. CONSULT THE ENGINEER IN THE EVENT SYMBOLOGY OR NOTATION INTERPRETATION IS REQUIRED. EA OA RA SA RISER NUMBER - - - - - - - - - - - - CHILLED WATER DOMESTIC WATER HEATING WATER GAS WASTE AND/OR VENT PIPING RISER (MISC TYPES) STORM DRAIN SECONDARY STORM DRAIN EXHAUST AIR OUTSIDE AIR RETURN AIR SUPPLY AIR AIR SIDE: PIPING SIDE: PLAN SYMBOLS CONTROL PANEL/RADIANT MANIFOLD CARBON DIOXIDE SENSOR CARBON MONOXIDE SENSOR DIAGRAM CONTINUATION REFERENCE PLUMBING/HVAC RISER POINT OF NEW CONNECTION DUCT STATIC PRESSURE SENSOR ROOM PRESSURE SENSOR EMERGENCY POWER OFF SWITCH ACCESS PANEL SNOWMELT MANIFOLD SECTION CUT LETTER/SHEET SHOWN ON POINT OF DISCONNECTION - SP CO2 EPO P CO -- - P THERMOSTAT HUMIDISTAT REMOTE TEMPERATURE SENSOR T S H H B W H TC FS ROOF DRAIN FLOOR DRAIN FLOOR SINK HORIZONTAL CLEANOUT VERTICAL CLEANOUT DECK/ROOF DRAIN ABOVE PIPING DESIGNATIONS SNOWMELT SUPPLY SNOWMELT RETURN CONDENSER RETURN NATURAL GAS MEDIUM PRESSURE GAS REFRIGERANT SUCTION REFRIGERANT LIQUID DOMESTIC WATER DOMESTIC HOT WATER DHW RECIRCULATION FIRE LINE PRESSURIZED WASTE PLUMBING VENT PIPE WASTE PIPE STORM DRAIN PIPE STORM DRAIN OVERFLOW SECONDARY DRAIN SAND AND OIL WASTE HEATING WATER SUPPLY HEATING WATER RETURN DRAIN PIPE GLYCOL FEED CONDENSER SUPPLY PLUMBING PIPING NON-SOFTENED DOMESTIC WATER CR CS GF HWR HWS SMS SMR D MG G RS RL CW HW HWC NS SO SD ST V W PW ST(OF) F HYDRONIC PIPING 90° ELBOW DOWN (ROUND DUCT ONLY) ROUND 90° ELBOW UP (ROUND DUCT ONLY) OFFSET TO CHANGE ELEVATION (AT 30° WHEN POSSIBLE) D = DROP R = RISE ROUND RADIUS ELBOW 90° STRAIGHT TEE 90° CONICAL TEE 45° BRANCH 45° CONICAL TEE SIZE OR SHAPE TRANSITION ROUND FLEXIBLE DUCT 90° ELBOW DN (NEGATIVE PRESSURE) 90° ELBOW DN (POSITIVE PRESSURE) 90° ELBOW UP (NEGATIVE PRESSURE) 90° ELBOW UP (POSITIVE PRESSURE) 90° RADIUS ELBOW 90° RADIUS ELBOW W/TURNING VANES SQUARE DUCT SPLIT ROUND DUCT SPLIT SUMP PUMPSP PR 203 MECHANICAL SYSTEMS LEGEND ABOVE SEA LEVEL PROJECT ALTITUDE 8230' ' ' ISSUE LOG KEY: # DATEISSUE LOG MECHANICAL SHEET INDEX TITLE MECHANICAL COVER SHEETM-000 DESIGN DEVELOPMENT02.19.2018ISSUED AS PART OF A SET ' ' NOT PART OF SET ' ' ISSUED FOR INFORMATION ONLY* √ √ √ √ √ MECHANICAL SCHEDULESM-002 MECHANICAL PLAN - PARKING LEVELSM-201H MECHANICAL PLAN - LEVEL 1M-202 MECHANICAL PLAN - LEVEL 3M-204 MECHANICAL SCHEDULESM-001 MECHANICAL PLAN - LEVEL 2M-203 MECHANICAL PLAN - LEVEL 4M-205 ENLARGED MECHANICAL PLAN - TYP STUDIO (NO SHAFT)M-301 ENLARGED MECHANICAL PLAN - TYP STUDIO (NO SHAFT)M-302 ENLARGED MECHANICAL PLAN - STUDIO X01M-303 ENLARGED MECHANICAL PLAN - STUDIO X07M-304 ENLARGED MECHANICAL PLAN - STUDIO X08M-305 ENLARGED MECHANICAL PLAN - TYP STUDIO + X09 LEVELS 2-4M-306 ENLARGED MECHANICAL PLAN - ACCESSIBLE STUDIO + LEVEL 1M-307 ENLARGED MECHANICAL PLAN - ONE BR X02 LEVELS 2-4M-308 ENLARGED MECHANICAL PLAN - ONE BR X03M-309 ENLARGED MECHANICAL PLAN - ONE BR X10 LEVELS 3-4M-310 ENLARGED MECHANICAL PLAN - TYP ONE BRM-311 MECHANICAL PLAN - ROOFM-206 ENLARGED MECHANICAL PLAN - ONE BR X16M-312 ENLARGED MECHANICAL PLAN - ONE BR X17M-313 ENLARGED MECHANICAL PLAN - ONE BR X02 LEVEL 1M-314 ENLARGED MECHANICAL PLAN - TWO BR X04M-315 ENLARGED MECHANICAL PLAN - ONE BR X10 LEVEL 2M-316 ENLARGED MECHANICAL PLAN - LAUNDRY AND LOBBY/OFFICEM-317 M-401 DOMESTIC WATER RISER DIAGRAMS M-402 M-403 MECHANICAL DIAGRAMSM-501 MECHANICAL DIAGRAMSM-502 MECHANICAL CONTROLSM-601 MECHANICAL CONTROLSM-602 HYDRONIC RISER DIAGRAMS √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ HYDRONIC RISER DIAGRAMS M-404 DOMESTIC WATER RISER DIAGRAMS WASTE AND VENT RISER DIAGRAMSM-405 √ √ √ WASTE AND VENT RISER DIAGRAMSM-406 √PERMIT ISSUE03.26.2018√ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ MECHANICAL PLAN - PARKING LEVELSM-200 PIPING PLAN - PARKING LEVELSM-201P √ √VE PERMIT ISSUE07.24.2018√ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ Sheet Number Date:VAIL, COLORADO953 S. Frontage Rd. West Vail, Colorado 81657 tel: 970.476.1147 gpslarchitects.com SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018 ALL SHEETS VE PERMIT ISSUE ALBUQUERQUE | AVON | DENVER | FORT COLLINS 303.278.3820 www ˛bgbuildingworks˛com Project No. 9911.00 Copyright 2018 Sheet Title M-000 MECHANICAL COVER SHEET 09/21/18 BOILER SCHEDULE MARK SERVICE BOILER TYPE FUEL TYPE TURNDOWN RATIO HEATING CAPACITY L.W.T. (°F) E.W.T. (°F) BURNER VENT TYPE MANUFACTURER* & MODEL #ACCESSORIES REMARKSINPUT @ S.L. (MBH) OUTPUT @ ALT. MINIMUM A.F.U.E.HP VOLT/ PH B-1 HEATING WATER CONDENSING NATURAL GAS 5:1 600 472 94% 140 120 15 A MOCP 120/1 IV LOCHINVAR KBN601 OUTDOOR AIR SENSOR - - - - - - - - - - - - - - - - - MANUFACTURERS: * TRIANGLE TUBE, PATTERSON KELLY, VIESSMANN OR BUDERUS GENERAL NOTES: A: B: MISCELLANEOUS MECHANICAL EQUIPMENT SCHEDULE MARK SERVICE TYPE CAPACITY ELECTRICAL MANUFACTURER* & MODEL #ACCESSORIES REMARKSHP VOLT/ PH GF-1 HWS/R; SMS/R GLYCOL FEEDER 55 GAL 0.7 AMP 120/1 AXIOM SF100 - 2 QTY ET-1 HWS/R EXPANSION TANK 21.7 GAL - -AMTROL EXTROL AX-40V - - ET-2 SMS/R EXPANSION TANK 10.9 GAL - -AMTROL EXTROL AX-20V - - ET-3 DHW EXPANSION TANK 14 GAL - -AMTROL ST-30VC - - MANUFACTURERS: * GENERAL NOTES: A: B: PUMP SCHEDULE MARK SERVICE TYPE GPM TDH (FT) FLUID MOTOR MANUFACTURER* & MODEL #ACCESSORIES REMARKSHPVOLT/ PH P-1 HEATING WATER CIRCULATION INLINE 50 40 30% P.G. 1380 W 208/1 GRUNDFOS MAGNA3 65-150F - 2 QTY; INTEGRAL VFD P-2 BOILER INJECTION INLINE 55 35 30% P.G. 1350 W 208/3 GRUNDFOS UPS 40-240F - 3 QTY P-3 WATER HEATER INJECTION INLINE 30 14 30% P.G. 400 W 120/1 GRUNDFOS UP 43-70 F - 2 QTY P-4 DOMESTIC HW RECIRC INLINE 9.5 15 DOMESTIC WATER 280 W 120/1 GRUNDFOS UPS 32-80 F B - 1 QTY; BRONZE HOUSING P-5 SNOW MELT CIRCULATION INLINE 13.1 30 50% P.G. 600 W 208/3 GRUNDFOS UPS 32-160 F - 1 QTY P-6 ELEVATOR SUMP SUBMERSIBLE 50 5 WATER 1/2 HP 120/1 LIBERTY ELV-280 INTEGRAL OILTECTOR CONTROL 1 QTY; SYSTEM TO ALARM WHEN OIL IS DETECTED MANUFACTURERS: * WILO, B&G, TACO OR AURORA EQUIVALENT GENERAL NOTES: A: B: FINNED TUBE SCHEDULE MARK BTUH PER L.F. @ S.L. BTUH PER L.F. @ ALT GPM AVERAGE WATER TEMP. (°F) ENTERING AIR TEMP. (°F) TUBE SIZE (IN.) FIN SIZE (IN.) ENCLOSURE SIZE (IN.) H x W MANUFACTURER* & MODEL #ACCESSORIES REMARKS BB-1 580 425 1 130 68 3/4 CU 3x3-1/4" ALUM 14 x 3-1/4 SLANT/FIN HD-1400 H-1 - 2-TIER ELEMENT BB-2 460 335 1 130 68 3/4 CU 3x7" ALUM 3 x 7 SMITH HEATING EDGE HE2-TK - - MANUFACTURERS: * STERLING, VULCAN GENERAL NOTES: A: B: MECHANICAL EQUIPMENT WIRING AND CONNECTIONS ITEM FURNISHED UNDER SET IN PLACE OR MTD. UNDER WIRED/ CONNECTED UNDER 1. EQUIPMENT MOTORS AND THERMAL OVERLOADS, RESISTANCE HEATERS. MD MD ED 2.VFD'S, MOTOR CONTROLLERS; MAGNETIC STARTERS, REDUCED VOLTAGE STARTERS AND OVERLOAD RELAYS.MD ED(a) ED 3. DISCONNECT SWITCHES (FUSED OR NON-FUSED), HP RATED SWITCHES, THERMAL OVERLOAD SWITCHES AND FUSES AND MANUAL OPERATING SWITCHES. ED(a) ED(a) ED 4. PUSHBUTTON STATIONS, PILOT LIGHTS, MULTI-SPEED SWITCHES, FLOAT SWITCHES, THERMOSTATS, CONTROL RELAYS, TIMECLOCKS, CONTROL TRANSFORMERS, CONTROL PANELS, MOTOR VALVES, DAMPER ACTUATORS, SOLENOID VALVES, EP AND PE SWITCHES AND INTERLOCKS. MD MD MD(b) 5. 120 VOLT POWER FOR BAS PANELS, FIRE PROTECTION AND BOILER CONTROLS. ED ED ED 6. FIRE/SMOKE DAMPERS AND ELEVATOR VENT DAMPERS. MD MD ED(c) MD = MECHANICAL DIVISION ED = ELECTRICAL DIVISION NOTES: (a) IF FURNISHED AS PART OF FACTORY-WIRED EQUIPMENT, THEN WIRING AND CONNECTIONS ONLY BY ED (b) IF ANY OF THESE DEVICES CARRY THE FULL LOAD CURRENT TO ANY MOTOR THEY SHALL BE CONNECTED BY ED. CONTROL DEVICES CARRYING FULL LOAD CURRENT FURNISHED BY MD AND WIRED BY ED SHALL BE LOCATED AT THE DEVICE BEING CONTROLLED, UNLESS SHOWN ON DRAWINGS OR MUTUAL AGREEMENT IS MADE BETWEEN THE CONTRACTORS WITH NO CHANGE IN THE CONTRACT PRICE. (c)WIRING FROM ALARM CONTACTS TO ALARM SYSTEM BY ED; ALL CONTROL FUNCTION WIRING BY MD. DUCT DETECTORS FURNISHED BY ED, SET IN PLACE BY MD. GENERAL NOTES: THE ABOVE LIST DOES NOT ATTEMPT TO INCLUDE ALL COMPONENTS. ALL ITEMS NECESSARY FOR A COMPLETE SYSTEM SHALL BE INCLUDED IN THE BASE CONTRACT. WATER HEATER SCHEDULE MARK SERVICE TYPE SIDE GPM FLUID E.W.T. (°F) L.W.T. (°F) MAX PRESSURE DROP (FT H2O) ELECTRICAL FIRST HOUR RECOVERY (GPH) DIMENSIONS H x D (IN) MANUFACTURER* & MODEL #ACCESSORIES REMARKSFLAVOLT/ PH WH-1 DOMESTIC HOT WATER INDIRECT INSTANTANEOUS HOT 30 30% PG 140 120 8 4 120/1 500 74 x 29 THERMO 2000 TURBOMAX 109 - 2 QTY COLD - WATER 40 120 1 - - - - - - - - - - - - - - - - - - - - MANUFACTURERS: * REX, PVI GENERAL NOTES: A: B: SNOWMELT MANIFOLD SCHEDULE ZONE DESCRIPTION APPROX AREA (SQ. FT.) GPM ESTIMATED # OF LOOPS MAX LOOP PRESSURE LOSS (FT H2O) ACCESSORIES REMARKS SZ-1 FIRE ACCESS DRIVE 795 13.1 9 4.4 MOISTURE/TEMP SENSOR - SZ-2 LOADING & ENTRY 820 13.5 6 14.7 MOISTURE/TEMP SENSOR - SZ-3 EAST ENTRY 157 2.6 1 21.7 MOISTURE/TEMP SENSOR - MANUFACTURERS: * GENERAL NOTES: A: B:HEAT EXCHANGER SCHEDULE MARK SERVICE TYPE SIDE GPM FLUID E.W.T. (°F) L.W.T. (°F) MAX PRESSURE DROP (PSI) FOULING FACTOR HEAT TRANSFER (MBH) MANUFACTURER* & MODEL #ACCESSORIES REMARKS HX-1 SNOWMELT BRAZED PLATE HOT 28.5 30% PG 140 120 0.8 0.0001 270 TACO TFP10X20L-30(2"TMPT)- - COLD 30.5 50% PG 90 110 0.9 - - - HOT - - - - - - - - - - COLD - - - - - MANUFACTURERS: * B&G, PATTERSON-KELLY, TRANTER GENERAL NOTES: A: B: PLUMBING FIXTURE SCHEDULE MARK TYPE A.D.A. FINISH MANUFACTURER* & MODEL # FAUCET TRIM MFR.* & MODEL #ACCESSORIES REMARKS 1-BOWL KITCHEN SINK YES STAINLESS; BRUSHED NICKEL PROFLO PFSR252264BP PROFLO PFXCM1M207 DRAIN KIT; SIDE SPRAY 1.5 GPM; DROP-IN; SINGLE BOWL 2-BOWL KITCHEN SINK YES STAINLESS; BRUSHED NICKEL PROFLO PFSR332264BP PROFLO PFXCM1M207 DRAIN KIT; SIDE SPRAY 1.5 GPM; DROP-IN; DOUBLE BOWL LAVATORY YES WHITE; BRUSHED NICKEL PROFLO PF20174 PROFLO PFWSC4746BN - 1.2 GPM; SINGLE HANDLE SHOWER YES BRUSHED NICKEL RE: ARCH PROFLO PF7610S PF3001 PRESSURE BALANCE VALVE 1.75 GPM; SINGLE HANDLE; STATIONARY SHOWERHEAD WATER CLOSET YES WHITE PROFLO PFCT103HE - SEAT, FLUSH VALVE 1.28 GPF; FLOOR-MOUNT; ELONGATED FRONT FLOOR DRAIN - NICKEL BRONZE ZURN Z415B - TRAP PRIMER - FLOOR SINK - A.R.E. COATED CAST IRON ZURN Z1901-HD - TRAP PRIMER; GRATE W/ OPENING FOR INDIRECT DRAINS - ST & ST(OF) ROOF DRAIN -COATED CAST IRON ZURN Z164 - - - DOWNSPOUT NOZZLE -NICKEL BRONZE ZURN Z199 - - - TRENCH DRAIN -DUCTILE IRON ZURN Z874-12 -BOTTOM DOME STRAINER TRAFFIC-RATED; VANDAL-PROOF WALL HYDRANT -ROUGH BRONZE ZURN Z1341-BFP - VACUUM BREAKER MODERATE CLIMATE WALL HYDRANT NON-FREEZE -NICKEL BRONZE ZURN Z1305 - VACUUM BREAKER KEYED; RECESSED MANUFACTURERS: FIXTURE: AMERICAN STANDARD, UNIVERSAL RUNDLE, FIAT STERN WILLIAMS FAUCET: SPEAKMAN, DELTA, AMERICAN STANDARD, CHICAGO DRAIN: JOSAM, WADE SMITH GENERAL NOTES: A: B: P1 P1a P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 Sheet Number Date:VAIL, COLORADO953 S. Frontage Rd. West Vail, Colorado 81657 tel: 970.476.1147 gpslarchitects.com SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018 ALL SHEETS VE PERMIT ISSUE ALBUQUERQUE | AVON | DENVER | FORT COLLINS 303.278.3820 www ˛bgbuildingworks˛com Project No. 9911.00 Copyright 2018 Sheet Title M-001 MECHANICAL SCHEDULE 09/21/18 GRILLE, REGISTER, DIFFUSER & LOUVER SYMBOL USE PATTERN FINISH MANUFACTURER* & MODEL #ACCESSORIES REMARKS CEILING & WALL EXH FIXED LOUVER 0°STD WHITE TITUS 30RL OBD A.; 3/8" BLADE SPACING; CONCEALED FASTENING; HEAVY-DUTY STEEL NOT USED CEILING & WALL SUPPLY FIXED LOUVER 38°STD WHITE TITUS 300RL-HD OBD A.; 1/2" BLADE SPACING; CONCEALED FASTENING; HEAVY-DUTY STEEL EXTERIOR LOUVER DRAINABLE STATIONARY RE: ARCH RUSKIN ELF6375DX INSECT SCREEN - EXTERIOR LOUVER STATIONARY RE: ARCH RUSKIN ELF15J INSECT SCREEN - DOOR XFR GRILLE LOUVERED RE: ARCH TITUS TL-700L - SURFACE MOUNT MANUFACTURERS: GRD KRUEGER, METALAIRE LOUVER GREENHECK, L&D GENERAL NOTES: A:PROVIDE PLENUM BOX EQUAL TO FACE SIZE OF DIFFUSER. WHERE USED FOR CORRIDOR VENTILATION SYSTEM, BRANCH DUCT TO EQUAL FACE SIZE OF DIFFUSER B: A B C D E F UNIT AND CABINET HEATER SCHEDULE (HYDRONIC) MARK TYPE CFM HEATING COIL ELECTRICAL MANUFACTURER* & MODEL #ACCESSORIES REMARKSSENSIBLE MBH WATER CONDITIONS HP/ (WATTS) VOLT/ PHE.W.T. (°F) L.W.T. (°F)GPM MAX. WTR. P.D. (FT.) UH-1 HORIZONTAL DISCHARGE 245 6.5 140 120 0.7 1 (16) 120/1 BEACON MORRIS HB-108A - GARAGE CUH-1 WALL 630 25 140 120 3 0.5 1/10 120/1 BEACON MORRIS WI-1130-06 - WEST STAIRWELL CUH-2 NOT USED - - - - - - - - - - CORRIDORS CUH-3 CEILING CABINET 230 16.4 140 120 1.64 0.2 1/15 120/1 BEACON MORRIS CBS-RC-1200-02 -ELEVATOR LOBBY; BOTTOM STAMPED INLET & OUTLET CUH-4 CEILING CABINET 430 29.8 140 120 2.98 0.6 1/10 120/1 BEACON MORRIS CBS-RC-1200-04 - EAST STAIRWELL MANUFACTURERS: * BEACON MORRIS, TRANE, MCQUAY, MODINE EQUIVALENT GENERAL NOTES: A: B: MAKE-UP AIR UNIT SCHEDULE MARK AREA SERVED MIN. OUTSIDE AIR (CFM) AIR DELIVERY CAPACITY GAS-FIRED HEATING ELECTRICAL FILTER WEIGHT (LBS) MANUFACTURER & MODEL #ACCESSORIES REMARKS SUPPLY FAN AIR CONDITIONS GAS SECTION MCA MOCP VOLT/ PHCFM ESP @ ALT (IN W.C.) MOTOR (HP/BHP) E.A.T. DB (°F) L.A.T. DB (°F) INPUT @ S.L. (MBH) OUTPUT @ ALT (MBH) MAU-1 CORRIDOR 1800 1800 0.41 3/4 -16 84 179 143 11.5 15 208/1 2 IN WASHABLE 987 GREENHECK IGK-109-H12 ALL GENERAL NOTES APPLY FRONT DISCHARGE/ INDIRECT-FIRED MAU-2 LAUNDRY 2300 2300 0.52 2 -16 77 214 171 10.9 15 208/3 2 IN WASHABLE 1311 GREENHECK IGK-112-H22 ALL GENERAL NOTES APPLY FRONT DISCHARGE MANUFACTURERS: * REZNOR, MODINE GENERAL NOTES: A: CONVENIENCE OUTLET (WIRED BY EC), VIBRATION ISOLATION PER SPECIFICATION, BACKDRAFT DAMPER, CONTROL PANEL HEATER, LOW FIRE START, FREEZE PROTECTION, BIRDSCREEN; FACTORY-WIRED DISCONNECT B: EXHAUST FAN SCHEDULE MARK TYPE FAN SOUND POWER (dB re. 10-12 WATT)MOTOR MANUFACTURER* & MODEL #ACCESSORIES REMARKSCFM SONES HP/ (WATT) VOLT/ PHASE@ ALT (IN WC) 63 HZ 125 HZ 250 HZ 500 HZ 1000 HZ 2000 HZ 4000 HZ 8000 HZ EF-1 CEILING 60 1.0 0.2 - - - - - - - - (17) 120/1 PANASONIC FV-05VS3 RADIATION DAMPER PC-RD05C5 BATHROOM EXHAUST EF-2 CEILING 100 1.3 0.15 - - - - - - - - (27) 120/1 PANASONIC FV-10VS3E - ELECTRICAL, TRASH EF-3 WALL 3500 11.1 0.12 78 78 74 70 65 63 61 57 1/4 120/1 COOK 24XLWH WALL COLLAR; MOTOR SIDE WIRE GUARD; INSECT SCREEN; MOTORIZED DAMPER GARAGE PURGE HEAVY-DUTY CONSTRUCTION EF-4 WALL 250 0.5 0.1 46 41 40 38 35 30 20 11 1/20 120/1 COOK 12XW26D103 WALL COLLAR; MOTOR SIDE WIRE GUARD; INSECT SCREEN GARAGE CONTINUOUS VENTILATION EF-5 CEILING 300 2.0 0.3 - - - - - - - - (126) 120/1 COOK GC-740 - BOILER ROOM EF-6 DRYER 173 - - - - - - - - - - (71.9) 120/1 FANTECH DBF4XLT-705 LINT TRAP DRYER EXHAUST MANUFACTURERS: * ACME, COOK, GREENHECK, PANASONIC, PENN GENERAL NOTES: A: FACTORY-PROVIDED PRE-WIRED DISCONNECT. B: Sheet Number Date:VAIL, COLORADO953 S. Frontage Rd. West Vail, Colorado 81657 tel: 970.476.1147 gpslarchitects.com SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018 ALL SHEETS VE PERMIT ISSUE ALBUQUERQUE | AVON | DENVER | FORT COLLINS 303.278.3820 www ˛bgbuildingworks˛com Project No. 9911.00 Copyright 2018 Sheet Title M-002 MECHANICAL SCHEDULE 09/21/18 UP (22R) FIRE EXCAB FIRE EXCAB UP U P 18/2 18/2 29 65 (MIN) 4C MAILBOXESw/ PARCEL LOCKERS 1 K J F E D B A 9 10 2 4 6 12 15 16 17 18 19 20 21 22 YB YA YC YD YF YG YH YL YJ YM 16 17 18 19 20 21 22 YK YE YD 7 5 1 2 L M 3 7 6 9 10 G H SCALE: MECHANICAL FOUNDATION PLAN 1/8" = 1'-0" SPACE FOR DHW PUMP, MIXING VALVE, ET, ETC. SPACE FOR HWS/R PUMPS, ET, GF, ETC. DHW PUMP, MIXING VALVE, ET, ETC. FLAG NOTES: 1 SNOWMELT PAVED SLAB-ON-GRADE WALKWAY BELOW OPEN-GRATE METAL STAIR. NO STAIR SNOWMELT NEEDED. 1. RE: M500 SERIES FOR ALL APPLICABLE DIAGRAMS. 2. CEILING COORDINATION OF ALL MEP SYSTEMS (LIGHTING, DUCTWORK, DIFFUSERS, ELECTRICAL, FIRE PROTECTION, ETC.) MUST BE COMPLETED BY THE CONTRACTOR PRIOR TO THE START OF ANY INSTALLATIONS. 3. DO NOT ROUTE DUCTWORK OR PIPING OVER ELECTRICAL ROOMS OR ELECTRICAL PANELS; MAINTAIN N.E.C. CLEARANCES. COORDINATE ROUTINGS WITH DIV. 26 CONTRACTOR. 4. CONTRACTOR TO MAINTAIN 8'-6" CLEAR HEAD HEIGHT IN GARAGE AND INFORM THE ENGINEER AND ARCHITECT OF ANY AREAS THAT MAY NOT MEET 8'-6" PRIOR TO INSTALLATION, MINIMUM 8'-2" CLEAR HEAD HEIGHT MUST BE MAINTAINED IN ACCESSIBLE VAN AREAS. 5. PROVIDE FLEXIBLE DUCT AND PIPE CONNECTIONS TO ALL MOTORIZED EQUIPMENT. 5. PROVIDE FLEXIBLE DUCT AND PIPE CONNECTIONS TO ALL MOTORIZED EQUIPMENT. 6. VERIFY ALL EQUIPMENT ACCESS PANELS WITH MANUFACTURER AND ARCHITECT. 7. ALL SOURCES OF IGNITION ON MECHANICAL EQUIPMENT SHALL BE MOUNTED 18" AFF. 8. ALL SOURCES OF IGNITION ON MECHANICAL EQUIPMENT SHALL BE MOUNTED 18" AFF. 9. PROTECT PIPING ROUTED ALONG COLUMNS, WALLS, ETC. FROM DAMAGE AS NECESSARY WITH CAGES. COORDINATE WITH ARCHITECT. 10. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED. 11. ALL PIPING SHALL BE ROUTED AS HIGH AS POSSIBLE IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN POSSIBLE, ESPECIALLY WHERE CROSSING OTHER PIPES, DUCTS, AND ELECTRICAL. 12. ACCESS PANELS SHALL BE 24x24, U.N.O. LOCATIONS SHOWN ARE APPROXIMATE, EXACT LOCATIONS SHALL BE COORDINATED WITH THE ARCHITECTS DRAWINGS AND WITH THE LOCATIONS OF THE EQUIPMENT OR APPARATUS THAT THEY SERVE. 13. REFER TO THE PLUMBING FIXTURE CONNECTION SCHEDULE FOR PIPE SIZES TO INDIVIDUAL FIXTURES. 14. NOT ALL REQUIRED CLEANOUTS ARE NECESSARILY SHOWN ON THESE PLANS. PROVIDE CLEANOUTS ON WASTE, VENT AND STORM PIPING AS REQUIRED BY CODE AND FOR REASONABLE MAINTENANCE BASED ON ACTUAL FIELD INSTALLATION. COORDINATE LOCATIONS WITH ARCHITECT/ENGINEER. 15. ST AND ST(OF) PIPING 3", U.N.O. HVAC & PIPING NOTES: W 19 W 6" W 5 W 9 W 3 W 1 W 2 W 8 W 10 W 12 W 16 SNOWMELT ZONE #3 SNOWMELT ZONE #2 1 SNOWMELT ZONE #3 M G FROM UTILITY, RE: CIVIL FCT. SM-3 IN LANDSCAPE BOX. W 4" 5" 4" 4" 4"W W 4 W 11 W 15 4" W 18 W 6 W 7 4 " 4 " 3" 4"4"P6 P6 FCO 4" W 13 5"5" 6" 4" W 14 3" 3" W 4" 4" 4" 4"3" W 4"4"4" W 4" W 4" W P-6 1-1/2"1-1/2"SMSSMRGAS PIPING, RE: M-201P FCT. COORDINATE LOCATION WITH ELEVATOR INSTALLER. P6 DOMESTIC WATER TO COMBINED FIRE WATER ENTRY, FROM UTILITY. I.E. = 8216' A.S.L. MAX. RE: CIVIL AND FP DRAWINGS FCT AND SIZE. WATER TO COMBINED ENTRY. RE: FP DRAWINGS. Sheet Number Date:VAIL, COLORADO953 S. Frontage Rd. West Vail, Colorado 81657 tel: 970.476.1147 gpslarchitects.com SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018 ALL SHEETS VE PERMIT ISSUE ALBUQUERQUE | AVON | DENVER | FORT COLLINS 303.278.3820 www˛bgbuildingworks˛com Project No. 9911.00 Copyright 2018 Sheet Title MECHANICAL PLUMBING PLAN - PARKING LEVELS M-200 09/21/18 UP (22R) FIRE EXCAB FIRE EXCAB UP U P 18/2 18/2 29 65 (MIN) 4C MAILBOXESw/ PARCEL LOCKERS 1 K J F E D B A 9 10 2 4 6 12 15 16 17 18 19 20 21 22 YB YA YC YD YF YG YH YL YJ YM 16 17 18 19 20 21 22 YK YE YD 7 5 1 2 L M 3 7 6 9 10 G H SCALE: MECHANICAL PLAN - PARKING LEVELS 1/8" = 1'-0" BDD EF-5 EF-1 EF-2 BDD BDD FXFR 14x14 SM-2 ANTICIPATED EXTENTS OF HEATED SOFFIT. EF-4 EF-3 EF-3 MOUNTED AT CEILING HEIGHT MAINTAIN 3' SEPARATION FROM ADJACENT WINDOWS ABOVE GARAGE. U.C. 3/4" BDD EF-2 12"Ø 12"Ø 9"Ø10"Ø 6"Ø EF-2 8"Ø 6"Ø 6"Ø1. RE: M500 SERIES FOR ALL APPLICABLE DIAGRAMS. 2. CEILING COORDINATION OF ALL MEP SYSTEMS (LIGHTING, DUCTWORK, DIFFUSERS, ELECTRICAL, FIRE PROTECTION, ETC.) MUST BE COMPLETED BY THE CONTRACTOR PRIOR TO THE START OF ANY INSTALLATIONS. 3. DO NOT ROUTE DUCTWORK OR PIPING OVER ELECTRICAL ROOMS OR ELECTRICAL PANELS; MAINTAIN N.E.C. CLEARANCES. COORDINATE ROUTINGS WITH DIV. 26 CONTRACTOR. 4. CONTRACTOR TO MAINTAIN 8'-6" CLEAR HEAD HEIGHT IN GARAGE AND INFORM THE ENGINEER AND ARCHITECT OF ANY AREAS THAT MAY NOT MEET 8'-6" PRIOR TO INSTALLATION, MINIMUM 8'-2" CLEAR HEAD HEIGHT MUST BE MAINTAINED IN ACCESSIBLE VAN AREAS. 5. PROVIDE FLEXIBLE DUCT AND PIPE CONNECTIONS TO ALL MOTORIZED EQUIPMENT. 5. PROVIDE FLEXIBLE DUCT AND PIPE CONNECTIONS TO ALL MOTORIZED EQUIPMENT. 6. VERIFY ALL EQUIPMENT ACCESS PANELS WITH MANUFACTURER AND ARCHITECT. 7. ALL SOURCES OF IGNITION ON MECHANICAL EQUIPMENT SHALL BE MOUNTED 18" AFF. 8. ALL SOURCES OF IGNITION ON MECHANICAL EQUIPMENT SHALL BE MOUNTED 18" AFF. 9. PROTECT PIPING ROUTED ALONG COLUMNS, WALLS, ETC. FROM DAMAGE AS NECESSARY WITH CAGES. COORDINATE WITH ARCHITECT. 10. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED. 11. ALL PIPING SHALL BE ROUTED AS HIGH AS POSSIBLE IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN POSSIBLE, ESPECIALLY WHERE CROSSING OTHER PIPES, DUCTS, AND ELECTRICAL. 12. ACCESS PANELS SHALL BE 24x24, U.N.O. LOCATIONS SHOWN ARE APPROXIMATE, EXACT LOCATIONS SHALL BE COORDINATED WITH THE ARCHITECTS DRAWINGS AND WITH THE LOCATIONS OF THE EQUIPMENT OR APPARATUS THAT THEY SERVE. 13. REFER TO THE PLUMBING FIXTURE CONNECTION SCHEDULE FOR PIPE SIZES TO INDIVIDUAL FIXTURES. 14. NOT ALL REQUIRED CLEANOUTS ARE NECESSARILY SHOWN ON THESE PLANS. PROVIDE CLEANOUTS ON WASTE, VENT AND STORM PIPING AS REQUIRED BY CODE AND FOR REASONABLE MAINTENANCE BASED ON ACTUAL FIELD INSTALLATION. COORDINATE LOCATIONS WITH ARCHITECT/ENGINEER. 15. ST AND ST(OF) PIPING 3", U.N.O. HVAC & PIPING NOTES: Sheet Number Date:VAIL, COLORADO953 S. Frontage Rd. West Vail, Colorado 81657 tel: 970.476.1147 gpslarchitects.com SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018 ALL SHEETS VE PERMIT ISSUE ALBUQUERQUE | AVON | DENVER | FORT COLLINS 303.278.3820 www˛bgbuildingworks˛com Project No. 9911.00 Copyright 2018 Sheet Title MECHANICAL PLAN - PARKING LEVELS M-201H 09/21/18 UP (22R) FIRE EXCAB FIRE EXCAB UP U P 18/2 18/2 29 65 (MIN) 4C MAILBOXESw/ PARCEL LOCKERS 1 K J F E D B A 9 10 2 4 6 12 15 16 17 18 19 20 21 22 YB YA YC YD YF YG YH YL YJ YM 16 17 18 19 20 21 22 YK YE YD 7 5 1 2 L M 3 7 6 9 10 G H SCALE: PIPING PLAN - PARKING LEVELS 1/8" = 1'-0" P6 SPACE FOR DHW PUMP, MIXING VALVE, ET, ETC. WH-1 WH-1 SPACE FOR HWS/R PUMPS, ET, GF, ETC. DHW PUMP, MIXING VALVE, ET, ETC. UH-1 1 UH-1 UH-1 UH-1UH-1 UH-1 UH-1 1 1 1 1 1 1 FLAG NOTES: 1 3/4" HWS/R TO UH SNOWMELT PAVED SLAB-ON-GRADE WALKWAY BELOW OPEN-GRATE METAL STAIR. NO STAIR SNOWMELT NEEDED INTERLOCK INDICATED UH-1 FAN OPERATION WITH EF-3 OPERATION. RE: CONTROLS DIAGRAM AND SEQUENCE FFI. UNDERGROUND GAS PIPING TO SERVE GENERATOR. SEE E100 FCT. P 1 P 2 P 3 W 4 P 4 P 5 W 19 P 19 W 18 P 18 P 7 P 8 P 9 W 11 P 11 P 10 P 12 P 13 P 14 P 15 P 16 1 2 P 6 3 4 17 5 7 6 8 9 10 11 13 12 15 14 16 W 5 W 7 W 9 W 3 W 1 W 2 W 6 W 8 W 10 W 12 W 13 W 15 W 14 W 16 B-1 B-1 B-1 UH-1 2 P9 GARAGE DOOR INTERLOCKED WITH EF-3 OPERATION TO OPEN 12" DURING PURGE MODE. RE: CONTROLS DRAWINGS M60Z FFI. SM-2 SM-3 2 (3) 4" BOILER FLUES AND (3) 4" CA INTAKE DUCTS UP IN SHAFT ABOVE TO ROOF. SM-1 IN LANDSCAPE BOX. TIE 2" V INTO COMMON BATHROOM VENT ABOVE. P6FCO CUH-3 UH-1 1 UH-1 HWS HWR 2-1/2" 2-1/2" 2-1/2" 2-1/2"3/4"3/4"HWSHWRHWS HWR 3/4" 3/4" HWS HWR 3/4" 3/4" HWS HWR 3/4" 3/4" HWR HWS 3/4" 3/4" 3/4" 3/4" HWR HWS 3/4" 3/4" HWR HWS 3/4 " 3/4"3/4"3/4"1-1/4" 1-1/4"1-1/4"1-1/4"HWSHWR1-1/4"1-1/4"2-1/2"2-1/2"1-1/4"1-1/4"2-1/2" 2-1/2" HWR HWS 2-1/2" 2-1/2" 2" 2" HWR HWS 1" 1" HWRHWS 1-1/2" 1-1/2" HWRHWS 1-1/4" 1-1/4" 1-1/4" 1 -1 /4 " HWC HW CW1-1/2"1-1/2"1-1/2" 1-1/2"HW CW 2" HW/CW HW CW 2" CW/HW HWCW 2 " 2" 1 -1 /2 " 1 -1 /2 " W4" W 4" 4"3"4" 4" 4" 4" 3/4" HWS/HWR 3/4" HWS/R 2" HWS/HWR 1-1/2 "1-1/2" 2-1/2" 2-1/2" 1-1/2 " 1-1/2 " 2-1/2" 2-1/2" 2-1/2" 2-1/2"2-1/2"2-1/2"HWC HWC HWC 4"W W 4 "4 " 3" 4" TIE 2" V INTO COMMON BATHROOM VENT ABOVE. 3" 4" 4" W 3" 4" W 2-1/2" 2-1/2" 2" 2"2-1/2" 2-1/2" 1-1/2"1 -1/2" 3 /4" 3/4"1"3/4" 3/4" 3/4" HWC 3/4"3/4"3/4" 3/4" 3/4" HWC1" 3/4"1" CUH-1 CUH-4 UH-1 1 UH-1 1 3/4" HWS/HWR 3/4" HWS/HWR PROVIDE BB-2, TOTAL LENGTH 36'. 3/4" HWS/HWR TO BB-2 3/4" HWS/HWR TO BB-2 3/4" HWS/HWR TO BB-2 3/4" HWS/R TO BB. BB-1, 2' 3/4"3/4"3 2" 1"2"2" G G 1" GAS SMSSMR SMS SMR SMS SMR SMS SMR SMS SMR 3/4"3/4" 3/4" 3/4"1-1/2"1-1/2"1-1/2" 1-1/2" 1-1/2" 1-1/2" 2" SMS/R 1-1/2"1-1/2"2"2"2"2" 3 3 3 3 SMS/R PIPING TO UNDERGROUND. REFER TO M-200 FCT. 41" 2" 4 W 1. RE: M500 SERIES FOR ALL APPLICABLE DIAGRAMS. 2. CEILING COORDINATION OF ALL MEP SYSTEMS (LIGHTING, DUCTWORK, DIFFUSERS, ELECTRICAL, FIRE PROTECTION, ETC.) MUST BE COMPLETED BY THE CONTRACTOR PRIOR TO THE START OF ANY INSTALLATIONS. 3. DO NOT ROUTE DUCTWORK OR PIPING OVER ELECTRICAL ROOMS OR ELECTRICAL PANELS; MAINTAIN N.E.C. CLEARANCES. COORDINATE ROUTINGS WITH DIV. 26 CONTRACTOR. 4. CONTRACTOR TO MAINTAIN 8'-6" CLEAR HEAD HEIGHT IN GARAGE AND INFORM THE ENGINEER AND ARCHITECT OF ANY AREAS THAT MAY NOT MEET 8'-6" PRIOR TO INSTALLATION, MINIMUM 8'-2" CLEAR HEAD HEIGHT MUST BE MAINTAINED IN ACCESSIBLE VAN AREAS. 5. PROVIDE FLEXIBLE DUCT AND PIPE CONNECTIONS TO ALL MOTORIZED EQUIPMENT. 5. PROVIDE FLEXIBLE DUCT AND PIPE CONNECTIONS TO ALL MOTORIZED EQUIPMENT. 6. VERIFY ALL EQUIPMENT ACCESS PANELS WITH MANUFACTURER AND ARCHITECT. 7. ALL SOURCES OF IGNITION ON MECHANICAL EQUIPMENT SHALL BE MOUNTED 18" AFF. 8. ALL SOURCES OF IGNITION ON MECHANICAL EQUIPMENT SHALL BE MOUNTED 18" AFF. 9. PROTECT PIPING ROUTED ALONG COLUMNS, WALLS, ETC. FROM DAMAGE AS NECESSARY WITH CAGES. COORDINATE WITH ARCHITECT. 10. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED. 11. ALL PIPING SHALL BE ROUTED AS HIGH AS POSSIBLE IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN POSSIBLE, ESPECIALLY WHERE CROSSING OTHER PIPES, DUCTS, AND ELECTRICAL. 12. ACCESS PANELS SHALL BE 24x24, U.N.O. LOCATIONS SHOWN ARE APPROXIMATE, EXACT LOCATIONS SHALL BE COORDINATED WITH THE ARCHITECTS DRAWINGS AND WITH THE LOCATIONS OF THE EQUIPMENT OR APPARATUS THAT THEY SERVE. 13. REFER TO THE PLUMBING FIXTURE CONNECTION SCHEDULE FOR PIPE SIZES TO INDIVIDUAL FIXTURES. 14. NOT ALL REQUIRED CLEANOUTS ARE NECESSARILY SHOWN ON THESE PLANS. PROVIDE CLEANOUTS ON WASTE, VENT AND STORM PIPING AS REQUIRED BY CODE AND FOR REASONABLE MAINTENANCE BASED ON ACTUAL FIELD INSTALLATION. COORDINATE LOCATIONS WITH ARCHITECT/ENGINEER. 15. ST AND ST(OF) PIPING 3", U.N.O. HVAC & PIPING NOTES: P6 WATER ENTRY Sheet Number Date:VAIL, COLORADO953 S. Frontage Rd. West Vail, Colorado 81657 tel: 970.476.1147 gpslarchitects.com SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018 ALL SHEETS VE PERMIT ISSUE ALBUQUERQUE | AVON | DENVER | FORT COLLINS 303.278.3820 www˛bgbuildingworks˛com Project No. 9911.00 Copyright 2018 Sheet Title PIPING PLAN - PARKING LEVELS M-201P 09/21/18 SCALE: MECHANICAL PLAN - LEVEL 1 1/8" = 1'-0" TO DECKING UNIT 101STUDIO UNIT 110STUDIO UNIT 106STUDIOUNIT 105STUDIOUNIT 1042 BR UNIT 109ONE BR UP DN UP DN UNIT 111STUDIO UNIT 113STUDIO UNIT 112STUDIO UNIT 114ONE BR UNIT 103ONE BR UNIT 107STUDIO ELECROOM UNIT 102ONE BR UNIT 108ACCESSIBLESTUDIO + LOBBY/COMMON OFFICE DN UNEXCAVATED EL 8235'-0" LAUNDRY 1 SEE A918 FOR ENLARGED PLAN W 1xD2xDW UNEXCAVATED D/W 1 K J F E D B A 8 10 2 4 6 12 15 16 17 18 19 20 21 22 YB YA YC YD YF YG YH YL YJ YM 16 17 18 19 20 21 22 YK YE YD 7 5 1 2 L M 3 7 6 8 10 G H D/W D/WD/WVENDINGMACHINES 4"Ø DRYER VENT TO ROOF, TYP. 3. W 1 P 1 W 2 W 6 P 2 P 3W 3 W 4 P 4 P 5 W 5 W 19 P 19 W 18 P 18 P 7 W 7 W 8 P 8 P 9 W 9 W 11 P 11 W 10 P 10 W 12 P 12 P 13 W 13 W 14P 14 P 15 W 15 P 16 W 16 1 2 P 6 3 4 17 5 7 6 8 9 10 11 13 12 15 14 16 W 20 F/S C200 8 x 10 F/S C 200 8x10 10x12 SA DUCT UP. 8x10 SA DUCT UP. 1. RE: M500 SERIES FOR ALL APPLICABLE DIAGRAMS. 2. CEILING COORDINATION OF ALL MEP SYSTEMS (LIGHTING, DUCTWORK, DIFFUSERS, ELECTRICAL, FIRE PROTECTION, ETC.) MUST BE COMPLETED BY THE CONTRACTOR PRIOR TO THE START OF ANY INSTALLATIONS. 3. DO NOT ROUTE DUCTWORK OR PIPING OVER ELECTRICAL ROOMS OR ELECTRICAL PANELS; MAINTAIN N.E.C. CLEARANCES. COORDINATE ROUTINGS WITH DIV. 26 CONTRACTOR. 4. PROVIDE FLEXIBLE DUCT AND PIPE CONNECTIONS TO ALL MOTORIZED EQUIPMENT. 5. VERIFY ALL EQUIPMENT ACCESS PANELS WITH MANUFACTURER AND ARCHITECT. 6. ALL SOURCES OF IGNITION ON MECHANICAL EQUIPMENT SHALL BE MOUNTED 18" AFF. 7. PROTECT PIPING ROUTED ALONG COLUMNS, WALLS, ETC. FROM DAMAGE AS NECESSARY WITH CAGES. COORDINATE WITH ARCHITECT. 8. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED. 9. ALL PIPING SHALL BE ROUTED AS HIGH AS POSSIBLE IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN POSSIBLE, ESPECIALLY WHERE CROSSING OTHER PIPES, DUCTS, AND ELECTRICAL. 10. ACCESS PANELS SHALL BE 24x24, U.N.O. LOCATIONS SHOWN ARE APPROXIMATE, EXACT LOCATIONS SHALL BE COORDINATED WITH THE ARCHITECTS DRAWINGS AND WITH THE LOCATIONS OF THE EQUIPMENT OR APPARATUS THAT THEY SERVE. 11. REFER TO THE PLUMBING FIXTURE CONNECTION SCHEDULE FOR PIPE SIZES TO INDIVIDUAL FIXTURES. 12. NOT ALL REQUIRED CLEANOUTS ARE NECESSARILY SHOWN ON THESE PLANS. PROVIDE CLEANOUTS ON WASTE, VENT AND STORM PIPING AS REQUIRED BY CODE AND FOR REASONABLE MAINTENANCE BASED ON ACTUAL FIELD INSTALLATION. COORDINATE LOCATIONS WITH ARCHITECT/ENGINEER. 13. ST AND ST(OF) PIPING 3", U.N.O. HVAC & PIPING NOTES: P6 W3" LOBBY/COMMON, UNIT 110, 112, AND 114 BB SERVED FROM CEILING. C 165 8x10 F/S F/S C 560 12x12 C 35 8x10 F/S 2" GAS UP 2"GAS DOWN 3/4" GAS TO DRYERS 4"Ø BOILER FLUE & INTAKE RISERS, TYP. 3. 20X12 SA Sheet Number Date:VAIL, COLORADO953 S. Frontage Rd. West Vail, Colorado 81657 tel: 970.476.1147 gpslarchitects.com SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018 ALL SHEETS VE PERMIT ISSUE ALBUQUERQUE | AVON | DENVER | FORT COLLINS 303.278.3820 www ˛bgbuildingworks˛com Project No. 9911.00 Copyright 2018 Sheet Title MECHANICAL PLAN - LEVEL 1 M-202 09/21/18 SCALE: MECHANICAL PLAN - LEVEL 2 1/8" = 1'-0" UNIT 201STUDIO UNIT 212STUDIO UNIT 209STUDIO + UNIT 206STUDIOUNIT 205STUDIO UNIT 208STUDIOUNIT 2042 BR UNIT 211ONE BR UP DN UNIT 210ACCESSIBLEONE BR UP DN UNIT 213STUDIO UNIT 215STUDIO UNIT 217ONE BR UNIT 214STUDIO UNIT 216ONE BR UNIT 203ONE BR UNIT 207STUDIO ELECROOM UNIT 202ONE BR LAUNDRY 2 VENDING MACHINES W 1xD2xDW GAS FIRED EMERGENCY GENERATOR ON CONC PAD SECURITY FENCE w/ GATE AS REQUIRED D/WDOOR18"D/WREFOVENDOOR30" MIN WORKSURFACE- 30"REMOVABLECABINET BELOWD/W 1 K J F E D B A 8 10 2 4 6 12 15 16 17 18 19 20 21 22 YB YA YC YD YF YG YH YL YJ YM 16 17 18 19 20 21 22 YK YE YD 7 5 1 2 L M 3 7 6 8 10 G H D/W D/WD/WW 1 P 1 W 2 W 6 P 2 P 3W 3 W 4 P 4 P 5 W 5 W 19 P 19 W 18 P 18 P 7 W 7 W 8 P 8 P 9 P 11 W 10 P 10 W 12 P 12 P 13 W 13 W 14 P 14 P 15 W 15 P 16 W 16 1 2 P 6 3 4 17 5 7 6 8 9 10 11 13 12 15 14 16 W 11 W 9 P 20 20 W 20 1. RE: M500 SERIES FOR ALL APPLICABLE DIAGRAMS. 2. CEILING COORDINATION OF ALL MEP SYSTEMS (LIGHTING, DUCTWORK, DIFFUSERS, ELECTRICAL, FIRE PROTECTION, ETC.) MUST BE COMPLETED BY THE CONTRACTOR PRIOR TO THE START OF ANY INSTALLATIONS. 3. DO NOT ROUTE DUCTWORK OR PIPING OVER ELECTRICAL ROOMS OR ELECTRICAL PANELS; MAINTAIN N.E.C. CLEARANCES. COORDINATE ROUTINGS WITH DIV. 26 CONTRACTOR. 4. PROVIDE FLEXIBLE DUCT AND PIPE CONNECTIONS TO ALL MOTORIZED EQUIPMENT. 5. VERIFY ALL EQUIPMENT ACCESS PANELS WITH MANUFACTURER AND ARCHITECT. 6. ALL SOURCES OF IGNITION ON MECHANICAL EQUIPMENT SHALL BE MOUNTED 18" AFF. 7. PROTECT PIPING ROUTED ALONG COLUMNS, WALLS, ETC. FROM DAMAGE AS NECESSARY WITH CAGES. COORDINATE WITH ARCHITECT. 8. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED. 9. ALL PIPING SHALL BE ROUTED AS HIGH AS POSSIBLE IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN POSSIBLE, ESPECIALLY WHERE CROSSING OTHER PIPES, DUCTS, AND ELECTRICAL. 10. ACCESS PANELS SHALL BE 24x24, U.N.O. LOCATIONS SHOWN ARE APPROXIMATE, EXACT LOCATIONS SHALL BE COORDINATED WITH THE ARCHITECTS DRAWINGS AND WITH THE LOCATIONS OF THE EQUIPMENT OR APPARATUS THAT THEY SERVE. 11. REFER TO THE PLUMBING FIXTURE CONNECTION SCHEDULE FOR PIPE SIZES TO INDIVIDUAL FIXTURES. 12. NOT ALL REQUIRED CLEANOUTS ARE NECESSARILY SHOWN ON THESE PLANS. PROVIDE CLEANOUTS ON WASTE, VENT AND STORM PIPING AS REQUIRED BY CODE AND FOR REASONABLE MAINTENANCE BASED ON ACTUAL FIELD INSTALLATION. COORDINATE LOCATIONS WITH ARCHITECT/ENGINEER. 13. ST AND ST(OF) PIPING 3", U.N.O. HVAC & PIPING NOTES: SEE NOTE 10 FOR ACCESS PANEL. F/SC200 8x10 12x12 SA DUCT UP. 10x12 SA DUCT DN. 10x12 SA DUCT UP. 8x10 SA DUCT DN. HWSHWR HWC HWCW 1"1"1-1/2"1-1 /2"3/4" P6 PROVIDE BB-1, TOTAL LENGTH 3.5'. 4"Ø DRYER VENT TO ROOF, TYP. 6. C 165 8x10 F/S F/S C 560 12x12 C 35 8x10 F/S 2" GAS UP 2" GAS DOWN 3/4" GAS TO DRYERS 4"Ø BOILER FLUE & INTAKE RISERS, TYP. 3. 20X12 SA Sheet Number Date:VAIL, COLORADO953 S. Frontage Rd. West Vail, Colorado 81657 tel: 970.476.1147 gpslarchitects.com SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018 ALL SHEETS VE PERMIT ISSUE ALBUQUERQUE | AVON | DENVER | FORT COLLINS 303.278.3820 www ˛bgbuildingworks˛com Project No. 9911.00 Copyright 2018 Sheet Title MECHANICAL PLAN - LEVEL 2 M-203 09/21/18 SCALE: MECHANICAL PLAN - LEVEL 3 1/8" = 1'-0" UNIT 301STUDIO UNIT 312STUDIO UNIT 309STUDIO + UNIT 306STUDIOUNIT 305STUDIO UNIT 308STUDIOUNIT 3042 BR UNIT 311ONE BR UP DN UP DN UNIT 313STUDIO UNIT 315STUDIO UNIT 317ONE BR UNIT 314STUDIO UNIT 316ONE BR UNIT 303ONE BR UNIT 307STUDIO ELECROOM UNIT 302ONE BR UNIT 310ONE BR LAUNDRY 3 W 1xD2xDW D/W 1 K J F E D B A 8 10 2 4 6 12 15 16 17 18 19 20 21 22 YB YA YC YD YF YG YH YL YJ YM 16 17 18 19 20 21 22 YK YE YD 7 5 1 2 L M 3 7 6 8 10 G H D/W D/WD/WD/WVENDINGMACHINES 4"Ø DRYER VENT TO ROOF, TYP. 9. W 1 P 1 W 2 W 6 P 2 P 3W 3 W 4 P 4 P 5 W 5 W 19 P 19 W 18 P 18 P 7 W 7 W 8 P 8 P 11 W 10 P 10 W 12 P 12 P 13 W 13 W 14 P 14 P 15 W 15 P 16 W 16 1 2 P 6 3 4 17 5 7 6 8 10 11 13 12 15 14 16 W 9 P 9 9 W 11 P 20 20 W 20 1. RE: M500 SERIES FOR ALL APPLICABLE DIAGRAMS. 2. CEILING COORDINATION OF ALL MEP SYSTEMS (LIGHTING, DUCTWORK, DIFFUSERS, ELECTRICAL, FIRE PROTECTION, ETC.) MUST BE COMPLETED BY THE CONTRACTOR PRIOR TO THE START OF ANY INSTALLATIONS. 3. DO NOT ROUTE DUCTWORK OR PIPING OVER ELECTRICAL ROOMS OR ELECTRICAL PANELS; MAINTAIN N.E.C. CLEARANCES. COORDINATE ROUTINGS WITH DIV. 26 CONTRACTOR. 4. PROVIDE FLEXIBLE DUCT AND PIPE CONNECTIONS TO ALL MOTORIZED EQUIPMENT. 5. VERIFY ALL EQUIPMENT ACCESS PANELS WITH MANUFACTURER AND ARCHITECT. 6. ALL SOURCES OF IGNITION ON MECHANICAL EQUIPMENT SHALL BE MOUNTED 18" AFF. 7. PROTECT PIPING ROUTED ALONG COLUMNS, WALLS, ETC. FROM DAMAGE AS NECESSARY WITH CAGES. COORDINATE WITH ARCHITECT. 8. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED. 9. ALL PIPING SHALL BE ROUTED AS HIGH AS POSSIBLE IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN POSSIBLE, ESPECIALLY WHERE CROSSING OTHER PIPES, DUCTS, AND ELECTRICAL. 10. ACCESS PANELS SHALL BE 24x24, U.N.O. LOCATIONS SHOWN ARE APPROXIMATE, EXACT LOCATIONS SHALL BE COORDINATED WITH THE ARCHITECTS DRAWINGS AND WITH THE LOCATIONS OF THE EQUIPMENT OR APPARATUS THAT THEY SERVE. 11. REFER TO THE PLUMBING FIXTURE CONNECTION SCHEDULE FOR PIPE SIZES TO INDIVIDUAL FIXTURES. 12. NOT ALL REQUIRED CLEANOUTS ARE NECESSARILY SHOWN ON THESE PLANS. PROVIDE CLEANOUTS ON WASTE, VENT AND STORM PIPING AS REQUIRED BY CODE AND FOR REASONABLE MAINTENANCE BASED ON ACTUAL FIELD INSTALLATION. COORDINATE LOCATIONS WITH ARCHITECT/ENGINEER. 13. ST AND ST(OF) PIPING 3", U.N.O. HVAC & PIPING NOTES: F/SC200 8x10 C 165 8x10 16x12 SA DUCT UP. 14x12 SA DUCT DN. 14x10 SA DUCT UP. 10x12 SA DUCT DN. F/S F/S P6 PROVIDE BB-1, TOTAL LENGTH 3.5'. C 560 12x12 C 35 8x10 F/S 20x20 SA UP; 20x12 SA DN. 1-1/2" GAS UP 2" GAS DOWN 3/4" GAS TO DRYERS 4"Ø BOILER FLUE & INTAKE RISERS, TYP. 3. Sheet Number Date:VAIL, COLORADO953 S. Frontage Rd. West Vail, Colorado 81657 tel: 970.476.1147 gpslarchitects.com SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018 ALL SHEETS VE PERMIT ISSUE ALBUQUERQUE | AVON | DENVER | FORT COLLINS 303.278.3820 www ˛bgbuildingworks˛com Project No. 9911.00 Copyright 2018 Sheet Title MECHANICAL PLAN - LEVEL 3 M-204 09/21/18 SCALE: MECHANICAL PLAN - LEVEL 4 1/8" = 1'-0" UNIT 401STUDIO UNIT 412STUDIO UNIT 409STUDIO + UNIT 406STUDIOUNIT 405STUDIO UNIT 408STUDIOUNIT 4042 BR UNIT411ONE BR DN H GF DN UNIT 413STUDIO UNIT 415STUDIO UNIT 417ONE BR UNIT 414STUDIO UNIT 416ONE BR UNIT 403ONE BR UNIT 407STUDIO UNIT 402ONE BR UNIT 410ONE BR LAUNDRY 4 ELECROOM W 1xD 2xD W 1 K J F E D B A 8 10 2 4 6 12 15 16 17 18 19 20 21 22 YB YA YC YD YF YG YH YL YJ YM 16 17 18 19 20 21 22 YK YE YD 7 5 1 2 L M 3 7 6 8 10 G H D/W D/W D/W D/WD/WVENDINGMACHINES W 1 P 1 W 2 W 6 P 2 P 3 W 3 W 4 P 4 P 5 W 5 W 19 P 19 W 18 P 18 P 7 W 7 W 8 P 8 P 11 W 10 P 10 W 12 P 12 P 13 W 13 W 14 P 14 P 15 W 15 P 16 W 16 1 2 P 6 3 4 17 5 7 6 8 10 11 13 12 15 14 16 W 9 P 9 9 W 11 P 20 20 W 20 1. RE: M500 SERIES FOR ALL APPLICABLE DIAGRAMS. 2. CEILING COORDINATION OF ALL MEP SYSTEMS (LIGHTING, DUCTWORK, DIFFUSERS, ELECTRICAL, FIRE PROTECTION, ETC.) MUST BE COMPLETED BY THE CONTRACTOR PRIOR TO THE START OF ANY INSTALLATIONS. 3. DO NOT ROUTE DUCTWORK OR PIPING OVER ELECTRICAL ROOMS OR ELECTRICAL PANELS; MAINTAIN N.E.C. CLEARANCES. COORDINATE ROUTINGS WITH DIV. 26 CONTRACTOR. 4. PROVIDE FLEXIBLE DUCT AND PIPE CONNECTIONS TO ALL MOTORIZED EQUIPMENT. 5. VERIFY ALL EQUIPMENT ACCESS PANELS WITH MANUFACTURER AND ARCHITECT. 6. ALL SOURCES OF IGNITION ON MECHANICAL EQUIPMENT SHALL BE MOUNTED 18" AFF. 7. PROTECT PIPING ROUTED ALONG COLUMNS, WALLS, ETC. FROM DAMAGE AS NECESSARY WITH CAGES. COORDINATE WITH ARCHITECT. 8. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED. 9. ALL PIPING SHALL BE ROUTED AS HIGH AS POSSIBLE IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN POSSIBLE, ESPECIALLY WHERE CROSSING OTHER PIPES, DUCTS, AND ELECTRICAL. 10. ACCESS PANELS SHALL BE 24x24, U.N.O. LOCATIONS SHOWN ARE APPROXIMATE, EXACT LOCATIONS SHALL BE COORDINATED WITH THE ARCHITECTS DRAWINGS AND WITH THE LOCATIONS OF THE EQUIPMENT OR APPARATUS THAT THEY SERVE. 11. REFER TO THE PLUMBING FIXTURE CONNECTION SCHEDULE FOR PIPE SIZES TO INDIVIDUAL FIXTURES. 12. NOT ALL REQUIRED CLEANOUTS ARE NECESSARILY SHOWN ON THESE PLANS. PROVIDE CLEANOUTS ON WASTE, VENT AND STORM PIPING AS REQUIRED BY CODE AND FOR REASONABLE MAINTENANCE BASED ON ACTUAL FIELD INSTALLATION. COORDINATE LOCATIONS WITH ARCHITECT/ENGINEER. 13. ST AND ST(OF) PIPING 3", U.N.O. HVAC & PIPING NOTES: F/S C 200 8x10 18x12 SA DUCT UP. 16x12 SA DUCT DN. 16x12 SA DUCT UP. 14x12 DUCT DN. P6 PROVIDE BB-1, TOTAL LENGTH 3.5'. 4"Ø DRYER VENT TO ROOF, TYP. 12. C 165 8x10 F/S F/S C 560 12x12 C 35 8x10 F/S 20x20 SA RISER. GAS UP TO MAU-2 GAS UP TO MAU-1 1-1/4"1-1/4" 1-1/2" GAS DOWN 3/4" GAS TO DRYERS 4"Ø BOILER FLUE & INTAKE RISERS, TYP. 3. 20X20 SA Sheet Number Date:VAIL, COLORADO953 S. Frontage Rd. West Vail, Colorado 81657 tel: 970.476.1147 gpslarchitects.com SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018 ALL SHEETS VE PERMIT ISSUE ALBUQUERQUE | AVON | DENVER | FORT COLLINS 303.278.3820 www ˛bgbuildingworks˛com Project No. 9911.00 Copyright 2018 Sheet Title MECHANICAL PLAN - LEVEL 4 M-205 09/21/18 SCALE: MECHANICAL PLAN - ROOF 1/8" = 1'-0" 1 K J F E D B A 9 10 2 4 6 12 15 16 17 18 19 20 21 22 YB YA YC YD YF YG YH YL YJ YM 16 17 18 19 20 21 22 YK YE YD 7 5 1 2 L M 3 7 6 9 10 G H MAU-2MAU-1 20x2018x18 W 1 W 2 W 6 W 3 W 4 W 5 W 19 W 18 W 7 W 8 W 10 W 12 W 13 W 14 W 15 W 16 W 9 W 11 W 20 D 1800 24x32 20x20 SA DN IN SHAFT. EF-6, TYP. 10. MOUNT ABOVE HEIGHT OF ADJACENT DUCT TO ALLOW FOR SERVICE ACCESS. D 2200 24x32 18x18 20x20 16x12 SA DN IN SHAFT BELOW. 20x20 18x12 FLUE & INTAKE UP TO ROOF, TYP. 2. INSTALL PER MFTR & 2015 IFGC RQTS. 18x12 SA DN IN SHAFT BELOW. 16x14 4"Ø BOILER FLUE & INTAKE RISERS, TYP. 3. TERMINATE THROUGH ROOF PER MFR RQT'S. Sheet Number Date:VAIL, COLORADO953 S. Frontage Rd. West Vail, Colorado 81657 tel: 970.476.1147 gpslarchitects.com SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018 ALL SHEETS VE PERMIT ISSUE ALBUQUERQUE | AVON | DENVER | FORT COLLINS 303.278.3820 www ˛bgbuildingworks˛com Project No. 9911.00 Copyright 2018 Sheet Title MECHANICAL PLAN - ROOF M-206 09/21/18 SCALE: 1 MECH PLAN - TYP STUDIO (NO SHAFT) @ LEVELS 1-3 1/4" = 1'-0"SCALE: 3 PLUMBING PLAN - TYP STUDIO (NO SHAFT) @ LEVELS 1-4 1/4" = 1'-0" 1. RE: M501 FOR ALL APPLICABLE MECHANICAL DIAGRAMS. 2. CEILING COORDINATION OF ALL MEP SYSTEMS (LIGHTING, DUCTWORK, DIFFUSERS, ELECTRICAL, FIRE PROTECTION, ETC.) MUST BE COMPLETED BY THE CONTRACTOR PRIOR TO THE START OF ANY INSTALLATIONS. 3. DO NOT ROUTE DUCTWORK OVER ELECTRICAL PANELS; MAINTAIN N.E.C. CLEARANCES. COORDINATE ROUTINGS WITH DIV. 26 CONTRACTOR. 4. PROVIDE FLEXIBLE DUCT AND PIPE CONNECTIONS TO ALL MOTORIZED EQUIPMENT. 5. VERIFY ALL EQUIPMENT ACCESS PANELS WITH MANUFACTURER AND ARCHITECT. 6. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED. 7. T-STATS AND OCCUPANCY SENSORS SHALL BE LOCATED NEAR THE LIGHT SWITCH WITHIN THE ROOM SHOWN. COORDINATE WITH ARCHITECT & ELECTRICAL ENGINEER TO MATCH HEIGHT AND LOCATION. 8. ALL DUCTWORK SHALL BE ROUTED AS HIGH AS POSSIBLE IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN POSSIBLE, ESPECIALLY WHERE CROSSING PIPES AND ELECTRICAL. 9. ACCESS PANEL LOCATIONS SHOWN ARE APPROXIMATE, EXACT LOCATIONS SHALL BE COORDINATED WITH THE ARCHITECT'S DRAWINGS AND WITH THE LOCATIONS OF THE EQUIPMENT OR APPARATUS THAT THEY SERVE. HVAC NOTES: 1. RE: M502 FOR ALL APPLICABLE PLUMBING DIAGRAMS. 2. REFER TO THE PLUMBING FIXTURE CONNECTION SCHEDULE FOR PIPE SIZES TO INDIVIDUAL FIXTURES. 3. NOT ALL REQUIRED CLEANOUTS ARE NECESSARILY SHOWN ON THESE PLANS. PROVIDE CLEANOUTS ON WASTE, VENT AND STORM PIPING AS REQUIRED BY CODE AND FOR REASONABLE MAINTENANCE BASED ON ACTUAL FIELD INSTALLATION. COORDINATE LOCATIONS WITH ARCHITECT/ENGINEER. 4. PIPING ON EXTERIOR WALLS OR PRE-CAST CONCRETE WALLS TO BE ROUTED IN FRAMED WALL ON INTERIOR SIDE OF INSULATION. 5. DO NOT ROUTE PIPING OVER ELECTRICAL PANELS; MAINTAIN N.E.C. CLEARANCES. COORDINATE ROUTINGS WITH DIV. 26 CONTRACTOR. 6. PROVIDE FLEXIBLE PIPE CONNECTIONS TO ALL MOTORIZED EQUIPMENT. 7. ROUTE DOMESTIC HOT WATER RECIRC TO WITHIN 2 FEET OF ALL HOT WATER FIXTURES. 8. VERIFY ALL EQUIPMENT ACCESS PANELS WITH MANUFACTURER AND ARCHITECT. 9. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED. 10. ALL VALVES SHALL BE INSTALLED WITH ACCESS PANELS IN HARD-LID CEILINGS. 11. ALL PIPING SHALL BE ROUTED AS HIGH AS POSSIBLE IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN POSSIBLE, ESPECIALLY WHERE CROSSING OTHER PIPES, DUCTS, AND ELECTRICAL. 12. ACCESS PANEL LOCATIONS SHOWN ARE APPROXIMATE, EXACT LOCATIONS SHALL BE COORDINATED WITH THE ARCHITECT'S DRAWINGS AND WITH THE LOCATIONS OF THE EQUIPMENT OR APPARATUS THAT THEY SERVE. PLUMBING NOTES:EEXH8x8HWS/R TO BASEBOARDS IN UNIT ABOVE, TYP. LEVEL 1-3. NO HWS/R PIPING IN LEVEL 4 UNIT. EF-1 BDD 6"ØT FLAG NOTES: 1 UNITS 205, 212, 214, 305, 312, & 314: PROVIDE BB-1, 9.5' TOTAL LENGTH. UNITS 105, 110, & 112: PROVIDE BB-1, 12' TOTAL LENGTH. UNITS 206 & 306: PROVIDE BB-1, 11.5' TOTAL LENGTH. UNITS 405, 412, & 414: PROVIDE BB-2, 14' TOTAL LENGTH. UNIT 406: PROVIDE BB-2, 17' TOTAL LENGTH. U.C. 3/4" CW HW P2 P4 P3 P1 1/2" 1/2"3/4"3/4"3/4" 3/4" 1/2" 1" CW, 3/4" HW 3/4" CW 1/2" HW 1 SCALE: 2 MECH PLAN - TYP STUDIO (NO SHAFT) @ LEVEL 4 1/4" = 1'-0"EEXH8x8EF-1 BDD 6"ØT U.C. 3/4" 2 2 BB IN UNITS 110 & 112 SUPPLIED FROM CEILING TO AVOID ROUTING PIPE OVER UNCONDITIONED GARAGE. BB SERVED FROM CEILING OF UNIT BELOW. Sheet Number Date:VAIL, COLORADO953 S. Frontage Rd. West Vail, Colorado 81657 tel: 970.476.1147 gpslarchitects.com SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018 ALL SHEETS VE PERMIT ISSUE ALBUQUERQUE | AVON | DENVER | FORT COLLINS 303.278.3820 www ˛bgbuildingworks˛com Project No. 9911.00 Copyright 2018 Sheet Title ENLARGED MECHANICAL PLAN - TYP STUDIO (NO SHAFT) M-301 09/21/18 SCALE: 1 MECH PLAN - TYP STUDIO (NO SHAFT) OPP HAND @ LEVELS 1-3 1/4" = 1'-0"SCALE: 3 PLUMBING PLAN - TYP STUDIO (NO SHAFT) OPP HAND @ LEVELS 1-4 1/4" = 1'-0" 1. RE: M501 FOR ALL APPLICABLE MECHANICAL DIAGRAMS. 2. CEILING COORDINATION OF ALL MEP SYSTEMS (LIGHTING, DUCTWORK, DIFFUSERS, ELECTRICAL, FIRE PROTECTION, ETC.) MUST BE COMPLETED BY THE CONTRACTOR PRIOR TO THE START OF ANY INSTALLATIONS. 3. DO NOT ROUTE DUCTWORK OVER ELECTRICAL PANELS; MAINTAIN N.E.C. CLEARANCES. COORDINATE ROUTINGS WITH DIV. 26 CONTRACTOR. 4. PROVIDE FLEXIBLE DUCT AND PIPE CONNECTIONS TO ALL MOTORIZED EQUIPMENT. 5. VERIFY ALL EQUIPMENT ACCESS PANELS WITH MANUFACTURER AND ARCHITECT. 6. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED. 7. T-STATS AND OCCUPANCY SENSORS SHALL BE LOCATED NEAR THE LIGHT SWITCH WITHIN THE ROOM SHOWN. COORDINATE WITH ARCHITECT & ELECTRICAL ENGINEER TO MATCH HEIGHT AND LOCATION. 8. ALL DUCTWORK SHALL BE ROUTED AS HIGH AS POSSIBLE IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN POSSIBLE, ESPECIALLY WHERE CROSSING PIPES AND ELECTRICAL. 9. ACCESS PANEL LOCATIONS SHOWN ARE APPROXIMATE, EXACT LOCATIONS SHALL BE COORDINATED WITH THE ARCHITECT'S DRAWINGS AND WITH THE LOCATIONS OF THE EQUIPMENT OR APPARATUS THAT THEY SERVE. HVAC NOTES: 1. RE: M502 FOR ALL APPLICABLE PLUMBING DIAGRAMS. 2. REFER TO THE PLUMBING FIXTURE CONNECTION SCHEDULE FOR PIPE SIZES TO INDIVIDUAL FIXTURES. 3. NOT ALL REQUIRED CLEANOUTS ARE NECESSARILY SHOWN ON THESE PLANS. PROVIDE CLEANOUTS ON WASTE, VENT AND STORM PIPING AS REQUIRED BY CODE AND FOR REASONABLE MAINTENANCE BASED ON ACTUAL FIELD INSTALLATION. COORDINATE LOCATIONS WITH ARCHITECT/ENGINEER. 4. PIPING ON EXTERIOR WALLS OR PRE-CAST CONCRETE WALLS TO BE ROUTED IN FRAMED WALL ON INTERIOR SIDE OF INSULATION. 5. DO NOT ROUTE PIPING OVER ELECTRICAL PANELS; MAINTAIN N.E.C. CLEARANCES. COORDINATE ROUTINGS WITH DIV. 26 CONTRACTOR. 6. PROVIDE FLEXIBLE PIPE CONNECTIONS TO ALL MOTORIZED EQUIPMENT. 7. ROUTE DOMESTIC HOT WATER RECIRC TO WITHIN 2 FEET OF ALL HOT WATER FIXTURES. 8. VERIFY ALL EQUIPMENT ACCESS PANELS WITH MANUFACTURER AND ARCHITECT. 9. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED. 10. ALL VALVES SHALL BE INSTALLED WITH ACCESS PANELS IN HARD-LID CEILINGS. 11. ALL PIPING SHALL BE ROUTED AS HIGH AS POSSIBLE IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN POSSIBLE, ESPECIALLY WHERE CROSSING OTHER PIPES, DUCTS, AND ELECTRICAL. 12. ACCESS PANEL LOCATIONS SHOWN ARE APPROXIMATE, EXACT LOCATIONS SHALL BE COORDINATED WITH THE ARCHITECT'S DRAWINGS AND WITH THE LOCATIONS OF THE EQUIPMENT OR APPARATUS THAT THEY SERVE. PLUMBING NOTES:EEXH8x8HWS/R TO BASEBOARDS IN UNIT ABOVE, TYP. LEVEL 1-3. NO HWS/R PIPING IN LEVEL 4 UNIT. BDD 6"ØT FLAG NOTES: 1 UNITS 111, 213, 215, 313, & 315: PROVIDE BB-1, 9.5' TOTAL LENGTH. UNIT 113: PROVIDE BB-1, 15' TOTAL LENGTH. UNITS 413 & 415: PROVIDE BB-2, 14' TOTAL LENGTH. EF-1 HW CW P2 P4 P3 P1 1/2" 1/2"3/4"3/4"3/4" 3/4" 1/2" 1" CW, 3/4" HW 3/4" CW 1/2" HW U.C. 3/4" 1 EEXH8x8BDD 6"ØT EF-1 U.C. 3/4" 2 SCALE: 2 MECH PLAN - TYP STUDIO (NO SHAFT) OPP HAND @ LEVEL 4 1/4" = 1'-0" 2 BB SERVED FROM CEILING OF UNIT BELOW. Sheet Number Date:VAIL, COLORADO953 S. Frontage Rd. West Vail, Colorado 81657 tel: 970.476.1147 gpslarchitects.com SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018 ALL SHEETS VE PERMIT ISSUE ALBUQUERQUE | AVON | DENVER | FORT COLLINS 303.278.3820 www ˛bgbuildingworks˛com Project No. 9911.00 Copyright 2018 Sheet Title ENLARGED MECHANICAL PLAN - TYP STUDIO (NO SHAFT) OPP HAND M-302 09/21/18 7 SCALE: 1 MECH PLAN - STUDIO X01 @ LEVELS 1-3 1/4" = 1'-0"SCALE: 3 PLUMBING PLAN - STUDIO X01 @ LEVELS 1-4 1/4" = 1'-0" 7 1. RE: M501 FOR ALL APPLICABLE MECHANICAL DIAGRAMS. 2. CEILING COORDINATION OF ALL MEP SYSTEMS (LIGHTING, DUCTWORK, DIFFUSERS, ELECTRICAL, FIRE PROTECTION, ETC.) MUST BE COMPLETED BY THE CONTRACTOR PRIOR TO THE START OF ANY INSTALLATIONS. 3. DO NOT ROUTE DUCTWORK OVER ELECTRICAL PANELS; MAINTAIN N.E.C. CLEARANCES. COORDINATE ROUTINGS WITH DIV. 26 CONTRACTOR. 4. PROVIDE FLEXIBLE DUCT AND PIPE CONNECTIONS TO ALL MOTORIZED EQUIPMENT. 5. VERIFY ALL EQUIPMENT ACCESS PANELS WITH MANUFACTURER AND ARCHITECT. 6. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED. 7. T-STATS AND OCCUPANCY SENSORS SHALL BE LOCATED NEAR THE LIGHT SWITCH WITHIN THE ROOM SHOWN. COORDINATE WITH ARCHITECT & ELECTRICAL ENGINEER TO MATCH HEIGHT AND LOCATION. 8. ALL DUCTWORK SHALL BE ROUTED AS HIGH AS POSSIBLE IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN POSSIBLE, ESPECIALLY WHERE CROSSING PIPES AND ELECTRICAL. 9. ACCESS PANEL LOCATIONS SHOWN ARE APPROXIMATE, EXACT LOCATIONS SHALL BE COORDINATED WITH THE ARCHITECT'S DRAWINGS AND WITH THE LOCATIONS OF THE EQUIPMENT OR APPARATUS THAT THEY SERVE. HVAC NOTES: 1. RE: M502 FOR ALL APPLICABLE PLUMBING DIAGRAMS. 2. REFER TO THE PLUMBING FIXTURE CONNECTION SCHEDULE FOR PIPE SIZES TO INDIVIDUAL FIXTURES. 3. NOT ALL REQUIRED CLEANOUTS ARE NECESSARILY SHOWN ON THESE PLANS. PROVIDE CLEANOUTS ON WASTE, VENT AND STORM PIPING AS REQUIRED BY CODE AND FOR REASONABLE MAINTENANCE BASED ON ACTUAL FIELD INSTALLATION. COORDINATE LOCATIONS WITH ARCHITECT/ENGINEER. 4. PIPING ON EXTERIOR WALLS OR PRE-CAST CONCRETE WALLS TO BE ROUTED IN FRAMED WALL ON INTERIOR SIDE OF INSULATION. 5. DO NOT ROUTE PIPING OVER ELECTRICAL PANELS; MAINTAIN N.E.C. CLEARANCES. COORDINATE ROUTINGS WITH DIV. 26 CONTRACTOR. 6. PROVIDE FLEXIBLE PIPE CONNECTIONS TO ALL MOTORIZED EQUIPMENT. 7. ROUTE DOMESTIC HOT WATER RECIRC TO WITHIN 2 FEET OF ALL HOT WATER FIXTURES. 8. VERIFY ALL EQUIPMENT ACCESS PANELS WITH MANUFACTURER AND ARCHITECT. 9. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED. 10. ALL VALVES SHALL BE INSTALLED WITH ACCESS PANELS IN HARD-LID CEILINGS. 11. ALL PIPING SHALL BE ROUTED AS HIGH AS POSSIBLE IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN POSSIBLE, ESPECIALLY WHERE CROSSING OTHER PIPES, DUCTS, AND ELECTRICAL. 12. ACCESS PANEL LOCATIONS SHOWN ARE APPROXIMATE, EXACT LOCATIONS SHALL BE COORDINATED WITH THE ARCHITECT'S DRAWINGS AND WITH THE LOCATIONS OF THE EQUIPMENT OR APPARATUS THAT THEY SERVE. PLUMBING NOTES: HWS/R TO BASEBOARDS IN UNIT ABOVE, TYP. LEVEL 1-3. NO HWS/R PIPING IN LEVEL 4 UNIT. HW CW P2 P4 P3 P1 1/2" 1/2"3/4"3/4"1/2" 1" CW, 3/4" HW 3/4" CW 1/2" HW FLAG NOTES: 1 UNIT 101: PROVIDE BB-1, 12' TOTAL LENGTH. UNITS 201 & 301: PROVIDE BB-1, 9.5' TOTAL LENGTH. UNIT 401: PROVIDE BB-2, 14' TOTAL LENGTH. T EEXH8x8EF-16"ØBDD U.C. 3/4" 3/4" 3/4" 1 7 SCALE: 2 MECH PLAN - STUDIO X01 @ LEVEL 4 1/4" = 1'-0" T EEXH8x8EF-16"ØBDD U.C. 3/4" 2 2 BB SERVED FROM CEILING OF UNIT BELOW. Sheet Number Date:VAIL, COLORADO953 S. Frontage Rd. West Vail, Colorado 81657 tel: 970.476.1147 gpslarchitects.com SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018 ALL SHEETS VE PERMIT ISSUE ALBUQUERQUE | AVON | DENVER | FORT COLLINS 303.278.3820 www ˛bgbuildingworks˛com Project No. 9911.00 Copyright 2018 Sheet Title ENLARGED MECHANICAL PLAN - STUDIO X01 M-303 09/21/18 SCALE: 1 MECH PLAN - STUDIO X07 @ LEVELS 1-3 1/4" = 1'-0"SCALE: 3 PLUMBING PLAN - STUDIO X07 @ LEVELS 1-4 1/4" = 1'-0" 1. RE: M501 FOR ALL APPLICABLE MECHANICAL DIAGRAMS. 2. CEILING COORDINATION OF ALL MEP SYSTEMS (LIGHTING, DUCTWORK, DIFFUSERS, ELECTRICAL, FIRE PROTECTION, ETC.) MUST BE COMPLETED BY THE CONTRACTOR PRIOR TO THE START OF ANY INSTALLATIONS. 3. DO NOT ROUTE DUCTWORK OVER ELECTRICAL PANELS; MAINTAIN N.E.C. CLEARANCES. COORDINATE ROUTINGS WITH DIV. 26 CONTRACTOR. 4. PROVIDE FLEXIBLE DUCT AND PIPE CONNECTIONS TO ALL MOTORIZED EQUIPMENT. 5. VERIFY ALL EQUIPMENT ACCESS PANELS WITH MANUFACTURER AND ARCHITECT. 6. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED. 7. T-STATS AND OCCUPANCY SENSORS SHALL BE LOCATED NEAR THE LIGHT SWITCH WITHIN THE ROOM SHOWN. COORDINATE WITH ARCHITECT & ELECTRICAL ENGINEER TO MATCH HEIGHT AND LOCATION. 8. ALL DUCTWORK SHALL BE ROUTED AS HIGH AS POSSIBLE IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN POSSIBLE, ESPECIALLY WHERE CROSSING PIPES AND ELECTRICAL. 9. ACCESS PANEL LOCATIONS SHOWN ARE APPROXIMATE, EXACT LOCATIONS SHALL BE COORDINATED WITH THE ARCHITECT'S DRAWINGS AND WITH THE LOCATIONS OF THE EQUIPMENT OR APPARATUS THAT THEY SERVE. HVAC NOTES: 1. RE: M502 FOR ALL APPLICABLE PLUMBING DIAGRAMS. 2. REFER TO THE PLUMBING FIXTURE CONNECTION SCHEDULE FOR PIPE SIZES TO INDIVIDUAL FIXTURES. 3. NOT ALL REQUIRED CLEANOUTS ARE NECESSARILY SHOWN ON THESE PLANS. PROVIDE CLEANOUTS ON WASTE, VENT AND STORM PIPING AS REQUIRED BY CODE AND FOR REASONABLE MAINTENANCE BASED ON ACTUAL FIELD INSTALLATION. COORDINATE LOCATIONS WITH ARCHITECT/ENGINEER. 4. PIPING ON EXTERIOR WALLS OR PRE-CAST CONCRETE WALLS TO BE ROUTED IN FRAMED WALL ON INTERIOR SIDE OF INSULATION. 5. DO NOT ROUTE PIPING OVER ELECTRICAL PANELS; MAINTAIN N.E.C. CLEARANCES. COORDINATE ROUTINGS WITH DIV. 26 CONTRACTOR. 6. PROVIDE FLEXIBLE PIPE CONNECTIONS TO ALL MOTORIZED EQUIPMENT. 7. ROUTE DOMESTIC HOT WATER RECIRC TO WITHIN 2 FEET OF ALL HOT WATER FIXTURES. 8. VERIFY ALL EQUIPMENT ACCESS PANELS WITH MANUFACTURER AND ARCHITECT. 9. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED. 10. ALL VALVES SHALL BE INSTALLED WITH ACCESS PANELS IN HARD-LID CEILINGS. 11. ALL PIPING SHALL BE ROUTED AS HIGH AS POSSIBLE IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN POSSIBLE, ESPECIALLY WHERE CROSSING OTHER PIPES, DUCTS, AND ELECTRICAL. 12. ACCESS PANEL LOCATIONS SHOWN ARE APPROXIMATE, EXACT LOCATIONS SHALL BE COORDINATED WITH THE ARCHITECT'S DRAWINGS AND WITH THE LOCATIONS OF THE EQUIPMENT OR APPARATUS THAT THEY SERVE. PLUMBING NOTES: HWS/R TO BASEBOARDS IN UNIT ABOVE, TYP. LEVEL 1-3. NO HWS/R PIPING IN LEVEL 4 UNIT.EEXH8x8BDD T FLAG NOTES: 1 UNIT 107: PROVIDE BB-1, 13.5' TOTAL LENGTH. UNITS 207 & 307: PROVIDE BB-1, 11.5' TOTAL LENGTH. UNIT 407: PROVIDE BB-2, 15.5' TOTAL LENGTH. EF-1 6"ØHW CW P2 P4 P3 P1 1/2" 1/2"3/4"1/2" 1" CW, 3/4" HW 3/4" CW 1/2" HW U.C. 3/4" 3/4" 3/4"3/4"1 EEXH8x8BDD T EF-1 6"ØU.C. 3/4" 2 SCALE: 2 MECH PLAN - STUDIO X07 @ LEVEL 4 1/4" = 1'-0" 2 BB SERVED FROM CEILING OF UNIT BELOW. Sheet Number Date:VAIL, COLORADO953 S. Frontage Rd. West Vail, Colorado 81657 tel: 970.476.1147 gpslarchitects.com SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018 ALL SHEETS VE PERMIT ISSUE ALBUQUERQUE | AVON | DENVER | FORT COLLINS 303.278.3820 www ˛bgbuildingworks˛com Project No. 9911.00 Copyright 2018 Sheet Title ENLARGED MECHANICAL PLAN - STUDIO X07 M-304 09/21/18 SCALE: 1 MECH PLAN - STUDIO X08 @ LEVELS 1-3 1/4" = 1'-0"SCALE: 3 PLUMBING PLAN - STUDIO X08 @ LEVELS 1-4 1/4" = 1'-0" 1. RE: M501 FOR ALL APPLICABLE MECHANICAL DIAGRAMS. 2. CEILING COORDINATION OF ALL MEP SYSTEMS (LIGHTING, DUCTWORK, DIFFUSERS, ELECTRICAL, FIRE PROTECTION, ETC.) MUST BE COMPLETED BY THE CONTRACTOR PRIOR TO THE START OF ANY INSTALLATIONS. 3. DO NOT ROUTE DUCTWORK OVER ELECTRICAL PANELS; MAINTAIN N.E.C. CLEARANCES. COORDINATE ROUTINGS WITH DIV. 26 CONTRACTOR. 4. PROVIDE FLEXIBLE DUCT AND PIPE CONNECTIONS TO ALL MOTORIZED EQUIPMENT. 5. VERIFY ALL EQUIPMENT ACCESS PANELS WITH MANUFACTURER AND ARCHITECT. 6. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED. 7. T-STATS AND OCCUPANCY SENSORS SHALL BE LOCATED NEAR THE LIGHT SWITCH WITHIN THE ROOM SHOWN. COORDINATE WITH ARCHITECT & ELECTRICAL ENGINEER TO MATCH HEIGHT AND LOCATION. 8. ALL DUCTWORK SHALL BE ROUTED AS HIGH AS POSSIBLE IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN POSSIBLE, ESPECIALLY WHERE CROSSING PIPES AND ELECTRICAL. 9. ACCESS PANEL LOCATIONS SHOWN ARE APPROXIMATE, EXACT LOCATIONS SHALL BE COORDINATED WITH THE ARCHITECT'S DRAWINGS AND WITH THE LOCATIONS OF THE EQUIPMENT OR APPARATUS THAT THEY SERVE. HVAC NOTES: 1. RE: M502 FOR ALL APPLICABLE PLUMBING DIAGRAMS. 2. REFER TO THE PLUMBING FIXTURE CONNECTION SCHEDULE FOR PIPE SIZES TO INDIVIDUAL FIXTURES. 3. NOT ALL REQUIRED CLEANOUTS ARE NECESSARILY SHOWN ON THESE PLANS. PROVIDE CLEANOUTS ON WASTE, VENT AND STORM PIPING AS REQUIRED BY CODE AND FOR REASONABLE MAINTENANCE BASED ON ACTUAL FIELD INSTALLATION. COORDINATE LOCATIONS WITH ARCHITECT/ENGINEER. 4. PIPING ON EXTERIOR WALLS OR PRE-CAST CONCRETE WALLS TO BE ROUTED IN FRAMED WALL ON INTERIOR SIDE OF INSULATION. 5. DO NOT ROUTE PIPING OVER ELECTRICAL PANELS; MAINTAIN N.E.C. CLEARANCES. COORDINATE ROUTINGS WITH DIV. 26 CONTRACTOR. 6. PROVIDE FLEXIBLE PIPE CONNECTIONS TO ALL MOTORIZED EQUIPMENT. 7. ROUTE DOMESTIC HOT WATER RECIRC TO WITHIN 2 FEET OF ALL HOT WATER FIXTURES. 8. VERIFY ALL EQUIPMENT ACCESS PANELS WITH MANUFACTURER AND ARCHITECT. 9. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED. 10. ALL VALVES SHALL BE INSTALLED WITH ACCESS PANELS IN HARD-LID CEILINGS. 11. ALL PIPING SHALL BE ROUTED AS HIGH AS POSSIBLE IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN POSSIBLE, ESPECIALLY WHERE CROSSING OTHER PIPES, DUCTS, AND ELECTRICAL. 12. ACCESS PANEL LOCATIONS SHOWN ARE APPROXIMATE, EXACT LOCATIONS SHALL BE COORDINATED WITH THE ARCHITECT'S DRAWINGS AND WITH THE LOCATIONS OF THE EQUIPMENT OR APPARATUS THAT THEY SERVE. PLUMBING NOTES: HWS/R TO BASEBOARDS IN UNIT ABOVE, TYP. LEVEL 1-3. NO HWS/R PIPING IN LEVEL 4 UNIT. T FLAG NOTES: 1 UNIT 106: PROVIDE BB-1, 15' TOTAL LENGTH. UNITS 208 & 308: PROVIDE BB-1, 11.5' TOTAL LENGTH. UNIT 408: PROVIDE BB-2, 17' TOTAL LENGTH.EEXH8x8EF-1 6"ØBDD U.C. 3/4" CW HW P2 P4 P3 P11/2" 1/2"3/4"1" CW, 3/4" HW 3/4" CW 1/2" HW 1/2"3/4"3/4" 3/4" 1 SCALE: 2 MECH PLAN - STUDIO X08 @ LEVEL 4 1/4" = 1'-0" TEEXH8x8 EF-16"ØBDD U.C. 3/4" 2 2 BB SERVED FROM CEILING OF UNIT BELOW. Sheet Number Date:VAIL, COLORADO953 S. Frontage Rd. West Vail, Colorado 81657 tel: 970.476.1147 gpslarchitects.com SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018 ALL SHEETS VE PERMIT ISSUE ALBUQUERQUE | AVON | DENVER | FORT COLLINS 303.278.3820 www ˛bgbuildingworks˛com Project No. 9911.00 Copyright 2018 Sheet Title ENLARGED MECHANICAL PLAN - STUDIO X08 M-305 09/21/18 SCALE: 1 MECH PLAN - TYP STUDIO + X09 UNITS @ LEVELS 2-3 1/4" = 1'-0"SCALE: 3 PLUMBING PLAN - TYP STUDIO + X09 UNITS @ LEVELS 2-4 1/4" = 1'-0" 1. RE: M501 FOR ALL APPLICABLE MECHANICAL DIAGRAMS. 2. CEILING COORDINATION OF ALL MEP SYSTEMS (LIGHTING, DUCTWORK, DIFFUSERS, ELECTRICAL, FIRE PROTECTION, ETC.) MUST BE COMPLETED BY THE CONTRACTOR PRIOR TO THE START OF ANY INSTALLATIONS. 3. DO NOT ROUTE DUCTWORK OVER ELECTRICAL PANELS; MAINTAIN N.E.C. CLEARANCES. COORDINATE ROUTINGS WITH DIV. 26 CONTRACTOR. 4. PROVIDE FLEXIBLE DUCT AND PIPE CONNECTIONS TO ALL MOTORIZED EQUIPMENT. 5. VERIFY ALL EQUIPMENT ACCESS PANELS WITH MANUFACTURER AND ARCHITECT. 6. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED. 7. T-STATS AND OCCUPANCY SENSORS SHALL BE LOCATED NEAR THE LIGHT SWITCH WITHIN THE ROOM SHOWN. COORDINATE WITH ARCHITECT & ELECTRICAL ENGINEER TO MATCH HEIGHT AND LOCATION. 8. ALL DUCTWORK SHALL BE ROUTED AS HIGH AS POSSIBLE IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN POSSIBLE, ESPECIALLY WHERE CROSSING PIPES AND ELECTRICAL. 9. ACCESS PANEL LOCATIONS SHOWN ARE APPROXIMATE, EXACT LOCATIONS SHALL BE COORDINATED WITH THE ARCHITECT'S DRAWINGS AND WITH THE LOCATIONS OF THE EQUIPMENT OR APPARATUS THAT THEY SERVE. HVAC NOTES: 1. RE: M502 FOR ALL APPLICABLE PLUMBING DIAGRAMS. 2. REFER TO THE PLUMBING FIXTURE CONNECTION SCHEDULE FOR PIPE SIZES TO INDIVIDUAL FIXTURES. 3. NOT ALL REQUIRED CLEANOUTS ARE NECESSARILY SHOWN ON THESE PLANS. PROVIDE CLEANOUTS ON WASTE, VENT AND STORM PIPING AS REQUIRED BY CODE AND FOR REASONABLE MAINTENANCE BASED ON ACTUAL FIELD INSTALLATION. COORDINATE LOCATIONS WITH ARCHITECT/ENGINEER. 4. PIPING ON EXTERIOR WALLS OR PRE-CAST CONCRETE WALLS TO BE ROUTED IN FRAMED WALL ON INTERIOR SIDE OF INSULATION. 5. DO NOT ROUTE PIPING OVER ELECTRICAL PANELS; MAINTAIN N.E.C. CLEARANCES. COORDINATE ROUTINGS WITH DIV. 26 CONTRACTOR. 6. PROVIDE FLEXIBLE PIPE CONNECTIONS TO ALL MOTORIZED EQUIPMENT. 7. ROUTE DOMESTIC HOT WATER RECIRC TO WITHIN 2 FEET OF ALL HOT WATER FIXTURES. 8. VERIFY ALL EQUIPMENT ACCESS PANELS WITH MANUFACTURER AND ARCHITECT. 9. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED. 10. ALL VALVES SHALL BE INSTALLED WITH ACCESS PANELS IN HARD-LID CEILINGS. 11. ALL PIPING SHALL BE ROUTED AS HIGH AS POSSIBLE IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN POSSIBLE, ESPECIALLY WHERE CROSSING OTHER PIPES, DUCTS, AND ELECTRICAL. 12. ACCESS PANEL LOCATIONS SHOWN ARE APPROXIMATE, EXACT LOCATIONS SHALL BE COORDINATED WITH THE ARCHITECT'S DRAWINGS AND WITH THE LOCATIONS OF THE EQUIPMENT OR APPARATUS THAT THEY SERVE. PLUMBING NOTES: HWS/R TO BASEBOARDS IN UNIT ABOVE, TYP. LEVEL 2 & 3. NO HWS/R PIPING IN LEVEL 4 UNIT. EF-1EEXH8x8 BDD T6"ØFLAG NOTES: 1 UNITS 209 & 309: PROVIDE BB-1, 9.5' TOTAL LENGTH. UNIT 409: PROVIDE BB-2, 15' TOTAL LENGTH. U.C. 3/4" P1 HW CW1/2" 1/2" P2 P4 P3 3/4"3/4"3/4" 3/4" 1/2" 1" CW, 3/4" HW, 1/2" HWC 3/4" CW 1/2" HW 1 2 SCALE: 2 MECH PLAN - TYP STUDIO + X09 UNITS @ LEVEL 4 1/4" = 1'-0" EF-1EEXH8x8 BDD T6"ØU.C. 3/4" 2 BB SERVED FROM CEILING OF UNIT BELOW. Sheet Number Date:VAIL, COLORADO953 S. Frontage Rd. West Vail, Colorado 81657 tel: 970.476.1147 gpslarchitects.com SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018 ALL SHEETS VE PERMIT ISSUE ALBUQUERQUE | AVON | DENVER | FORT COLLINS 303.278.3820 www ˛bgbuildingworks˛com Project No. 9911.00 Copyright 2018 Sheet Title ENLARGED MECHANICAL PLAN - TYP STUDIO + X09 LEVELS 2-4 M-306 09/21/18 MAX.SCALE: 1 MECHANICAL PLAN - ACCESSIBLE STUDIO + @ LEVEL 1 1/4" = 1'-0" SCALE: 2 PLUMBING PLAN - ACCESSIBLE STUDIO + @ LEVEL 1 1/4" = 1'-0"MAX.EEXH8x8HWS/R TO BASEBOARD IN UNIT ABOVE. EF-1 1. RE: M501 FOR ALL APPLICABLE MECHANICAL DIAGRAMS. 2. CEILING COORDINATION OF ALL MEP SYSTEMS (LIGHTING, DUCTWORK, DIFFUSERS, ELECTRICAL, FIRE PROTECTION, ETC.) MUST BE COMPLETED BY THE CONTRACTOR PRIOR TO THE START OF ANY INSTALLATIONS. 3. DO NOT ROUTE DUCTWORK OVER ELECTRICAL PANELS; MAINTAIN N.E.C. CLEARANCES. COORDINATE ROUTINGS WITH DIV. 26 CONTRACTOR. 4. PROVIDE FLEXIBLE DUCT AND PIPE CONNECTIONS TO ALL MOTORIZED EQUIPMENT. 5. VERIFY ALL EQUIPMENT ACCESS PANELS WITH MANUFACTURER AND ARCHITECT. 6. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED. 7. T-STATS AND OCCUPANCY SENSORS SHALL BE LOCATED NEAR THE LIGHT SWITCH WITHIN THE ROOM SHOWN. COORDINATE WITH ARCHITECT & ELECTRICAL ENGINEER TO MATCH HEIGHT AND LOCATION. 8. ALL DUCTWORK SHALL BE ROUTED AS HIGH AS POSSIBLE IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN POSSIBLE, ESPECIALLY WHERE CROSSING PIPES AND ELECTRICAL. 9. ACCESS PANEL LOCATIONS SHOWN ARE APPROXIMATE, EXACT LOCATIONS SHALL BE COORDINATED WITH THE ARCHITECT'S DRAWINGS AND WITH THE LOCATIONS OF THE EQUIPMENT OR APPARATUS THAT THEY SERVE. HVAC NOTES: 1. RE: M502 FOR ALL APPLICABLE PLUMBING DIAGRAMS. 2. REFER TO THE PLUMBING FIXTURE CONNECTION SCHEDULE FOR PIPE SIZES TO INDIVIDUAL FIXTURES. 3. NOT ALL REQUIRED CLEANOUTS ARE NECESSARILY SHOWN ON THESE PLANS. PROVIDE CLEANOUTS ON WASTE, VENT AND STORM PIPING AS REQUIRED BY CODE AND FOR REASONABLE MAINTENANCE BASED ON ACTUAL FIELD INSTALLATION. COORDINATE LOCATIONS WITH ARCHITECT/ENGINEER. 4. PIPING ON EXTERIOR WALLS OR PRE-CAST CONCRETE WALLS TO BE ROUTED IN FRAMED WALL ON INTERIOR SIDE OF INSULATION. 5. DO NOT ROUTE PIPING OVER ELECTRICAL PANELS; MAINTAIN N.E.C. CLEARANCES. COORDINATE ROUTINGS WITH DIV. 26 CONTRACTOR. 6. PROVIDE FLEXIBLE PIPE CONNECTIONS TO ALL MOTORIZED EQUIPMENT. 7. ROUTE DOMESTIC HOT WATER RECIRC TO WITHIN 2 FEET OF ALL HOT WATER FIXTURES. 8. VERIFY ALL EQUIPMENT ACCESS PANELS WITH MANUFACTURER AND ARCHITECT. 9. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED. 10. ALL VALVES SHALL BE INSTALLED WITH ACCESS PANELS IN HARD-LID CEILINGS. 11. ALL PIPING SHALL BE ROUTED AS HIGH AS POSSIBLE IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN POSSIBLE, ESPECIALLY WHERE CROSSING OTHER PIPES, DUCTS, AND ELECTRICAL. 12. ACCESS PANEL LOCATIONS SHOWN ARE APPROXIMATE, EXACT LOCATIONS SHALL BE COORDINATED WITH THE ARCHITECT'S DRAWINGS AND WITH THE LOCATIONS OF THE EQUIPMENT OR APPARATUS THAT THEY SERVE. PLUMBING NOTES: BDD 6"ØT U.C. 3/4" P1 HW CW1/2" 1/2" P2 P4 P3 3/4"3/4" 3/4" 1/2" 1" CW, 3/4" HW 3/4" CW 1/2" HW 3/4"FLAG NOTES: 1 UNIT 108: PROVIDE BB-1, 9.5' TOTAL LENGTH. 1 Sheet Number Date:VAIL, COLORADO953 S. Frontage Rd. West Vail, Colorado 81657 tel: 970.476.1147 gpslarchitects.com SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018 ALL SHEETS VE PERMIT ISSUE ALBUQUERQUE | AVON | DENVER | FORT COLLINS 303.278.3820 www ˛bgbuildingworks˛com Project No. 9911.00 Copyright 2018 Sheet Title ENLARGED MECHANICAL PLAN - ACCESSIBLE STUDIO + LEVEL 1 M-307 09/21/18 SCALE: 1 MECH PLAN - ONE BR X02 @ LEVELS 2-3 1/4" = 1'-0"D/WSCALE: 3 PLUMBING PLAN - ONE BR X02 @ LEVELS 2-4 1/4" = 1'-0"D/WHWS/R TO BASEBOARDS IN UNIT ABOVE, TYP. LEVEL 2-3. NO HWS/R PIPING IN LEVEL 4 UNIT. 1. RE: M501 FOR ALL APPLICABLE MECHANICAL DIAGRAMS. 2. CEILING COORDINATION OF ALL MEP SYSTEMS (LIGHTING, DUCTWORK, DIFFUSERS, ELECTRICAL, FIRE PROTECTION, ETC.) MUST BE COMPLETED BY THE CONTRACTOR PRIOR TO THE START OF ANY INSTALLATIONS. 3. DO NOT ROUTE DUCTWORK OVER ELECTRICAL PANELS; MAINTAIN N.E.C. CLEARANCES. COORDINATE ROUTINGS WITH DIV. 26 CONTRACTOR. 4. PROVIDE FLEXIBLE DUCT AND PIPE CONNECTIONS TO ALL MOTORIZED EQUIPMENT. 5. VERIFY ALL EQUIPMENT ACCESS PANELS WITH MANUFACTURER AND ARCHITECT. 6. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED. 7. T-STATS AND OCCUPANCY SENSORS SHALL BE LOCATED NEAR THE LIGHT SWITCH WITHIN THE ROOM SHOWN. COORDINATE WITH ARCHITECT & ELECTRICAL ENGINEER TO MATCH HEIGHT AND LOCATION. 8. ALL DUCTWORK SHALL BE ROUTED AS HIGH AS POSSIBLE IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN POSSIBLE, ESPECIALLY WHERE CROSSING PIPES AND ELECTRICAL. 9. ACCESS PANEL LOCATIONS SHOWN ARE APPROXIMATE, EXACT LOCATIONS SHALL BE COORDINATED WITH THE ARCHITECT'S DRAWINGS AND WITH THE LOCATIONS OF THE EQUIPMENT OR APPARATUS THAT THEY SERVE. HVAC NOTES: 1. RE: M502 FOR ALL APPLICABLE PLUMBING DIAGRAMS. 2. REFER TO THE PLUMBING FIXTURE CONNECTION SCHEDULE FOR PIPE SIZES TO INDIVIDUAL FIXTURES. 3. NOT ALL REQUIRED CLEANOUTS ARE NECESSARILY SHOWN ON THESE PLANS. PROVIDE CLEANOUTS ON WASTE, VENT AND STORM PIPING AS REQUIRED BY CODE AND FOR REASONABLE MAINTENANCE BASED ON ACTUAL FIELD INSTALLATION. COORDINATE LOCATIONS WITH ARCHITECT/ENGINEER. 4. PIPING ON EXTERIOR WALLS OR PRE-CAST CONCRETE WALLS TO BE ROUTED IN FRAMED WALL ON INTERIOR SIDE OF INSULATION. 5. DO NOT ROUTE PIPING OVER ELECTRICAL PANELS; MAINTAIN N.E.C. CLEARANCES. COORDINATE ROUTINGS WITH DIV. 26 CONTRACTOR. 6. PROVIDE FLEXIBLE PIPE CONNECTIONS TO ALL MOTORIZED EQUIPMENT. 7. ROUTE DOMESTIC HOT WATER RECIRC TO WITHIN 2 FEET OF ALL HOT WATER FIXTURES. 8. VERIFY ALL EQUIPMENT ACCESS PANELS WITH MANUFACTURER AND ARCHITECT. 9. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED. 10. ALL VALVES SHALL BE INSTALLED WITH ACCESS PANELS IN HARD-LID CEILINGS. 11. ALL PIPING SHALL BE ROUTED AS HIGH AS POSSIBLE IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN POSSIBLE, ESPECIALLY WHERE CROSSING OTHER PIPES, DUCTS, AND ELECTRICAL. 12. ACCESS PANEL LOCATIONS SHOWN ARE APPROXIMATE, EXACT LOCATIONS SHALL BE COORDINATED WITH THE ARCHITECT'S DRAWINGS AND WITH THE LOCATIONS OF THE EQUIPMENT OR APPARATUS THAT THEY SERVE. PLUMBING NOTES: T T EEXH8x86"ØEF-1 BDD U.C. 3/4" P2 P4 P3 P1A 3/4"3/4"1/2" 1" CW, 1" HW 3/4" CW 1/2" HW 3/4" 3/4" 3/4" 3/4"CW HW FLAG NOTES: 1 UNIT 202 & 302: PROVIDE BB-1, 6.5' TOTAL LENGTH. UNIT 202 & 302: PROVIDE BB-1, 9' TOTAL LENGTH. UNIT 402: PROVIDE BB-2, 9.5' TOTAL LENGTH. UNIT 402: PROVIDE BB-2, 13.5' TOTAL LENGTH. 2 2 1 SCALE: 2 MECH PLAN - ONE BR X02 @ LEVEL 4 1/4" = 1'-0"D/WT T EEXH8x86"ØEF-1 BDD U.C. 3/4" 4 3 3 4 BB SERVED FROM CEILING OF UNIT BELOW. Sheet Number Date:VAIL, COLORADO953 S. Frontage Rd. West Vail, Colorado 81657 tel: 970.476.1147 gpslarchitects.com SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018 ALL SHEETS VE PERMIT ISSUE ALBUQUERQUE | AVON | DENVER | FORT COLLINS 303.278.3820 www ˛bgbuildingworks˛com Project No. 9911.00 Copyright 2018 Sheet Title ENLARGED MECHANICAL PLAN - ONE BR X02 LEVELS 2-4 M-308 09/21/18 SCALE: 1 MECH PLAN - ONE BR X03 @ LEVELS 1-3 1/4" = 1'-0"D/WSCALE:3 PLUMBING PLAN - ONE BR X03 @ LEVELS 1-4 1/4" = 1'-0"D/WEEXH8x8HWS/R TO BASEBOARDS IN UNIT ABOVE, TYP. LEVEL 1-3. NO HWS/R PIPING IN LEVEL 4 UNIT. EF-1 1. RE: M501 FOR ALL APPLICABLE MECHANICAL DIAGRAMS. 2. CEILING COORDINATION OF ALL MEP SYSTEMS (LIGHTING, DUCTWORK, DIFFUSERS, ELECTRICAL, FIRE PROTECTION, ETC.) MUST BE COMPLETED BY THE CONTRACTOR PRIOR TO THE START OF ANY INSTALLATIONS. 3. DO NOT ROUTE DUCTWORK OVER ELECTRICAL PANELS; MAINTAIN N.E.C. CLEARANCES. COORDINATE ROUTINGS WITH DIV. 26 CONTRACTOR. 4. PROVIDE FLEXIBLE DUCT AND PIPE CONNECTIONS TO ALL MOTORIZED EQUIPMENT. 5. VERIFY ALL EQUIPMENT ACCESS PANELS WITH MANUFACTURER AND ARCHITECT. 6. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED. 7. T-STATS AND OCCUPANCY SENSORS SHALL BE LOCATED NEAR THE LIGHT SWITCH WITHIN THE ROOM SHOWN. COORDINATE WITH ARCHITECT & ELECTRICAL ENGINEER TO MATCH HEIGHT AND LOCATION. 8. ALL DUCTWORK SHALL BE ROUTED AS HIGH AS POSSIBLE IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN POSSIBLE, ESPECIALLY WHERE CROSSING PIPES AND ELECTRICAL. 9. ACCESS PANEL LOCATIONS SHOWN ARE APPROXIMATE, EXACT LOCATIONS SHALL BE COORDINATED WITH THE ARCHITECT'S DRAWINGS AND WITH THE LOCATIONS OF THE EQUIPMENT OR APPARATUS THAT THEY SERVE. HVAC NOTES: 1. RE: M502 FOR ALL APPLICABLE PLUMBING DIAGRAMS. 2. REFER TO THE PLUMBING FIXTURE CONNECTION SCHEDULE FOR PIPE SIZES TO INDIVIDUAL FIXTURES. 3. NOT ALL REQUIRED CLEANOUTS ARE NECESSARILY SHOWN ON THESE PLANS. PROVIDE CLEANOUTS ON WASTE, VENT AND STORM PIPING AS REQUIRED BY CODE AND FOR REASONABLE MAINTENANCE BASED ON ACTUAL FIELD INSTALLATION. COORDINATE LOCATIONS WITH ARCHITECT/ENGINEER. 4. PIPING ON EXTERIOR WALLS OR PRE-CAST CONCRETE WALLS TO BE ROUTED IN FRAMED WALL ON INTERIOR SIDE OF INSULATION. 5. DO NOT ROUTE PIPING OVER ELECTRICAL PANELS; MAINTAIN N.E.C. CLEARANCES. COORDINATE ROUTINGS WITH DIV. 26 CONTRACTOR. 6. PROVIDE FLEXIBLE PIPE CONNECTIONS TO ALL MOTORIZED EQUIPMENT. 7. ROUTE DOMESTIC HOT WATER RECIRC TO WITHIN 2 FEET OF ALL HOT WATER FIXTURES. 8. VERIFY ALL EQUIPMENT ACCESS PANELS WITH MANUFACTURER AND ARCHITECT. 9. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED. 10. ALL VALVES SHALL BE INSTALLED WITH ACCESS PANELS IN HARD-LID CEILINGS. 11. ALL PIPING SHALL BE ROUTED AS HIGH AS POSSIBLE IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN POSSIBLE, ESPECIALLY WHERE CROSSING OTHER PIPES, DUCTS, AND ELECTRICAL. 12. ACCESS PANEL LOCATIONS SHOWN ARE APPROXIMATE, EXACT LOCATIONS SHALL BE COORDINATED WITH THE ARCHITECT'S DRAWINGS AND WITH THE LOCATIONS OF THE EQUIPMENT OR APPARATUS THAT THEY SERVE. PLUMBING NOTES:6"ØT T BDD P1A HW CW P4 P3 3/4" 3/4" 3/4" 1/2" FLAG NOTES: 1 UNIT 103: PROVIDE BB-1, 13' TOTAL LENGTH. UNITS 203 & 303: PROVIDE BB-1, 9' TOTAL LENGTH. UNIT 103: PROVIDE BB-1, 9' TOTAL LENGTH. UNITS 203 & 303: PROVIDE BB-1, 5' TOTAL LENGTH. UNIT 403: PROVIDE BB-2, 13.5' TOTAL LENGTH. UNIT 403: PROVIDE BB-2, 7.5' TOTAL LENGTH. 2 U.C. 3/4" P2 1" CW, 1" HW 3/4" CW 1/2" HW 3/4"3/4"3/4" 1 2 SCALE: 2 MECH PLAN - ONE BR X03 @ LEVEL 4 1/4" = 1'-0"D/WEEXH8x8EF-16"ØT T BDD U.C. 3/4" 3 4 3 4 BB SERVED FROM CEILING OF UNIT BELOW. Sheet Number Date:VAIL, COLORADO953 S. Frontage Rd. West Vail, Colorado 81657 tel: 970.476.1147 gpslarchitects.com SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018 ALL SHEETS VE PERMIT ISSUE ALBUQUERQUE | AVON | DENVER | FORT COLLINS 303.278.3820 www ˛bgbuildingworks˛com Project No. 9911.00 Copyright 2018 Sheet Title ENLARGED MECHANICAL PLAN - ONE BR X03 M-309 09/21/18 SCALE: 1 MECH PLAN - ONE BR X10 @ LEVEL 3 1/4" = 1'-0"D/WSCALE:3 PLUMBING PLAN - ONE BR X10 @ LEVELS 3-4 1/4" = 1'-0"D/WHWS/R TO BASEBOARDS IN UNIT ABOVE. 1. RE: M501 FOR ALL APPLICABLE MECHANICAL DIAGRAMS. 2. CEILING COORDINATION OF ALL MEP SYSTEMS (LIGHTING, DUCTWORK, DIFFUSERS, ELECTRICAL, FIRE PROTECTION, ETC.) MUST BE COMPLETED BY THE CONTRACTOR PRIOR TO THE START OF ANY INSTALLATIONS. 3. DO NOT ROUTE DUCTWORK OVER ELECTRICAL PANELS; MAINTAIN N.E.C. CLEARANCES. COORDINATE ROUTINGS WITH DIV. 26 CONTRACTOR. 4. PROVIDE FLEXIBLE DUCT AND PIPE CONNECTIONS TO ALL MOTORIZED EQUIPMENT. 5. VERIFY ALL EQUIPMENT ACCESS PANELS WITH MANUFACTURER AND ARCHITECT. 6. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED. 7. T-STATS AND OCCUPANCY SENSORS SHALL BE LOCATED NEAR THE LIGHT SWITCH WITHIN THE ROOM SHOWN. COORDINATE WITH ARCHITECT & ELECTRICAL ENGINEER TO MATCH HEIGHT AND LOCATION. 8. ALL DUCTWORK SHALL BE ROUTED AS HIGH AS POSSIBLE IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN POSSIBLE, ESPECIALLY WHERE CROSSING PIPES AND ELECTRICAL. 9. ACCESS PANEL LOCATIONS SHOWN ARE APPROXIMATE, EXACT LOCATIONS SHALL BE COORDINATED WITH THE ARCHITECT'S DRAWINGS AND WITH THE LOCATIONS OF THE EQUIPMENT OR APPARATUS THAT THEY SERVE. HVAC NOTES: 1. RE: M502 FOR ALL APPLICABLE PLUMBING DIAGRAMS. 2. REFER TO THE PLUMBING FIXTURE CONNECTION SCHEDULE FOR PIPE SIZES TO INDIVIDUAL FIXTURES. 3. NOT ALL REQUIRED CLEANOUTS ARE NECESSARILY SHOWN ON THESE PLANS. PROVIDE CLEANOUTS ON WASTE, VENT AND STORM PIPING AS REQUIRED BY CODE AND FOR REASONABLE MAINTENANCE BASED ON ACTUAL FIELD INSTALLATION. COORDINATE LOCATIONS WITH ARCHITECT/ENGINEER. 4. PIPING ON EXTERIOR WALLS OR PRE-CAST CONCRETE WALLS TO BE ROUTED IN FRAMED WALL ON INTERIOR SIDE OF INSULATION. 5. DO NOT ROUTE PIPING OVER ELECTRICAL PANELS; MAINTAIN N.E.C. CLEARANCES. COORDINATE ROUTINGS WITH DIV. 26 CONTRACTOR. 6. PROVIDE FLEXIBLE PIPE CONNECTIONS TO ALL MOTORIZED EQUIPMENT. 7. ROUTE DOMESTIC HOT WATER RECIRC TO WITHIN 2 FEET OF ALL HOT WATER FIXTURES. 8. VERIFY ALL EQUIPMENT ACCESS PANELS WITH MANUFACTURER AND ARCHITECT. 9. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED. 10. ALL VALVES SHALL BE INSTALLED WITH ACCESS PANELS IN HARD-LID CEILINGS. 11. ALL PIPING SHALL BE ROUTED AS HIGH AS POSSIBLE IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN POSSIBLE, ESPECIALLY WHERE CROSSING OTHER PIPES, DUCTS, AND ELECTRICAL. 12. ACCESS PANEL LOCATIONS SHOWN ARE APPROXIMATE, EXACT LOCATIONS SHALL BE COORDINATED WITH THE ARCHITECT'S DRAWINGS AND WITH THE LOCATIONS OF THE EQUIPMENT OR APPARATUS THAT THEY SERVE. PLUMBING NOTES: T T EEXH8x86"ØEF-1 BDD U.C. 3/4" P2 P4 P3 P1A 3/4"3/4"1/2" 1" CW, 1" HW 3/4" CW 1/2" HW 3/4" 3/4" CW HW 3/4" 3/4" FLAG NOTES: 1 UNIT 310: PROVIDE BB-1, 8.5' TOTAL LENGTH. UNIT 310: PROVIDE BB-1, 6.5' TOTAL LENGTH. UNIT 410: PROVIDE BB-2, 13' TOTAL LENGTH. UNIT 410: PROVIDE BB-2, 9' TOTAL LENGTH. 2 2 1 SCALE: 2 MECH PLAN - ONE BR X10 @ LEVEL 4 1/4" = 1'-0"D/WT T EEXH8x86"ØEF-1 BDD U.C. 3/4" 4 3 3 4 BB SERVED FROM CEILING OF UNIT BELOW. Sheet Number Date:VAIL, COLORADO953 S. Frontage Rd. West Vail, Colorado 81657 tel: 970.476.1147 gpslarchitects.com SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018 ALL SHEETS VE PERMIT ISSUE ALBUQUERQUE | AVON | DENVER | FORT COLLINS 303.278.3820 www ˛bgbuildingworks˛com Project No. 9911.00 Copyright 2018 Sheet Title M-310 ENLARGED MECHANICAL PLAN - ONE BR X10 LEVELS 3-4 09/21/18 SCALE: 1 MECH PLAN - TYP ONE BR @ LEVELS 1-3 1/4" = 1'-0"D/WSCALE:3 PLUMBING PLAN - TYP ONE BR @ LEVELS 1-4 1/4" = 1'-0"D/W1. RE: M501 FOR ALL APPLICABLE MECHANICAL DIAGRAMS. 2. CEILING COORDINATION OF ALL MEP SYSTEMS (LIGHTING, DUCTWORK, DIFFUSERS, ELECTRICAL, FIRE PROTECTION, ETC.) MUST BE COMPLETED BY THE CONTRACTOR PRIOR TO THE START OF ANY INSTALLATIONS. 3. DO NOT ROUTE DUCTWORK OVER ELECTRICAL PANELS; MAINTAIN N.E.C. CLEARANCES. COORDINATE ROUTINGS WITH DIV. 26 CONTRACTOR. 4. PROVIDE FLEXIBLE DUCT AND PIPE CONNECTIONS TO ALL MOTORIZED EQUIPMENT. 5. VERIFY ALL EQUIPMENT ACCESS PANELS WITH MANUFACTURER AND ARCHITECT. 6. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED. 7. T-STATS AND OCCUPANCY SENSORS SHALL BE LOCATED NEAR THE LIGHT SWITCH WITHIN THE ROOM SHOWN. COORDINATE WITH ARCHITECT & ELECTRICAL ENGINEER TO MATCH HEIGHT AND LOCATION. 8. ALL DUCTWORK SHALL BE ROUTED AS HIGH AS POSSIBLE IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN POSSIBLE, ESPECIALLY WHERE CROSSING PIPES AND ELECTRICAL. 9. ACCESS PANEL LOCATIONS SHOWN ARE APPROXIMATE, EXACT LOCATIONS SHALL BE COORDINATED WITH THE ARCHITECT'S DRAWINGS AND WITH THE LOCATIONS OF THE EQUIPMENT OR APPARATUS THAT THEY SERVE. HVAC NOTES: 1. RE: M502 FOR ALL APPLICABLE PLUMBING DIAGRAMS. 2. REFER TO THE PLUMBING FIXTURE CONNECTION SCHEDULE FOR PIPE SIZES TO INDIVIDUAL FIXTURES. 3. NOT ALL REQUIRED CLEANOUTS ARE NECESSARILY SHOWN ON THESE PLANS. PROVIDE CLEANOUTS ON WASTE, VENT AND STORM PIPING AS REQUIRED BY CODE AND FOR REASONABLE MAINTENANCE BASED ON ACTUAL FIELD INSTALLATION. COORDINATE LOCATIONS WITH ARCHITECT/ENGINEER. 4. PIPING ON EXTERIOR WALLS OR PRE-CAST CONCRETE WALLS TO BE ROUTED IN FRAMED WALL ON INTERIOR SIDE OF INSULATION. 5. DO NOT ROUTE PIPING OVER ELECTRICAL PANELS; MAINTAIN N.E.C. CLEARANCES. COORDINATE ROUTINGS WITH DIV. 26 CONTRACTOR. 6. PROVIDE FLEXIBLE PIPE CONNECTIONS TO ALL MOTORIZED EQUIPMENT. 7. ROUTE DOMESTIC HOT WATER RECIRC TO WITHIN 2 FEET OF ALL HOT WATER FIXTURES. 8. VERIFY ALL EQUIPMENT ACCESS PANELS WITH MANUFACTURER AND ARCHITECT. 9. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED. 10. ALL VALVES SHALL BE INSTALLED WITH ACCESS PANELS IN HARD-LID CEILINGS. 11. ALL PIPING SHALL BE ROUTED AS HIGH AS POSSIBLE IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN POSSIBLE, ESPECIALLY WHERE CROSSING OTHER PIPES, DUCTS, AND ELECTRICAL. 12. ACCESS PANEL LOCATIONS SHOWN ARE APPROXIMATE, EXACT LOCATIONS SHALL BE COORDINATED WITH THE ARCHITECT'S DRAWINGS AND WITH THE LOCATIONS OF THE EQUIPMENT OR APPARATUS THAT THEY SERVE. PLUMBING NOTES:EEXH8x8HWS/R TO BASEBOARDS IN UNIT ABOVE, TYP. LEVEL 1-3. NO HWS/R PIPING IN LEVEL 4 UNIT. EF-1 BDD 6"ØT T FLAG NOTES: 1 UNITS 109, 211, & 311: PROVIDE BB-1, 8.5' TOTAL LENGTH. UNITS 109, 211, & 311: PROVIDE BB-1, 5.5' TOTAL LENGTH. UNIT 411: PROVIDE BB-2, 13' TOTAL LENGTH. UNIT 411: PROVIDE BB-2, 8' TOTAL LENGTH. 2 U.C. 3/4" P1A HW CW P4 P3 3/4" 3/4" 1/2" P2 3/4"3/4"1" CW, 1" HW 3/4" CW 1/2" HW 3/4" 3/4" 3 4 SCALE: 2 MECH PLAN - TYP ONE BR @ LEVEL 4 1/4" = 1'-0"D/WEEXH8x8EF-1 BDD 6"ØT T U.C. 3/4" 3 4 1 2 BB SERVED FROM CEILING OF UNIT BELOW. Sheet Number Date:VAIL, COLORADO953 S. Frontage Rd. West Vail, Colorado 81657 tel: 970.476.1147 gpslarchitects.com SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018 ALL SHEETS VE PERMIT ISSUE ALBUQUERQUE | AVON | DENVER | FORT COLLINS 303.278.3820 www ˛bgbuildingworks˛com Project No. 9911.00 Copyright 2018 Sheet Title M-311 ENLARGED MECHANICAL PLAN - TYP ONE BR 09/21/18 SCALE: 1 MECH PLAN - ONE BR X16 @ LEVELS 1-3 1/4" = 1'-0" D/W SCALE:3 PLUMBING PLAN - ONE BR X16 @ LEVELS 1-4 1/4" = 1'-0" D/W 1. RE: M501 FOR ALL APPLICABLE MECHANICAL DIAGRAMS. 2. CEILING COORDINATION OF ALL MEP SYSTEMS (LIGHTING, DUCTWORK, DIFFUSERS, ELECTRICAL, FIRE PROTECTION, ETC.) MUST BE COMPLETED BY THE CONTRACTOR PRIOR TO THE START OF ANY INSTALLATIONS. 3. DO NOT ROUTE DUCTWORK OVER ELECTRICAL PANELS; MAINTAIN N.E.C. CLEARANCES. COORDINATE ROUTINGS WITH DIV. 26 CONTRACTOR. 4. PROVIDE FLEXIBLE DUCT AND PIPE CONNECTIONS TO ALL MOTORIZED EQUIPMENT. 5. VERIFY ALL EQUIPMENT ACCESS PANELS WITH MANUFACTURER AND ARCHITECT. 6. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED. 7. T-STATS AND OCCUPANCY SENSORS SHALL BE LOCATED NEAR THE LIGHT SWITCH WITHIN THE ROOM SHOWN. COORDINATE WITH ARCHITECT & ELECTRICAL ENGINEER TO MATCH HEIGHT AND LOCATION. 8. ALL DUCTWORK SHALL BE ROUTED AS HIGH AS POSSIBLE IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN POSSIBLE, ESPECIALLY WHERE CROSSING PIPES AND ELECTRICAL. 9. ACCESS PANEL LOCATIONS SHOWN ARE APPROXIMATE, EXACT LOCATIONS SHALL BE COORDINATED WITH THE ARCHITECT'S DRAWINGS AND WITH THE LOCATIONS OF THE EQUIPMENT OR APPARATUS THAT THEY SERVE. HVAC NOTES: 1. RE: M502 FOR ALL APPLICABLE PLUMBING DIAGRAMS. 2. REFER TO THE PLUMBING FIXTURE CONNECTION SCHEDULE FOR PIPE SIZES TO INDIVIDUAL FIXTURES. 3. NOT ALL REQUIRED CLEANOUTS ARE NECESSARILY SHOWN ON THESE PLANS. PROVIDE CLEANOUTS ON WASTE, VENT AND STORM PIPING AS REQUIRED BY CODE AND FOR REASONABLE MAINTENANCE BASED ON ACTUAL FIELD INSTALLATION. COORDINATE LOCATIONS WITH ARCHITECT/ENGINEER. 4. PIPING ON EXTERIOR WALLS OR PRE-CAST CONCRETE WALLS TO BE ROUTED IN FRAMED WALL ON INTERIOR SIDE OF INSULATION. 5. DO NOT ROUTE PIPING OVER ELECTRICAL PANELS; MAINTAIN N.E.C. CLEARANCES. COORDINATE ROUTINGS WITH DIV. 26 CONTRACTOR. 6. PROVIDE FLEXIBLE PIPE CONNECTIONS TO ALL MOTORIZED EQUIPMENT. 7. ROUTE DOMESTIC HOT WATER RECIRC TO WITHIN 2 FEET OF ALL HOT WATER FIXTURES. 8. VERIFY ALL EQUIPMENT ACCESS PANELS WITH MANUFACTURER AND ARCHITECT. 9. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED. 10. ALL VALVES SHALL BE INSTALLED WITH ACCESS PANELS IN HARD-LID CEILINGS. 11. ALL PIPING SHALL BE ROUTED AS HIGH AS POSSIBLE IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN POSSIBLE, ESPECIALLY WHERE CROSSING OTHER PIPES, DUCTS, AND ELECTRICAL. 12. ACCESS PANEL LOCATIONS SHOWN ARE APPROXIMATE, EXACT LOCATIONS SHALL BE COORDINATED WITH THE ARCHITECT'S DRAWINGS AND WITH THE LOCATIONS OF THE EQUIPMENT OR APPARATUS THAT THEY SERVE. PLUMBING NOTES: HWS/R TO BASEBOARDS IN UNIT ABOVE, TYP. LEVEL 1-3. NO HWS/R PIPING IN LEVEL 4 UNIT. T T FLAG NOTES: 1 UNITS 216 & 316: PROVIDE BB-1, 9' TOTAL LENGTH. UNITS 216 & 316: PROVIDE BB-1, 8.5' TOTAL LENGTH. UNIT 114: PROVIDE BB-2, 13.5' TOTAL LENGTH. UNIT 114: PROVIDE BB-2, 12' TOTAL LENGTH. 2 EF-1 EEXH8x8BDD 6"ØU.C. 3/4" P1A P4 P3 P2 1" CW, 1" HW 3/4" CW 1/2" HW 3/4"3/4"3/4" 3/4" 1/2" HW CW 3/4" 3/4" 3 4 1 2 SCALE: 2 MECH PLAN - ONE BR X16 @ LEVEL 4 1/4" = 1'-0" D/W T T EF-1EEXH8x8 BDD 6"ØU.C. 3/4" 3 4 BB IN UNIT 114 SUPPLIED FROM CEILING TO AVOID ROUTING PIPE OVER UNCONDITIONED GARAGE. BB SERVED FROM CEILING OF UNIT BELOW. Sheet Number Date:VAIL, COLORADO953 S. Frontage Rd. West Vail, Colorado 81657 tel: 970.476.1147 gpslarchitects.com SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018 ALL SHEETS VE PERMIT ISSUE ALBUQUERQUE | AVON | DENVER | FORT COLLINS 303.278.3820 www ˛bgbuildingworks˛com Project No. 9911.00 Copyright 2018 Sheet Title M-312 ENLARGED MECHANICAL PLAN - ONE BR X16 09/21/18 SCALE: 1 MECH PLAN - ONE BR X17 @ LEVELS 2-3 1/4" = 1'-0" D/W SCALE:3 PLUMBING PLAN - ONE BR X17 @ LEVELS 2-4 1/4" = 1'-0" D/WEEXH8x8 EF-1 1. RE: M501 FOR ALL APPLICABLE MECHANICAL DIAGRAMS. 2. CEILING COORDINATION OF ALL MEP SYSTEMS (LIGHTING, DUCTWORK, DIFFUSERS, ELECTRICAL, FIRE PROTECTION, ETC.) MUST BE COMPLETED BY THE CONTRACTOR PRIOR TO THE START OF ANY INSTALLATIONS. 3. DO NOT ROUTE DUCTWORK OVER ELECTRICAL PANELS; MAINTAIN N.E.C. CLEARANCES. COORDINATE ROUTINGS WITH DIV. 26 CONTRACTOR. 4. PROVIDE FLEXIBLE DUCT AND PIPE CONNECTIONS TO ALL MOTORIZED EQUIPMENT. 5. VERIFY ALL EQUIPMENT ACCESS PANELS WITH MANUFACTURER AND ARCHITECT. 6. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED. 7. T-STATS AND OCCUPANCY SENSORS SHALL BE LOCATED NEAR THE LIGHT SWITCH WITHIN THE ROOM SHOWN. COORDINATE WITH ARCHITECT & ELECTRICAL ENGINEER TO MATCH HEIGHT AND LOCATION. 8. ALL DUCTWORK SHALL BE ROUTED AS HIGH AS POSSIBLE IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN POSSIBLE, ESPECIALLY WHERE CROSSING PIPES AND ELECTRICAL. 9. ACCESS PANEL LOCATIONS SHOWN ARE APPROXIMATE, EXACT LOCATIONS SHALL BE COORDINATED WITH THE ARCHITECT'S DRAWINGS AND WITH THE LOCATIONS OF THE EQUIPMENT OR APPARATUS THAT THEY SERVE. HVAC NOTES: 1. RE: M502 FOR ALL APPLICABLE PLUMBING DIAGRAMS. 2. REFER TO THE PLUMBING FIXTURE CONNECTION SCHEDULE FOR PIPE SIZES TO INDIVIDUAL FIXTURES. 3. NOT ALL REQUIRED CLEANOUTS ARE NECESSARILY SHOWN ON THESE PLANS. PROVIDE CLEANOUTS ON WASTE, VENT AND STORM PIPING AS REQUIRED BY CODE AND FOR REASONABLE MAINTENANCE BASED ON ACTUAL FIELD INSTALLATION. COORDINATE LOCATIONS WITH ARCHITECT/ENGINEER. 4. PIPING ON EXTERIOR WALLS OR PRE-CAST CONCRETE WALLS TO BE ROUTED IN FRAMED WALL ON INTERIOR SIDE OF INSULATION. 5. DO NOT ROUTE PIPING OVER ELECTRICAL PANELS; MAINTAIN N.E.C. CLEARANCES. COORDINATE ROUTINGS WITH DIV. 26 CONTRACTOR. 6. PROVIDE FLEXIBLE PIPE CONNECTIONS TO ALL MOTORIZED EQUIPMENT. 7. ROUTE DOMESTIC HOT WATER RECIRC TO WITHIN 2 FEET OF ALL HOT WATER FIXTURES. 8. VERIFY ALL EQUIPMENT ACCESS PANELS WITH MANUFACTURER AND ARCHITECT. 9. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED. 10. ALL VALVES SHALL BE INSTALLED WITH ACCESS PANELS IN HARD-LID CEILINGS. 11. ALL PIPING SHALL BE ROUTED AS HIGH AS POSSIBLE IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN POSSIBLE, ESPECIALLY WHERE CROSSING OTHER PIPES, DUCTS, AND ELECTRICAL. 12. ACCESS PANEL LOCATIONS SHOWN ARE APPROXIMATE, EXACT LOCATIONS SHALL BE COORDINATED WITH THE ARCHITECT'S DRAWINGS AND WITH THE LOCATIONS OF THE EQUIPMENT OR APPARATUS THAT THEY SERVE. PLUMBING NOTES: HWS/R TO BASEBOARDS IN UNIT ABOVE, TYP. LEVELS 2 & 3. NO HWS/R PIPING IN LEVEL 4 UNIT. T T 6"ØBDD U.C. 3/4" P2 P4 P3 P1A 1/2" 1" CW, 1" HW 3/4" CW 1/2" HW 3/4" 3/4"CW HW 3/4"3/4" 3/4" FLAG NOTES: 1 UNITS 217 AND 317: PROVIDE BB-1 9.5' TOTAL LENGTH. UNITS 217 AND 317: PROVIDE BB-1 8.5' TOTAL LENGTH. UNITS 417: PROVIDE BB-2, 14' TOTAL LENGTH. UNITS 417: PROVIDE BB-2, 12' TOTAL LENGTH. 2 3 4 1 2 SCALE: 2 MECH PLAN - ONE BR X17 @ LEVEL 4 1/4" = 1'-0" D/W EEXH8x8EF-1 T T 6"ØBDD U.C. 3/4" 3 4 3/4"BB SERVED FROM CEILING OF UNIT BELOW. Sheet Number Date:VAIL, COLORADO953 S. Frontage Rd. West Vail, Colorado 81657 tel: 970.476.1147 gpslarchitects.com SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018 ALL SHEETS VE PERMIT ISSUE ALBUQUERQUE | AVON | DENVER | FORT COLLINS 303.278.3820 www ˛bgbuildingworks˛com Project No. 9911.00 Copyright 2018 Sheet Title M-313 ENLARGED MECHANICAL PLAN - ONE BR X17 09/21/18 D/WSCALE: 1 MECHANICAL PLAN - ONE BR X02 @ LEVEL 1 1/4" = 1'-0"D/WSCALE:2 PLUMBING PLAN - ONE BR X02 @ LEVEL 1 1/4" = 1'-0" 1. RE: M501 FOR ALL APPLICABLE MECHANICAL DIAGRAMS. 2. CEILING COORDINATION OF ALL MEP SYSTEMS (LIGHTING, DUCTWORK, DIFFUSERS, ELECTRICAL, FIRE PROTECTION, ETC.) MUST BE COMPLETED BY THE CONTRACTOR PRIOR TO THE START OF ANY INSTALLATIONS. 3. DO NOT ROUTE DUCTWORK OVER ELECTRICAL PANELS; MAINTAIN N.E.C. CLEARANCES. COORDINATE ROUTINGS WITH DIV. 26 CONTRACTOR. 4. PROVIDE FLEXIBLE DUCT AND PIPE CONNECTIONS TO ALL MOTORIZED EQUIPMENT. 5. VERIFY ALL EQUIPMENT ACCESS PANELS WITH MANUFACTURER AND ARCHITECT. 6. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED. 7. T-STATS AND OCCUPANCY SENSORS SHALL BE LOCATED NEAR THE LIGHT SWITCH WITHIN THE ROOM SHOWN. COORDINATE WITH ARCHITECT & ELECTRICAL ENGINEER TO MATCH HEIGHT AND LOCATION. 8. ALL DUCTWORK SHALL BE ROUTED AS HIGH AS POSSIBLE IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN POSSIBLE, ESPECIALLY WHERE CROSSING PIPES AND ELECTRICAL. 9. ACCESS PANEL LOCATIONS SHOWN ARE APPROXIMATE, EXACT LOCATIONS SHALL BE COORDINATED WITH THE ARCHITECT'S DRAWINGS AND WITH THE LOCATIONS OF THE EQUIPMENT OR APPARATUS THAT THEY SERVE. HVAC NOTES: 1. RE: M502 FOR ALL APPLICABLE PLUMBING DIAGRAMS. 2. REFER TO THE PLUMBING FIXTURE CONNECTION SCHEDULE FOR PIPE SIZES TO INDIVIDUAL FIXTURES. 3. NOT ALL REQUIRED CLEANOUTS ARE NECESSARILY SHOWN ON THESE PLANS. PROVIDE CLEANOUTS ON WASTE, VENT AND STORM PIPING AS REQUIRED BY CODE AND FOR REASONABLE MAINTENANCE BASED ON ACTUAL FIELD INSTALLATION. COORDINATE LOCATIONS WITH ARCHITECT/ENGINEER. 4. PIPING ON EXTERIOR WALLS OR PRE-CAST CONCRETE WALLS TO BE ROUTED IN FRAMED WALL ON INTERIOR SIDE OF INSULATION. 5. DO NOT ROUTE PIPING OVER ELECTRICAL PANELS; MAINTAIN N.E.C. CLEARANCES. COORDINATE ROUTINGS WITH DIV. 26 CONTRACTOR. 6. PROVIDE FLEXIBLE PIPE CONNECTIONS TO ALL MOTORIZED EQUIPMENT. 7. ROUTE DOMESTIC HOT WATER RECIRC TO WITHIN 2 FEET OF ALL HOT WATER FIXTURES. 8. VERIFY ALL EQUIPMENT ACCESS PANELS WITH MANUFACTURER AND ARCHITECT. 9. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED. 10. ALL VALVES SHALL BE INSTALLED WITH ACCESS PANELS IN HARD-LID CEILINGS. 11. ALL PIPING SHALL BE ROUTED AS HIGH AS POSSIBLE IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN POSSIBLE, ESPECIALLY WHERE CROSSING OTHER PIPES, DUCTS, AND ELECTRICAL. 12. ACCESS PANEL LOCATIONS SHOWN ARE APPROXIMATE, EXACT LOCATIONS SHALL BE COORDINATED WITH THE ARCHITECT'S DRAWINGS AND WITH THE LOCATIONS OF THE EQUIPMENT OR APPARATUS THAT THEY SERVE. PLUMBING NOTES: FLAG NOTES: 1 UNIT 102: PROVIDE BB-1, 10.5' TOTAL LENGTH. UNIT 102: PROVIDE BB-1, 13' TOTAL LENGTH.2 P2 P4 P3 P1A 3/4"3/4"1/2" 1" CW, 1" HW 3/4" CW 1/2" HW 3/4" 3/4" 3/4" 3/4"CW HW HWS/R TO BASEBOARDS IN UNIT ABOVE.T T 6"ØEF-1 BDD U.C. 3/4" 2 1 Sheet Number Date:VAIL, COLORADO953 S. Frontage Rd. West Vail, Colorado 81657 tel: 970.476.1147 gpslarchitects.com SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018 ALL SHEETS VE PERMIT ISSUE ALBUQUERQUE | AVON | DENVER | FORT COLLINS 303.278.3820 www ˛bgbuildingworks˛com Project No. 9911.00 Copyright 2018 Sheet Title M-314 ENLARGED MECHANICAL PLAN - ONE BR X02 LEVEL 1 09/21/18 SCALE: 1 MECH PLAN - TWO BR X04 @ LEVELS 1-3 1/4" = 1'-0" D/W SCALE:3 PLUMBING PLAN - TWO BR X04 @ LEVELS 1-4 1/4" = 1'-0" D/WU.C.3/4"1. RE: M501 FOR ALL APPLICABLE MECHANICAL DIAGRAMS. 2. CEILING COORDINATION OF ALL MEP SYSTEMS (LIGHTING, DUCTWORK, DIFFUSERS, ELECTRICAL, FIRE PROTECTION, ETC.) MUST BE COMPLETED BY THE CONTRACTOR PRIOR TO THE START OF ANY INSTALLATIONS. 3. DO NOT ROUTE DUCTWORK OVER ELECTRICAL PANELS; MAINTAIN N.E.C. CLEARANCES. COORDINATE ROUTINGS WITH DIV. 26 CONTRACTOR. 4. PROVIDE FLEXIBLE DUCT AND PIPE CONNECTIONS TO ALL MOTORIZED EQUIPMENT. 5. VERIFY ALL EQUIPMENT ACCESS PANELS WITH MANUFACTURER AND ARCHITECT. 6. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED. 7. T-STATS AND OCCUPANCY SENSORS SHALL BE LOCATED NEAR THE LIGHT SWITCH WITHIN THE ROOM SHOWN. COORDINATE WITH ARCHITECT & ELECTRICAL ENGINEER TO MATCH HEIGHT AND LOCATION. 8. ALL DUCTWORK SHALL BE ROUTED AS HIGH AS POSSIBLE IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN POSSIBLE, ESPECIALLY WHERE CROSSING PIPES AND ELECTRICAL. 9. ACCESS PANEL LOCATIONS SHOWN ARE APPROXIMATE, EXACT LOCATIONS SHALL BE COORDINATED WITH THE ARCHITECT'S DRAWINGS AND WITH THE LOCATIONS OF THE EQUIPMENT OR APPARATUS THAT THEY SERVE. HVAC NOTES: 1. RE: M502 FOR ALL APPLICABLE PLUMBING DIAGRAMS. 2. REFER TO THE PLUMBING FIXTURE CONNECTION SCHEDULE FOR PIPE SIZES TO INDIVIDUAL FIXTURES. 3. NOT ALL REQUIRED CLEANOUTS ARE NECESSARILY SHOWN ON THESE PLANS. PROVIDE CLEANOUTS ON WASTE, VENT AND STORM PIPING AS REQUIRED BY CODE AND FOR REASONABLE MAINTENANCE BASED ON ACTUAL FIELD INSTALLATION. COORDINATE LOCATIONS WITH ARCHITECT/ENGINEER. 4. PIPING ON EXTERIOR WALLS OR PRE-CAST CONCRETE WALLS TO BE ROUTED IN FRAMED WALL ON INTERIOR SIDE OF INSULATION. 5. DO NOT ROUTE PIPING OVER ELECTRICAL PANELS; MAINTAIN N.E.C. CLEARANCES. COORDINATE ROUTINGS WITH DIV. 26 CONTRACTOR. 6. PROVIDE FLEXIBLE PIPE CONNECTIONS TO ALL MOTORIZED EQUIPMENT. 7. ROUTE DOMESTIC HOT WATER RECIRC TO WITHIN 2 FEET OF ALL HOT WATER FIXTURES. 8. VERIFY ALL EQUIPMENT ACCESS PANELS WITH MANUFACTURER AND ARCHITECT. 9. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED. 10. ALL VALVES SHALL BE INSTALLED WITH ACCESS PANELS IN HARD-LID CEILINGS. 11. ALL PIPING SHALL BE ROUTED AS HIGH AS POSSIBLE IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN POSSIBLE, ESPECIALLY WHERE CROSSING OTHER PIPES, DUCTS, AND ELECTRICAL. 12. ACCESS PANEL LOCATIONS SHOWN ARE APPROXIMATE, EXACT LOCATIONS SHALL BE COORDINATED WITH THE ARCHITECT'S DRAWINGS AND WITH THE LOCATIONS OF THE EQUIPMENT OR APPARATUS THAT THEY SERVE. PLUMBING NOTES: T T T P1A P2 P4 P3 FLAG NOTES: 1 UNIT 104: PROVIDE BB-1, 10.5' TOTAL LENGTH. UNITS 204 & 304: PROVIDE BB-1, 5.5' TOTAL LENGTH. UNIT 104: PROVIDE BB-1, 12' TOTAL LENGTH. UNITS 204 & 304: PROVIDE BB-1, 7' TOTAL LENGTH. UNIT 104: PROVIDE BB-1, 13' TOTAL LENGTH. UNITS 204 & 304: PROVIDE BB-1, 8' TOTAL LENGTH. UNIT 404: PROVIDE BB-2, 10' TOTAL LENGTH. UNIT 404: PROVIDE BB-2, 11.5' TOTAL LENGTH. UNIT 404: PROVIDE BB-2, 12' TOTAL LENGTH. 2 3 EF-1 E EXH 8x8 BDD6"Ø HWS/R TO BASEBOARDS IN UNIT ABOVE, LEVEL 3. NO HWS/R PIPING IN LEVEL 4 UNIT. HW CW1/2"P2 HW1/2"3/4"4 5 6 SCALE: 2 MECH PLAN - TWO BR X04 @ LEVEL 4 1/4" = 1'-0" D/W U.C.3/4"T T T EF-1 E EXH 8x8 BDD6"Ø 3 2 1 4 5 6 3/4" CW 3/4" HWCW3/4"3/4"3/4"1" CW, 1" HW 3/4" BB SERVED FROM CEILING OF UNIT BELOW. BB SERVED FROM CEILING OF UNIT BELOW. BB SERVED FROM CEILING OF UNIT BELOW. Sheet Number Date:VAIL, COLORADO953 S. Frontage Rd. West Vail, Colorado 81657 tel: 970.476.1147 gpslarchitects.com SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018 ALL SHEETS VE PERMIT ISSUE ALBUQUERQUE | AVON | DENVER | FORT COLLINS 303.278.3820 www ˛bgbuildingworks˛com Project No. 9911.00 Copyright 2018 Sheet Title M-315 ENLARGED MECHANICAL PLAN - TWO BR X04 09/21/18 SCALE: 1 MECHANICAL PLAN - ONE BR X10 @ LEVEL 2 1/4" = 1'-0" SCALE: 2 PLUMBING PLAN - ONE BR X10 @ LEVEL 2 1/4" = 1'-0" 1. RE: M501 FOR ALL APPLICABLE MECHANICAL DIAGRAMS. 2. CEILING COORDINATION OF ALL MEP SYSTEMS (LIGHTING, DUCTWORK, DIFFUSERS, ELECTRICAL, FIRE PROTECTION, ETC.) MUST BE COMPLETED BY THE CONTRACTOR PRIOR TO THE START OF ANY INSTALLATIONS. 3. DO NOT ROUTE DUCTWORK OVER ELECTRICAL PANELS; MAINTAIN N.E.C. CLEARANCES. COORDINATE ROUTINGS WITH DIV. 26 CONTRACTOR. 4. PROVIDE FLEXIBLE DUCT AND PIPE CONNECTIONS TO ALL MOTORIZED EQUIPMENT. 5. VERIFY ALL EQUIPMENT ACCESS PANELS WITH MANUFACTURER AND ARCHITECT. 6. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED. 7. T-STATS AND OCCUPANCY SENSORS SHALL BE LOCATED NEAR THE LIGHT SWITCH WITHIN THE ROOM SHOWN. COORDINATE WITH ARCHITECT & ELECTRICAL ENGINEER TO MATCH HEIGHT AND LOCATION. 8. ALL DUCTWORK SHALL BE ROUTED AS HIGH AS POSSIBLE IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN POSSIBLE, ESPECIALLY WHERE CROSSING PIPES AND ELECTRICAL. 9. ACCESS PANEL LOCATIONS SHOWN ARE APPROXIMATE, EXACT LOCATIONS SHALL BE COORDINATED WITH THE ARCHITECT'S DRAWINGS AND WITH THE LOCATIONS OF THE EQUIPMENT OR APPARATUS THAT THEY SERVE. HVAC NOTES: 1. RE: M502 FOR ALL APPLICABLE PLUMBING DIAGRAMS. 2. REFER TO THE PLUMBING FIXTURE CONNECTION SCHEDULE FOR PIPE SIZES TO INDIVIDUAL FIXTURES. 3. NOT ALL REQUIRED CLEANOUTS ARE NECESSARILY SHOWN ON THESE PLANS. PROVIDE CLEANOUTS ON WASTE, VENT AND STORM PIPING AS REQUIRED BY CODE AND FOR REASONABLE MAINTENANCE BASED ON ACTUAL FIELD INSTALLATION. COORDINATE LOCATIONS WITH ARCHITECT/ENGINEER. 4. PIPING ON EXTERIOR WALLS OR PRE-CAST CONCRETE WALLS TO BE ROUTED IN FRAMED WALL ON INTERIOR SIDE OF INSULATION. 5. DO NOT ROUTE PIPING OVER ELECTRICAL PANELS; MAINTAIN N.E.C. CLEARANCES. COORDINATE ROUTINGS WITH DIV. 26 CONTRACTOR. 6. PROVIDE FLEXIBLE PIPE CONNECTIONS TO ALL MOTORIZED EQUIPMENT. 7. ROUTE DOMESTIC HOT WATER RECIRC TO WITHIN 2 FEET OF ALL HOT WATER FIXTURES. 8. VERIFY ALL EQUIPMENT ACCESS PANELS WITH MANUFACTURER AND ARCHITECT. 9. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED. 10. ALL VALVES SHALL BE INSTALLED WITH ACCESS PANELS IN HARD-LID CEILINGS. 11. ALL PIPING SHALL BE ROUTED AS HIGH AS POSSIBLE IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN POSSIBLE, ESPECIALLY WHERE CROSSING OTHER PIPES, DUCTS, AND ELECTRICAL. 12. ACCESS PANEL LOCATIONS SHOWN ARE APPROXIMATE, EXACT LOCATIONS SHALL BE COORDINATED WITH THE ARCHITECT'S DRAWINGS AND WITH THE LOCATIONS OF THE EQUIPMENT OR APPARATUS THAT THEY SERVE. PLUMBING NOTES: FLAG NOTES: 1 UNIT 210: PROVIDE BB-1, 8.5' TOTAL LENGTH. UNIT 210: PROVIDE BB-1, 6.5' TOTAL LENGTH.2 3/4"3/4"CW P2 P4 P3 P1A 1" CW, 1" HW 3/4" CW 1/2" HW 3/4" 3/4" 3/4" 1/2" HW 3/4" HWS/R TO BASEBOARDS IN UNIT ABOVE. T T 6"ØEF-1 BDD U.C. 3/4" 2 1 Sheet Number Date:VAIL, COLORADO953 S. Frontage Rd. West Vail, Colorado 81657 tel: 970.476.1147 gpslarchitects.com SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018 ALL SHEETS VE PERMIT ISSUE ALBUQUERQUE | AVON | DENVER | FORT COLLINS 303.278.3820 www ˛bgbuildingworks˛com Project No. 9911.00 Copyright 2018 Sheet Title M-316 ENLARGED MECHANICAL PLAN - ONE BR X10 LEVEL 2 09/21/18 ENTRY VESTIBULE COMMON LOBBY MANAGEMENT OFFICE E. CORRIDOR W. CORRIDOR SCALE: 1 MECHANICAL PLAN - LOBBY/OFFICE/ENTRY - LEVEL 1 1/4" = 1'-0" FLAG NOTES: 1 MANAGEMENT OFFICE: PROVIDE BB-1, 4.5' TOTAL LENGTH. COMMON LOBBY: PROVIDE BB-1, 19.5' TOTAL LENGTH. HWS/HWR TO BASEBOARDS SERVING OFFICE. T T 2 21 HWS/HWR TO BASEBOARDS SERVING COMMON LOBBY. 1. RE: M501 FOR ALL APPLICABLE MECHANICAL DIAGRAMS. 2. CEILING COORDINATION OF ALL MEP SYSTEMS (LIGHTING, DUCTWORK, DIFFUSERS, ELECTRICAL, FIRE PROTECTION, ETC.) MUST BE COMPLETED BY THE CONTRACTOR PRIOR TO THE START OF ANY INSTALLATIONS. 3. DO NOT ROUTE DUCTWORK OVER ELECTRICAL PANELS; MAINTAIN N.E.C. CLEARANCES. COORDINATE ROUTINGS WITH DIV. 26 CONTRACTOR. 4. PROVIDE FLEXIBLE DUCT AND PIPE CONNECTIONS TO ALL MOTORIZED EQUIPMENT. 5. VERIFY ALL EQUIPMENT ACCESS PANELS WITH MANUFACTURER AND ARCHITECT. 6. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED. 7. T-STATS AND OCCUPANCY SENSORS SHALL BE LOCATED NEAR THE LIGHT SWITCH WITHIN THE ROOM SHOWN. COORDINATE WITH ARCHITECT & ELECTRICAL ENGINEER TO MATCH HEIGHT AND LOCATION. 8. ALL DUCTWORK SHALL BE ROUTED AS HIGH AS POSSIBLE IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN POSSIBLE, ESPECIALLY WHERE CROSSING PIPES AND ELECTRICAL. 9. ACCESS PANEL LOCATIONS SHOWN ARE APPROXIMATE, EXACT LOCATIONS SHALL BE COORDINATED WITH THE ARCHITECT'S DRAWINGS AND WITH THE LOCATIONS OF THE EQUIPMENT OR APPARATUS THAT THEY SERVE. HVAC NOTES: 1. RE: M502 FOR ALL APPLICABLE PLUMBING DIAGRAMS. 2. REFER TO THE PLUMBING FIXTURE CONNECTION SCHEDULE FOR PIPE SIZES TO INDIVIDUAL FIXTURES. 3. NOT ALL REQUIRED CLEANOUTS ARE NECESSARILY SHOWN ON THESE PLANS. PROVIDE CLEANOUTS ON WASTE, VENT AND STORM PIPING AS REQUIRED BY CODE AND FOR REASONABLE MAINTENANCE BASED ON ACTUAL FIELD INSTALLATION. COORDINATE LOCATIONS WITH ARCHITECT/ENGINEER. 4. PIPING ON EXTERIOR WALLS OR PRE-CAST CONCRETE WALLS TO BE ROUTED IN FRAMED WALL ON INTERIOR SIDE OF INSULATION. 5. DO NOT ROUTE PIPING OVER ELECTRICAL PANELS; MAINTAIN N.E.C. CLEARANCES. COORDINATE ROUTINGS WITH DIV. 26 CONTRACTOR. 6. PROVIDE FLEXIBLE PIPE CONNECTIONS TO ALL MOTORIZED EQUIPMENT. 7. ROUTE DOMESTIC HOT WATER RECIRC TO WITHIN 2 FEET OF ALL HOT WATER FIXTURES. 8. VERIFY ALL EQUIPMENT ACCESS PANELS WITH MANUFACTURER AND ARCHITECT. 9. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED. 10. ALL VALVES SHALL BE INSTALLED WITH ACCESS PANELS IN HARD-LID CEILINGS. 11. ALL PIPING SHALL BE ROUTED AS HIGH AS POSSIBLE IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN POSSIBLE, ESPECIALLY WHERE CROSSING OTHER PIPES, DUCTS, AND ELECTRICAL. 12. ACCESS PANEL LOCATIONS SHOWN ARE APPROXIMATE, EXACT LOCATIONS SHALL BE COORDINATED WITH THE ARCHITECT'S DRAWINGS AND WITH THE LOCATIONS OF THE EQUIPMENT OR APPARATUS THAT THEY SERVE. PLUMBING NOTES: Sheet Number Date:VAIL, COLORADO953 S. Frontage Rd. West Vail, Colorado 81657 tel: 970.476.1147 gpslarchitects.com SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018 ALL SHEETS VE PERMIT ISSUE ALBUQUERQUE | AVON | DENVER | FORT COLLINS 303.278.3820 www ˛bgbuildingworks˛com Project No. 9911.00 Copyright 2018 Sheet Title M-317 ENLARGED MECHANICAL PLAN - LAUNDRY AND LOBBY/OFFICE 09/21/18 SCALE: HYDRONIC RISER DIAGRAMS NONE LEVEL 4 ROOF LEVEL 3 LEVEL 2 LEVEL 1 GARAGE LEVEL 4 ROOF LEVEL 3 LEVEL 2 LEVEL 1 GARAGE 1 2 3 4 5 6RISER TOTALS: 30.5 MBH 8 GPM RISER TOTALS: 17.3 MBH 4 GPM RISER TOTALS: 28.1 MBH 8 GPM RISER TOTALS: 11.9 MBH 4 GPM RISER TOTALS: 17.6 MBH 4 GPM RISER TOTALS: 19.6 MBH 4 GPM HWS HWR HWSHWRHWSHWRHWS HWR BB-1 6.5' 2.7 MBH 1 GPM BB-1 9' 3.8 MBH 1 GPM HWS HWR BB-2 13.5' 4.5 MBH 1 GPM 3/4"3/4"1"1"BB-2 9.5' 3.1 MBH 1 GPM HWS HWR BB-1 10.5' 4.4 MBH 1 GPM BB-1 13' 5.5 MBH 1 GPM 1"1"BB-1 6.5' 2.7 MBH 1 GPM BB-1 9' 3.8 MBH 1 GPM HWSHWRHWSHWRBB-1 9.5' 3.8 MBH 1 GPM 3/4"3/4"1"1"BB-2 14' 4.7 MBH 1 GPM HWS HWR HWS HWR BB-1 12' 5.0 MBH 1 GPM 3/4"3/4"BB-1 9.5' 3.8 MBH 1 GPM HWSHWRHWR BB-1 5' 2.1 MBH 1 GPM BB-1 9' 3.8 MBH 1 GPM BB-2 13.5' 4.5 MBH 1 GPM BB-2 7.5' 2.5 MBH 1 GPM BB-1 9' 3.8 MBH 1 GPM BB-1 13' 5.5 MBH 1 GPM BB-1 5' 2.1 MBH 1 GPM BB-1 9' 3.8 MBH 1 GPM HWS 1"1"1"1"3/4"3/4"HWSHWRBB-1 5.5' 2.2 MBH 1 GPM 3/4"3/4"1"1"BB-2 10' 3.2 MBH 1 GPM BB-1 10.5' 4.3 MBH 1 GPM 3/4"3/4"BB-1 5.5' 2.2 MBH 1 GPM BB-1 9.5' 3.9 MBH 1 GPM BB-2 14' 4.7 MBH 1 GPM BB-1 12' 5.1 MBH 1 GPM BB-1 9.5' 3.9 MBH 1 GPM BB-1 11.5' 4.4 MBH 1 GPM BB-2 15.5' 5.2 MBH 1 GPM BB-1 13.5' 5.6 MBH 1 GPM BB-1 11.5' 4.4 MBH 1 GPM 7 8RISER TOTALS: 21.2 MBH 4 GPM RISER TOTALS: 17 MBH 4 GPM 9 RISER TOTALS: 25.8 MBH 10 GPM BB-1 11.5' 4.8 MBH 1 GPM BB-2 17' 5.6 MBH 1 GPM BB-1 15' 6.0 MBH 1 GPM BB-1 11.5' 4.8 MBH 1 GPM BB-1 9.5' 4.0 MBH 1 GPM BB-2 15' 5.0 MBH 1 GPM BB-1 9.5' 4.0 MBH 1 GPM BB-1 9.5' 4.0 MBH 1 GPM BB-1 11.5' 4.7 MBH 1 GPM 3/4"3/4"1"1"BB-2 17' 5.5 MBH 1 GPM BB-1 4.5' 1.9 MBH 1 GPM 3/4"3/4"BB-1 11.5' 4.7 MBH 1 GPMHWSHWRHWSHWR HWSHWRHWSHWRHWSHWRHWSHWRHWSHWRHWSHWRHWSHWRHWSHWRHWSHWR1-1/4" HWS/HWR 1" HWS/HWR HWS HWR HWS HWR HWS HWR 1-1/4" HWS/HWR HWS HWR HWS HWR HWS HWR HWS HWR BB-2 4.5' 1.5 MBH 1 GPM HWS HWR HWS HWR BB-2 4.5' 1.5 MBH 1 GPM HWS HWR BB-2 4.5' 1.5 MBH 1 GPM 1" HWS/HWR HWS HWR 1" HWS/HWR HWS HWR HWS HWR HWS HWR 3/4"3/4"1"1"3/4"3/4"HWS HWR 1" HWS/HWR HWS HWR HWS HWR HWS HWR 3/4"3/4"1"1"3/4"3/4"HWS HWR 1" HWS/HWR HWS HWR HWS HWR HWS HWR 3/4"3/4"1"1"3/4"3/4"HWS HWR 1" HWS/HWR HWS HWR HWS HWR HWS HWR 3/4"3/4"1"1"3/4"3/4"HWS HWR 1" HWS/HWR HWS HWR HWS HWR HWS HWR BB-1 3.5' 1.5 MBH 1 GPM BB-1 3.5' 1.5 MBH 1 GPM BB-1 3.5' 1.5 MBH 1 GPM Sheet Number Date:VAIL, COLORADO953 S. Frontage Rd. West Vail, Colorado 81657 tel: 970.476.1147 gpslarchitects.com SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018 ALL SHEETS VE PERMIT ISSUE ALBUQUERQUE | AVON | DENVER | FORT COLLINS 303.278.3820 www ˛bgbuildingworks˛com Project No. 9911.00 Copyright 2018 Sheet Title M-401 HYDRONIC RISER DIAGRAMS 09/21/18 LEVEL 4 ROOF LEVEL 3 LEVEL 2 LEVEL 1 GARAGE LEVEL 4 ROOF LEVEL 3 LEVEL 2 LEVEL 1 GARAGE 11 14 17 201216 SCALE: HYDRONIC RISER DIAGRAMS NONE 10 RISER TOTALS: 24 MBH 8 GPM RISER TOTALS: 27.8 MBH 7 GPM RISER TOTALS: 16.3 MBH 4 GPM RISER TOTALS: 40.9 MBH 10 GPM RISER TOTALS: 30.5 MBH 8 GPM RISER TOTALS: 16.1 MBH 8 GPM RISER TOTALS: 23.3 MBH 6 GPM BB-1 5.5' 2.1 MBH 1 GPM BB-1 8.5' 3.6 MBH 1 GPM BB-2 13' 4.3 MBH 1 GPM BB-2 8' 2.6 MBH 1 GPM 1"1"BB-1 5.5' 2.1 MBH 1 GPM BB-1 8.5' 3.6 MBH 1 GPM BB-1 5.5' 2.2 MBH 1 GPM BB-1 8.5' 3.5 MBH 1 GPM HWS HWR BB-2 13' 4.3 MBH 1 GPM 3/4"3/4"1"1"BB-2 9' 3.0 MBH 1 GPM HWS HWR 1"1"BB-1 6.5' 2.6 MBH 1 GPM BB-1 8.5' 3.6 MBH 1 GPM BB-1 19.5' 8.1 MBH 1 GPM BB-1 9.5' 3.9 MBH 1 GPM 3/4"3/4"1"1"BB-2 14' 4.7 MBH 1 GPM HWS HWR BB-1 9.5' 3.8 MBH 1 GPM 3/4"3/4"BB-1 9.5' 3.9 MBH 1 GPM BB-1 9.5' 3.9 MBH 1 GPM 3/4"3/4"1-1/4"1-1/4"BB-2 14' 4.7 MBH 1 GPM BB-1 9.5' 5.1 MBH 1 GPM 1"1"BB-1 9.5' 3.9 MBH 1 GPM HWS HWR 20 1" 1" BB-1 8.5' 3.5 MBH 1 GPM BB-1 9' 3.7 MBH 1 GPM HWS HWR BB-2 13.5' 4.4 MBH 1 GPM 3/4"3/4"1-1/4"1-1/4"BB-2 12' 3.9 MBH 1 GPM 1"1"HWS HWR BB-1 12.5' 5.2 MBH 1 GPM BB-1 13' 5.4 MBH 1 GPM BB-2 12' 4.0 MBH 1 GPM BB-2 11.5' 3.8 MBH 1 GPM BB-1 7' 2.8 MBH 1 GPM BB-1 8' 3.3 MBH 1 GPM BB-1 12' 5.0 MBH 1 GPM BB-1 13' 5.5 MBH 1 GPM HWS HWR BB-1 8.5' 3.5 MBH 1 GPM BB-1 9.5' 3.9 MBH 1 GPM HWS HWR BB-2 14' 4.6 MBH 1 GPM 1"1"3/4"3/4"BB-2 12' 3.9 MBH 1 GPM HWS HWR 14 1" 1"HWSHWRHWSHWRHWSHWRHWSHWRHWSHWRHWSHWRHWSHWRHWSHWRHWSHWRHWSHWRHWSHWRHWSHWRHWSHWRHWSHWRBB-1 6.5' 2.6 MBH 1 GPM BB-1 8.5' 3.6 MBH 1 GPM BB-1 8.5' 3.5 MBH 1 GPM BB-1 9' 3.7 MBH 1 GPM BB-1 7' 2.8 MBH 1 GPM BB-1 8' 3.3 MBH 1 GPM BB-1 8.5' 3.5 MBH 1 GPM BB-1 9.5' 3.9 MBH 1 GPM 13 RISER TOTALS: 17.6 MBH 4 GPM BB-1 9.5' 3.9 MBH 1 GPM 3/4"3/4"1"1"BB-2 14' 4.7 MBH 1 GPM HWS HWR HWS HWR BB-1 12' 5.1 MBH 1 GPM 3/4"3/4"BB-1 9.5' 3.9 MBH 1 GPM 15 HWSHWRHWSHWRHWS HWR 1-1/4" HWS/HWR 1"1"3/4"3/4"HWS HWR HWS HWR HWS HWR HWS HWS HWR HWR 1" HWS/HWR HWS HWR HWS HWR HWS HWR HWS HWR HWS HWR HWS HWR 1-1/4" HWS/HWR HWS HWR HWS HWR HWS HWR HWS HWR HWS HWR 1"1"HWS HWR 1-1/4" HWS/HWR1"1"3/4"3/4"HWS HWR HWS HWR HWS HWR HWS HWR Sheet Number Date:VAIL, COLORADO953 S. Frontage Rd. West Vail, Colorado 81657 tel: 970.476.1147 gpslarchitects.com SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018 ALL SHEETS VE PERMIT ISSUE ALBUQUERQUE | AVON | DENVER | FORT COLLINS 303.278.3820 www ˛bgbuildingworks˛com Project No. 9911.00 Copyright 2018 Sheet Title M-402 HYDRONIC RISER DIAGRAMS 09/21/18 SCALE: DOMESTIC WATER RISER DIAGRAMS NONE LEVEL 4 ROOF LEVEL 3 LEVEL 2 LEVEL 1 GARAGE P 1 GARAGE P 2 P 4 P 9 RE: ENLARGED PLANS FOR UNIT BRANCH SIZING AND DHW BALANCE VALVE LOCATIONS.CWHWHWCCW HW CW HW TO BATHROOM GROUP CW HW CW HW TO BATHROOM GROUP CW HW CW HW TO BATHROOM GROUP CWHWHWCCWHWHWCCW HW CW HW TO BATHROOM GROUP TO KITCHENETTE W/ DISHWASH TO KITCHENETTE W/ DISHWASH TO KITCHENETTE W/ DISHWASH TO KITCHENETTE W/ DISHWASH 3/4"1-1/2"1-1/2"3/4"1-1/4"1-1/4"3/4"1-1/4"1-1/4"1"1"1/2"P 3 P 10 P 16 CWHWHWCCW HW CW HW TO BATHROOM GROUP TO KITCHENETTE CW HW CW HW TO BATHROOM GROUP TO KITCHENETTE CW HW CW HW TO BATHROOM GROUP TO KITCHENETTE CWHWHWCCWHWHWCCW HW CW HW TO BATHROOM GROUP TO KITCHENETTE3/4"1"1/2"1" 1-1/4" 3/4" 1-1/4"1-1/4"3/4"3/4"1-1/2"1-1/4"P 5 P 6 P 7 P 12 P 13 P 15 CWHWHWCCW HW CW HW TO BATHROOM GROUP PLUS LAV TO KITCHENETTE W/ DISHWASH CW HW CW HW CW HW CW HW CWHWHWCCWHWHWCTO KITCHENETTE W/ DISHWASH TO KITCHENETTE W/ DISHWASH1"1"1/2"1-1/4"1-1/4"3/4"1-1/4"1-1/4"3/4"TO BATHROOM GROUP PLUS LAV TO BATHROOM GROUP PLUS LAV P 8 CW HW CW HW TO KITCHENETTE W/ DISHWASH TO BATHROOM GROUP PLUS LAV LEVEL 4 ROOF LEVEL 3 LEVEL 2 LEVEL 1 CWHWHWCCW HW CW HW TO BATHROOM GROUP TO KITCHENETTE CW HW CW HW TO BATHROOM GROUP TO KITCHENETTE CW HW CW HW TO BATHROOM GROUP TO KITCHENETTE CWHWHWC3/4"1"1/2"1"1-1/4"3/4"1-1/4"1-1/4"3/4"3/4"1-1/2"1-1/2"0.58 GPM 0.50 GPM 0.74 GPM 0.40 GPM Sheet Number Date:VAIL, COLORADO953 S. Frontage Rd. West Vail, Colorado 81657 tel: 970.476.1147 gpslarchitects.com SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018 ALL SHEETS VE PERMIT ISSUE ALBUQUERQUE | AVON | DENVER | FORT COLLINS 303.278.3820 www ˛bgbuildingworks˛com Project No. 9911.00 Copyright 2018 Sheet Title M-403 DOMESTIC WATER RISER DIAGRAMS 09/21/18 SCALE: DOMESTIC WATER RISER DIAGRAMS NONE LEVEL 4 ROOF LEVEL 3 LEVEL 2 LEVEL 1 GARAGE LEVEL 4 ROOF LEVEL 3 GARAGE P 20 P 11 RE: ENLARGED PLANS FOR BRANCH SIZING AND DHW BALANCE VALVE LOCATIONS. LEVEL 2 LEVEL 1 CWHWHWCCW HW CW HW TO BATHROOM GROUP CW HW CW HW TO BATHROOM GROUP CW HW CW HW TO BATHROOM GROUP CWHWHWCTO KITCHENETTE W/ DISHWASH TO KITCHENETTE W/ DISHWASH TO KITCHENETTE W/ DISHWASH 3/4"1-1/4"1-1/4"3/4"1-1/4"1-1/4"1"1"1/2"CWHWHWCCW HW HWC CW HWTO CLOTHES WASHER CW HW CWHWHWCCWHWHWCTO CLOTHES WASHER TO CLOTHES WASHER 3/4"3/4"1/2"1"1"3/4"1-1/4"1-1/4"3/4"CW HW HWC TO CLOTHES WASHER P 18 P 19CWHWHWCCW HW CW HW TO BATHROOM GROUP CW HW CW HW TO BATHROOM GROUP TO KITCHENETTE W/ DISHWASHER CW HW CW HW TO BATHROOM GROUP CWHWHWCCWHWHWCCW HW CW HW TO BATHROOM GROUP 1"1"1/2"1-1/4"1-1/4"3/4"1-1/2"1-1/2"3/4"3/4"1-1/2"1-1/2"P 14 P 20 3/4" 1-1/4" 1-1/4"CWHWHWCCW HW CW HW TO BATHROOM GROUP CW HW CW HW TO BATHROOM GROUP P 14 CW HW CW HW TO BATHROOM GROUP CWHWHWC1"1"1/2"1-1/2" CW, 1-1/2" HW 1-1/4" 1-1/4" 3/4"1-1/4"1-1/4"3/4"TO KITCHENETTE W/ DISHWASHER TO KITCHENETTE W/ DISHWASHER TO KITCHENETTE W/ DISHWASHER TO KITCHENETTE W/ DISHWASHER TO KITCHENETTE W/ DISHWASHER TO KITCHENETTE W/ DISHWASHER 1-1/2" CW, 1-1/2" HW, 1/2" HWC CWHWHWC1"1"3/4"0.46 GPM 0.95 GPM 0.10 GPM 0.41 GPM Sheet Number Date:VAIL, COLORADO953 S. Frontage Rd. West Vail, Colorado 81657 tel: 970.476.1147 gpslarchitects.com SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018 ALL SHEETS VE PERMIT ISSUE ALBUQUERQUE | AVON | DENVER | FORT COLLINS 303.278.3820 www ˛bgbuildingworks˛com Project No. 9911.00 Copyright 2018 Sheet Title M-404 DOMESTIC WATER RISER DIAGRAMS 09/21/18 SCALE: WASTE AND VENT RISER DIAGRAMS NONE W 1 W 2 W 4 W 9 W SHOWER W KITCHEN SINK LAV W.C. W SHOWER KITCHEN SINK LAV W.C. W SHOWER KITCHEN SINK LAV W.C. W SHOWER KITCHEN SINK LAV W.C. DISH WASHER DISH WASHER DISH WASHER DISH WASHER3"2"3" 2" 3" 2" 3" 2" 1-1/2"4" W 3 W 10 W 16 W 5 W 6 W 7 W 8 W 12 W 13 W 15 W SHOWER W W KITCHEN SINK LAV W.C. W SHOWER KITCHEN SINK LAV W.C. W SHOWER KITCHEN SINK LAV W.C. W SHOWER KITCHEN SINK LAV W.C. 3"2"3" 2" 3" 2" 3" 2" 4" W SHOWER KITCHEN SINK W.C. W SHOWER KITCHEN SINK W.C. W SHOWER LAV W.C. LAV LAV W SHOWER KITCHEN SINK LAV W.C. DISH WASHER KITCHEN SINK 3" 2" 1-1/2"V 3"2"3" 2" 3" 2" LAV1-1/2" 1-1/2"1-1/2" 1-1/2"1-1/2" 1-1/2" 1-1/2"V W V 1-1/2"V DISH WASHER 1-1/2" V LAV 1-1/2" V DISH WASHER 1-1/2" V LAV 1-1/2" V DISH WASHER 1-1/2"V LAV 1-1/2"V W SHOWER KITCHEN SINK LAV W.C. W SHOWER KITCHEN SINK LAV W.C. W SHOWER KITCHEN SINK LAV W.C.1-1/2" 1-1/2" 1-1/2"W 3" 2"2" 2" V 3"3" 3" W LEVEL 4 ATTIC LEVEL 3 LEVEL 2 LEVEL 1 GARAGE LEVEL 4 ATTIC LEVEL 3 LEVEL 2 LEVEL 1 GARAGE FLAG NOTES: 1 RE: ATTIC & ROOF PLAN FCT. RE: SHEET M-200 FCT OF WASTE PIPING TO FOUNDATION. 1 1 1 1 2 2 2 4" W 4" 2 4" W3" 23" Sheet Number Date:VAIL, COLORADO953 S. Frontage Rd. West Vail, Colorado 81657 tel: 970.476.1147 gpslarchitects.com SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018 ALL SHEETS VE PERMIT ISSUE ALBUQUERQUE | AVON | DENVER | FORT COLLINS 303.278.3820 www ˛bgbuildingworks˛com Project No. 9911.00 Copyright 2018 Sheet Title M-405 WASTE AND VENT RISER DIAGRAMS 09/21/18 SCALE: WASTE AND VENT RISER DIAGRAMS NONE LEVEL 4 ATTIC LEVEL 3 LEVEL 2 LEVEL 1 GARAGE LEVEL 4 ATTIC LEVEL 3 LEVEL 2 LEVEL 1 GARAGE CLOTHES WASHER CLOTHES WASHER CLOTHES WASHER FLOOR DRAIN CLOTHES WASHER W FLOOR DRAIN FLOOR DRAIN CLOTHES WASHER FLOOR DRAIN CLOTHES WASHER CLOTHES WASHER CLOTHES WASHER1-1/2" 3" 1-1/2"3"1-1/2"2" 2" 3"1-1/2"WW2" 3"1-1/2"W W 3" 3" W 17 W 18 W 19 W 14 W 14 W SHOWER W W KITCHEN SINK LAV W.C. W SHOWER KITCHEN SINK LAV W.C. W SHOWER KITCHEN SINK LAV W.C.3"2"3" 2" 3" 2" 3" W 20 W SHOWER W W KITCHEN SINK LAV W.C. W SHOWER KITCHEN SINK LAV W.C. W SHOWER KITCHEN SINK LAV W.C. W SHOWER KITCHEN SINK LAV W.C. 3"2"3" 2" 3" 2" 3" 2" 4" 1-1/2"1-1/2" 1-1/2" 1-1/2"V W V W 20W3" V W W VVDISH WASHER DISH WASHER 1-1/2"1-1/2" 1-1/2"W SHOWER W KITCHEN SINK LAV W.C. W SHOWER KITCHEN SINK LAV W.C. W SHOWER KITCHEN SINK LAV W.C. 3"2"3" 2" 3" 2" DISH WASHER W 11V DISH WASHER 1-1/2" DISH WASHER 1-1/2"1-1/2"W 3" 1 1 1 11 2 2 2 FLAG NOTES: 1 RE: ATTIC & ROOF PLAN FCT. RE: SHEET M-200 FCT OF WASTE PIPING TO FOUNDATION. 2 W3" 23" Sheet Number Date:VAIL, COLORADO953 S. Frontage Rd. West Vail, Colorado 81657 tel: 970.476.1147 gpslarchitects.com SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018 ALL SHEETS VE PERMIT ISSUE ALBUQUERQUE | AVON | DENVER | FORT COLLINS 303.278.3820 www ˛bgbuildingworks˛com Project No. 9911.00 Copyright 2018 Sheet Title M-406 WASTE AND VENT RISER DIAGRAMS 09/21/18 NO SCALE DUCTWORK DIAGRAM DUCT CLAMP, OR STRAP AS REQUIRED FOR SQUARE OR ROUND DUCTWORK. IF DUCTWORK IS INSULATED, INSULATION SHALL BE CONTINUOUS THRU CLAMP. ROOF MOUNTED UPRIGHT GALVANIZED CHANNEL GALVANIZED CHANNEL DURA-BLOK OR EQUIVALENT BASE SUPPORTS. NOTES: 1. BASE SUPPORTS SHALL BE RUBBER. 2. SPACING OF BASE SUPPORTS AND INSTALLATION SHALL BE PER MFG'S RECOMMENDATIONS. 3. ADJUST HEIGHT OF HORIZONTAL CHANNEL TO MATCH ELEVATION OF DUCTWORK. BOTTOM OF DUCT SHALL BE A MIN 18" ABOVE FINISHED ROOF TO ALLOW FOR FUTURE ROOF WORK.AIR FLOWNO SCALE USE DUCT SEALANT OR GASKETED FITTING ON HIGH VELOCITY DUCT. CONICAL SPIN-IN FITTING W/ MANUAL DAMPER, HANDLE, & LOCK NUT. FLEX DUCT. WORM DRIVE S.S. CLAMP. NOTE: DIAGRAM FOR LOW & HIGH VELOCITY DUCTWORK EXCEPT UPSTREAM OF VAV BOXES. OMIT DAMPER & FLEX DUCT UPSTREAM OF VAV BOXES. ROUND DUCT TAKE-OFF DIAGRAM THRU ROOF DIAGRAM DRYER VENT NO SCALE STORM COLLAR/ COUNTER FLASHING. SEAL TO DUCT. LONG RADIUS ELBOW. FULLY WELDED CURB CAP, SIMILAR TO TRANSITION. TIGHT TO, BUT NOT FASTENED TO DUCT. PREFAB, INSULATED ROOF CURB WITH TREATED WOOD NAILER. SUPPORT DUCT FROM STRUCTURE. DRYER VENT CAP W/ BACKDRAFT DAMPER. DUCT HANGER DIAGRAM NO SCALE NUT, WASHER & ALL THREAD BY M.C. BAR JOIST OR OTHER STRUCTURE BY G.C. 1/4" ALL THREAD. ROD EYE (SOCKET) GRINNEL 110 R, OR EQUAL. SHEET METAL STRAP BY M.C. SPIRAL DUCT. GARAGE EXHAUST FAN DIAGRAM NO SCALE WIRE GUARD. WALL. EXHAUST FAN. EXTERIOR LOUVER. SECURELY MOUNT FAN IN WALL. MOTORIZED SHUT-OFF DAMPER. 2-WAY COIL PIPING DIAGRAM NO SCALE COIL NOTES: 1. FLEXIBLE PIPE CONNECTOR REQ'D FOR EQUIPMENT CONTAINING FANS OR COMPRESSORS, NOT REQ'D FOR EQUIPMENT SUCH AS DUCT COILS. 2. PIPE ALL MULTI-ROW COILS FOR COUNTERFLOW (WATER ENTERS MOST DOWNSTREAM COIL, LEAVES MOST UPSTREAM COIL). 3. REFER TO CONTROLS DRAWINGS FOR ADDITIONAL INFORMATION. 4. 2-WAY VALVE NORMALLY OPEN FOR HEATING AND NORMALLY CLOSED FOR COOLING. G STRAINER WITH BLOWDOWN AND CAP. MANUAL AIR VENT AT HIGHEST POINT IN PIPING. RETURN SUPPLY D COIL PIPING DIAGRAM NO SCALE COIL NOTES: 1. FLEXIBLE PIPE CONNECTOR REQ'D FOR EQUIPMENT CONTAINING FANS OR COMPRESSORS, NOT REQ'D FOR EQUIPMENT SUCH AS DUCT COILS. 2. PIPE ALL MULTI-ROW COILS FOR COUNTERFLOW (WATER ENTERS MOST DOWNSTREAM COIL, LEAVES MOST UPSTREAM COIL). 3. REFER TO CONTROLS DRAWINGS FOR ADDITIONAL INFORMATION. 4. 3-WAY VALVE WITH COIL RETURN PIPED TO NORMALLY OPEN PORT FOR HEATING AND NORMALLY CLOSED PORT FOR COOLING. BASEBOARD RADIATION DIAGRAM NO SCALE HWSHWR( DOWNFEED ) PLANS UP IN WALL UP IN WALL MANUAL AIR VENT AT HIGH POINTS. PROVIDE ACCESS PANEL OR ROUTE 3/8" TUBING WITH VALVES TO BASEBOARD ENCLOSURE. ALTERNATE ROUTING FOR SAME END CONNECTIONS. CONTINUE AS PER PLANS CONTROL VALVE IN ENCLOSURE ON RETURN SIDE (AS APPLICABLE) RISE IN DIRECTION OF FLOW LENGTH PER PLANS MOUNTING HEIGHT AS PER EQUIPMENT LIST OR MANUFACTURERS LISTING SNOWMELT MANIFOLD PIPING DIAGRAM NO SCALE SMRSMSMANUAL AIR VENT AT HIGHEST POINT IN PIPING. STRAINER WITH BLOWDOWN VALVE AND CAP. MANIFOLD BOX (WALL MOUNTED FOR RADIANT; LOCATED IN SLAB FOR SNOWMELT). MANUFACTURER'S MANIFOLD ASSY. LOOP BALANCE/ISOLATION VALVE SUPPLY MANUFACTURER'S MANIFOLD ASSEMBLY WITH REVERSE RETURN PIPING. RETURN 3-WAY (DIVERTING VALVE) RADIANT/SNOWMELT TUBING. LOOP QUANTIITY AS REQUIRED. NOTES: 1. PROVIDE MANUFACTURER'S MANIFOLDS AND ISOLATION VALVES WITH PIPING. 2. FOR EXTERIOR MANIFOLD LOCATIONS PROVIDE WATERPROOF MANIFOLD BOX OR WATERPROOF CONTROL VALVE. TO PIPING MAINS APPLIES TO ALL L4 CUH AIR VENT AT HIGH POINTS, TYPICAL. MANIFOLD BALANCE VALVE. SNOWMELT CONNECTION: STAIR TO WALK DIAGRAM NO SCALE STAIR #2 STAIR #1 & 3 5/8" POLYETHYLENE HEAT PIPE. 5/8" POLYETHYLENE AT STAIRS & LANDINGS. 3" SANDSTONE AT STAIR & LANDING. CONCRETE AT STAIR & LANDING. NOTE: REFER TO ARCH. DWG #___ FOR STAIR DIMENSIONS. 9" O.C. TYP. FOR ALL LANDINGS & WALKS. 312" 3 12" 412" 412" 412" 4" 3" 212" MAX 14"1 HEAT TAPE DIAGRAM NO SCALE RE: ELECTRICAL FOR CONT. THERMOSTAT UNDER COVER. TRACE ENTIRE LENGTH OF EXTERNAL EXPOSED PIPING WITH 7 WATTS PER LINEAL FOOT HEAT TAPE. PROVIDE STRAP ON __________ MODEL __ STAT TO LOCKOUT HEATING ABOVE 4O°F AMBIENT TEMP. PROVIDE COLD LEADS TO ELECTRICAL CONNECTION. ALUMINUM JACKET. 3" THICK PIPE INSULATION (1) PIPE SIZE LARGER THAN PIPE. EXTERNAL EXPOSED PIPING REQUIRING FREEZE PROTECTION .NOTE: MECHANICAL CONTRACTOR PROVIDE AND INSTALL, ELECTRICAL CONTRACTOR TO POWER. SNOWMELT TUBING LAYOUT DIAGRAM NO SCALE SERPENTINE LAYOUT NOTES: 1. INSTALL ALL SNOWMELT TUBING IN REVERSE RETURN FASHION FOR SURFACE TEMPERATURE UNIFORMITY. 2. CONVENTIONAL SERPENTINE LAYOUT NOT PERMITTED. L REVERSE-RETURN LAYOUT CF K J E B AH M RADIUSED DUCT SPLIT DIAGRAM NO SCALE RADIUS IS = TO SIZE A. RADIUS IS 2 X SIZE A. RADIUS IS 0.75 X SIZE C. RADIUS IS SIZE B + 0.75 X SIZE C. 1 2 3 4 A C B A 2 1 4 3 BALL-IN -SOCKET ROD GUIDE WITH SET SCREEN. HINGES 1"HW TURNED BACK SMOOTH. 16 GAUGE DAMPER BLADE, 2xB" LONG, FULL DEPTH OF DUCT. NOTE: PROVIDE TWO ADJUSTING RODS FOR DUCTS OVER 24" DEEP. 45° NO SCALE W H 1/4 OF "W" OR 6" MINIMUM. END BEARING. SINGLE BLADE DAMPER IF H<8" OPPOSED BLADE DAMPER IF H>=8" SEAL AIRTIGHT AROUND ENTIRE TAKE-OFF. WATERTIGHT INTAKE DUCT CONNECTION DIAGRAM NO SCALE 12" MIN 3"1" 2- 3/ 4 " 2" MASTIC. WEEPHOLES. 20 GAUGE ALUMINUM. WALL. DRAINABLE LOUVER. GROUT. THIS PORTION OF DUCTWORK SHALL BE ALUMINUM. PROVIDE WATERPROOFING ON BOTTOM & SIDES. NOTE: REFER TO MANUFACTURER'S INSTRUCTIONS FOR SPECIFIC MOUNTING DETAILS. COOR'D WITH ARCITECTURAL REQUIRMENTS. LINTELS. DRAINABLE LOUVER & SCREEN. RETURN SHEET METAL UNDER WALL BOX & EXTEND 2" BEYOND FACE OF WALL TO DRIP LIP. WRAP INSULATION PER OUTDOOR DUCT REQ'MTS 24" INBOARD OF ENVELOPE. MOTORIZED SHUT-OFF DAMPER. M 24" MIN N P Q APPLIES TO ALL HEATING EXCEPT L4 CUH'S 6" MIN.4" NOTE: COORD. ROOF PENETRATION AND SEALING WITH ROOF MFTR & INSTALLING CONTRACTOR. CONTROL VALVE Sheet Number Date:VAIL, COLORADO953 S. Frontage Rd. West Vail, Colorado 81657 tel: 970.476.1147 gpslarchitects.com SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018 ALL SHEETS VE PERMIT ISSUE ALBUQUERQUE | AVON | DENVER | FORT COLLINS 303.278.3820 www ˛bgbuildingworks˛com Project No. 9911.00 Copyright 2018 Sheet Title M-501 MECHANICAL DIAGRAMS 09/21/18 M B-1 600 MBH 730 CFH 3082 MBH 3758 CFH TOTAL PRV SET TO 2 PSI MIN DISCHARGE PRESSURE. MECHANICAL GAS PIPING DIAGRAM NO SCALE NOTES: 1. PROVIDE ACCESSIBLE OR KEYED SHUT OFF VALVE AT EACH GAS APPLIANCE. 2. GAS SYSTEM BASED ON 810 BTUH/CFH. 3. THIS DIAGRAM PROVIDES ALL SIZING AND VALVE INFORMATION. CONTRACTOR TO COORDINATE ACCESSIBLE PLACEMENT OF SHUT-OFF VALVES AT EACH APPLIANCE, FIREPLACE, AND PIECE OF EQUIPMENT. 4. PROVIDE SEDIMENT TRAP AT EACH APPLIANCE. 5. PROVIDE STRAINER UPSTREAM OF EACH REGULATOR. 6. VENT REGULATORS TO OUTDOORS IN ACCORDANCE WITH MANUFACTURER'S REQUIREMENTS. 7. PROVIDE 1/2" GAS CONNECTION INTO EACH INDIVIDUAL DRYER UNIT. L4 LAUNDRY ROOM (3 DRYERS @ 25 MBH EA) 75 MBH; 92 CFH FURTHEST DRYER @ 65' MAU-1 180 MBH 220 CFH MAU-2 205 MBH 250 CFH 85' CLEANOUT DIAGRAMS FLOOR CLEANOUT (FCO) NO SCALE SLOPE DN @ 1/4"/L.F. CLEANOUT TO GRADE (COTG) WASTE LINE FINISHED GRADE 6" ADJUSTABLE GRADE CLEANOUT AND ACCESS ENCLOSURE WITH ANCHOR FLANGE, HEAVY DUTY TOP, AND VANDAL PROOF FASTENERS, ZURN, Z-1400-HD-KBRASS CLEANOUT PLUG W/COUNTER SUNK HEAD. ADJUSTABLE CLEANOUT AND ACCESS COVER ZURN ZB-1400. TOP OF COVER TO BE FLUSH W/ TOP OF FLOOR. 16" CONC. PAD TROWEL SMOOTH & EDGE. 1/8 C.I. BEND BALANCE OF PIPING SAME AS CLEANOUT TO GRADE. FLOOR LINE 1/8 C.I. BEND C.I. WASTE LINE. LGTH TO SUIT. 1/8 BEND IF CLEANOUT OCCURS AT END OF LINE. PROVIDE FOLLOWING OPTIONS AS APPROPRIATE CARPET MARKER - FOR CARPETED AREAS. SQUARE TOP - FOR CERAMIC TILE OR SIMILAR SQUARE PATTERN FLOOR. FLASHING CLAMP - FOR ABOVE GRADE WATER PROOFED AREAS. WALL CLEANOUT DIAGRAM NO SCALE 1'-0"MAY EXTEND AS A WASTE OR VENT. CHROME WALLCOVER AND SCREW. PLUGGED TEE WITH CLEANOUT. WALL. FLOOR LINE. 1/8 C.I. BEND. BALANCE OF PIPING SAME AS CLEANOUT TO GRADE. WASTE LINE SLOPE DN @ 1/4"/L.F. TWO-WAY CLEANOUT TO GRADE DIAGRAMS NO SCALE 6" FINISHED GRADE ADJUSTABLE GRADE CLEANOUT AND ACCESS ENCLOSURE WITH ANCHOR FLANGE, HEAVY DUTY TOP, AND VANDAL PROOF FASTENERS, ZURN, Z-1400-HD-KBRASS CLEANOUT PLUG W/COUNTER SUNK HEAD. 24" X1 6"Ø CONC. PAD TROWEL SMOOTH & EDGE. C.I. WASTE LINE. LGTH TO SUIT. 1/8 C.I. BEND DRAIN THRU WALL DIAGRAM SANITARY OR STORM BLDG. SLOPE 1/4"/L.F. NO SCALE C.O.T.G SEE DIAGRAM . BASEMENT WALL. COORDINATE WALL OPENING SIZE WITH PIPE MATERIAL AND SIZE AND MANUFACTURER REQUIREMENTS. STORM OR SANITARY BLDG. DRAIN. LINK-SEAL OR EQUIVALENT. - GRADE TRENCH DRAIN DIAGRAM NO SCALE CROSS BAR, 12"DIA. BEARING BAR 11 2" x 1 14". ANGLE IRON POURED IN CONCRETE FLOOR. MEDIUM DUTY FLOOR DRAIN. 12" 2" MIN. DIAGRAM TRAP PRIMER CONNECTION NO SCALE FLOOR MIN. HEIGHT PER MFR. BALL VALVE. TAKE-OFF FROM TOP OF CW PIPE. TRAP PRIMER VALVE, SIOUX CHIEF PRIME PERFECT OR EQUAL. DISTRIBUTION UNIT (FOR MULTIPLE DRAINS). 12" TYPE K SOFT COPPER LINE(S) TO FLOOR DRAIN(S). QUANTITY AS REQUIRED. NO JOINTS BELOW GRADE.1/2"EQUIP. RAIL FOR ROOF MOUNTING NO SCALE PIPE SUPPORT SADDLE STAND. COUNTER FLASHING OVER TREATED WOOD NAILER. GALVANIZED STEEL, MIN. 18 GAGE, WITH WELDED SEAMS. DOMESTIC WATER ENTRANCE SCHEMATIC NO SCALE N.C. M S D1-1/4"CW TO IRRIGATION. ESTIMATED FLOW=30GPM PER IRRIGATION CONSULTANT, CONFIRM FINAL FLOW AND SIZE WITH IRRIGATION DESIGN/BUILD CONTRACTOR. 3" CW TO BUILDING. PRESSURE REDUCING VALVE WATTS #LF223, TYP. BY-PASS VALVE. RELIEF VALVE-PIPE INDIRECT TO FLOOR DRAIN. SECURE TO REINFORCED WALL. COOR'D W/ G.C. BACKFLOW PREVENTER (REDUCED PRESSURE TYPE) WATTS #LF909, TYP. WATER METER WITH REMOTE READOUT, 3" WATER SERVICE SHUT-OFF VALVE. 3"CW SERVICE FROM MAIN. PIPE TO FLOOR DRAIN. SET PRV #1 @ 60 PSI, 3" SET PRV #2 @ 60 PSI., 1" THRUST BLOCK DIAGRAM NO SCALE BEARING AREA OF BLOCK IN SQ. FT. UNDISTURBED EARTH. FITTING SIZE TEE & END 90° BEND 45° BEND 22.5° BEND 11.25° BEND 3" 4" 6" 8" 10" 10.3 6.7 5.75 1.67 1.0 1.33 2.4 5.4 9.5 15.0 7.0 5.2 2.5 1.1 0.67 0.4 0.67 1.5 2.7 4.1 2.0 1.33 0.8 0.4 0.25 SOIL BEARING PRESSURE MULTIPLIER 1000 1500 2000 3000 2.0 1.33 1.0 0.67 BEARING AREA PLACE DOUBLE LAYER OF TAR PAPER BETWEEN CONC. BLOCKING & PLUG TO PERMIT EASY REMOVAL FOR FUTURE EXTENSION. REFER TO SOILS REPORT FOR SOIL BEARING PRESSURE AND BLOCK SIZING AND INSTALLATION REQUIREMENTS. NOTE: WATER &/OR FIRE ENTRY DIAGRAM NO SCALE FLANGED CAST IRON TO WATER &/OR FIRE SERVICE VALVES. PIPE SLEEVE; CAST IN PLACE. BLDG. FLOOR SLAB. CAULK. COORDINATE WALL OPENING SIZE WITH PIPE MATERIAL AND SIZE AND MANUFACTURER REQUIREMENTS. TIE RODS; TYP. THRUST BLOCK. CAST IRON HUB TO FLANGED ADAPTER. FOUNDATION WALL OR GRADE BEAM. GRADE. LINK-SEAL OR EQUIVALENT. SERVICE FROM STREET.NOTE: COORDINATE SEISMIC RESTRAINT(S) AND OPENING SIZE REQUIREMENTS WITH LOCAL AHJ AND/OR STRUCTURAL ENGINEER.TYPICAL HANGER DIAGRAM NO SCALE ANCHOR, REFER TO STRUCTURAL. THREADED ROD. HANGER. PIPE. CONCRETE STRUCTURE. NOTE: ALL PIPING WITH INSULATION TO HAVE INSULATION RUN FULL SIZE THROUGH HANGER WITH SHIELD AND INSERT. FOR WATER DIAGRAM TYPICAL PIPE SIZE CHANGE TOP OF PIPE NO SCALE PIPE PIPE INVERTED ECCENTRIC REDUCER. A B D C E F G H MP L N Q J L3 LAUNDRY ROOM (3 DRYERS @ 25 MBH EA) 75 MBH; 92 CFH FARTHEST DRYER @ 50' L2 LAUNDRY ROOM (3 DRYERS @ 25 MBH EA) 75 MBH; 92 CFH FARTHEST DRYER @ 35' GAS CONTENT: 820 BTU/CF MED PRESSURE: IFGC 2015 TABLE 402.4(5) LOW PRESSURE: IFGC 2015 TABLE 402.4(2) B-1 600 MBH 730 CFH B-1 600 MBH 730 CFH PRV SET TO 11 IN WC MIN DISCHARGE PRESSURE. PRV SET TO 11 IN WC MIN DISCHARGE PRESSURE. FIRE ENTRY PIPING DIAGRAM NO SCALE D FSDDF FIRE DEPT. CONNECTION. EXTERIOR BLDG. WALL. TO FIRE PROTECTION SYSTEMS. TEST VALVE; PIPE TO OUTSIDE. FLOW SWITCH TO ALARMS, SEE SPECS. DRAIN VALVE; PIPE INDIRECT TO FLOOR DRAIN PER NFPA 25 REQUIREMENTS, TYP. SHUT-OFF VALVE. DOUBLE CHECK TYPE BACKFLOW PREVENTER. TAMPER SWITCHES ON VALVES. FIRE SERVICE FLANGE. FLOOR SINK BALL DRIP VALVE. C.W. SERVICE DESIGNER NOTE: 1. VERIFY WITH AHJ BACK FLOW REQUIREMENTS (SOME REQUIRE DOUBLE CHECK, SOME REQUIRED REDUCED PRESSURE) 2. VERIFY WITH AHJ IF SINGLE WATER ENTRY IS ALLOWED 3. VERTICAL BACKFLOWS CAN BE USED IF SPACE IS LIMITED BUT IT DOES REQUIRE A SPECIAL VERTICAL TYPE BACKFLOW. 4. VERIFY FLOOR DRAIN REQUIREMENT WITH NFPA 25 REQUIREMENTS, MIN 4" FLOOR DRAIN PREFERRED MAY REQUIRE LARGER. 5. VERIFY IF PRV IS REQUIRED. DIAGRAM SHOWN FOR REFERENCE ONLY, CONFIRM FINAL REQUIREMENTSWITH FIREPROTECTIONDESIGN BUILD CONTRACTOR AND ENGINEER OF RECORD. PRV SET @ 150 PSI PIPE THRU ROOF DIAGRAM NO SCALE 6" MIN.24 GA. GALV. ROOF JACK W/ 6" FLANGE BY M.C., SET IN PLASTIC CEMENT BY G.C. PIPE BY M.C. 24 GA. GALV. STORM COLLAR BY M.C., CLAMP IN PLACE & CAULK WEATHERTIGHT. FINISHED ROOF FELTS BY G.C. SOLDERED LAP SEAM PIPE SLEEVE & CAULKING BY M.C. 2" MIN. ROOF 2 LAYERS OF FELT BY G.C. NOTE: COOR'D ROOF PENETRATION AND SEALING WITH ROOF MANUFACTURER AND INSTALLING CONTRACTOR. K GENERATOR 600 MBH 730 CFH 192' L1 LAUNDRY ROOM (3 DRYERS @ 25 MBH EA) 75 MBH; 92 CFH FARTHEST DRYER @ 20' 1-1/4" 1-1/4" 1-1/2" 3/4" 3/4" 3/4" 3/4" 2"2" 2" 1" 2" 3" 2-1/2" 2'2"2"1" 1-1/2" 2" Sheet Number Date:VAIL, COLORADO953 S. Frontage Rd. West Vail, Colorado 81657 tel: 970.476.1147 gpslarchitects.com SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018 ALL SHEETS VE PERMIT ISSUE ALBUQUERQUE | AVON | DENVER | FORT COLLINS 303.278.3820 www ˛bgbuildingworks˛com Project No. 9911.00 Copyright 2018 Sheet Title M-502 MECHANICAL DIAGRAMS 09/21/18 1. COALESCING TYPE AIR SEPARATOR WITH WITH AUTOMATIC RELIEF FLOAT. 1 AND SMALLER: SPIROTHERM SPIROVENT JR, B&G EASB JR, OR TACO VORTEC. 2" PIPE AND LARGER: SPIROTHERM SPIROVENT SR, B&G CRS, OR TACO 4900. OR EQUIVALENT. 2. EXTEND DRAIN TO NEAREST FLOOR SINK FOR INDIRECT CONNECTION. DO NOT COMBINE DRAIN WITH OTHERS. 3. PROVIDE ALL STRAINERS WITH BLOWDOWN BALL VALVE, HOSE END THREAD, GASKETED CAP AND CHAIN. 4. PROVIDE GASKETED CAP AND CHAIN FOR DRAINS. 5. EXTEND ALL SAFETY RELIEF VALVES TO DRAIN PER VALVE MFG's RECOMMENDATIONS WITHOUT PIPE BELLIES OR UPWARD SLOPE. DO NOT COMBINE WITH OTHERS. 6. INDICATES UNION OR FLANGE CONNECTION FOR SERVICE PURPOSES. DIELECTRIC UNIONS NOT PERMITTED EXCEPT AT DOMESTIC WATER CONNECTIONS TO WATER HEATERS. PROVIDE DIELECTRIC NIPPLES OR FLANGES AT FERROUS TO NON-FERROUS PIPING MATERIAL TRANSITIONS. 7. THREE-WAY VALVE WITH PORTS IDENTIFIED: C = COMMON NC = NORMALLY CLOSED NO = NORMALLY OPEN 8. DIAGRAM IS SCHEMATIC IN NATURE. NOT ALL APPURTENANCES REQ'D ARE NECESSARILY SHOWN. PROVIDE SYSTEM ACCESS, VALVING, AND DRAINAGE AS REQ'D FOR PROPER SYSTEM MAINTENANCE AND PURGE/FILL PROCEDURES. 9. PROVIDE MANUAL AIR VENT AT ALL HIGH POINTS AND MANUAL DRAIN VALVES AT ALL LOW POINTS. PIPE DRAIN VALVES TO A SUITABLE LOCATION WHEN DRAINS ARE IN A LOCATION IN WHICH THEIR DRAINAGE WILL BE A NUISANCE OR CAUSE DAMAGE. 10. ALL PARALLEL EQUIPMENT SUCH AS BOILERS, PUMPS, TANKS, ETC. SHALL BE PIPED IN TRUE REVERSED RETURN FASHION FOR AUTOMATIC FLOW BALANCING BETWEEN THE PARALLEL ITEMS. 11. PROVIDE 4" HIGH CONCRETE SHOP KEEPING PAD IN ADDITION TO MFG's BASE FOR ALL FLOOR MOUNTED EQUIPMENT. COORDINATE EXACT PAD SIZES AND LOCATIONS WITH PIPING SHOP DRAWINGS AND CONCRETE CONTRACTOR. 12. ALL ISOLATION VALVES SHALL BE FULL PORT VALVES EQUIVALENT TO PIPE SIZE SHOWN. 13. ROUTE COMBUSTION EQUIPMENT AND VENT STACK TEE CONDENSATE DRAIN LINES AND INDIRECT CONNECT TO CONDENSATE NEUTRALIZATION BASIN SIZED PER COMBUSTION EQUIPMENT MFG's RECOMMENDATIONS. INDIRECT CONNECT BASIN OUTLET TO NEAREST WASTE RECEPTOR. 14. RE: R/M301 FOR POT FEEDER CONNECTION. 15. REFER TO CONTROLS DRAWINGS FOR ADDITIONAL DEVICE REQUIREMENTS SUCH AS PRESSURE AND TEMPERATURE PICKUP LOCATIONS. 16. RE: Q/M301 FOR PIGTAIL PRESSURE GAUGE CONNECTION. 17. PROVIDE DOWNWARD GAS FLOW INTO SEDIMENT/DRIP LEG TEES. PLANT PIPING NOTES: S NOD DWH-1 SCALE: HEATING PLANT PIPING DIAGRAM NONE DB-1B-1 P-3 P-2 P-2 ET-1 P-1 P-1 HWS HWR HWS AS HWS/R TO BUILDING DISTRIBUTION, RE: M-201 FCT. DD TO CONDENSATE NEUTRALIZER, TYP. S DS DAIR VENT ALL HIGH POINTS, TYP. TO GLYCOL FEEDER GF-1. CP CP VFD VFD TE S DET-3 P-4 CW, HW, HWR TO PIPE RACK, RE: M-201 FCT. WH-1D TE S REVERSE/RETURN PIPING, TYP. SCALE:1 HYDRONIC HEATING PLANT PIPING DIAGRAM & DDC CONTROL SCHEMATIC NONE CENTRAL PLANT SEQUENCE OF CONTROL DESCRIPTION The Central Plant consists of three modulating, condensing boilers serving building heat, hot water, and snowmelt; two indirect-fired instantaneous water heaters serving domestic hot water heating; and associated pumps, heat exchanger, and controls components. SCHEDULING Operation of the Central Plant is not scheduled, and shall be based on demand for heating water production. HEATING WATER Enable boilers and associated boiler injection pumps upon a call for heat from space heating, snowmelt, or domestic water heating. The boilers shall be staged and operate only as needed through the boiler manufacturer's control system to maintain heating water supply temperature of 140°F. Hot water supply temperature shall vary between 140°F to 110°F as outside air temperature rises from 20°F to 60°F (outdoor air reset). Disable boilers and associated boiler injection pumps when a call for heat is no longer present. Pumps P-1 shall enable and modulate per manufacturer-integral controls to maintain system differential pressure and temperature. Alternate lead/lag pump per manufacturer controls to achieve equal run time on both pumps. DOMESTIC HOT WATER On a call for domestic hot water priority from a tank-mounted aquastat set at 140°F, associated boiler shall enable to provide 140°F HWS temperature, associated boiler injection pump P-2 shall be off, and water heater lead circulation pump P-3 shall enable to divert heating water to water heater. SNOWMELT Upon a call for snowmelt from slab temperature+moisture sensor, snowmelt HX-1 control valve shall open, snowmelt zone control valve shall open, and snowmelt circulation pump P-5 shall enable. BOILER ROOM EMERGENCY POWER OFF Boiler manufacturer shall provide control wiring schematic for boiler shutdown switch located at boiler room exit door. Shutdown control system shall comply with ASME-CDS-1, latest edition "Controls and Safety Devices for Automatically Fired Boilers." Contractor shall provide switch and control wiring in conduit. A clear polycarbonate hinged cover shall be provided to prevent accidental operation of switch. Switch shall have engraved nameplate to identify as "BOILER EMERGENCY SHUTDOWN."1"P-3 110° THERMOSTATIC MIXING VALVE.120° HX-1 SMS SMR AS P-5 SMS/R TO SNOWMELT DISTRIBUTION PIPING. RE: M-201 FCT. ET-2D B-1 P-2 D S DCP G HWR HWS GAS PIPE, RE: GAS PIPING DIAGRAM, M502, FOR SIZING & FFI. 3" 3" 2" 2" 2" 2"2"2"2"2"3" 3" 4" 4" 3"2"2"2" TO GLYCOL FEEDER GF-1. 3"2"2"Sheet Number Date:VAIL, COLORADO953 S. Frontage Rd. West Vail, Colorado 81657 tel: 970.476.1147 gpslarchitects.com SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018 ALL SHEETS VE PERMIT ISSUE ALBUQUERQUE | AVON | DENVER | FORT COLLINS 303.278.3820 www ˛bgbuildingworks˛com Project No. 9911.00 Copyright 2018 Sheet Title M-601 MECHANICAL CONTROLS 09/21/18 THE SYSTEM CONSISTS OF A MAKE UP AIR UNIT COMPLETE WITH SUPPLY FAN, GAS HEATING SECTION, AND INTERNAL OPERATING CONTROLS. SCHEDULING: THE MAKE UP AIR HANDLING UNIT OPERATION SHALL OPERATE CONTINUOUSLY. TEMPERATURE CONTROL: DISCHARGE AIR TEMPERATURE SHALL BE MAINTAINED AT ROOM TEMPERATURE SETPOINT (75°F ADJ.) BY THE MAKE UP AIR UNIT INTERNAL CONTROLS. DISCHARGE AIR TEMPERATURE MAY BE RESET BY THE MAKE UP AIR UNIT CONTROL SYSTEM. WHEN OSA TEMP IS HIGHER THAN ROOM SETPOINT, GAS HEATING SECTION SHALL BE OFF. GAS HEATING SECTION CONTROL WILL BE THROUGH THE MAKE UP AIR UNIT'S INTERNAL CONTROLS. CP SCALE:1 CORRIDOR VENTILATION UNIT CONTROL DIAGRAM NONE OSA SA MS SCALE:3 SWITCH CONTROL SCHEMATIC NONE EXHAUST FAN WALL UNIT MOTOR STARTER. BDD MAIN TRUNK EXHAUST DUCT, TO EXHAUST LOUVER. GRAVITY OPERATED NON-MOTORIZED BACK DRAFT DAMPER. SCALE:2 EXHAUST FAN NONE OCCUPANCY SENSOR APPLIES TO ALL EXHAUST FAN IN RESTROOMS. OCCUPANCY SENSOR PROVIDED WITH LIGHTING CONTROLS SYSTEM TO BE USED FOR FAN CONTROL IN OFFICE RESTROOMS; PROVIDE CEILING-MOUNTED OCCUPANCY SENSOR FOR FAN CONTROL IN UNIT RESTROOMS. START EXHAUST FAN UPON DETECTION OF OCCUPANCY. FAN TO CONTINUE TO RUN FOR 10 MINUTES (ADJ.) AFTER OCCUPANCY IS NO LONGER DETECTED. MS OS BDD MAIN TRUNK EXHAUST DUCT, TO EXHAUST LOUVER. GRAVITY OPERATED NON-MOTORIZED BACK DRAFT DAMPER, LOCATED AT WALL LOUVER FOR INDIVIDUALLY- DUCTED FANS; LOCATED PRIOR TO CONNECTION TO COMMON DUCT FOR COMBINED EXHAUST DUCTS. TSTAT APPLIES TO MECHANICAL, ELECTRICAL & IT ROOM EXHAUST FANS. EXHAUST FAN SHALL BE CONTROLLED BY INDIVIDUAL SPACE MOUNTED COOLING THERMOSTAT SET AT 80°F (ADJ). UPON A RISE IN SPACE TEMPERATURE ABOVE SETPOINT PLUS DIFFERENTIAL, EXHAUST FANS SHALL ENABLE. CONVERSELY, UPON A DECREASE IN SPACE TEMPERATURE BELOW SETPOINT PLUS DIFFERENTIAL, EXHAUST FANS SHALL DISABLE. MANUAL OVERRIDE WALL SWITCH TO BE PROVIDED. WHEN SWITCH IS IN ON POSITION, FAN SHALL OPERATE. WHEN SWITCH IS IN OFF POSITION, FAN SHALL BE CONTROLLED BY SPACE MOUNTED THERMOSTAT AS DESCRIBED ABOVE. M HWR HWR SCALE: 4 CUH AND UH CONTROL SCHEMATIC NONE APPLIES TO ALL CABINET AND UNIT HEATERS. UPON A DROP IN TEMPERATURE BELOW SETPOINT PLUS DIFFERENTIAL, FAN SHALL ENERGIZE AND HEATING WATER CONTROL VALVE SHALL OPEN. CONVERSELY, UPON A RISE IN TEMPERATURE ABOVE SETPOINT PLUS DIFFERENTIAL, FAN SHALL BE DE-ENERGIZED AND HEATING WATER CONTROL VALVE SHALL CLOSE. UNIT-MOUNTED THERMOSTAT TSTAT SCALE:5 BASEBOARD HEATING CONTROL NONE SPACE MOUNTED THERMOSTAT. SEQUENCE: UPON A DROP IN TEMPERATURE BELOW SETPOINT PLUS DIFFERENTIAL THE HEATING WATER CONTROL VALVE SHALL OPEN. APARTMENT, MAIL ROOM, AND SKI ROOM THERMOSTATS TO HAVE ON/OFF FUNCTION, AND COLDER/WARMER CONTROL WITH UPPER AND LOWER LIMIT SET BY FACILITY STAFF, NOT OCCUPANTS. LOBBY THERMOSTAT TO BE SEVEN DAY PROGRAMMABLE TYPE, ACCESSIBLE ONLY TO FACILITY STAFF EITHER VIA CLEAR LOCKBOX, OR REMOTE LOCATION WITH SPACE-MOUNTED TEMPERATURE SENSOR. CONFIRM ALL THERMOSTAT LOCATIONS, TYPES, AND PROTECTION WITH OWNER PRIOR TO RELEASE. TSTAT SCALE:6 LAUNDRY MAKE-UP AIR CONTROL NONE APPLIES TO MAU-2, LAUNDRY MAKE-UP AIR UNIT SYSTEM CONSISTS OF INDIRECT-FIRED GAS MAKE-UP AIR UNIT, FAN WITH VFD, MOTORIZED MODULATING ZONE DAMPERS, MAU BYPASS DAMPER, SPACE PRESSURE SENSORS FOR EACH LAUNDRY ROOM, DUCT STATIC PRESSURE & LEAVING AIR TEMPERATURE CONTROL. SYSTEM SHALL NOT BE SCHEDULED, BUT SHALL OPERATE WHENEVER DEMAND EXISTS. SYSTEM SHALL OPERATE TO MAINTAIN EACH LAUNDRY AT SLIGHTLY NEGATIVE RELATIVE TO ADJACENT CORRIDOR. UPON A DROP IN SPACE PRESSURE RELATIVE TO ADJACENT CORRIDOR ON ANY LEVEL, ASSOCIATED ZONE DAMPER SHALL MODULATE OPEN. FAN SHALL MODULATE TO MAINTAIN DUCT STATIC PRESSURE. WHEN FAN IS AT LOWEST AVAILABLE SPEED, IF DUCT PRESSURE IS ABOVE SETPOINT, MODULATE OPEN BYPASS DAMPER. FURNACE SECTION SHALL OPERATE PER MANUFACTURER CONTROLS TO MAINTAIN LEAVING AIR TEMPERATURE AT 75°F (ADJ.) IN THE WINTER AND 68°F (ADJ) IN THE SUMMER. SCALE:7 CONTROL SEQUENCES NONE MISCELLANEOUS SYSTEMS CP-1, DOMESTIC HOT WATER RECIRCULATION PUMP: DOMESTIC RECIRC PUMP SHALL OPERATE TO MAINTAIN RECIRC LINE TEMPERATURE SETPOINT WHEN DEMAND FOR HOT WATER IS DETECTED, THROUGH PUMP-PACKAGED CONTROLS. SP-1, ELEVATOR PIT SUMP PUMP SUMP PUMP WILL BE EQUIPPED WITH FLOAT SWITCH TO ACTIVATE THE PUMP WHEN WATER LEVEL IN THE SUMP RISES ABOVE THE ACTIVATION LEVEL. A HIGH-WATER FLOAT SWITCH WILL SOUND A LOCAL, AUDIBLE ALARM IF THE WATER LEVEL IN THE SUMP RISES ABOVE THE ACTIVATION LEVEL. CONTINUOUS OPERATION EXHAUST FAN: APPLIES TO TRASH ENCLOSURE EXHAUST FAN. FAN SHALL OPERATE CONTINUOUSLY, AND BE EQUIPPED WITH A MANUAL OVERRIDE OFF SWITCH MOUNTED AT THE FAN. EF-3 & EF-4, GARAGE EXHAUST FANS & GAS DETECTION SYSTEM: EF-4 SHALL OPERATE CONTINUOUSLY. PROVIDE NO2 & CO SENSORS ON BOTH EAST AND WEST PARKING LEVELS OF PARKING GARAGE. EF-3 PURGE FAN SHALL BE CONTROLLED BY THE GAS DETECTION SYSTEM TO MEET THE IMC VENTILATION REQUIREMENTS FOR ENCLOSED PARKING GARAGES. UPON DETECTION OF GAS LEVELS ABOVE SETPOINT PER 2015 IMC AT EITHER LOCATION, EF-3 SHALL BE ON, ASSOCIATED GARAGE DOOR NOTED ON PLANS SHALL OPEN TO 12" ABOVE CLOSED POSITION, AND ASSOCIATED UNIT HEATER FANS NOTED ON PLANS SHALL ENABLE TO CIRCULATE GARAGE AIR TO PURGE FAN LOCATION. WHEN CALL FOR VENTILATION FROM THE GAS DETECTION SYSTEM IS NO LONGER PRESENT, EF-3 SHALL BE OFF, GARAGE DOOR SHALL CLOSE, AND ASSOCIATED UNIT HEATER FANS SHALL REVERT TO OPERATION PER UNIT HEATER SCHEDULE. PROVIDE AUDIBLE ALARM AND REMOTE NOTIFICATION TO FACILITY ENGINEERING IF GAS LEVELS RISE ABOVE HIGH LIMIT AT EITHER PARKING LEVEL. OSA SA MAU CONTROL PANEL FILTER SECTION SA PE DPT ADJACENT CORRIDOR LAUNDRY ROOM, TYP. 4 VFD DUCT PRESSURE SENSOR LOCATED 2/3 DISTANCE FROM MAU TO FURTHEST DIFFUSER. TE CP CP Sheet Number Date:VAIL, COLORADO953 S. Frontage Rd. West Vail, Colorado 81657 tel: 970.476.1147 gpslarchitects.com SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018 ALL SHEETS VE PERMIT ISSUE ALBUQUERQUE | AVON | DENVER | FORT COLLINS 303.278.3820 www ˛bgbuildingworks˛com Project No. 9911.00 Copyright 2018 Sheet Title M-602 MECHANICAL CONTROLS 09/21/18