HomeMy WebLinkAboutB18-0096_Mech & Plumb Approved Plans_1537562903.pdfSINGLE LINE DESCRIPTION DOUBLE LINE
D D
SPLIT BRANCH TAKE-OFF WITH SQUARE
ELBOW & SPLITTER DAMPER
SPLIT BRANCH TAKE-OFF WITH RADIUS
ELBOW & SPLITTER DAMPER
POSITIVE PRESSURE RISER,
TYPICALLY SUPPLY
NEGATIVE PRESSURE RISER, TYPICALLY
RETURN, EXHAUST OR OUTSIDE AIR
F/S COMBINATION FIRE & SMOKE DAMPER F/S
FIRE DAMPER
MOTOR OPERATED DAMPER (MOD)
MANUAL VOLUME DAMPER, SINGLE BLADE
DAMPER (SBD) FOR ROUND OR <10" TALL,
OPPOSED BLADE DAMPER (OBD) >10" TALL
BACKDRAFT DAMPER BDD BDD
SMOKE DAMPER
SMOKE DETECTOR
DUCT SIZE: FIRST NUMBER IS PLAN WIDTH,
SECOND NUMBER IS DEPTH.
24x36 24x36
DUCTWORK LEGEND
SDSD
PRESSURE REDUCING VALVE
SHOCK ABSORBER
STRAINER W/ BLOW-OFF VALVE
SAFETY RELIEF VALVE
VACUUM BREAKER
PRESSURE GAUGE W/ PIG TAIL & COCK
THERMOMETER
PRESSURE - TEMP. TAP
AIR VENT
PIPE ANCHOR
FLEXIBLE CONNECTOR
PIPE EXPANSION JOINT
PIPE UNION
DOUBLE CHECK BACKFLOW PREVENTER
PUMP & EQUIPMENT CONNECTOR
TEMPERATURE CONTROL VALVE (2-WAY)
DRAIN VALVE W/ HOSE END
PLUG VALVE IN RISER
FLOW BALANCING VALVE
GATE OR GLOBE VALVE IN RISER
FLOW CONTROL VALVE
BALL VALVE
PLUG OR BALANCING VALVE
CHECK VALVE
GLOBE VALVE
BUTTERFLY VALVE
VENTURI/FLOW INDICATOR
TEMPERATURE CONTROL VALVE (3-WAY)
SOLENOID VALVE
90° ELBOW UP
TEE UP
TEE DOWN
SHUT OFF (BALL, GATE, BUTTERFLY)
PIPING SYMBOLS
90° ELBOW DN
S
DUCT/PIPE RISER DESIGNATION KEY
CH
DW
HW
G
W V
PR
ST
S2
FLOW SWITCH
HOSE BIBB
WALL HYDRANT
TEMPERATURE CONTROLLER OR SENSOR
STEAM TRAP TEST CHAMBER
STEAM TRAP:
FT-FLOAT & THERMOSTATIC
TD-THERMODYNAMIC
IB-INVERTED BUCKET
TS-THERMOSTATIC
BP-BALANCED PRESSURE
BAR SINK BS 1/2" 1/2" 1-1/2"1-1/2"
FIXTURE CONNECTION SCHEDULE
HW CW WASTE VENT
NOTES:
1. SIZES SHOWN ARE MINIMUM PIPE SIZES TO A SINGLE FIXTURE. LARGER
SIZES MAY BE INDICATED ON PLANS WHERE REQUIRED.
2. MINIMUM DOMESTIC PIPE SIZE TO (2) OR MORE FIXTURES IS 3/4".
3. RE: MANUFACTURER'S INSTALLATION INSTRUCTIONS FOR INDIRECT WASTE
SIZES.
4. WASTE AND VENT SIZES SHOWN ABOVE APPLY TO INDIVIDUAL VENTING ONLY.
WHERE ALLOWED, INDIVIDUAL VENT CONNECTIONS MAY BE OMITTED OR
SIZES MAY VARY WHEN CIRCUIT VENTS, COMMON VENTS, WASTE STACK
VENTS, WET VENTS, OR COMBINATION DRAIN AND VENT SYSTEMS ARE USED.
PRIOR APPROVAL FROM THE ENGINEER IS REQUIRED TO USE THESE
ALTERNATIVE VENTING METHODS.
5. PROVIDE TRAP PRIMER FOR ALL FLOOR DRAINS AND FLOOR SINKS NOT
LOCATED IN FOOD SERVICE AREAS.
6. MINIMUM SIZE FOR WASTE AND VENT PIPING BENEATH SLAB IS 2".
7. ALL FIXTURES LISTED ARE NOT NECESSARILY USED ON THIS PROJECT.
8. REFER TO APPLIANCE SCHEDULES (BY OTHERS) FOR ADDITIONAL PLUMBING
FIXTURE CONNECTIONS SUCH AS INST-HOTS, COFFEE MAKERS, AND
GARBAGE DISPOSALS.
9. PROVIDE ICE MAKER BOX ROUGH IN W/ 1/2"CW CONNECTION FOR ALL
REFRIGERATOR LOCATIONS.
ABBREV.
CS CLOTHES WASHER ROUGH-IN 1/2" 1/2" 2" 1-1/2"
DRINKING FOUNTAIN / E.W.C. DF - 1/2" 1-1/2" 1-1/2"
DISH MACHINE ROUGH-IN DM 3/4" 3/4" 2" 1-1/2"
DW DISHWASHER ROUGH-IN - 1/2" 2" 1-1/2"
FD FLOOR DRAIN - - 2" 1-1/2"
FS FLOOR SINK - - 3" 2"
HOSE BIB HB - - -3/4"
HAND SINK HS 1-1/2" 1-1/2"1/2" 1/2"
KITCHEN SINK W/ OR W/O DISPOSER KS 1/2" 1/2" 2" 1-1/2"
LAVATORY LAV 1/2" 1-1/2" 1-1/2"1/2"
MOP SERVICE BASIN MSB 3/4" 3" 2"3/4"
SHOWER / BATHTUB SH 3/4" 3/4" 2" 1-1/2"
SERVICE SINK SS 3" 2"1/2" 1/2"
TROUGH DRAIN TD - - 3" 2"
URINAL (BLOWOUT) UR 1" 2" 1-1/2"-
URINAL (WASHDOWN) UR
UR URINAL (WATERLESS)
3/4" 2" 1-1/2"
- 2" 1-1/2"
-
-
WATER CLOSET (FLUSH VALVE) WC
WATER CLOSET (FLUSH TANK) WCT
- 1" 3" 2"
- 1/2" 3" 2"
WS 3/4" 3/4" 2" 1-1/2"WORK SINK
EQUIPMENT ABBREVIATIONS
AIR HANDLING UNITAHU
AIR SEPARATORAS
BOILER (HOT WATER)B
BASE BOARDBB
BUFFER TANKBT
CONSTANT VOLUME BOXCV
DISHWASHER EXHAUST FANDEF
ELECTRIC BASEBOARD HEATEREBH
FURNACEF
FAN COILFC
FAN POWERED BOXFP
GLYCOL FEEDERGF
HUMIDIFIER
HC HEATING COIL
HP HEAT PUMP
HX HEAT EXCHANGER
KITCHEN EXHAUST FANKEF
MAKE-UP AIR UNITMAU
MOTOR CONTROL CENTERMCC
MIXING VALVEMV
PUMPP
RETURN (OR RELIEF) AIR FANRF
RADIANT ZONERZ
SNOWMELT AREASA
SUMP BASINSB
SUPPLY FANSF
STORAGE TANKST
THERMOSTATIC MIXING VALVETMV
UNIT HEATERUH
VARIABLE VOLUME BOXVV
WATER HEATERWH
H
CHILLERCH
COOLING COILCC
CIRC PUMPCP
CABINET UNIT HEATERCUH
COOLING TOWERCT
DUCT COILDC
ELECTRIC WATER HEATEREWH
EVAPORATIVE COOLING UNITECU
ENERGY RECOVERY UNITERU
EXHAUST FANEF
EXPANSION TANKET
VARIABLE VOLUME BOX W/ REHEATVR
TYPE OF AIR DEVICE
RE: GRD SCHEDULE.
AIR DEVICE DESIGNATION KEY
#
CA
EXH
OSA
RA
XFR
SIZE (INCHES) OR MINIMUM
FREE AREA REQUIRED IN
SQUARE FEET.
NOTE:
FOR STANDARD MODULE SIZE REGISTERS, SIZE GIVEN IS
NECK SIZE. REFER TO GRD SCHEDULE FOR MODULE SIZE.
INDICATES AIR
INLET DEVICE.
=
=
=
=
=
=
AIR QUANTITY (CFM)
COMBUSTION AIR
EXHAUST
OUTSIDE AIR
RETURN
TRANSFER
B XFR
12x6
A 150
12x6
REFERENCE SAMPLE
FFI = FOR FURTHER INFORMATION
FCT = FOR CONTINUATION
RE: B/M400 FFI
REFER TO:
DRAWING NUMBER OR
DIAGRAM LETTER
SHEET NUMBER
PLAN ABBREVIATIONS
ABOVE FINISHED FLOOR
AIR ADMITTANCE VALVE
ABOVE FINISHED GRADE
AUTOMATIC
BUILDING CONTROL SYSTEM
BACK DRAFT DAMPER
BUILDING
AAV
AFF
AFG
AUTO
BCS
BDD
BLDG
BETWEEN
COMMON (OR CLOSED)
COMBUSTION AIR
CONTROLS CONTRACTOR
CONTINUATION DESIGN BUILD
B/N
C
CA
CC
CDBBC
CUBIC FEET PER MINUTE (AIR FLOW RATE)
CAST IN PLACE
CEILING (OR COOLING)
CONCRETE
CONDENSATE
CONNECT (OR CONNECTION)
CONTRACTOR
CFM
CIP
CLG
CONC
COND
CONN
CONTR'R
CLEANOUT TO GRADECOTG
DOMESTIC HOT WATER RECIRC
EXISTING
DWR
(E)
EXHAUST AIREA
ENTERING AIR TEMPERATURE
ELECTRICAL CONTRACTOR
ENTERING WATER TEMPERATURE
EAT
EC
EXH EXHAUST
EWT
GENERAL CONTRACTOR
GROUND HEAT EXCHANGER
GC
GHX
GALLONS PER MINUTE (WATER FLOW RATE)GPM
HORSEPOWER
HOT WATER
IN LIEU OF
HP
HW
ILO
KILOWATTSKW
LEAVING AIR TEMPERATURE
LINEAR FOOT
LEAVING WATER TEMPERATURE
LAT
LF
LWT
MECHANICAL CONTRACTORMC
MANUFACTURER
MOTOR OPERATED DAMPER
NEW
MFR
MOD
(N)
NORMALLY CLOSEDNC
NATIONAL ELECTRIC CODE
NOT IN CONTRACT
NORMALLY OPEN
NEC
NIC
NO
OUTSIDE AIROA
OPPOSED BLADE VOLUME DAMPER
ON CENTER
OBD
OC
OUTSIDE AIROSA
RETURN AIR
REQUIRED
RA
REQ'D
REQUIREMENTSREQ'MTS
SUPPLY AIR
SQUARE FOOT (FEET)
SA
SF
STATIC PRESSURESP
STAINLESS STEEL
THROW-AWAY (TRANSFER AIR)
TYPICAL
SS
TA
TYP
UNLESS NOTED OTHERWISEUNO
WALL CLEANOUTWCO
WITH REGARD TO
WATER COOLED
TRANSFER
WRT
W/C
XFR
DIAMETERØ
BY CONTRACTOR
COLD WATERCW
HOT WATER RECIRCHWC
ABOVEABV
BELOW FINISHED GRADEBFG
DOMESTIC WATER
DOMESTIC HOT WATER
DW
DHW
DOWNDN
DOMESTIC HOT WATER RECIRCDHR
COMBINATION FIRE/SMOKE DAMPER
FURNISHED BY OWNER
FSD
FBO
FLOOR CLEANOUTFCO
FOR CONTINUATIONFCT
FD FIRE DAMPER
REFER TO:RE:
WITHW/
CLEANOUTCO
FUTURE(F)
FREE AREAFA
FFI FOR FURTHER INFORMATION
WITHOUTW/O
VENT THRU ROOFVTR
NOTES
1. ALL SYMBOLS, ABBREVIATIONS, AND DESIGNATIONS
ON LEGEND SHEET ARE NOT NECESSARILY USED ON
THIS PROJECT.
2. THIS DRAWING SET CONSISTS OF DATA GENERATED, IN
PART, BY OTHER PARTIES. NOT ALL SYMBOLOGIES AND
NOTATION CONVENTIONS OCCURRING IN THIS
DRAWING SET ARE NECESSARILY DEFINED ON THESE
LEGENDS. CONSULT THE ENGINEER IN THE EVENT
SYMBOLOGY OR NOTATION INTERPRETATION IS
REQUIRED.
EA
OA
RA
SA
RISER NUMBER
-
-
-
-
-
-
-
-
-
-
-
-
CHILLED WATER
DOMESTIC WATER
HEATING WATER
GAS
WASTE AND/OR VENT
PIPING RISER (MISC TYPES)
STORM DRAIN
SECONDARY STORM DRAIN
EXHAUST AIR
OUTSIDE AIR
RETURN AIR
SUPPLY AIR
AIR SIDE:
PIPING SIDE:
PLAN SYMBOLS
CONTROL PANEL/RADIANT MANIFOLD
CARBON DIOXIDE SENSOR
CARBON MONOXIDE SENSOR
DIAGRAM CONTINUATION REFERENCE
PLUMBING/HVAC RISER
POINT OF NEW CONNECTION
DUCT STATIC PRESSURE SENSOR
ROOM PRESSURE SENSOR
EMERGENCY POWER OFF SWITCH
ACCESS PANEL
SNOWMELT MANIFOLD
SECTION CUT LETTER/SHEET SHOWN ON
POINT OF DISCONNECTION
-
SP
CO2
EPO
P
CO
--
-
P
THERMOSTAT
HUMIDISTAT
REMOTE TEMPERATURE SENSOR
T
S
H
H B
W H
TC
FS
ROOF DRAIN
FLOOR DRAIN
FLOOR SINK
HORIZONTAL CLEANOUT
VERTICAL CLEANOUT
DECK/ROOF DRAIN ABOVE
PIPING DESIGNATIONS
SNOWMELT SUPPLY
SNOWMELT RETURN
CONDENSER RETURN
NATURAL GAS
MEDIUM PRESSURE GAS
REFRIGERANT SUCTION
REFRIGERANT LIQUID
DOMESTIC WATER
DOMESTIC HOT WATER
DHW RECIRCULATION
FIRE LINE
PRESSURIZED WASTE
PLUMBING VENT PIPE
WASTE PIPE
STORM DRAIN PIPE
STORM DRAIN OVERFLOW
SECONDARY DRAIN
SAND AND OIL WASTE
HEATING WATER SUPPLY
HEATING WATER RETURN
DRAIN PIPE
GLYCOL FEED
CONDENSER SUPPLY
PLUMBING PIPING
NON-SOFTENED DOMESTIC WATER
CR
CS
GF
HWR
HWS
SMS
SMR
D
MG
G
RS
RL
CW
HW
HWC
NS
SO
SD
ST
V
W
PW
ST(OF)
F
HYDRONIC PIPING
90° ELBOW DOWN (ROUND DUCT ONLY)
ROUND 90° ELBOW UP (ROUND DUCT ONLY)
OFFSET TO CHANGE ELEVATION
(AT 30° WHEN POSSIBLE)
D = DROP R = RISE
ROUND RADIUS ELBOW
90° STRAIGHT TEE
90° CONICAL TEE
45° BRANCH
45° CONICAL TEE
SIZE OR SHAPE TRANSITION
ROUND FLEXIBLE DUCT
90° ELBOW DN (NEGATIVE PRESSURE)
90° ELBOW DN (POSITIVE PRESSURE)
90° ELBOW UP (NEGATIVE PRESSURE)
90° ELBOW UP (POSITIVE PRESSURE)
90° RADIUS ELBOW
90° RADIUS ELBOW W/TURNING VANES
SQUARE DUCT SPLIT
ROUND DUCT SPLIT
SUMP PUMPSP
PR
203
MECHANICAL SYSTEMS LEGEND
ABOVE SEA LEVEL
PROJECT ALTITUDE
8230'
' '
ISSUE LOG KEY:
# DATEISSUE LOG
MECHANICAL SHEET INDEX
TITLE
MECHANICAL COVER SHEETM-000 DESIGN DEVELOPMENT02.19.2018ISSUED AS PART OF A SET
' ' NOT PART OF SET
' ' ISSUED FOR INFORMATION ONLY*
√
√
√
√
√
MECHANICAL SCHEDULESM-002
MECHANICAL PLAN - PARKING LEVELSM-201H
MECHANICAL PLAN - LEVEL 1M-202
MECHANICAL PLAN - LEVEL 3M-204
MECHANICAL SCHEDULESM-001
MECHANICAL PLAN - LEVEL 2M-203
MECHANICAL PLAN - LEVEL 4M-205
ENLARGED MECHANICAL PLAN - TYP STUDIO (NO SHAFT)M-301
ENLARGED MECHANICAL PLAN - TYP STUDIO (NO SHAFT)M-302
ENLARGED MECHANICAL PLAN - STUDIO X01M-303
ENLARGED MECHANICAL PLAN - STUDIO X07M-304
ENLARGED MECHANICAL PLAN - STUDIO X08M-305
ENLARGED MECHANICAL PLAN - TYP STUDIO + X09 LEVELS 2-4M-306
ENLARGED MECHANICAL PLAN - ACCESSIBLE STUDIO + LEVEL 1M-307
ENLARGED MECHANICAL PLAN - ONE BR X02 LEVELS 2-4M-308
ENLARGED MECHANICAL PLAN - ONE BR X03M-309
ENLARGED MECHANICAL PLAN - ONE BR X10 LEVELS 3-4M-310
ENLARGED MECHANICAL PLAN - TYP ONE BRM-311
MECHANICAL PLAN - ROOFM-206
ENLARGED MECHANICAL PLAN - ONE BR X16M-312
ENLARGED MECHANICAL PLAN - ONE BR X17M-313
ENLARGED MECHANICAL PLAN - ONE BR X02 LEVEL 1M-314
ENLARGED MECHANICAL PLAN - TWO BR X04M-315
ENLARGED MECHANICAL PLAN - ONE BR X10 LEVEL 2M-316
ENLARGED MECHANICAL PLAN - LAUNDRY AND LOBBY/OFFICEM-317
M-401
DOMESTIC WATER RISER DIAGRAMS
M-402
M-403
MECHANICAL DIAGRAMSM-501
MECHANICAL DIAGRAMSM-502
MECHANICAL CONTROLSM-601
MECHANICAL CONTROLSM-602
HYDRONIC RISER DIAGRAMS
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
HYDRONIC RISER DIAGRAMS
M-404 DOMESTIC WATER RISER DIAGRAMS
WASTE AND VENT RISER DIAGRAMSM-405
√
√
√
WASTE AND VENT RISER DIAGRAMSM-406 √PERMIT ISSUE03.26.2018√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
MECHANICAL PLAN - PARKING LEVELSM-200
PIPING PLAN - PARKING LEVELSM-201P
√ √VE PERMIT ISSUE07.24.2018√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
√
Sheet Number
Date:VAIL, COLORADO953 S. Frontage Rd. West
Vail, Colorado 81657
tel: 970.476.1147
gpslarchitects.com
SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018
ALL SHEETS
VE PERMIT ISSUE
ALBUQUERQUE | AVON | DENVER | FORT COLLINS
303.278.3820 www ˛bgbuildingworks˛com
Project No. 9911.00 Copyright 2018
Sheet Title
M-000
MECHANICAL
COVER SHEET
09/21/18
BOILER SCHEDULE
MARK SERVICE BOILER
TYPE
FUEL
TYPE
TURNDOWN
RATIO
HEATING CAPACITY
L.W.T.
(°F)
E.W.T.
(°F)
BURNER
VENT
TYPE
MANUFACTURER*
& MODEL #ACCESSORIES REMARKSINPUT
@ S.L.
(MBH)
OUTPUT
@ ALT.
MINIMUM
A.F.U.E.HP VOLT/
PH
B-1 HEATING
WATER CONDENSING NATURAL
GAS 5:1 600 472 94% 140 120 15 A
MOCP 120/1 IV LOCHINVAR
KBN601 OUTDOOR AIR SENSOR -
- - - - - - - - - - - - - - - -
MANUFACTURERS:
* TRIANGLE TUBE, PATTERSON KELLY, VIESSMANN OR BUDERUS
GENERAL NOTES:
A:
B:
MISCELLANEOUS MECHANICAL EQUIPMENT SCHEDULE
MARK SERVICE TYPE CAPACITY
ELECTRICAL MANUFACTURER*
& MODEL #ACCESSORIES REMARKSHP VOLT/
PH
GF-1 HWS/R;
SMS/R
GLYCOL
FEEDER 55 GAL 0.7 AMP 120/1 AXIOM
SF100 - 2 QTY
ET-1 HWS/R EXPANSION
TANK 21.7 GAL - -AMTROL
EXTROL AX-40V - -
ET-2 SMS/R EXPANSION
TANK 10.9 GAL - -AMTROL
EXTROL AX-20V - -
ET-3 DHW EXPANSION
TANK 14 GAL - -AMTROL
ST-30VC - -
MANUFACTURERS:
*
GENERAL NOTES:
A:
B:
PUMP SCHEDULE
MARK SERVICE TYPE GPM TDH (FT) FLUID
MOTOR MANUFACTURER*
& MODEL #ACCESSORIES REMARKSHPVOLT/
PH
P-1
HEATING
WATER
CIRCULATION
INLINE 50 40 30% P.G. 1380 W 208/1 GRUNDFOS
MAGNA3 65-150F - 2 QTY; INTEGRAL VFD
P-2 BOILER
INJECTION INLINE 55 35 30% P.G. 1350 W 208/3 GRUNDFOS
UPS 40-240F - 3 QTY
P-3 WATER HEATER
INJECTION INLINE 30 14 30% P.G. 400 W 120/1 GRUNDFOS
UP 43-70 F - 2 QTY
P-4 DOMESTIC HW
RECIRC INLINE 9.5 15 DOMESTIC
WATER 280 W 120/1 GRUNDFOS
UPS 32-80 F B - 1 QTY; BRONZE HOUSING
P-5 SNOW MELT
CIRCULATION INLINE 13.1 30 50% P.G. 600 W 208/3 GRUNDFOS
UPS 32-160 F - 1 QTY
P-6 ELEVATOR
SUMP SUBMERSIBLE 50 5 WATER 1/2 HP 120/1 LIBERTY
ELV-280
INTEGRAL
OILTECTOR
CONTROL
1 QTY; SYSTEM TO ALARM
WHEN OIL IS DETECTED
MANUFACTURERS:
* WILO, B&G, TACO OR AURORA EQUIVALENT
GENERAL NOTES:
A:
B:
FINNED TUBE SCHEDULE
MARK
BTUH
PER L.F.
@ S.L.
BTUH
PER L.F.
@ ALT
GPM
AVERAGE
WATER
TEMP. (°F)
ENTERING
AIR TEMP.
(°F)
TUBE
SIZE
(IN.)
FIN
SIZE
(IN.)
ENCLOSURE
SIZE (IN.)
H x W
MANUFACTURER*
& MODEL #ACCESSORIES REMARKS
BB-1 580 425 1 130 68 3/4 CU 3x3-1/4"
ALUM 14 x 3-1/4 SLANT/FIN
HD-1400 H-1 - 2-TIER ELEMENT
BB-2 460 335 1 130 68 3/4 CU 3x7"
ALUM 3 x 7 SMITH HEATING EDGE
HE2-TK - -
MANUFACTURERS:
* STERLING, VULCAN
GENERAL NOTES:
A:
B:
MECHANICAL EQUIPMENT WIRING AND CONNECTIONS
ITEM FURNISHED
UNDER
SET IN PLACE
OR MTD.
UNDER
WIRED/
CONNECTED
UNDER
1. EQUIPMENT MOTORS AND THERMAL OVERLOADS, RESISTANCE HEATERS. MD MD ED
2.VFD'S, MOTOR CONTROLLERS; MAGNETIC STARTERS, REDUCED VOLTAGE
STARTERS AND OVERLOAD RELAYS.MD ED(a) ED
3.
DISCONNECT SWITCHES (FUSED OR NON-FUSED), HP RATED SWITCHES,
THERMAL OVERLOAD SWITCHES AND FUSES AND MANUAL OPERATING
SWITCHES.
ED(a) ED(a) ED
4.
PUSHBUTTON STATIONS, PILOT LIGHTS, MULTI-SPEED SWITCHES, FLOAT
SWITCHES, THERMOSTATS, CONTROL RELAYS, TIMECLOCKS, CONTROL
TRANSFORMERS, CONTROL PANELS, MOTOR VALVES, DAMPER ACTUATORS,
SOLENOID VALVES, EP AND PE SWITCHES AND INTERLOCKS.
MD MD MD(b)
5. 120 VOLT POWER FOR BAS PANELS, FIRE PROTECTION AND BOILER CONTROLS. ED ED ED
6. FIRE/SMOKE DAMPERS AND ELEVATOR VENT DAMPERS. MD MD ED(c)
MD = MECHANICAL DIVISION
ED = ELECTRICAL DIVISION
NOTES:
(a) IF FURNISHED AS PART OF FACTORY-WIRED EQUIPMENT, THEN WIRING AND CONNECTIONS ONLY BY ED
(b)
IF ANY OF THESE DEVICES CARRY THE FULL LOAD CURRENT TO ANY MOTOR THEY SHALL BE CONNECTED BY ED. CONTROL DEVICES
CARRYING FULL LOAD CURRENT FURNISHED BY MD AND WIRED BY ED SHALL BE LOCATED AT THE DEVICE BEING CONTROLLED, UNLESS
SHOWN ON DRAWINGS OR MUTUAL AGREEMENT IS MADE BETWEEN THE CONTRACTORS WITH NO CHANGE IN THE CONTRACT PRICE.
(c)WIRING FROM ALARM CONTACTS TO ALARM SYSTEM BY ED; ALL CONTROL FUNCTION WIRING BY MD. DUCT DETECTORS FURNISHED BY
ED, SET IN PLACE BY MD.
GENERAL NOTES: THE ABOVE LIST DOES NOT ATTEMPT TO INCLUDE ALL COMPONENTS. ALL ITEMS NECESSARY FOR A
COMPLETE SYSTEM SHALL BE INCLUDED IN THE BASE CONTRACT.
WATER HEATER SCHEDULE
MARK SERVICE TYPE SIDE GPM FLUID E.W.T.
(°F)
L.W.T.
(°F)
MAX
PRESSURE
DROP
(FT H2O)
ELECTRICAL FIRST
HOUR
RECOVERY
(GPH)
DIMENSIONS
H x D
(IN)
MANUFACTURER*
& MODEL #ACCESSORIES REMARKSFLAVOLT/
PH
WH-1 DOMESTIC
HOT WATER
INDIRECT
INSTANTANEOUS
HOT 30 30% PG 140 120 8
4 120/1 500 74 x 29 THERMO 2000
TURBOMAX 109 - 2 QTY
COLD - WATER 40 120 1
- - -
- - - - - -
- - - - -
- - - - - -
MANUFACTURERS:
* REX, PVI
GENERAL NOTES:
A:
B:
SNOWMELT MANIFOLD SCHEDULE
ZONE DESCRIPTION
APPROX
AREA
(SQ. FT.)
GPM ESTIMATED #
OF LOOPS
MAX LOOP
PRESSURE
LOSS
(FT H2O)
ACCESSORIES REMARKS
SZ-1 FIRE ACCESS
DRIVE 795 13.1 9 4.4 MOISTURE/TEMP
SENSOR -
SZ-2 LOADING & ENTRY 820 13.5 6 14.7 MOISTURE/TEMP
SENSOR -
SZ-3 EAST ENTRY 157 2.6 1 21.7 MOISTURE/TEMP
SENSOR -
MANUFACTURERS:
*
GENERAL NOTES:
A:
B:HEAT EXCHANGER SCHEDULE
MARK SERVICE TYPE SIDE GPM FLUID E.W.T.
(°F)
L.W.T.
(°F)
MAX
PRESSURE
DROP (PSI)
FOULING
FACTOR
HEAT
TRANSFER
(MBH)
MANUFACTURER* &
MODEL #ACCESSORIES REMARKS
HX-1 SNOWMELT BRAZED
PLATE
HOT 28.5 30% PG 140 120 0.8
0.0001 270 TACO
TFP10X20L-30(2"TMPT)- -
COLD 30.5 50% PG 90 110 0.9
- - -
HOT - - - - -
- - - - -
COLD - - - - -
MANUFACTURERS:
* B&G, PATTERSON-KELLY, TRANTER
GENERAL NOTES:
A:
B:
PLUMBING FIXTURE SCHEDULE
MARK TYPE A.D.A. FINISH MANUFACTURER*
& MODEL #
FAUCET TRIM
MFR.* & MODEL #ACCESSORIES REMARKS
1-BOWL
KITCHEN
SINK
YES
STAINLESS;
BRUSHED
NICKEL
PROFLO
PFSR252264BP
PROFLO
PFXCM1M207 DRAIN KIT; SIDE SPRAY 1.5 GPM; DROP-IN; SINGLE
BOWL
2-BOWL
KITCHEN
SINK
YES
STAINLESS;
BRUSHED
NICKEL
PROFLO
PFSR332264BP
PROFLO
PFXCM1M207 DRAIN KIT; SIDE SPRAY 1.5 GPM; DROP-IN; DOUBLE
BOWL
LAVATORY YES
WHITE;
BRUSHED
NICKEL
PROFLO
PF20174
PROFLO
PFWSC4746BN - 1.2 GPM; SINGLE HANDLE
SHOWER YES BRUSHED
NICKEL RE: ARCH PROFLO
PF7610S
PF3001 PRESSURE
BALANCE VALVE
1.75 GPM; SINGLE HANDLE;
STATIONARY
SHOWERHEAD
WATER
CLOSET YES WHITE PROFLO
PFCT103HE - SEAT, FLUSH VALVE 1.28 GPF; FLOOR-MOUNT;
ELONGATED FRONT
FLOOR DRAIN - NICKEL
BRONZE
ZURN
Z415B - TRAP PRIMER -
FLOOR SINK -
A.R.E.
COATED
CAST IRON
ZURN
Z1901-HD -
TRAP PRIMER; GRATE
W/ OPENING FOR
INDIRECT DRAINS
-
ST & ST(OF)
ROOF DRAIN -COATED
CAST IRON
ZURN
Z164 - - -
DOWNSPOUT
NOZZLE -NICKEL
BRONZE
ZURN
Z199 - - -
TRENCH
DRAIN -DUCTILE
IRON
ZURN
Z874-12 -BOTTOM DOME
STRAINER
TRAFFIC-RATED;
VANDAL-PROOF
WALL
HYDRANT -ROUGH
BRONZE
ZURN
Z1341-BFP - VACUUM BREAKER MODERATE CLIMATE
WALL
HYDRANT
NON-FREEZE
-NICKEL
BRONZE
ZURN
Z1305 - VACUUM BREAKER KEYED; RECESSED
MANUFACTURERS:
FIXTURE: AMERICAN STANDARD, UNIVERSAL RUNDLE, FIAT STERN WILLIAMS
FAUCET: SPEAKMAN, DELTA, AMERICAN STANDARD, CHICAGO
DRAIN: JOSAM, WADE SMITH
GENERAL NOTES:
A:
B:
P1
P1a
P2
P3
P4
P5
P6
P7
P8
P9
P10
P11
Sheet Number
Date:VAIL, COLORADO953 S. Frontage Rd. West
Vail, Colorado 81657
tel: 970.476.1147
gpslarchitects.com
SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018
ALL SHEETS
VE PERMIT ISSUE
ALBUQUERQUE | AVON | DENVER | FORT COLLINS
303.278.3820 www ˛bgbuildingworks˛com
Project No. 9911.00 Copyright 2018
Sheet Title
M-001
MECHANICAL
SCHEDULE
09/21/18
GRILLE, REGISTER, DIFFUSER & LOUVER
SYMBOL USE PATTERN FINISH MANUFACTURER*
& MODEL #ACCESSORIES REMARKS
CEILING & WALL
EXH
FIXED LOUVER
0°STD WHITE TITUS
30RL OBD
A.; 3/8" BLADE SPACING;
CONCEALED FASTENING;
HEAVY-DUTY STEEL
NOT USED
CEILING & WALL
SUPPLY
FIXED LOUVER
38°STD WHITE TITUS
300RL-HD OBD
A.; 1/2" BLADE SPACING;
CONCEALED FASTENING;
HEAVY-DUTY STEEL
EXTERIOR
LOUVER
DRAINABLE
STATIONARY RE: ARCH RUSKIN
ELF6375DX INSECT SCREEN -
EXTERIOR
LOUVER STATIONARY RE: ARCH RUSKIN
ELF15J INSECT SCREEN -
DOOR XFR
GRILLE LOUVERED RE: ARCH TITUS
TL-700L - SURFACE MOUNT
MANUFACTURERS:
GRD KRUEGER, METALAIRE
LOUVER GREENHECK, L&D
GENERAL NOTES:
A:PROVIDE PLENUM BOX EQUAL TO FACE SIZE OF DIFFUSER. WHERE USED FOR CORRIDOR VENTILATION SYSTEM, BRANCH DUCT
TO EQUAL FACE SIZE OF DIFFUSER
B:
A
B
C
D
E
F
UNIT AND CABINET HEATER SCHEDULE (HYDRONIC)
MARK TYPE CFM
HEATING COIL ELECTRICAL
MANUFACTURER*
& MODEL #ACCESSORIES REMARKSSENSIBLE
MBH
WATER CONDITIONS
HP/
(WATTS)
VOLT/
PHE.W.T.
(°F)
L.W.T.
(°F)GPM MAX. WTR.
P.D. (FT.)
UH-1 HORIZONTAL
DISCHARGE 245 6.5 140 120 0.7 1 (16) 120/1 BEACON MORRIS
HB-108A - GARAGE
CUH-1 WALL 630 25 140 120 3 0.5 1/10 120/1 BEACON MORRIS
WI-1130-06 - WEST STAIRWELL
CUH-2 NOT USED - - - - - - - - - - CORRIDORS
CUH-3 CEILING
CABINET 230 16.4 140 120 1.64 0.2 1/15 120/1 BEACON MORRIS
CBS-RC-1200-02 -ELEVATOR LOBBY;
BOTTOM STAMPED INLET & OUTLET
CUH-4 CEILING
CABINET 430 29.8 140 120 2.98 0.6 1/10 120/1 BEACON MORRIS
CBS-RC-1200-04 - EAST STAIRWELL
MANUFACTURERS:
* BEACON MORRIS, TRANE, MCQUAY, MODINE EQUIVALENT
GENERAL NOTES:
A:
B:
MAKE-UP AIR UNIT SCHEDULE
MARK AREA
SERVED
MIN.
OUTSIDE
AIR
(CFM)
AIR DELIVERY CAPACITY GAS-FIRED HEATING ELECTRICAL
FILTER WEIGHT
(LBS)
MANUFACTURER
& MODEL #ACCESSORIES REMARKS
SUPPLY FAN AIR CONDITIONS GAS SECTION
MCA MOCP VOLT/
PHCFM
ESP @
ALT
(IN W.C.)
MOTOR
(HP/BHP)
E.A.T.
DB (°F)
L.A.T.
DB (°F)
INPUT @
S.L.
(MBH)
OUTPUT @
ALT
(MBH)
MAU-1 CORRIDOR 1800 1800 0.41 3/4 -16 84 179 143 11.5 15 208/1 2 IN
WASHABLE 987 GREENHECK
IGK-109-H12
ALL GENERAL NOTES
APPLY
FRONT
DISCHARGE/
INDIRECT-FIRED
MAU-2 LAUNDRY 2300 2300 0.52 2 -16 77 214 171 10.9 15 208/3 2 IN
WASHABLE 1311 GREENHECK
IGK-112-H22
ALL GENERAL NOTES
APPLY
FRONT
DISCHARGE
MANUFACTURERS:
* REZNOR, MODINE
GENERAL NOTES:
A: CONVENIENCE OUTLET (WIRED BY EC), VIBRATION ISOLATION PER SPECIFICATION, BACKDRAFT DAMPER, CONTROL PANEL HEATER, LOW FIRE START, FREEZE PROTECTION, BIRDSCREEN; FACTORY-WIRED DISCONNECT
B:
EXHAUST FAN SCHEDULE
MARK TYPE
FAN SOUND POWER (dB re. 10-12 WATT)MOTOR
MANUFACTURER*
& MODEL #ACCESSORIES REMARKSCFM SONES HP/
(WATT)
VOLT/
PHASE@ ALT
(IN WC)
63
HZ
125
HZ
250
HZ
500
HZ
1000
HZ
2000
HZ
4000
HZ
8000
HZ
EF-1 CEILING 60 1.0 0.2 - - - - - - - - (17) 120/1 PANASONIC
FV-05VS3 RADIATION DAMPER PC-RD05C5 BATHROOM EXHAUST
EF-2 CEILING 100 1.3 0.15 - - - - - - - - (27) 120/1 PANASONIC
FV-10VS3E - ELECTRICAL, TRASH
EF-3 WALL 3500 11.1 0.12 78 78 74 70 65 63 61 57 1/4 120/1 COOK
24XLWH
WALL COLLAR; MOTOR SIDE WIRE
GUARD; INSECT SCREEN;
MOTORIZED DAMPER
GARAGE PURGE
HEAVY-DUTY CONSTRUCTION
EF-4 WALL 250 0.5 0.1 46 41 40 38 35 30 20 11 1/20 120/1 COOK
12XW26D103
WALL COLLAR; MOTOR SIDE WIRE
GUARD; INSECT SCREEN
GARAGE CONTINUOUS
VENTILATION
EF-5 CEILING 300 2.0 0.3 - - - - - - - - (126) 120/1 COOK
GC-740 - BOILER ROOM
EF-6 DRYER 173 - - - - - - - - - - (71.9) 120/1 FANTECH
DBF4XLT-705 LINT TRAP DRYER EXHAUST
MANUFACTURERS:
* ACME, COOK, GREENHECK, PANASONIC, PENN
GENERAL NOTES:
A: FACTORY-PROVIDED PRE-WIRED DISCONNECT.
B:
Sheet Number
Date:VAIL, COLORADO953 S. Frontage Rd. West
Vail, Colorado 81657
tel: 970.476.1147
gpslarchitects.com
SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018
ALL SHEETS
VE PERMIT ISSUE
ALBUQUERQUE | AVON | DENVER | FORT COLLINS
303.278.3820 www ˛bgbuildingworks˛com
Project No. 9911.00 Copyright 2018
Sheet Title
M-002
MECHANICAL
SCHEDULE
09/21/18
UP
(22R)
FIRE EXCAB
FIRE EXCAB
UP
U P
18/2
18/2
29
65 (MIN) 4C MAILBOXESw/ PARCEL LOCKERS
1
K
J
F
E
D
B
A
9 10 2 4 6 12 15
16
17
18
19
20
21
22
YB
YA
YC
YD
YF YG
YH
YL
YJ
YM
16
17
18
19
20
21
22
YK
YE
YD
7
5 1
2
L
M
3 7
6
9 10
G
H
SCALE:
MECHANICAL FOUNDATION PLAN
1/8" = 1'-0"
SPACE FOR DHW
PUMP, MIXING VALVE,
ET, ETC.
SPACE FOR HWS/R
PUMPS, ET, GF, ETC.
DHW PUMP, MIXING
VALVE, ET, ETC.
FLAG NOTES:
1 SNOWMELT PAVED SLAB-ON-GRADE WALKWAY
BELOW OPEN-GRATE METAL STAIR. NO STAIR
SNOWMELT NEEDED.
1. RE: M500 SERIES FOR ALL APPLICABLE
DIAGRAMS.
2. CEILING COORDINATION OF ALL MEP
SYSTEMS (LIGHTING, DUCTWORK,
DIFFUSERS, ELECTRICAL, FIRE
PROTECTION, ETC.) MUST BE COMPLETED
BY THE CONTRACTOR PRIOR TO THE START
OF ANY INSTALLATIONS.
3. DO NOT ROUTE DUCTWORK OR PIPING
OVER ELECTRICAL ROOMS OR ELECTRICAL
PANELS; MAINTAIN N.E.C. CLEARANCES.
COORDINATE ROUTINGS WITH DIV. 26
CONTRACTOR.
4. CONTRACTOR TO MAINTAIN 8'-6" CLEAR
HEAD HEIGHT IN GARAGE AND INFORM THE
ENGINEER AND ARCHITECT OF ANY AREAS
THAT MAY NOT MEET 8'-6" PRIOR TO
INSTALLATION, MINIMUM 8'-2" CLEAR HEAD
HEIGHT MUST BE MAINTAINED IN
ACCESSIBLE VAN AREAS.
5. PROVIDE FLEXIBLE DUCT AND PIPE
CONNECTIONS TO ALL MOTORIZED
EQUIPMENT.
5. PROVIDE FLEXIBLE DUCT AND PIPE
CONNECTIONS TO ALL MOTORIZED
EQUIPMENT.
6. VERIFY ALL EQUIPMENT ACCESS PANELS
WITH MANUFACTURER AND ARCHITECT.
7. ALL SOURCES OF IGNITION ON MECHANICAL
EQUIPMENT SHALL BE MOUNTED 18" AFF.
8. ALL SOURCES OF IGNITION ON MECHANICAL
EQUIPMENT SHALL BE MOUNTED 18" AFF.
9. PROTECT PIPING ROUTED ALONG
COLUMNS, WALLS, ETC. FROM DAMAGE AS
NECESSARY WITH CAGES. COORDINATE
WITH ARCHITECT.
10. PEX PIPING SHALL NOT BE ALLOWED TO
PENETRATE FIRE BARRIERS WHERE FIRE
CAULKING IS REQUIRED.
11. ALL PIPING SHALL BE ROUTED AS HIGH AS
POSSIBLE IN THE CEILING SPACE. UTILIZE
JOIST SPACE WHEN POSSIBLE, ESPECIALLY
WHERE CROSSING OTHER PIPES, DUCTS,
AND ELECTRICAL.
12. ACCESS PANELS SHALL BE 24x24, U.N.O.
LOCATIONS SHOWN ARE APPROXIMATE,
EXACT LOCATIONS SHALL BE
COORDINATED WITH THE ARCHITECTS
DRAWINGS AND WITH THE LOCATIONS OF
THE EQUIPMENT OR APPARATUS THAT
THEY SERVE.
13. REFER TO THE PLUMBING FIXTURE
CONNECTION SCHEDULE FOR PIPE SIZES
TO INDIVIDUAL FIXTURES.
14. NOT ALL REQUIRED CLEANOUTS ARE
NECESSARILY SHOWN ON THESE PLANS.
PROVIDE CLEANOUTS ON WASTE, VENT
AND STORM PIPING AS REQUIRED BY CODE
AND FOR REASONABLE MAINTENANCE
BASED ON ACTUAL FIELD INSTALLATION.
COORDINATE LOCATIONS WITH
ARCHITECT/ENGINEER.
15. ST AND ST(OF) PIPING 3", U.N.O.
HVAC & PIPING NOTES:
W
19
W 6" W
5
W
9
W
3
W
1
W
2
W
8
W
10
W
12
W
16
SNOWMELT
ZONE #3
SNOWMELT
ZONE #2
1
SNOWMELT
ZONE #3
M
G FROM UTILITY, RE:
CIVIL FCT.
SM-3 IN LANDSCAPE BOX.
W 4" 5" 4"
4"
4"W
W
4
W
11
W
15
4" W
18
W
6
W
7
4 "
4 " 3"
4"4"P6
P6
FCO
4"
W
13
5"5" 6" 4" W
14
3"
3" W 4" 4" 4"
4"3" W
4"4"4" W
4" W
4" W
P-6
1-1/2"1-1/2"SMSSMRGAS PIPING, RE: M-201P
FCT.
COORDINATE LOCATION
WITH ELEVATOR INSTALLER.
P6
DOMESTIC WATER TO COMBINED FIRE WATER
ENTRY, FROM UTILITY. I.E. = 8216' A.S.L. MAX.
RE: CIVIL AND FP DRAWINGS FCT AND SIZE.
WATER TO COMBINED
ENTRY. RE: FP DRAWINGS.
Sheet Number
Date:VAIL, COLORADO953 S. Frontage Rd. West
Vail, Colorado 81657
tel: 970.476.1147
gpslarchitects.com
SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018
ALL SHEETS
VE PERMIT ISSUE
ALBUQUERQUE | AVON | DENVER | FORT COLLINS
303.278.3820 www˛bgbuildingworks˛com
Project No. 9911.00 Copyright 2018
Sheet Title
MECHANICAL
PLUMBING PLAN -
PARKING LEVELS
M-200
09/21/18
UP
(22R)
FIRE EXCAB
FIRE EXCAB
UP
U P
18/2
18/2
29
65 (MIN) 4C MAILBOXESw/ PARCEL LOCKERS
1
K
J
F
E
D
B
A
9 10 2 4 6 12 15
16
17
18
19
20
21
22
YB
YA
YC
YD
YF YG
YH
YL
YJ
YM
16
17
18
19
20
21
22
YK
YE
YD
7
5 1
2
L
M
3 7
6
9 10
G
H
SCALE:
MECHANICAL PLAN - PARKING LEVELS
1/8" = 1'-0"
BDD
EF-5
EF-1
EF-2
BDD
BDD
FXFR
14x14
SM-2
ANTICIPATED
EXTENTS OF
HEATED SOFFIT.
EF-4
EF-3
EF-3 MOUNTED AT CEILING HEIGHT MAINTAIN 3'
SEPARATION FROM ADJACENT WINDOWS ABOVE
GARAGE.
U.C.
3/4"
BDD
EF-2
12"Ø 12"Ø 9"Ø10"Ø
6"Ø
EF-2
8"Ø
6"Ø
6"Ø1. RE: M500 SERIES FOR ALL APPLICABLE
DIAGRAMS.
2. CEILING COORDINATION OF ALL MEP
SYSTEMS (LIGHTING, DUCTWORK,
DIFFUSERS, ELECTRICAL, FIRE
PROTECTION, ETC.) MUST BE COMPLETED
BY THE CONTRACTOR PRIOR TO THE START
OF ANY INSTALLATIONS.
3. DO NOT ROUTE DUCTWORK OR PIPING
OVER ELECTRICAL ROOMS OR ELECTRICAL
PANELS; MAINTAIN N.E.C. CLEARANCES.
COORDINATE ROUTINGS WITH DIV. 26
CONTRACTOR.
4. CONTRACTOR TO MAINTAIN 8'-6" CLEAR
HEAD HEIGHT IN GARAGE AND INFORM THE
ENGINEER AND ARCHITECT OF ANY AREAS
THAT MAY NOT MEET 8'-6" PRIOR TO
INSTALLATION, MINIMUM 8'-2" CLEAR HEAD
HEIGHT MUST BE MAINTAINED IN
ACCESSIBLE VAN AREAS.
5. PROVIDE FLEXIBLE DUCT AND PIPE
CONNECTIONS TO ALL MOTORIZED
EQUIPMENT.
5. PROVIDE FLEXIBLE DUCT AND PIPE
CONNECTIONS TO ALL MOTORIZED
EQUIPMENT.
6. VERIFY ALL EQUIPMENT ACCESS PANELS
WITH MANUFACTURER AND ARCHITECT.
7. ALL SOURCES OF IGNITION ON MECHANICAL
EQUIPMENT SHALL BE MOUNTED 18" AFF.
8. ALL SOURCES OF IGNITION ON MECHANICAL
EQUIPMENT SHALL BE MOUNTED 18" AFF.
9. PROTECT PIPING ROUTED ALONG
COLUMNS, WALLS, ETC. FROM DAMAGE AS
NECESSARY WITH CAGES. COORDINATE
WITH ARCHITECT.
10. PEX PIPING SHALL NOT BE ALLOWED TO
PENETRATE FIRE BARRIERS WHERE FIRE
CAULKING IS REQUIRED.
11. ALL PIPING SHALL BE ROUTED AS HIGH AS
POSSIBLE IN THE CEILING SPACE. UTILIZE
JOIST SPACE WHEN POSSIBLE, ESPECIALLY
WHERE CROSSING OTHER PIPES, DUCTS,
AND ELECTRICAL.
12. ACCESS PANELS SHALL BE 24x24, U.N.O.
LOCATIONS SHOWN ARE APPROXIMATE,
EXACT LOCATIONS SHALL BE
COORDINATED WITH THE ARCHITECTS
DRAWINGS AND WITH THE LOCATIONS OF
THE EQUIPMENT OR APPARATUS THAT
THEY SERVE.
13. REFER TO THE PLUMBING FIXTURE
CONNECTION SCHEDULE FOR PIPE SIZES
TO INDIVIDUAL FIXTURES.
14. NOT ALL REQUIRED CLEANOUTS ARE
NECESSARILY SHOWN ON THESE PLANS.
PROVIDE CLEANOUTS ON WASTE, VENT
AND STORM PIPING AS REQUIRED BY CODE
AND FOR REASONABLE MAINTENANCE
BASED ON ACTUAL FIELD INSTALLATION.
COORDINATE LOCATIONS WITH
ARCHITECT/ENGINEER.
15. ST AND ST(OF) PIPING 3", U.N.O.
HVAC & PIPING NOTES:
Sheet Number
Date:VAIL, COLORADO953 S. Frontage Rd. West
Vail, Colorado 81657
tel: 970.476.1147
gpslarchitects.com
SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018
ALL SHEETS
VE PERMIT ISSUE
ALBUQUERQUE | AVON | DENVER | FORT COLLINS
303.278.3820 www˛bgbuildingworks˛com
Project No. 9911.00 Copyright 2018
Sheet Title
MECHANICAL
PLAN - PARKING
LEVELS
M-201H
09/21/18
UP
(22R)
FIRE EXCAB
FIRE EXCAB
UP
U P
18/2
18/2
29
65 (MIN) 4C MAILBOXESw/ PARCEL LOCKERS
1
K
J
F
E
D
B
A
9 10 2 4 6 12 15
16
17
18
19
20
21
22
YB
YA
YC
YD
YF YG
YH
YL
YJ
YM
16
17
18
19
20
21
22
YK
YE
YD
7
5 1
2
L
M
3 7
6
9 10
G
H
SCALE:
PIPING PLAN - PARKING LEVELS
1/8" = 1'-0"
P6
SPACE FOR DHW
PUMP, MIXING VALVE,
ET, ETC.
WH-1 WH-1
SPACE FOR HWS/R
PUMPS, ET, GF, ETC.
DHW PUMP, MIXING
VALVE, ET, ETC.
UH-1 1
UH-1 UH-1
UH-1UH-1
UH-1 UH-1
1 1
1
1
1
1
FLAG NOTES:
1 3/4" HWS/R TO UH
SNOWMELT PAVED SLAB-ON-GRADE WALKWAY
BELOW OPEN-GRATE METAL STAIR. NO STAIR
SNOWMELT NEEDED
INTERLOCK INDICATED UH-1 FAN OPERATION WITH
EF-3 OPERATION. RE: CONTROLS DIAGRAM AND
SEQUENCE FFI.
UNDERGROUND GAS PIPING TO SERVE
GENERATOR. SEE E100 FCT.
P
1
P
2
P
3
W
4
P
4
P
5
W
19
P
19
W
18
P
18
P
7
P
8
P
9
W
11
P
11
P
10
P
12
P
13
P
14
P
15
P
16
1
2
P
6
3
4
17
5
7
6
8
9
10
11
13
12
15
14
16
W
5 W
7
W
9
W
3
W
1
W
2
W
6
W
8
W
10
W
12
W
13
W
15
W
14
W
16
B-1
B-1
B-1
UH-1
2
P9
GARAGE DOOR INTERLOCKED
WITH EF-3 OPERATION TO OPEN
12" DURING PURGE MODE. RE:
CONTROLS DRAWINGS M60Z FFI.
SM-2
SM-3
2
(3) 4" BOILER FLUES AND
(3) 4" CA INTAKE DUCTS
UP IN SHAFT ABOVE TO
ROOF.
SM-1 IN LANDSCAPE BOX.
TIE 2" V INTO COMMON
BATHROOM VENT ABOVE.
P6FCO
CUH-3
UH-1
1
UH-1
HWS
HWR
2-1/2"
2-1/2"
2-1/2"
2-1/2"3/4"3/4"HWSHWRHWS
HWR 3/4"
3/4"
HWS
HWR 3/4"
3/4"
HWS
HWR 3/4"
3/4"
HWR
HWS 3/4"
3/4"
3/4"
3/4"
HWR
HWS 3/4"
3/4"
HWR HWS 3/4 "
3/4"3/4"3/4"1-1/4"
1-1/4"1-1/4"1-1/4"HWSHWR1-1/4"1-1/4"2-1/2"2-1/2"1-1/4"1-1/4"2-1/2" 2-1/2" HWR
HWS 2-1/2"
2-1/2"
2"
2"
HWR
HWS 1"
1"
HWRHWS 1-1/2"
1-1/2"
HWRHWS 1-1/4"
1-1/4"
1-1/4"
1 -1 /4 "
HWC
HW
CW1-1/2"1-1/2"1-1/2"
1-1/2"HW
CW
2" HW/CW
HW
CW
2" CW/HW
HWCW 2 "
2"
1 -1 /2 "
1 -1 /2 "
W4"
W 4"
4"3"4"
4"
4"
4"
3/4" HWS/HWR
3/4" HWS/R
2" HWS/HWR
1-1/2 "1-1/2"
2-1/2"
2-1/2"
1-1/2 "
1-1/2 "
2-1/2"
2-1/2"
2-1/2"
2-1/2"2-1/2"2-1/2"HWC
HWC
HWC
4"W
W
4 "4 "
3"
4"
TIE 2" V INTO COMMON
BATHROOM VENT ABOVE.
3"
4"
4" W
3"
4" W
2-1/2"
2-1/2"
2"
2"2-1/2" 2-1/2" 1-1/2"1 -1/2"
3 /4"
3/4"1"3/4"
3/4"
3/4" HWC
3/4"3/4"3/4"
3/4"
3/4" HWC1" 3/4"1"
CUH-1
CUH-4
UH-1
1
UH-1
1
3/4"
HWS/HWR
3/4"
HWS/HWR
PROVIDE BB-2,
TOTAL LENGTH 36'.
3/4" HWS/HWR
TO BB-2
3/4" HWS/HWR
TO BB-2
3/4" HWS/HWR
TO BB-2
3/4" HWS/R
TO BB.
BB-1, 2' 3/4"3/4"3
2"
1"2"2" G
G
1" GAS
SMSSMR
SMS
SMR
SMS
SMR
SMS
SMR
SMS
SMR 3/4"3/4"
3/4"
3/4"1-1/2"1-1/2"1-1/2"
1-1/2"
1-1/2"
1-1/2"
2" SMS/R
1-1/2"1-1/2"2"2"2"2"
3
3
3
3
SMS/R PIPING TO
UNDERGROUND.
REFER TO M-200 FCT.
41" 2"
4
W
1. RE: M500 SERIES FOR ALL APPLICABLE
DIAGRAMS.
2. CEILING COORDINATION OF ALL MEP
SYSTEMS (LIGHTING, DUCTWORK,
DIFFUSERS, ELECTRICAL, FIRE
PROTECTION, ETC.) MUST BE COMPLETED
BY THE CONTRACTOR PRIOR TO THE START
OF ANY INSTALLATIONS.
3. DO NOT ROUTE DUCTWORK OR PIPING
OVER ELECTRICAL ROOMS OR ELECTRICAL
PANELS; MAINTAIN N.E.C. CLEARANCES.
COORDINATE ROUTINGS WITH DIV. 26
CONTRACTOR.
4. CONTRACTOR TO MAINTAIN 8'-6" CLEAR
HEAD HEIGHT IN GARAGE AND INFORM THE
ENGINEER AND ARCHITECT OF ANY AREAS
THAT MAY NOT MEET 8'-6" PRIOR TO
INSTALLATION, MINIMUM 8'-2" CLEAR HEAD
HEIGHT MUST BE MAINTAINED IN
ACCESSIBLE VAN AREAS.
5. PROVIDE FLEXIBLE DUCT AND PIPE
CONNECTIONS TO ALL MOTORIZED
EQUIPMENT.
5. PROVIDE FLEXIBLE DUCT AND PIPE
CONNECTIONS TO ALL MOTORIZED
EQUIPMENT.
6. VERIFY ALL EQUIPMENT ACCESS PANELS
WITH MANUFACTURER AND ARCHITECT.
7. ALL SOURCES OF IGNITION ON MECHANICAL
EQUIPMENT SHALL BE MOUNTED 18" AFF.
8. ALL SOURCES OF IGNITION ON MECHANICAL
EQUIPMENT SHALL BE MOUNTED 18" AFF.
9. PROTECT PIPING ROUTED ALONG
COLUMNS, WALLS, ETC. FROM DAMAGE AS
NECESSARY WITH CAGES. COORDINATE
WITH ARCHITECT.
10. PEX PIPING SHALL NOT BE ALLOWED TO
PENETRATE FIRE BARRIERS WHERE FIRE
CAULKING IS REQUIRED.
11. ALL PIPING SHALL BE ROUTED AS HIGH AS
POSSIBLE IN THE CEILING SPACE. UTILIZE
JOIST SPACE WHEN POSSIBLE, ESPECIALLY
WHERE CROSSING OTHER PIPES, DUCTS,
AND ELECTRICAL.
12. ACCESS PANELS SHALL BE 24x24, U.N.O.
LOCATIONS SHOWN ARE APPROXIMATE,
EXACT LOCATIONS SHALL BE
COORDINATED WITH THE ARCHITECTS
DRAWINGS AND WITH THE LOCATIONS OF
THE EQUIPMENT OR APPARATUS THAT
THEY SERVE.
13. REFER TO THE PLUMBING FIXTURE
CONNECTION SCHEDULE FOR PIPE SIZES
TO INDIVIDUAL FIXTURES.
14. NOT ALL REQUIRED CLEANOUTS ARE
NECESSARILY SHOWN ON THESE PLANS.
PROVIDE CLEANOUTS ON WASTE, VENT
AND STORM PIPING AS REQUIRED BY CODE
AND FOR REASONABLE MAINTENANCE
BASED ON ACTUAL FIELD INSTALLATION.
COORDINATE LOCATIONS WITH
ARCHITECT/ENGINEER.
15. ST AND ST(OF) PIPING 3", U.N.O.
HVAC & PIPING NOTES:
P6
WATER
ENTRY
Sheet Number
Date:VAIL, COLORADO953 S. Frontage Rd. West
Vail, Colorado 81657
tel: 970.476.1147
gpslarchitects.com
SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018
ALL SHEETS
VE PERMIT ISSUE
ALBUQUERQUE | AVON | DENVER | FORT COLLINS
303.278.3820 www˛bgbuildingworks˛com
Project No. 9911.00 Copyright 2018
Sheet Title
PIPING PLAN -
PARKING LEVELS
M-201P
09/21/18
SCALE:
MECHANICAL PLAN - LEVEL 1
1/8" = 1'-0"
TO DECKING
UNIT 101STUDIO
UNIT 110STUDIO
UNIT 106STUDIOUNIT 105STUDIOUNIT 1042 BR
UNIT 109ONE BR UP
DN
UP
DN
UNIT 111STUDIO
UNIT 113STUDIO
UNIT 112STUDIO
UNIT 114ONE BR
UNIT 103ONE BR
UNIT 107STUDIO
ELECROOM
UNIT 102ONE BR
UNIT 108ACCESSIBLESTUDIO +
LOBBY/COMMON
OFFICE
DN
UNEXCAVATED
EL 8235'-0"
LAUNDRY 1
SEE A918 FOR ENLARGED PLAN
W 1xD2xDW
UNEXCAVATED
D/W
1
K
J
F
E
D
B
A
8 10 2 4 6 12 15
16
17
18
19
20
21
22
YB
YA
YC
YD
YF YG
YH
YL
YJ
YM
16
17
18
19
20
21
22
YK
YE
YD
7
5 1
2
L
M
3 7
6
8 10
G
H
D/W D/WD/WVENDINGMACHINES
4"Ø DRYER VENT
TO ROOF, TYP. 3.
W
1
P
1
W
2
W
6
P
2
P
3W
3
W
4
P
4
P
5
W
5
W
19
P
19
W
18
P
18
P
7
W
7
W
8
P
8
P
9
W
9
W
11
P
11
W
10
P
10
W
12
P
12
P
13 W
13
W
14P
14
P
15
W
15
P
16
W
16
1
2
P
6
3
4
17
5 7
6
8
9
10
11
13
12
15
14
16
W
20
F/S C200
8 x 10
F/S C 200
8x10
10x12 SA DUCT UP.
8x10 SA DUCT UP.
1. RE: M500 SERIES FOR ALL APPLICABLE DIAGRAMS.
2. CEILING COORDINATION OF ALL MEP SYSTEMS
(LIGHTING, DUCTWORK, DIFFUSERS, ELECTRICAL,
FIRE PROTECTION, ETC.) MUST BE COMPLETED BY
THE CONTRACTOR PRIOR TO THE START OF ANY
INSTALLATIONS.
3. DO NOT ROUTE DUCTWORK OR PIPING OVER
ELECTRICAL ROOMS OR ELECTRICAL PANELS;
MAINTAIN N.E.C. CLEARANCES. COORDINATE
ROUTINGS WITH DIV. 26 CONTRACTOR.
4. PROVIDE FLEXIBLE DUCT AND PIPE CONNECTIONS TO
ALL MOTORIZED EQUIPMENT.
5. VERIFY ALL EQUIPMENT ACCESS PANELS WITH
MANUFACTURER AND ARCHITECT.
6. ALL SOURCES OF IGNITION ON MECHANICAL
EQUIPMENT SHALL BE MOUNTED 18" AFF.
7. PROTECT PIPING ROUTED ALONG COLUMNS, WALLS,
ETC. FROM DAMAGE AS NECESSARY WITH CAGES.
COORDINATE WITH ARCHITECT.
8. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE
FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED.
9. ALL PIPING SHALL BE ROUTED AS HIGH AS POSSIBLE
IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN
POSSIBLE, ESPECIALLY WHERE CROSSING OTHER
PIPES, DUCTS, AND ELECTRICAL.
10. ACCESS PANELS SHALL BE 24x24, U.N.O. LOCATIONS
SHOWN ARE APPROXIMATE, EXACT LOCATIONS
SHALL BE COORDINATED WITH THE ARCHITECTS
DRAWINGS AND WITH THE LOCATIONS OF THE
EQUIPMENT OR APPARATUS THAT THEY SERVE.
11. REFER TO THE PLUMBING FIXTURE CONNECTION
SCHEDULE FOR PIPE SIZES TO INDIVIDUAL FIXTURES.
12. NOT ALL REQUIRED CLEANOUTS ARE NECESSARILY
SHOWN ON THESE PLANS. PROVIDE CLEANOUTS ON
WASTE, VENT AND STORM PIPING AS REQUIRED BY
CODE AND FOR REASONABLE MAINTENANCE BASED
ON ACTUAL FIELD INSTALLATION. COORDINATE
LOCATIONS WITH ARCHITECT/ENGINEER.
13. ST AND ST(OF) PIPING 3", U.N.O.
HVAC & PIPING NOTES:
P6
W3"
LOBBY/COMMON, UNIT 110, 112,
AND 114 BB SERVED FROM CEILING.
C 165
8x10
F/S
F/S
C 560
12x12
C 35
8x10
F/S
2" GAS UP
2"GAS DOWN
3/4" GAS TO DRYERS
4"Ø BOILER FLUE &
INTAKE RISERS,
TYP. 3.
20X12 SA
Sheet Number
Date:VAIL, COLORADO953 S. Frontage Rd. West
Vail, Colorado 81657
tel: 970.476.1147
gpslarchitects.com
SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018
ALL SHEETS
VE PERMIT ISSUE
ALBUQUERQUE | AVON | DENVER | FORT COLLINS
303.278.3820 www ˛bgbuildingworks˛com
Project No. 9911.00 Copyright 2018
Sheet Title
MECHANICAL
PLAN - LEVEL 1
M-202
09/21/18
SCALE:
MECHANICAL PLAN - LEVEL 2
1/8" = 1'-0"
UNIT 201STUDIO
UNIT 212STUDIO
UNIT 209STUDIO +
UNIT 206STUDIOUNIT 205STUDIO UNIT 208STUDIOUNIT 2042 BR
UNIT 211ONE BR UP
DN
UNIT 210ACCESSIBLEONE BR
UP
DN
UNIT 213STUDIO
UNIT 215STUDIO
UNIT 217ONE BR
UNIT 214STUDIO
UNIT 216ONE BR
UNIT 203ONE BR
UNIT 207STUDIO
ELECROOM
UNIT 202ONE BR
LAUNDRY 2
VENDING
MACHINES
W 1xD2xDW
GAS FIRED EMERGENCY
GENERATOR ON CONC PAD
SECURITY FENCE w/
GATE AS REQUIRED
D/WDOOR18"D/WREFOVENDOOR30" MIN WORKSURFACE- 30"REMOVABLECABINET BELOWD/W
1
K
J
F
E
D
B
A
8 10 2 4 6 12 15
16
17
18
19
20
21
22
YB
YA
YC
YD
YF YG
YH
YL
YJ
YM
16
17
18
19
20
21
22
YK
YE
YD
7
5 1
2
L
M
3 7
6
8 10
G
H
D/W
D/WD/WW
1
P
1
W
2
W
6
P
2
P
3W
3
W
4
P
4
P
5
W
5
W
19
P
19
W
18
P
18
P
7
W
7
W
8
P
8
P
9
P
11
W
10
P
10
W
12
P
12
P
13
W
13
W
14
P
14
P
15
W
15
P
16
W
16
1
2
P
6
3
4
17
5 7
6
8
9
10
11
13
12
15
14
16
W
11
W
9
P
20
20
W
20
1. RE: M500 SERIES FOR ALL APPLICABLE DIAGRAMS.
2. CEILING COORDINATION OF ALL MEP SYSTEMS
(LIGHTING, DUCTWORK, DIFFUSERS, ELECTRICAL,
FIRE PROTECTION, ETC.) MUST BE COMPLETED BY
THE CONTRACTOR PRIOR TO THE START OF ANY
INSTALLATIONS.
3. DO NOT ROUTE DUCTWORK OR PIPING OVER
ELECTRICAL ROOMS OR ELECTRICAL PANELS;
MAINTAIN N.E.C. CLEARANCES. COORDINATE
ROUTINGS WITH DIV. 26 CONTRACTOR.
4. PROVIDE FLEXIBLE DUCT AND PIPE CONNECTIONS TO
ALL MOTORIZED EQUIPMENT.
5. VERIFY ALL EQUIPMENT ACCESS PANELS WITH
MANUFACTURER AND ARCHITECT.
6. ALL SOURCES OF IGNITION ON MECHANICAL
EQUIPMENT SHALL BE MOUNTED 18" AFF.
7. PROTECT PIPING ROUTED ALONG COLUMNS, WALLS,
ETC. FROM DAMAGE AS NECESSARY WITH CAGES.
COORDINATE WITH ARCHITECT.
8. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE
FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED.
9. ALL PIPING SHALL BE ROUTED AS HIGH AS POSSIBLE
IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN
POSSIBLE, ESPECIALLY WHERE CROSSING OTHER
PIPES, DUCTS, AND ELECTRICAL.
10. ACCESS PANELS SHALL BE 24x24, U.N.O. LOCATIONS
SHOWN ARE APPROXIMATE, EXACT LOCATIONS
SHALL BE COORDINATED WITH THE ARCHITECTS
DRAWINGS AND WITH THE LOCATIONS OF THE
EQUIPMENT OR APPARATUS THAT THEY SERVE.
11. REFER TO THE PLUMBING FIXTURE CONNECTION
SCHEDULE FOR PIPE SIZES TO INDIVIDUAL FIXTURES.
12. NOT ALL REQUIRED CLEANOUTS ARE NECESSARILY
SHOWN ON THESE PLANS. PROVIDE CLEANOUTS ON
WASTE, VENT AND STORM PIPING AS REQUIRED BY
CODE AND FOR REASONABLE MAINTENANCE BASED
ON ACTUAL FIELD INSTALLATION. COORDINATE
LOCATIONS WITH ARCHITECT/ENGINEER.
13. ST AND ST(OF) PIPING 3", U.N.O.
HVAC & PIPING NOTES:
SEE NOTE 10 FOR
ACCESS PANEL.
F/SC200
8x10
12x12 SA DUCT UP.
10x12 SA DUCT DN.
10x12 SA DUCT UP.
8x10 SA DUCT DN.
HWSHWR
HWC
HWCW 1"1"1-1/2"1-1 /2"3/4"
P6
PROVIDE
BB-1, TOTAL
LENGTH 3.5'.
4"Ø DRYER VENT
TO ROOF, TYP. 6.
C 165
8x10
F/S
F/S
C 560
12x12
C 35
8x10
F/S
2" GAS UP
2" GAS DOWN
3/4" GAS TO DRYERS
4"Ø BOILER FLUE &
INTAKE RISERS,
TYP. 3.
20X12 SA
Sheet Number
Date:VAIL, COLORADO953 S. Frontage Rd. West
Vail, Colorado 81657
tel: 970.476.1147
gpslarchitects.com
SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018
ALL SHEETS
VE PERMIT ISSUE
ALBUQUERQUE | AVON | DENVER | FORT COLLINS
303.278.3820 www ˛bgbuildingworks˛com
Project No. 9911.00 Copyright 2018
Sheet Title
MECHANICAL
PLAN - LEVEL 2
M-203
09/21/18
SCALE:
MECHANICAL PLAN - LEVEL 3
1/8" = 1'-0"
UNIT 301STUDIO
UNIT 312STUDIO
UNIT 309STUDIO +
UNIT 306STUDIOUNIT 305STUDIO UNIT 308STUDIOUNIT 3042 BR
UNIT 311ONE BR UP
DN
UP
DN
UNIT 313STUDIO
UNIT 315STUDIO
UNIT 317ONE BR
UNIT 314STUDIO
UNIT 316ONE BR
UNIT 303ONE BR
UNIT 307STUDIO
ELECROOM
UNIT 302ONE BR
UNIT 310ONE BR
LAUNDRY 3
W 1xD2xDW
D/W
1
K
J
F
E
D
B
A
8 10 2 4 6 12 15
16
17
18
19
20
21
22
YB
YA
YC
YD
YF YG
YH
YL
YJ
YM
16
17
18
19
20
21
22
YK
YE
YD
7
5 1
2
L
M
3 7
6
8 10
G
H
D/W
D/WD/WD/WVENDINGMACHINES
4"Ø DRYER VENT
TO ROOF, TYP. 9.
W
1
P
1
W
2 W
6
P
2
P
3W
3
W
4
P
4
P
5
W
5
W
19
P
19
W
18
P
18
P
7
W
7
W
8
P
8
P
11
W
10
P
10
W
12
P
12
P
13 W
13
W
14
P
14
P
15
W
15
P
16
W
16
1
2
P
6
3
4
17
5 7
6
8
10
11
13
12
15
14
16
W
9
P
9
9
W
11
P
20
20
W
20
1. RE: M500 SERIES FOR ALL APPLICABLE DIAGRAMS.
2. CEILING COORDINATION OF ALL MEP SYSTEMS
(LIGHTING, DUCTWORK, DIFFUSERS, ELECTRICAL,
FIRE PROTECTION, ETC.) MUST BE COMPLETED BY
THE CONTRACTOR PRIOR TO THE START OF ANY
INSTALLATIONS.
3. DO NOT ROUTE DUCTWORK OR PIPING OVER
ELECTRICAL ROOMS OR ELECTRICAL PANELS;
MAINTAIN N.E.C. CLEARANCES. COORDINATE
ROUTINGS WITH DIV. 26 CONTRACTOR.
4. PROVIDE FLEXIBLE DUCT AND PIPE CONNECTIONS TO
ALL MOTORIZED EQUIPMENT.
5. VERIFY ALL EQUIPMENT ACCESS PANELS WITH
MANUFACTURER AND ARCHITECT.
6. ALL SOURCES OF IGNITION ON MECHANICAL
EQUIPMENT SHALL BE MOUNTED 18" AFF.
7. PROTECT PIPING ROUTED ALONG COLUMNS, WALLS,
ETC. FROM DAMAGE AS NECESSARY WITH CAGES.
COORDINATE WITH ARCHITECT.
8. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE
FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED.
9. ALL PIPING SHALL BE ROUTED AS HIGH AS POSSIBLE
IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN
POSSIBLE, ESPECIALLY WHERE CROSSING OTHER
PIPES, DUCTS, AND ELECTRICAL.
10. ACCESS PANELS SHALL BE 24x24, U.N.O. LOCATIONS
SHOWN ARE APPROXIMATE, EXACT LOCATIONS
SHALL BE COORDINATED WITH THE ARCHITECTS
DRAWINGS AND WITH THE LOCATIONS OF THE
EQUIPMENT OR APPARATUS THAT THEY SERVE.
11. REFER TO THE PLUMBING FIXTURE CONNECTION
SCHEDULE FOR PIPE SIZES TO INDIVIDUAL FIXTURES.
12. NOT ALL REQUIRED CLEANOUTS ARE NECESSARILY
SHOWN ON THESE PLANS. PROVIDE CLEANOUTS ON
WASTE, VENT AND STORM PIPING AS REQUIRED BY
CODE AND FOR REASONABLE MAINTENANCE BASED
ON ACTUAL FIELD INSTALLATION. COORDINATE
LOCATIONS WITH ARCHITECT/ENGINEER.
13. ST AND ST(OF) PIPING 3", U.N.O.
HVAC & PIPING NOTES:
F/SC200
8x10
C 165
8x10
16x12 SA DUCT UP.
14x12 SA DUCT DN.
14x10 SA DUCT UP.
10x12 SA DUCT DN.
F/S
F/S
P6
PROVIDE
BB-1, TOTAL
LENGTH 3.5'.
C 560
12x12
C 35
8x10
F/S
20x20 SA UP;
20x12 SA DN.
1-1/2" GAS UP
2" GAS DOWN
3/4" GAS TO DRYERS
4"Ø BOILER FLUE &
INTAKE RISERS,
TYP. 3.
Sheet Number
Date:VAIL, COLORADO953 S. Frontage Rd. West
Vail, Colorado 81657
tel: 970.476.1147
gpslarchitects.com
SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018
ALL SHEETS
VE PERMIT ISSUE
ALBUQUERQUE | AVON | DENVER | FORT COLLINS
303.278.3820 www ˛bgbuildingworks˛com
Project No. 9911.00 Copyright 2018
Sheet Title
MECHANICAL
PLAN - LEVEL 3
M-204
09/21/18
SCALE:
MECHANICAL PLAN - LEVEL 4
1/8" = 1'-0"
UNIT 401STUDIO
UNIT 412STUDIO
UNIT 409STUDIO +
UNIT 406STUDIOUNIT 405STUDIO UNIT 408STUDIOUNIT 4042 BR
UNIT411ONE BR
DN
H
GF
DN
UNIT 413STUDIO
UNIT 415STUDIO
UNIT 417ONE BR
UNIT 414STUDIO
UNIT 416ONE BR
UNIT 403ONE BR
UNIT 407STUDIO
UNIT 402ONE BR
UNIT 410ONE BR
LAUNDRY 4 ELECROOM
W 1xD 2xD W
1
K
J
F
E
D
B
A
8 10 2 4 6 12 15
16
17
18
19
20
21
22
YB
YA
YC
YD
YF YG
YH
YL
YJ
YM
16
17
18
19
20
21
22
YK
YE
YD
7
5 1
2
L
M
3 7
6
8 10
G
H
D/W
D/W
D/W D/WD/WVENDINGMACHINES
W
1
P
1
W
2 W
6
P
2
P
3
W
3
W
4
P
4
P
5
W
5
W
19
P
19
W
18
P
18
P
7
W
7
W
8
P
8
P
11
W
10
P
10
W
12
P
12
P
13
W
13
W
14
P
14
P
15
W
15
P
16
W
16
1
2
P
6
3
4
17
5
7
6
8
10
11
13
12
15
14
16
W
9
P
9
9
W
11
P
20
20
W
20
1. RE: M500 SERIES FOR ALL APPLICABLE DIAGRAMS.
2. CEILING COORDINATION OF ALL MEP SYSTEMS
(LIGHTING, DUCTWORK, DIFFUSERS, ELECTRICAL,
FIRE PROTECTION, ETC.) MUST BE COMPLETED BY
THE CONTRACTOR PRIOR TO THE START OF ANY
INSTALLATIONS.
3. DO NOT ROUTE DUCTWORK OR PIPING OVER
ELECTRICAL ROOMS OR ELECTRICAL PANELS;
MAINTAIN N.E.C. CLEARANCES. COORDINATE
ROUTINGS WITH DIV. 26 CONTRACTOR.
4. PROVIDE FLEXIBLE DUCT AND PIPE CONNECTIONS TO
ALL MOTORIZED EQUIPMENT.
5. VERIFY ALL EQUIPMENT ACCESS PANELS WITH
MANUFACTURER AND ARCHITECT.
6. ALL SOURCES OF IGNITION ON MECHANICAL
EQUIPMENT SHALL BE MOUNTED 18" AFF.
7. PROTECT PIPING ROUTED ALONG COLUMNS, WALLS,
ETC. FROM DAMAGE AS NECESSARY WITH CAGES.
COORDINATE WITH ARCHITECT.
8. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE
FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED.
9. ALL PIPING SHALL BE ROUTED AS HIGH AS POSSIBLE
IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN
POSSIBLE, ESPECIALLY WHERE CROSSING OTHER
PIPES, DUCTS, AND ELECTRICAL.
10. ACCESS PANELS SHALL BE 24x24, U.N.O. LOCATIONS
SHOWN ARE APPROXIMATE, EXACT LOCATIONS
SHALL BE COORDINATED WITH THE ARCHITECTS
DRAWINGS AND WITH THE LOCATIONS OF THE
EQUIPMENT OR APPARATUS THAT THEY SERVE.
11. REFER TO THE PLUMBING FIXTURE CONNECTION
SCHEDULE FOR PIPE SIZES TO INDIVIDUAL FIXTURES.
12. NOT ALL REQUIRED CLEANOUTS ARE NECESSARILY
SHOWN ON THESE PLANS. PROVIDE CLEANOUTS ON
WASTE, VENT AND STORM PIPING AS REQUIRED BY
CODE AND FOR REASONABLE MAINTENANCE BASED
ON ACTUAL FIELD INSTALLATION. COORDINATE
LOCATIONS WITH ARCHITECT/ENGINEER.
13. ST AND ST(OF) PIPING 3", U.N.O.
HVAC & PIPING NOTES:
F/S C 200
8x10
18x12 SA DUCT UP.
16x12 SA DUCT DN.
16x12 SA DUCT UP.
14x12 DUCT DN.
P6
PROVIDE
BB-1, TOTAL
LENGTH 3.5'.
4"Ø DRYER VENT
TO ROOF, TYP. 12.
C 165
8x10
F/S
F/S
C 560
12x12
C 35
8x10
F/S
20x20 SA RISER.
GAS UP TO MAU-2
GAS UP TO MAU-1
1-1/4"1-1/4"
1-1/2" GAS DOWN
3/4" GAS TO DRYERS
4"Ø BOILER FLUE &
INTAKE RISERS,
TYP. 3.
20X20 SA
Sheet Number
Date:VAIL, COLORADO953 S. Frontage Rd. West
Vail, Colorado 81657
tel: 970.476.1147
gpslarchitects.com
SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018
ALL SHEETS
VE PERMIT ISSUE
ALBUQUERQUE | AVON | DENVER | FORT COLLINS
303.278.3820 www ˛bgbuildingworks˛com
Project No. 9911.00 Copyright 2018
Sheet Title
MECHANICAL
PLAN - LEVEL 4
M-205
09/21/18
SCALE:
MECHANICAL PLAN - ROOF
1/8" = 1'-0"
1
K
J
F
E
D
B
A
9 10 2 4 6 12 15
16
17
18
19
20
21
22
YB
YA
YC
YD
YF YG
YH
YL
YJ
YM
16
17
18
19
20
21
22
YK
YE
YD
7
5 1
2
L
M
3 7
6
9 10
G
H
MAU-2MAU-1 20x2018x18
W
1
W
2
W
6
W
3
W
4
W
5
W
19
W
18
W
7
W
8
W
10
W
12
W
13
W
14
W
15
W
16
W
9
W
11
W
20
D 1800
24x32
20x20 SA DN IN SHAFT.
EF-6, TYP. 10. MOUNT
ABOVE HEIGHT OF
ADJACENT DUCT TO
ALLOW FOR SERVICE
ACCESS.
D
2200
24x32
18x18
20x20
16x12 SA DN IN
SHAFT BELOW.
20x20
18x12
FLUE & INTAKE UP TO
ROOF, TYP. 2. INSTALL
PER MFTR & 2015 IFGC
RQTS.
18x12 SA DN IN
SHAFT BELOW.
16x14
4"Ø BOILER FLUE &
INTAKE RISERS,
TYP. 3. TERMINATE
THROUGH ROOF
PER MFR RQT'S.
Sheet Number
Date:VAIL, COLORADO953 S. Frontage Rd. West
Vail, Colorado 81657
tel: 970.476.1147
gpslarchitects.com
SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018
ALL SHEETS
VE PERMIT ISSUE
ALBUQUERQUE | AVON | DENVER | FORT COLLINS
303.278.3820 www ˛bgbuildingworks˛com
Project No. 9911.00 Copyright 2018
Sheet Title
MECHANICAL
PLAN - ROOF
M-206
09/21/18
SCALE: 1 MECH PLAN - TYP STUDIO (NO SHAFT) @ LEVELS 1-3
1/4" = 1'-0"SCALE: 3 PLUMBING PLAN - TYP STUDIO (NO SHAFT) @ LEVELS 1-4
1/4" = 1'-0"
1. RE: M501 FOR ALL APPLICABLE MECHANICAL
DIAGRAMS.
2. CEILING COORDINATION OF ALL MEP SYSTEMS
(LIGHTING, DUCTWORK, DIFFUSERS, ELECTRICAL,
FIRE PROTECTION, ETC.) MUST BE COMPLETED BY
THE CONTRACTOR PRIOR TO THE START OF ANY
INSTALLATIONS.
3. DO NOT ROUTE DUCTWORK OVER ELECTRICAL
PANELS; MAINTAIN N.E.C. CLEARANCES. COORDINATE
ROUTINGS WITH DIV. 26 CONTRACTOR.
4. PROVIDE FLEXIBLE DUCT AND PIPE CONNECTIONS TO
ALL MOTORIZED EQUIPMENT.
5. VERIFY ALL EQUIPMENT ACCESS PANELS WITH
MANUFACTURER AND ARCHITECT.
6. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE
FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED.
7. T-STATS AND OCCUPANCY SENSORS SHALL BE
LOCATED NEAR THE LIGHT SWITCH WITHIN THE
ROOM SHOWN. COORDINATE WITH ARCHITECT &
ELECTRICAL ENGINEER TO MATCH HEIGHT AND
LOCATION.
8. ALL DUCTWORK SHALL BE ROUTED AS HIGH AS
POSSIBLE IN THE CEILING SPACE. UTILIZE JOIST
SPACE WHEN POSSIBLE, ESPECIALLY WHERE
CROSSING PIPES AND ELECTRICAL.
9. ACCESS PANEL LOCATIONS SHOWN ARE
APPROXIMATE, EXACT LOCATIONS SHALL BE
COORDINATED WITH THE ARCHITECT'S DRAWINGS
AND WITH THE LOCATIONS OF THE EQUIPMENT OR
APPARATUS THAT THEY SERVE.
HVAC NOTES:
1. RE: M502 FOR ALL APPLICABLE PLUMBING DIAGRAMS.
2. REFER TO THE PLUMBING FIXTURE CONNECTION
SCHEDULE FOR PIPE SIZES TO INDIVIDUAL FIXTURES.
3. NOT ALL REQUIRED CLEANOUTS ARE NECESSARILY
SHOWN ON THESE PLANS. PROVIDE CLEANOUTS ON
WASTE, VENT AND STORM PIPING AS REQUIRED BY
CODE AND FOR REASONABLE MAINTENANCE BASED
ON ACTUAL FIELD INSTALLATION. COORDINATE
LOCATIONS WITH ARCHITECT/ENGINEER.
4. PIPING ON EXTERIOR WALLS OR PRE-CAST
CONCRETE WALLS TO BE ROUTED IN FRAMED WALL
ON INTERIOR SIDE OF INSULATION.
5. DO NOT ROUTE PIPING OVER ELECTRICAL PANELS;
MAINTAIN N.E.C. CLEARANCES. COORDINATE
ROUTINGS WITH DIV. 26 CONTRACTOR.
6. PROVIDE FLEXIBLE PIPE CONNECTIONS TO ALL
MOTORIZED EQUIPMENT.
7. ROUTE DOMESTIC HOT WATER RECIRC TO WITHIN 2
FEET OF ALL HOT WATER FIXTURES.
8. VERIFY ALL EQUIPMENT ACCESS PANELS WITH
MANUFACTURER AND ARCHITECT.
9. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE
FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED.
10. ALL VALVES SHALL BE INSTALLED WITH ACCESS
PANELS IN HARD-LID CEILINGS.
11. ALL PIPING SHALL BE ROUTED AS HIGH AS POSSIBLE
IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN
POSSIBLE, ESPECIALLY WHERE CROSSING OTHER
PIPES, DUCTS, AND ELECTRICAL.
12. ACCESS PANEL LOCATIONS SHOWN ARE
APPROXIMATE, EXACT LOCATIONS SHALL BE
COORDINATED WITH THE ARCHITECT'S DRAWINGS
AND WITH THE LOCATIONS OF THE EQUIPMENT OR
APPARATUS THAT THEY SERVE.
PLUMBING NOTES:EEXH8x8HWS/R TO BASEBOARDS IN UNIT
ABOVE, TYP. LEVEL 1-3. NO
HWS/R PIPING IN LEVEL 4 UNIT.
EF-1
BDD 6"ØT
FLAG NOTES:
1 UNITS 205, 212, 214, 305, 312, & 314: PROVIDE BB-1,
9.5' TOTAL LENGTH. UNITS 105, 110, & 112: PROVIDE
BB-1, 12' TOTAL LENGTH. UNITS 206 & 306: PROVIDE
BB-1, 11.5' TOTAL LENGTH.
UNITS 405, 412, & 414: PROVIDE BB-2, 14' TOTAL
LENGTH. UNIT 406: PROVIDE BB-2, 17' TOTAL
LENGTH.
U.C.
3/4"
CW
HW
P2
P4
P3
P1
1/2"
1/2"3/4"3/4"3/4"
3/4"
1/2"
1" CW, 3/4" HW
3/4" CW
1/2" HW
1
SCALE: 2 MECH PLAN - TYP STUDIO (NO SHAFT) @ LEVEL 4
1/4" = 1'-0"EEXH8x8EF-1
BDD
6"ØT
U.C.
3/4"
2
2
BB IN UNITS 110 & 112 SUPPLIED
FROM CEILING TO AVOID
ROUTING PIPE OVER
UNCONDITIONED GARAGE.
BB SERVED FROM CEILING
OF UNIT BELOW.
Sheet Number
Date:VAIL, COLORADO953 S. Frontage Rd. West
Vail, Colorado 81657
tel: 970.476.1147
gpslarchitects.com
SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018
ALL SHEETS
VE PERMIT ISSUE
ALBUQUERQUE | AVON | DENVER | FORT COLLINS
303.278.3820 www ˛bgbuildingworks˛com
Project No. 9911.00 Copyright 2018
Sheet Title
ENLARGED
MECHANICAL
PLAN - TYP
STUDIO (NO
SHAFT)
M-301
09/21/18
SCALE: 1 MECH PLAN - TYP STUDIO (NO SHAFT) OPP HAND @ LEVELS 1-3
1/4" = 1'-0"SCALE: 3 PLUMBING PLAN - TYP STUDIO (NO SHAFT) OPP HAND @ LEVELS 1-4
1/4" = 1'-0"
1. RE: M501 FOR ALL APPLICABLE MECHANICAL
DIAGRAMS.
2. CEILING COORDINATION OF ALL MEP SYSTEMS
(LIGHTING, DUCTWORK, DIFFUSERS, ELECTRICAL,
FIRE PROTECTION, ETC.) MUST BE COMPLETED BY
THE CONTRACTOR PRIOR TO THE START OF ANY
INSTALLATIONS.
3. DO NOT ROUTE DUCTWORK OVER ELECTRICAL
PANELS; MAINTAIN N.E.C. CLEARANCES. COORDINATE
ROUTINGS WITH DIV. 26 CONTRACTOR.
4. PROVIDE FLEXIBLE DUCT AND PIPE CONNECTIONS TO
ALL MOTORIZED EQUIPMENT.
5. VERIFY ALL EQUIPMENT ACCESS PANELS WITH
MANUFACTURER AND ARCHITECT.
6. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE
FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED.
7. T-STATS AND OCCUPANCY SENSORS SHALL BE
LOCATED NEAR THE LIGHT SWITCH WITHIN THE
ROOM SHOWN. COORDINATE WITH ARCHITECT &
ELECTRICAL ENGINEER TO MATCH HEIGHT AND
LOCATION.
8. ALL DUCTWORK SHALL BE ROUTED AS HIGH AS
POSSIBLE IN THE CEILING SPACE. UTILIZE JOIST
SPACE WHEN POSSIBLE, ESPECIALLY WHERE
CROSSING PIPES AND ELECTRICAL.
9. ACCESS PANEL LOCATIONS SHOWN ARE
APPROXIMATE, EXACT LOCATIONS SHALL BE
COORDINATED WITH THE ARCHITECT'S DRAWINGS
AND WITH THE LOCATIONS OF THE EQUIPMENT OR
APPARATUS THAT THEY SERVE.
HVAC NOTES:
1. RE: M502 FOR ALL APPLICABLE PLUMBING DIAGRAMS.
2. REFER TO THE PLUMBING FIXTURE CONNECTION
SCHEDULE FOR PIPE SIZES TO INDIVIDUAL FIXTURES.
3. NOT ALL REQUIRED CLEANOUTS ARE NECESSARILY
SHOWN ON THESE PLANS. PROVIDE CLEANOUTS ON
WASTE, VENT AND STORM PIPING AS REQUIRED BY
CODE AND FOR REASONABLE MAINTENANCE BASED
ON ACTUAL FIELD INSTALLATION. COORDINATE
LOCATIONS WITH ARCHITECT/ENGINEER.
4. PIPING ON EXTERIOR WALLS OR PRE-CAST
CONCRETE WALLS TO BE ROUTED IN FRAMED WALL
ON INTERIOR SIDE OF INSULATION.
5. DO NOT ROUTE PIPING OVER ELECTRICAL PANELS;
MAINTAIN N.E.C. CLEARANCES. COORDINATE
ROUTINGS WITH DIV. 26 CONTRACTOR.
6. PROVIDE FLEXIBLE PIPE CONNECTIONS TO ALL
MOTORIZED EQUIPMENT.
7. ROUTE DOMESTIC HOT WATER RECIRC TO WITHIN 2
FEET OF ALL HOT WATER FIXTURES.
8. VERIFY ALL EQUIPMENT ACCESS PANELS WITH
MANUFACTURER AND ARCHITECT.
9. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE
FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED.
10. ALL VALVES SHALL BE INSTALLED WITH ACCESS
PANELS IN HARD-LID CEILINGS.
11. ALL PIPING SHALL BE ROUTED AS HIGH AS POSSIBLE
IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN
POSSIBLE, ESPECIALLY WHERE CROSSING OTHER
PIPES, DUCTS, AND ELECTRICAL.
12. ACCESS PANEL LOCATIONS SHOWN ARE
APPROXIMATE, EXACT LOCATIONS SHALL BE
COORDINATED WITH THE ARCHITECT'S DRAWINGS
AND WITH THE LOCATIONS OF THE EQUIPMENT OR
APPARATUS THAT THEY SERVE.
PLUMBING NOTES:EEXH8x8HWS/R TO BASEBOARDS IN UNIT
ABOVE, TYP. LEVEL 1-3. NO HWS/R
PIPING IN LEVEL 4 UNIT.
BDD 6"ØT
FLAG NOTES:
1 UNITS 111, 213, 215, 313, & 315: PROVIDE BB-1, 9.5'
TOTAL LENGTH. UNIT 113: PROVIDE BB-1, 15' TOTAL
LENGTH.
UNITS 413 & 415: PROVIDE BB-2, 14' TOTAL LENGTH.
EF-1
HW
CW
P2
P4
P3
P1
1/2"
1/2"3/4"3/4"3/4"
3/4"
1/2"
1" CW, 3/4" HW
3/4" CW
1/2" HW
U.C.
3/4"
1 EEXH8x8BDD
6"ØT
EF-1
U.C.
3/4"
2
SCALE: 2 MECH PLAN - TYP STUDIO (NO SHAFT) OPP HAND @ LEVEL 4
1/4" = 1'-0"
2
BB SERVED FROM CEILING
OF UNIT BELOW.
Sheet Number
Date:VAIL, COLORADO953 S. Frontage Rd. West
Vail, Colorado 81657
tel: 970.476.1147
gpslarchitects.com
SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018
ALL SHEETS
VE PERMIT ISSUE
ALBUQUERQUE | AVON | DENVER | FORT COLLINS
303.278.3820 www ˛bgbuildingworks˛com
Project No. 9911.00 Copyright 2018
Sheet Title
ENLARGED
MECHANICAL
PLAN - TYP
STUDIO (NO
SHAFT) OPP
HAND
M-302
09/21/18
7
SCALE: 1 MECH PLAN - STUDIO X01 @ LEVELS 1-3
1/4" = 1'-0"SCALE: 3 PLUMBING PLAN - STUDIO X01 @ LEVELS 1-4
1/4" = 1'-0"
7
1. RE: M501 FOR ALL APPLICABLE MECHANICAL
DIAGRAMS.
2. CEILING COORDINATION OF ALL MEP SYSTEMS
(LIGHTING, DUCTWORK, DIFFUSERS, ELECTRICAL,
FIRE PROTECTION, ETC.) MUST BE COMPLETED BY
THE CONTRACTOR PRIOR TO THE START OF ANY
INSTALLATIONS.
3. DO NOT ROUTE DUCTWORK OVER ELECTRICAL
PANELS; MAINTAIN N.E.C. CLEARANCES. COORDINATE
ROUTINGS WITH DIV. 26 CONTRACTOR.
4. PROVIDE FLEXIBLE DUCT AND PIPE CONNECTIONS TO
ALL MOTORIZED EQUIPMENT.
5. VERIFY ALL EQUIPMENT ACCESS PANELS WITH
MANUFACTURER AND ARCHITECT.
6. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE
FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED.
7. T-STATS AND OCCUPANCY SENSORS SHALL BE
LOCATED NEAR THE LIGHT SWITCH WITHIN THE
ROOM SHOWN. COORDINATE WITH ARCHITECT &
ELECTRICAL ENGINEER TO MATCH HEIGHT AND
LOCATION.
8. ALL DUCTWORK SHALL BE ROUTED AS HIGH AS
POSSIBLE IN THE CEILING SPACE. UTILIZE JOIST
SPACE WHEN POSSIBLE, ESPECIALLY WHERE
CROSSING PIPES AND ELECTRICAL.
9. ACCESS PANEL LOCATIONS SHOWN ARE
APPROXIMATE, EXACT LOCATIONS SHALL BE
COORDINATED WITH THE ARCHITECT'S DRAWINGS
AND WITH THE LOCATIONS OF THE EQUIPMENT OR
APPARATUS THAT THEY SERVE.
HVAC NOTES:
1. RE: M502 FOR ALL APPLICABLE PLUMBING DIAGRAMS.
2. REFER TO THE PLUMBING FIXTURE CONNECTION
SCHEDULE FOR PIPE SIZES TO INDIVIDUAL FIXTURES.
3. NOT ALL REQUIRED CLEANOUTS ARE NECESSARILY
SHOWN ON THESE PLANS. PROVIDE CLEANOUTS ON
WASTE, VENT AND STORM PIPING AS REQUIRED BY
CODE AND FOR REASONABLE MAINTENANCE BASED
ON ACTUAL FIELD INSTALLATION. COORDINATE
LOCATIONS WITH ARCHITECT/ENGINEER.
4. PIPING ON EXTERIOR WALLS OR PRE-CAST
CONCRETE WALLS TO BE ROUTED IN FRAMED WALL
ON INTERIOR SIDE OF INSULATION.
5. DO NOT ROUTE PIPING OVER ELECTRICAL PANELS;
MAINTAIN N.E.C. CLEARANCES. COORDINATE
ROUTINGS WITH DIV. 26 CONTRACTOR.
6. PROVIDE FLEXIBLE PIPE CONNECTIONS TO ALL
MOTORIZED EQUIPMENT.
7. ROUTE DOMESTIC HOT WATER RECIRC TO WITHIN 2
FEET OF ALL HOT WATER FIXTURES.
8. VERIFY ALL EQUIPMENT ACCESS PANELS WITH
MANUFACTURER AND ARCHITECT.
9. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE
FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED.
10. ALL VALVES SHALL BE INSTALLED WITH ACCESS
PANELS IN HARD-LID CEILINGS.
11. ALL PIPING SHALL BE ROUTED AS HIGH AS POSSIBLE
IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN
POSSIBLE, ESPECIALLY WHERE CROSSING OTHER
PIPES, DUCTS, AND ELECTRICAL.
12. ACCESS PANEL LOCATIONS SHOWN ARE
APPROXIMATE, EXACT LOCATIONS SHALL BE
COORDINATED WITH THE ARCHITECT'S DRAWINGS
AND WITH THE LOCATIONS OF THE EQUIPMENT OR
APPARATUS THAT THEY SERVE.
PLUMBING NOTES:
HWS/R TO BASEBOARDS IN UNIT
ABOVE, TYP. LEVEL 1-3. NO
HWS/R PIPING IN LEVEL 4 UNIT.
HW
CW
P2
P4
P3
P1
1/2"
1/2"3/4"3/4"1/2"
1" CW, 3/4" HW
3/4" CW
1/2" HW
FLAG NOTES:
1 UNIT 101: PROVIDE BB-1, 12' TOTAL LENGTH. UNITS
201 & 301: PROVIDE BB-1, 9.5' TOTAL LENGTH.
UNIT 401: PROVIDE BB-2, 14' TOTAL LENGTH.
T EEXH8x8EF-16"ØBDD
U.C.
3/4"
3/4"
3/4"
1
7
SCALE: 2 MECH PLAN - STUDIO X01 @ LEVEL 4
1/4" = 1'-0"
T EEXH8x8EF-16"ØBDD
U.C.
3/4"
2
2
BB SERVED FROM CEILING
OF UNIT BELOW.
Sheet Number
Date:VAIL, COLORADO953 S. Frontage Rd. West
Vail, Colorado 81657
tel: 970.476.1147
gpslarchitects.com
SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018
ALL SHEETS
VE PERMIT ISSUE
ALBUQUERQUE | AVON | DENVER | FORT COLLINS
303.278.3820 www ˛bgbuildingworks˛com
Project No. 9911.00 Copyright 2018
Sheet Title
ENLARGED
MECHANICAL
PLAN - STUDIO
X01
M-303
09/21/18
SCALE: 1 MECH PLAN - STUDIO X07 @ LEVELS 1-3
1/4" = 1'-0"SCALE: 3 PLUMBING PLAN - STUDIO X07 @ LEVELS 1-4
1/4" = 1'-0"
1. RE: M501 FOR ALL APPLICABLE MECHANICAL
DIAGRAMS.
2. CEILING COORDINATION OF ALL MEP SYSTEMS
(LIGHTING, DUCTWORK, DIFFUSERS, ELECTRICAL,
FIRE PROTECTION, ETC.) MUST BE COMPLETED BY
THE CONTRACTOR PRIOR TO THE START OF ANY
INSTALLATIONS.
3. DO NOT ROUTE DUCTWORK OVER ELECTRICAL
PANELS; MAINTAIN N.E.C. CLEARANCES. COORDINATE
ROUTINGS WITH DIV. 26 CONTRACTOR.
4. PROVIDE FLEXIBLE DUCT AND PIPE CONNECTIONS TO
ALL MOTORIZED EQUIPMENT.
5. VERIFY ALL EQUIPMENT ACCESS PANELS WITH
MANUFACTURER AND ARCHITECT.
6. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE
FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED.
7. T-STATS AND OCCUPANCY SENSORS SHALL BE
LOCATED NEAR THE LIGHT SWITCH WITHIN THE
ROOM SHOWN. COORDINATE WITH ARCHITECT &
ELECTRICAL ENGINEER TO MATCH HEIGHT AND
LOCATION.
8. ALL DUCTWORK SHALL BE ROUTED AS HIGH AS
POSSIBLE IN THE CEILING SPACE. UTILIZE JOIST
SPACE WHEN POSSIBLE, ESPECIALLY WHERE
CROSSING PIPES AND ELECTRICAL.
9. ACCESS PANEL LOCATIONS SHOWN ARE
APPROXIMATE, EXACT LOCATIONS SHALL BE
COORDINATED WITH THE ARCHITECT'S DRAWINGS
AND WITH THE LOCATIONS OF THE EQUIPMENT OR
APPARATUS THAT THEY SERVE.
HVAC NOTES:
1. RE: M502 FOR ALL APPLICABLE PLUMBING DIAGRAMS.
2. REFER TO THE PLUMBING FIXTURE CONNECTION
SCHEDULE FOR PIPE SIZES TO INDIVIDUAL FIXTURES.
3. NOT ALL REQUIRED CLEANOUTS ARE NECESSARILY
SHOWN ON THESE PLANS. PROVIDE CLEANOUTS ON
WASTE, VENT AND STORM PIPING AS REQUIRED BY
CODE AND FOR REASONABLE MAINTENANCE BASED
ON ACTUAL FIELD INSTALLATION. COORDINATE
LOCATIONS WITH ARCHITECT/ENGINEER.
4. PIPING ON EXTERIOR WALLS OR PRE-CAST
CONCRETE WALLS TO BE ROUTED IN FRAMED WALL
ON INTERIOR SIDE OF INSULATION.
5. DO NOT ROUTE PIPING OVER ELECTRICAL PANELS;
MAINTAIN N.E.C. CLEARANCES. COORDINATE
ROUTINGS WITH DIV. 26 CONTRACTOR.
6. PROVIDE FLEXIBLE PIPE CONNECTIONS TO ALL
MOTORIZED EQUIPMENT.
7. ROUTE DOMESTIC HOT WATER RECIRC TO WITHIN 2
FEET OF ALL HOT WATER FIXTURES.
8. VERIFY ALL EQUIPMENT ACCESS PANELS WITH
MANUFACTURER AND ARCHITECT.
9. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE
FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED.
10. ALL VALVES SHALL BE INSTALLED WITH ACCESS
PANELS IN HARD-LID CEILINGS.
11. ALL PIPING SHALL BE ROUTED AS HIGH AS POSSIBLE
IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN
POSSIBLE, ESPECIALLY WHERE CROSSING OTHER
PIPES, DUCTS, AND ELECTRICAL.
12. ACCESS PANEL LOCATIONS SHOWN ARE
APPROXIMATE, EXACT LOCATIONS SHALL BE
COORDINATED WITH THE ARCHITECT'S DRAWINGS
AND WITH THE LOCATIONS OF THE EQUIPMENT OR
APPARATUS THAT THEY SERVE.
PLUMBING NOTES:
HWS/R TO BASEBOARDS IN
UNIT ABOVE, TYP. LEVEL 1-3. NO
HWS/R PIPING IN LEVEL 4 UNIT.EEXH8x8BDD
T
FLAG NOTES:
1 UNIT 107: PROVIDE BB-1, 13.5' TOTAL LENGTH. UNITS
207 & 307: PROVIDE BB-1, 11.5' TOTAL LENGTH.
UNIT 407: PROVIDE BB-2, 15.5' TOTAL LENGTH.
EF-1 6"ØHW
CW
P2
P4
P3
P1
1/2"
1/2"3/4"1/2"
1" CW, 3/4" HW
3/4" CW
1/2" HW
U.C.
3/4"
3/4"
3/4"3/4"1 EEXH8x8BDD
T
EF-1 6"ØU.C.
3/4"
2
SCALE: 2 MECH PLAN - STUDIO X07 @ LEVEL 4
1/4" = 1'-0"
2
BB SERVED FROM CEILING
OF UNIT BELOW.
Sheet Number
Date:VAIL, COLORADO953 S. Frontage Rd. West
Vail, Colorado 81657
tel: 970.476.1147
gpslarchitects.com
SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018
ALL SHEETS
VE PERMIT ISSUE
ALBUQUERQUE | AVON | DENVER | FORT COLLINS
303.278.3820 www ˛bgbuildingworks˛com
Project No. 9911.00 Copyright 2018
Sheet Title
ENLARGED
MECHANICAL
PLAN - STUDIO
X07
M-304
09/21/18
SCALE: 1 MECH PLAN - STUDIO X08 @ LEVELS 1-3
1/4" = 1'-0"SCALE: 3 PLUMBING PLAN - STUDIO X08 @ LEVELS 1-4
1/4" = 1'-0"
1. RE: M501 FOR ALL APPLICABLE MECHANICAL
DIAGRAMS.
2. CEILING COORDINATION OF ALL MEP SYSTEMS
(LIGHTING, DUCTWORK, DIFFUSERS, ELECTRICAL,
FIRE PROTECTION, ETC.) MUST BE COMPLETED BY
THE CONTRACTOR PRIOR TO THE START OF ANY
INSTALLATIONS.
3. DO NOT ROUTE DUCTWORK OVER ELECTRICAL
PANELS; MAINTAIN N.E.C. CLEARANCES. COORDINATE
ROUTINGS WITH DIV. 26 CONTRACTOR.
4. PROVIDE FLEXIBLE DUCT AND PIPE CONNECTIONS TO
ALL MOTORIZED EQUIPMENT.
5. VERIFY ALL EQUIPMENT ACCESS PANELS WITH
MANUFACTURER AND ARCHITECT.
6. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE
FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED.
7. T-STATS AND OCCUPANCY SENSORS SHALL BE
LOCATED NEAR THE LIGHT SWITCH WITHIN THE
ROOM SHOWN. COORDINATE WITH ARCHITECT &
ELECTRICAL ENGINEER TO MATCH HEIGHT AND
LOCATION.
8. ALL DUCTWORK SHALL BE ROUTED AS HIGH AS
POSSIBLE IN THE CEILING SPACE. UTILIZE JOIST
SPACE WHEN POSSIBLE, ESPECIALLY WHERE
CROSSING PIPES AND ELECTRICAL.
9. ACCESS PANEL LOCATIONS SHOWN ARE
APPROXIMATE, EXACT LOCATIONS SHALL BE
COORDINATED WITH THE ARCHITECT'S DRAWINGS
AND WITH THE LOCATIONS OF THE EQUIPMENT OR
APPARATUS THAT THEY SERVE.
HVAC NOTES:
1. RE: M502 FOR ALL APPLICABLE PLUMBING DIAGRAMS.
2. REFER TO THE PLUMBING FIXTURE CONNECTION
SCHEDULE FOR PIPE SIZES TO INDIVIDUAL FIXTURES.
3. NOT ALL REQUIRED CLEANOUTS ARE NECESSARILY
SHOWN ON THESE PLANS. PROVIDE CLEANOUTS ON
WASTE, VENT AND STORM PIPING AS REQUIRED BY
CODE AND FOR REASONABLE MAINTENANCE BASED
ON ACTUAL FIELD INSTALLATION. COORDINATE
LOCATIONS WITH ARCHITECT/ENGINEER.
4. PIPING ON EXTERIOR WALLS OR PRE-CAST
CONCRETE WALLS TO BE ROUTED IN FRAMED WALL
ON INTERIOR SIDE OF INSULATION.
5. DO NOT ROUTE PIPING OVER ELECTRICAL PANELS;
MAINTAIN N.E.C. CLEARANCES. COORDINATE
ROUTINGS WITH DIV. 26 CONTRACTOR.
6. PROVIDE FLEXIBLE PIPE CONNECTIONS TO ALL
MOTORIZED EQUIPMENT.
7. ROUTE DOMESTIC HOT WATER RECIRC TO WITHIN 2
FEET OF ALL HOT WATER FIXTURES.
8. VERIFY ALL EQUIPMENT ACCESS PANELS WITH
MANUFACTURER AND ARCHITECT.
9. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE
FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED.
10. ALL VALVES SHALL BE INSTALLED WITH ACCESS
PANELS IN HARD-LID CEILINGS.
11. ALL PIPING SHALL BE ROUTED AS HIGH AS POSSIBLE
IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN
POSSIBLE, ESPECIALLY WHERE CROSSING OTHER
PIPES, DUCTS, AND ELECTRICAL.
12. ACCESS PANEL LOCATIONS SHOWN ARE
APPROXIMATE, EXACT LOCATIONS SHALL BE
COORDINATED WITH THE ARCHITECT'S DRAWINGS
AND WITH THE LOCATIONS OF THE EQUIPMENT OR
APPARATUS THAT THEY SERVE.
PLUMBING NOTES:
HWS/R TO BASEBOARDS IN UNIT
ABOVE, TYP. LEVEL 1-3. NO HWS/R
PIPING IN LEVEL 4 UNIT.
T
FLAG NOTES:
1 UNIT 106: PROVIDE BB-1, 15' TOTAL LENGTH. UNITS
208 & 308: PROVIDE BB-1, 11.5' TOTAL LENGTH.
UNIT 408: PROVIDE BB-2, 17' TOTAL LENGTH.EEXH8x8EF-1 6"ØBDD
U.C.
3/4"
CW
HW
P2
P4
P3
P11/2"
1/2"3/4"1" CW, 3/4" HW
3/4" CW
1/2" HW
1/2"3/4"3/4"
3/4"
1
SCALE: 2 MECH PLAN - STUDIO X08 @ LEVEL 4
1/4" = 1'-0"
TEEXH8x8
EF-16"ØBDD
U.C.
3/4"
2
2
BB SERVED FROM CEILING
OF UNIT BELOW.
Sheet Number
Date:VAIL, COLORADO953 S. Frontage Rd. West
Vail, Colorado 81657
tel: 970.476.1147
gpslarchitects.com
SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018
ALL SHEETS
VE PERMIT ISSUE
ALBUQUERQUE | AVON | DENVER | FORT COLLINS
303.278.3820 www ˛bgbuildingworks˛com
Project No. 9911.00 Copyright 2018
Sheet Title
ENLARGED
MECHANICAL
PLAN - STUDIO
X08
M-305
09/21/18
SCALE: 1 MECH PLAN - TYP STUDIO + X09 UNITS @ LEVELS 2-3
1/4" = 1'-0"SCALE: 3 PLUMBING PLAN - TYP STUDIO + X09 UNITS @ LEVELS 2-4
1/4" = 1'-0"
1. RE: M501 FOR ALL APPLICABLE MECHANICAL
DIAGRAMS.
2. CEILING COORDINATION OF ALL MEP SYSTEMS
(LIGHTING, DUCTWORK, DIFFUSERS, ELECTRICAL,
FIRE PROTECTION, ETC.) MUST BE COMPLETED BY
THE CONTRACTOR PRIOR TO THE START OF ANY
INSTALLATIONS.
3. DO NOT ROUTE DUCTWORK OVER ELECTRICAL
PANELS; MAINTAIN N.E.C. CLEARANCES. COORDINATE
ROUTINGS WITH DIV. 26 CONTRACTOR.
4. PROVIDE FLEXIBLE DUCT AND PIPE CONNECTIONS TO
ALL MOTORIZED EQUIPMENT.
5. VERIFY ALL EQUIPMENT ACCESS PANELS WITH
MANUFACTURER AND ARCHITECT.
6. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE
FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED.
7. T-STATS AND OCCUPANCY SENSORS SHALL BE
LOCATED NEAR THE LIGHT SWITCH WITHIN THE
ROOM SHOWN. COORDINATE WITH ARCHITECT &
ELECTRICAL ENGINEER TO MATCH HEIGHT AND
LOCATION.
8. ALL DUCTWORK SHALL BE ROUTED AS HIGH AS
POSSIBLE IN THE CEILING SPACE. UTILIZE JOIST
SPACE WHEN POSSIBLE, ESPECIALLY WHERE
CROSSING PIPES AND ELECTRICAL.
9. ACCESS PANEL LOCATIONS SHOWN ARE
APPROXIMATE, EXACT LOCATIONS SHALL BE
COORDINATED WITH THE ARCHITECT'S DRAWINGS
AND WITH THE LOCATIONS OF THE EQUIPMENT OR
APPARATUS THAT THEY SERVE.
HVAC NOTES:
1. RE: M502 FOR ALL APPLICABLE PLUMBING DIAGRAMS.
2. REFER TO THE PLUMBING FIXTURE CONNECTION
SCHEDULE FOR PIPE SIZES TO INDIVIDUAL FIXTURES.
3. NOT ALL REQUIRED CLEANOUTS ARE NECESSARILY
SHOWN ON THESE PLANS. PROVIDE CLEANOUTS ON
WASTE, VENT AND STORM PIPING AS REQUIRED BY
CODE AND FOR REASONABLE MAINTENANCE BASED
ON ACTUAL FIELD INSTALLATION. COORDINATE
LOCATIONS WITH ARCHITECT/ENGINEER.
4. PIPING ON EXTERIOR WALLS OR PRE-CAST
CONCRETE WALLS TO BE ROUTED IN FRAMED WALL
ON INTERIOR SIDE OF INSULATION.
5. DO NOT ROUTE PIPING OVER ELECTRICAL PANELS;
MAINTAIN N.E.C. CLEARANCES. COORDINATE
ROUTINGS WITH DIV. 26 CONTRACTOR.
6. PROVIDE FLEXIBLE PIPE CONNECTIONS TO ALL
MOTORIZED EQUIPMENT.
7. ROUTE DOMESTIC HOT WATER RECIRC TO WITHIN 2
FEET OF ALL HOT WATER FIXTURES.
8. VERIFY ALL EQUIPMENT ACCESS PANELS WITH
MANUFACTURER AND ARCHITECT.
9. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE
FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED.
10. ALL VALVES SHALL BE INSTALLED WITH ACCESS
PANELS IN HARD-LID CEILINGS.
11. ALL PIPING SHALL BE ROUTED AS HIGH AS POSSIBLE
IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN
POSSIBLE, ESPECIALLY WHERE CROSSING OTHER
PIPES, DUCTS, AND ELECTRICAL.
12. ACCESS PANEL LOCATIONS SHOWN ARE
APPROXIMATE, EXACT LOCATIONS SHALL BE
COORDINATED WITH THE ARCHITECT'S DRAWINGS
AND WITH THE LOCATIONS OF THE EQUIPMENT OR
APPARATUS THAT THEY SERVE.
PLUMBING NOTES:
HWS/R TO BASEBOARDS IN UNIT
ABOVE, TYP. LEVEL 2 & 3. NO
HWS/R PIPING IN LEVEL 4 UNIT.
EF-1EEXH8x8 BDD
T6"ØFLAG NOTES:
1 UNITS 209 & 309: PROVIDE BB-1, 9.5' TOTAL LENGTH.
UNIT 409: PROVIDE BB-2, 15' TOTAL LENGTH.
U.C.
3/4"
P1
HW
CW1/2"
1/2"
P2
P4
P3 3/4"3/4"3/4"
3/4"
1/2"
1" CW, 3/4" HW,
1/2" HWC
3/4" CW
1/2" HW
1
2
SCALE: 2 MECH PLAN - TYP STUDIO + X09 UNITS @ LEVEL 4
1/4" = 1'-0"
EF-1EEXH8x8 BDD
T6"ØU.C.
3/4"
2
BB SERVED FROM CEILING
OF UNIT BELOW.
Sheet Number
Date:VAIL, COLORADO953 S. Frontage Rd. West
Vail, Colorado 81657
tel: 970.476.1147
gpslarchitects.com
SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018
ALL SHEETS
VE PERMIT ISSUE
ALBUQUERQUE | AVON | DENVER | FORT COLLINS
303.278.3820 www ˛bgbuildingworks˛com
Project No. 9911.00 Copyright 2018
Sheet Title
ENLARGED
MECHANICAL
PLAN - TYP
STUDIO + X09
LEVELS 2-4
M-306
09/21/18
MAX.SCALE: 1 MECHANICAL PLAN - ACCESSIBLE STUDIO + @ LEVEL 1
1/4" = 1'-0" SCALE: 2 PLUMBING PLAN - ACCESSIBLE STUDIO + @ LEVEL 1
1/4" = 1'-0"MAX.EEXH8x8HWS/R TO BASEBOARD
IN UNIT ABOVE.
EF-1
1. RE: M501 FOR ALL APPLICABLE MECHANICAL
DIAGRAMS.
2. CEILING COORDINATION OF ALL MEP SYSTEMS
(LIGHTING, DUCTWORK, DIFFUSERS, ELECTRICAL,
FIRE PROTECTION, ETC.) MUST BE COMPLETED BY
THE CONTRACTOR PRIOR TO THE START OF ANY
INSTALLATIONS.
3. DO NOT ROUTE DUCTWORK OVER ELECTRICAL
PANELS; MAINTAIN N.E.C. CLEARANCES. COORDINATE
ROUTINGS WITH DIV. 26 CONTRACTOR.
4. PROVIDE FLEXIBLE DUCT AND PIPE CONNECTIONS TO
ALL MOTORIZED EQUIPMENT.
5. VERIFY ALL EQUIPMENT ACCESS PANELS WITH
MANUFACTURER AND ARCHITECT.
6. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE
FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED.
7. T-STATS AND OCCUPANCY SENSORS SHALL BE
LOCATED NEAR THE LIGHT SWITCH WITHIN THE
ROOM SHOWN. COORDINATE WITH ARCHITECT &
ELECTRICAL ENGINEER TO MATCH HEIGHT AND
LOCATION.
8. ALL DUCTWORK SHALL BE ROUTED AS HIGH AS
POSSIBLE IN THE CEILING SPACE. UTILIZE JOIST
SPACE WHEN POSSIBLE, ESPECIALLY WHERE
CROSSING PIPES AND ELECTRICAL.
9. ACCESS PANEL LOCATIONS SHOWN ARE
APPROXIMATE, EXACT LOCATIONS SHALL BE
COORDINATED WITH THE ARCHITECT'S DRAWINGS
AND WITH THE LOCATIONS OF THE EQUIPMENT OR
APPARATUS THAT THEY SERVE.
HVAC NOTES:
1. RE: M502 FOR ALL APPLICABLE PLUMBING DIAGRAMS.
2. REFER TO THE PLUMBING FIXTURE CONNECTION
SCHEDULE FOR PIPE SIZES TO INDIVIDUAL FIXTURES.
3. NOT ALL REQUIRED CLEANOUTS ARE NECESSARILY
SHOWN ON THESE PLANS. PROVIDE CLEANOUTS ON
WASTE, VENT AND STORM PIPING AS REQUIRED BY
CODE AND FOR REASONABLE MAINTENANCE BASED
ON ACTUAL FIELD INSTALLATION. COORDINATE
LOCATIONS WITH ARCHITECT/ENGINEER.
4. PIPING ON EXTERIOR WALLS OR PRE-CAST
CONCRETE WALLS TO BE ROUTED IN FRAMED WALL
ON INTERIOR SIDE OF INSULATION.
5. DO NOT ROUTE PIPING OVER ELECTRICAL PANELS;
MAINTAIN N.E.C. CLEARANCES. COORDINATE
ROUTINGS WITH DIV. 26 CONTRACTOR.
6. PROVIDE FLEXIBLE PIPE CONNECTIONS TO ALL
MOTORIZED EQUIPMENT.
7. ROUTE DOMESTIC HOT WATER RECIRC TO WITHIN 2
FEET OF ALL HOT WATER FIXTURES.
8. VERIFY ALL EQUIPMENT ACCESS PANELS WITH
MANUFACTURER AND ARCHITECT.
9. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE
FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED.
10. ALL VALVES SHALL BE INSTALLED WITH ACCESS
PANELS IN HARD-LID CEILINGS.
11. ALL PIPING SHALL BE ROUTED AS HIGH AS POSSIBLE
IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN
POSSIBLE, ESPECIALLY WHERE CROSSING OTHER
PIPES, DUCTS, AND ELECTRICAL.
12. ACCESS PANEL LOCATIONS SHOWN ARE
APPROXIMATE, EXACT LOCATIONS SHALL BE
COORDINATED WITH THE ARCHITECT'S DRAWINGS
AND WITH THE LOCATIONS OF THE EQUIPMENT OR
APPARATUS THAT THEY SERVE.
PLUMBING NOTES:
BDD
6"ØT
U.C.
3/4"
P1
HW
CW1/2"
1/2"
P2
P4
P3 3/4"3/4"
3/4"
1/2"
1" CW, 3/4" HW
3/4" CW
1/2" HW
3/4"FLAG NOTES:
1 UNIT 108: PROVIDE BB-1, 9.5' TOTAL LENGTH.
1
Sheet Number
Date:VAIL, COLORADO953 S. Frontage Rd. West
Vail, Colorado 81657
tel: 970.476.1147
gpslarchitects.com
SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018
ALL SHEETS
VE PERMIT ISSUE
ALBUQUERQUE | AVON | DENVER | FORT COLLINS
303.278.3820 www ˛bgbuildingworks˛com
Project No. 9911.00 Copyright 2018
Sheet Title
ENLARGED
MECHANICAL
PLAN -
ACCESSIBLE
STUDIO + LEVEL 1
M-307
09/21/18
SCALE: 1 MECH PLAN - ONE BR X02 @ LEVELS 2-3
1/4" = 1'-0"D/WSCALE: 3 PLUMBING PLAN - ONE BR X02 @ LEVELS 2-4
1/4" = 1'-0"D/WHWS/R TO BASEBOARDS IN UNIT
ABOVE, TYP. LEVEL 2-3. NO
HWS/R PIPING IN LEVEL 4 UNIT.
1. RE: M501 FOR ALL APPLICABLE MECHANICAL
DIAGRAMS.
2. CEILING COORDINATION OF ALL MEP SYSTEMS
(LIGHTING, DUCTWORK, DIFFUSERS, ELECTRICAL,
FIRE PROTECTION, ETC.) MUST BE COMPLETED BY
THE CONTRACTOR PRIOR TO THE START OF ANY
INSTALLATIONS.
3. DO NOT ROUTE DUCTWORK OVER ELECTRICAL
PANELS; MAINTAIN N.E.C. CLEARANCES. COORDINATE
ROUTINGS WITH DIV. 26 CONTRACTOR.
4. PROVIDE FLEXIBLE DUCT AND PIPE CONNECTIONS TO
ALL MOTORIZED EQUIPMENT.
5. VERIFY ALL EQUIPMENT ACCESS PANELS WITH
MANUFACTURER AND ARCHITECT.
6. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE
FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED.
7. T-STATS AND OCCUPANCY SENSORS SHALL BE
LOCATED NEAR THE LIGHT SWITCH WITHIN THE
ROOM SHOWN. COORDINATE WITH ARCHITECT &
ELECTRICAL ENGINEER TO MATCH HEIGHT AND
LOCATION.
8. ALL DUCTWORK SHALL BE ROUTED AS HIGH AS
POSSIBLE IN THE CEILING SPACE. UTILIZE JOIST
SPACE WHEN POSSIBLE, ESPECIALLY WHERE
CROSSING PIPES AND ELECTRICAL.
9. ACCESS PANEL LOCATIONS SHOWN ARE
APPROXIMATE, EXACT LOCATIONS SHALL BE
COORDINATED WITH THE ARCHITECT'S DRAWINGS
AND WITH THE LOCATIONS OF THE EQUIPMENT OR
APPARATUS THAT THEY SERVE.
HVAC NOTES:
1. RE: M502 FOR ALL APPLICABLE PLUMBING DIAGRAMS.
2. REFER TO THE PLUMBING FIXTURE CONNECTION
SCHEDULE FOR PIPE SIZES TO INDIVIDUAL FIXTURES.
3. NOT ALL REQUIRED CLEANOUTS ARE NECESSARILY
SHOWN ON THESE PLANS. PROVIDE CLEANOUTS ON
WASTE, VENT AND STORM PIPING AS REQUIRED BY
CODE AND FOR REASONABLE MAINTENANCE BASED
ON ACTUAL FIELD INSTALLATION. COORDINATE
LOCATIONS WITH ARCHITECT/ENGINEER.
4. PIPING ON EXTERIOR WALLS OR PRE-CAST
CONCRETE WALLS TO BE ROUTED IN FRAMED WALL
ON INTERIOR SIDE OF INSULATION.
5. DO NOT ROUTE PIPING OVER ELECTRICAL PANELS;
MAINTAIN N.E.C. CLEARANCES. COORDINATE
ROUTINGS WITH DIV. 26 CONTRACTOR.
6. PROVIDE FLEXIBLE PIPE CONNECTIONS TO ALL
MOTORIZED EQUIPMENT.
7. ROUTE DOMESTIC HOT WATER RECIRC TO WITHIN 2
FEET OF ALL HOT WATER FIXTURES.
8. VERIFY ALL EQUIPMENT ACCESS PANELS WITH
MANUFACTURER AND ARCHITECT.
9. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE
FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED.
10. ALL VALVES SHALL BE INSTALLED WITH ACCESS
PANELS IN HARD-LID CEILINGS.
11. ALL PIPING SHALL BE ROUTED AS HIGH AS POSSIBLE
IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN
POSSIBLE, ESPECIALLY WHERE CROSSING OTHER
PIPES, DUCTS, AND ELECTRICAL.
12. ACCESS PANEL LOCATIONS SHOWN ARE
APPROXIMATE, EXACT LOCATIONS SHALL BE
COORDINATED WITH THE ARCHITECT'S DRAWINGS
AND WITH THE LOCATIONS OF THE EQUIPMENT OR
APPARATUS THAT THEY SERVE.
PLUMBING NOTES:
T
T EEXH8x86"ØEF-1
BDD
U.C.
3/4"
P2
P4
P3
P1A 3/4"3/4"1/2"
1" CW, 1" HW
3/4" CW
1/2" HW
3/4"
3/4"
3/4"
3/4"CW
HW
FLAG NOTES:
1 UNIT 202 & 302: PROVIDE BB-1, 6.5' TOTAL LENGTH.
UNIT 202 & 302: PROVIDE BB-1, 9' TOTAL LENGTH.
UNIT 402: PROVIDE BB-2, 9.5' TOTAL LENGTH.
UNIT 402: PROVIDE BB-2, 13.5' TOTAL LENGTH.
2
2
1
SCALE: 2 MECH PLAN - ONE BR X02 @ LEVEL 4
1/4" = 1'-0"D/WT
T EEXH8x86"ØEF-1
BDD
U.C.
3/4"
4
3
3
4
BB SERVED FROM CEILING
OF UNIT BELOW.
Sheet Number
Date:VAIL, COLORADO953 S. Frontage Rd. West
Vail, Colorado 81657
tel: 970.476.1147
gpslarchitects.com
SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018
ALL SHEETS
VE PERMIT ISSUE
ALBUQUERQUE | AVON | DENVER | FORT COLLINS
303.278.3820 www ˛bgbuildingworks˛com
Project No. 9911.00 Copyright 2018
Sheet Title
ENLARGED
MECHANICAL
PLAN - ONE BR
X02 LEVELS 2-4
M-308
09/21/18
SCALE: 1 MECH PLAN - ONE BR X03 @ LEVELS 1-3
1/4" = 1'-0"D/WSCALE:3 PLUMBING PLAN - ONE BR X03 @ LEVELS 1-4
1/4" = 1'-0"D/WEEXH8x8HWS/R TO BASEBOARDS IN UNIT
ABOVE, TYP. LEVEL 1-3. NO HWS/R
PIPING IN LEVEL 4 UNIT.
EF-1
1. RE: M501 FOR ALL APPLICABLE MECHANICAL
DIAGRAMS.
2. CEILING COORDINATION OF ALL MEP SYSTEMS
(LIGHTING, DUCTWORK, DIFFUSERS, ELECTRICAL,
FIRE PROTECTION, ETC.) MUST BE COMPLETED BY
THE CONTRACTOR PRIOR TO THE START OF ANY
INSTALLATIONS.
3. DO NOT ROUTE DUCTWORK OVER ELECTRICAL
PANELS; MAINTAIN N.E.C. CLEARANCES. COORDINATE
ROUTINGS WITH DIV. 26 CONTRACTOR.
4. PROVIDE FLEXIBLE DUCT AND PIPE CONNECTIONS TO
ALL MOTORIZED EQUIPMENT.
5. VERIFY ALL EQUIPMENT ACCESS PANELS WITH
MANUFACTURER AND ARCHITECT.
6. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE
FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED.
7. T-STATS AND OCCUPANCY SENSORS SHALL BE
LOCATED NEAR THE LIGHT SWITCH WITHIN THE
ROOM SHOWN. COORDINATE WITH ARCHITECT &
ELECTRICAL ENGINEER TO MATCH HEIGHT AND
LOCATION.
8. ALL DUCTWORK SHALL BE ROUTED AS HIGH AS
POSSIBLE IN THE CEILING SPACE. UTILIZE JOIST
SPACE WHEN POSSIBLE, ESPECIALLY WHERE
CROSSING PIPES AND ELECTRICAL.
9. ACCESS PANEL LOCATIONS SHOWN ARE
APPROXIMATE, EXACT LOCATIONS SHALL BE
COORDINATED WITH THE ARCHITECT'S DRAWINGS
AND WITH THE LOCATIONS OF THE EQUIPMENT OR
APPARATUS THAT THEY SERVE.
HVAC NOTES:
1. RE: M502 FOR ALL APPLICABLE PLUMBING DIAGRAMS.
2. REFER TO THE PLUMBING FIXTURE CONNECTION
SCHEDULE FOR PIPE SIZES TO INDIVIDUAL FIXTURES.
3. NOT ALL REQUIRED CLEANOUTS ARE NECESSARILY
SHOWN ON THESE PLANS. PROVIDE CLEANOUTS ON
WASTE, VENT AND STORM PIPING AS REQUIRED BY
CODE AND FOR REASONABLE MAINTENANCE BASED
ON ACTUAL FIELD INSTALLATION. COORDINATE
LOCATIONS WITH ARCHITECT/ENGINEER.
4. PIPING ON EXTERIOR WALLS OR PRE-CAST
CONCRETE WALLS TO BE ROUTED IN FRAMED WALL
ON INTERIOR SIDE OF INSULATION.
5. DO NOT ROUTE PIPING OVER ELECTRICAL PANELS;
MAINTAIN N.E.C. CLEARANCES. COORDINATE
ROUTINGS WITH DIV. 26 CONTRACTOR.
6. PROVIDE FLEXIBLE PIPE CONNECTIONS TO ALL
MOTORIZED EQUIPMENT.
7. ROUTE DOMESTIC HOT WATER RECIRC TO WITHIN 2
FEET OF ALL HOT WATER FIXTURES.
8. VERIFY ALL EQUIPMENT ACCESS PANELS WITH
MANUFACTURER AND ARCHITECT.
9. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE
FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED.
10. ALL VALVES SHALL BE INSTALLED WITH ACCESS
PANELS IN HARD-LID CEILINGS.
11. ALL PIPING SHALL BE ROUTED AS HIGH AS POSSIBLE
IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN
POSSIBLE, ESPECIALLY WHERE CROSSING OTHER
PIPES, DUCTS, AND ELECTRICAL.
12. ACCESS PANEL LOCATIONS SHOWN ARE
APPROXIMATE, EXACT LOCATIONS SHALL BE
COORDINATED WITH THE ARCHITECT'S DRAWINGS
AND WITH THE LOCATIONS OF THE EQUIPMENT OR
APPARATUS THAT THEY SERVE.
PLUMBING NOTES:6"ØT
T
BDD
P1A
HW
CW
P4
P3
3/4"
3/4"
3/4"
1/2"
FLAG NOTES:
1 UNIT 103: PROVIDE BB-1, 13' TOTAL LENGTH. UNITS
203 & 303: PROVIDE BB-1, 9' TOTAL LENGTH.
UNIT 103: PROVIDE BB-1, 9' TOTAL LENGTH. UNITS
203 & 303: PROVIDE BB-1, 5' TOTAL LENGTH.
UNIT 403: PROVIDE BB-2, 13.5' TOTAL LENGTH.
UNIT 403: PROVIDE BB-2, 7.5' TOTAL LENGTH.
2
U.C.
3/4"
P2
1" CW, 1" HW
3/4" CW
1/2" HW
3/4"3/4"3/4"
1
2
SCALE: 2 MECH PLAN - ONE BR X03 @ LEVEL 4
1/4" = 1'-0"D/WEEXH8x8EF-16"ØT
T
BDD
U.C.
3/4"
3
4
3
4
BB SERVED FROM CEILING
OF UNIT BELOW.
Sheet Number
Date:VAIL, COLORADO953 S. Frontage Rd. West
Vail, Colorado 81657
tel: 970.476.1147
gpslarchitects.com
SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018
ALL SHEETS
VE PERMIT ISSUE
ALBUQUERQUE | AVON | DENVER | FORT COLLINS
303.278.3820 www ˛bgbuildingworks˛com
Project No. 9911.00 Copyright 2018
Sheet Title
ENLARGED
MECHANICAL
PLAN - ONE BR
X03
M-309
09/21/18
SCALE: 1 MECH PLAN - ONE BR X10 @ LEVEL 3
1/4" = 1'-0"D/WSCALE:3 PLUMBING PLAN - ONE BR X10 @ LEVELS 3-4
1/4" = 1'-0"D/WHWS/R TO BASEBOARDS IN UNIT
ABOVE.
1. RE: M501 FOR ALL APPLICABLE MECHANICAL
DIAGRAMS.
2. CEILING COORDINATION OF ALL MEP SYSTEMS
(LIGHTING, DUCTWORK, DIFFUSERS, ELECTRICAL,
FIRE PROTECTION, ETC.) MUST BE COMPLETED BY
THE CONTRACTOR PRIOR TO THE START OF ANY
INSTALLATIONS.
3. DO NOT ROUTE DUCTWORK OVER ELECTRICAL
PANELS; MAINTAIN N.E.C. CLEARANCES. COORDINATE
ROUTINGS WITH DIV. 26 CONTRACTOR.
4. PROVIDE FLEXIBLE DUCT AND PIPE CONNECTIONS TO
ALL MOTORIZED EQUIPMENT.
5. VERIFY ALL EQUIPMENT ACCESS PANELS WITH
MANUFACTURER AND ARCHITECT.
6. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE
FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED.
7. T-STATS AND OCCUPANCY SENSORS SHALL BE
LOCATED NEAR THE LIGHT SWITCH WITHIN THE
ROOM SHOWN. COORDINATE WITH ARCHITECT &
ELECTRICAL ENGINEER TO MATCH HEIGHT AND
LOCATION.
8. ALL DUCTWORK SHALL BE ROUTED AS HIGH AS
POSSIBLE IN THE CEILING SPACE. UTILIZE JOIST
SPACE WHEN POSSIBLE, ESPECIALLY WHERE
CROSSING PIPES AND ELECTRICAL.
9. ACCESS PANEL LOCATIONS SHOWN ARE
APPROXIMATE, EXACT LOCATIONS SHALL BE
COORDINATED WITH THE ARCHITECT'S DRAWINGS
AND WITH THE LOCATIONS OF THE EQUIPMENT OR
APPARATUS THAT THEY SERVE.
HVAC NOTES:
1. RE: M502 FOR ALL APPLICABLE PLUMBING DIAGRAMS.
2. REFER TO THE PLUMBING FIXTURE CONNECTION
SCHEDULE FOR PIPE SIZES TO INDIVIDUAL FIXTURES.
3. NOT ALL REQUIRED CLEANOUTS ARE NECESSARILY
SHOWN ON THESE PLANS. PROVIDE CLEANOUTS ON
WASTE, VENT AND STORM PIPING AS REQUIRED BY
CODE AND FOR REASONABLE MAINTENANCE BASED
ON ACTUAL FIELD INSTALLATION. COORDINATE
LOCATIONS WITH ARCHITECT/ENGINEER.
4. PIPING ON EXTERIOR WALLS OR PRE-CAST
CONCRETE WALLS TO BE ROUTED IN FRAMED WALL
ON INTERIOR SIDE OF INSULATION.
5. DO NOT ROUTE PIPING OVER ELECTRICAL PANELS;
MAINTAIN N.E.C. CLEARANCES. COORDINATE
ROUTINGS WITH DIV. 26 CONTRACTOR.
6. PROVIDE FLEXIBLE PIPE CONNECTIONS TO ALL
MOTORIZED EQUIPMENT.
7. ROUTE DOMESTIC HOT WATER RECIRC TO WITHIN 2
FEET OF ALL HOT WATER FIXTURES.
8. VERIFY ALL EQUIPMENT ACCESS PANELS WITH
MANUFACTURER AND ARCHITECT.
9. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE
FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED.
10. ALL VALVES SHALL BE INSTALLED WITH ACCESS
PANELS IN HARD-LID CEILINGS.
11. ALL PIPING SHALL BE ROUTED AS HIGH AS POSSIBLE
IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN
POSSIBLE, ESPECIALLY WHERE CROSSING OTHER
PIPES, DUCTS, AND ELECTRICAL.
12. ACCESS PANEL LOCATIONS SHOWN ARE
APPROXIMATE, EXACT LOCATIONS SHALL BE
COORDINATED WITH THE ARCHITECT'S DRAWINGS
AND WITH THE LOCATIONS OF THE EQUIPMENT OR
APPARATUS THAT THEY SERVE.
PLUMBING NOTES:
T
T EEXH8x86"ØEF-1
BDD
U.C.
3/4"
P2
P4
P3
P1A 3/4"3/4"1/2"
1" CW, 1" HW
3/4" CW
1/2" HW
3/4"
3/4"
CW
HW 3/4"
3/4"
FLAG NOTES:
1 UNIT 310: PROVIDE BB-1, 8.5' TOTAL LENGTH.
UNIT 310: PROVIDE BB-1, 6.5' TOTAL LENGTH.
UNIT 410: PROVIDE BB-2, 13' TOTAL LENGTH.
UNIT 410: PROVIDE BB-2, 9' TOTAL LENGTH.
2
2
1
SCALE: 2 MECH PLAN - ONE BR X10 @ LEVEL 4
1/4" = 1'-0"D/WT
T EEXH8x86"ØEF-1
BDD
U.C.
3/4"
4
3
3
4
BB SERVED FROM CEILING
OF UNIT BELOW.
Sheet Number
Date:VAIL, COLORADO953 S. Frontage Rd. West
Vail, Colorado 81657
tel: 970.476.1147
gpslarchitects.com
SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018
ALL SHEETS
VE PERMIT ISSUE
ALBUQUERQUE | AVON | DENVER | FORT COLLINS
303.278.3820 www ˛bgbuildingworks˛com
Project No. 9911.00 Copyright 2018
Sheet Title
M-310
ENLARGED
MECHANICAL
PLAN - ONE BR
X10 LEVELS 3-4
09/21/18
SCALE: 1 MECH PLAN - TYP ONE BR @ LEVELS 1-3
1/4" = 1'-0"D/WSCALE:3 PLUMBING PLAN - TYP ONE BR @ LEVELS 1-4
1/4" = 1'-0"D/W1. RE: M501 FOR ALL APPLICABLE MECHANICAL
DIAGRAMS.
2. CEILING COORDINATION OF ALL MEP SYSTEMS
(LIGHTING, DUCTWORK, DIFFUSERS, ELECTRICAL,
FIRE PROTECTION, ETC.) MUST BE COMPLETED BY
THE CONTRACTOR PRIOR TO THE START OF ANY
INSTALLATIONS.
3. DO NOT ROUTE DUCTWORK OVER ELECTRICAL
PANELS; MAINTAIN N.E.C. CLEARANCES. COORDINATE
ROUTINGS WITH DIV. 26 CONTRACTOR.
4. PROVIDE FLEXIBLE DUCT AND PIPE CONNECTIONS TO
ALL MOTORIZED EQUIPMENT.
5. VERIFY ALL EQUIPMENT ACCESS PANELS WITH
MANUFACTURER AND ARCHITECT.
6. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE
FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED.
7. T-STATS AND OCCUPANCY SENSORS SHALL BE
LOCATED NEAR THE LIGHT SWITCH WITHIN THE
ROOM SHOWN. COORDINATE WITH ARCHITECT &
ELECTRICAL ENGINEER TO MATCH HEIGHT AND
LOCATION.
8. ALL DUCTWORK SHALL BE ROUTED AS HIGH AS
POSSIBLE IN THE CEILING SPACE. UTILIZE JOIST
SPACE WHEN POSSIBLE, ESPECIALLY WHERE
CROSSING PIPES AND ELECTRICAL.
9. ACCESS PANEL LOCATIONS SHOWN ARE
APPROXIMATE, EXACT LOCATIONS SHALL BE
COORDINATED WITH THE ARCHITECT'S DRAWINGS
AND WITH THE LOCATIONS OF THE EQUIPMENT OR
APPARATUS THAT THEY SERVE.
HVAC NOTES:
1. RE: M502 FOR ALL APPLICABLE PLUMBING DIAGRAMS.
2. REFER TO THE PLUMBING FIXTURE CONNECTION
SCHEDULE FOR PIPE SIZES TO INDIVIDUAL FIXTURES.
3. NOT ALL REQUIRED CLEANOUTS ARE NECESSARILY
SHOWN ON THESE PLANS. PROVIDE CLEANOUTS ON
WASTE, VENT AND STORM PIPING AS REQUIRED BY
CODE AND FOR REASONABLE MAINTENANCE BASED
ON ACTUAL FIELD INSTALLATION. COORDINATE
LOCATIONS WITH ARCHITECT/ENGINEER.
4. PIPING ON EXTERIOR WALLS OR PRE-CAST
CONCRETE WALLS TO BE ROUTED IN FRAMED WALL
ON INTERIOR SIDE OF INSULATION.
5. DO NOT ROUTE PIPING OVER ELECTRICAL PANELS;
MAINTAIN N.E.C. CLEARANCES. COORDINATE
ROUTINGS WITH DIV. 26 CONTRACTOR.
6. PROVIDE FLEXIBLE PIPE CONNECTIONS TO ALL
MOTORIZED EQUIPMENT.
7. ROUTE DOMESTIC HOT WATER RECIRC TO WITHIN 2
FEET OF ALL HOT WATER FIXTURES.
8. VERIFY ALL EQUIPMENT ACCESS PANELS WITH
MANUFACTURER AND ARCHITECT.
9. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE
FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED.
10. ALL VALVES SHALL BE INSTALLED WITH ACCESS
PANELS IN HARD-LID CEILINGS.
11. ALL PIPING SHALL BE ROUTED AS HIGH AS POSSIBLE
IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN
POSSIBLE, ESPECIALLY WHERE CROSSING OTHER
PIPES, DUCTS, AND ELECTRICAL.
12. ACCESS PANEL LOCATIONS SHOWN ARE
APPROXIMATE, EXACT LOCATIONS SHALL BE
COORDINATED WITH THE ARCHITECT'S DRAWINGS
AND WITH THE LOCATIONS OF THE EQUIPMENT OR
APPARATUS THAT THEY SERVE.
PLUMBING NOTES:EEXH8x8HWS/R TO BASEBOARDS IN UNIT
ABOVE, TYP. LEVEL 1-3. NO
HWS/R PIPING IN LEVEL 4 UNIT.
EF-1
BDD 6"ØT
T
FLAG NOTES:
1 UNITS 109, 211, & 311: PROVIDE BB-1, 8.5' TOTAL
LENGTH.
UNITS 109, 211, & 311: PROVIDE BB-1, 5.5' TOTAL
LENGTH.
UNIT 411: PROVIDE BB-2, 13' TOTAL LENGTH.
UNIT 411: PROVIDE BB-2, 8' TOTAL LENGTH.
2
U.C.
3/4"
P1A
HW
CW
P4
P3
3/4"
3/4"
1/2"
P2
3/4"3/4"1" CW, 1" HW
3/4" CW
1/2" HW
3/4"
3/4"
3
4
SCALE: 2 MECH PLAN - TYP ONE BR @ LEVEL 4
1/4" = 1'-0"D/WEEXH8x8EF-1
BDD
6"ØT
T
U.C.
3/4"
3
4
1
2
BB SERVED FROM CEILING
OF UNIT BELOW.
Sheet Number
Date:VAIL, COLORADO953 S. Frontage Rd. West
Vail, Colorado 81657
tel: 970.476.1147
gpslarchitects.com
SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018
ALL SHEETS
VE PERMIT ISSUE
ALBUQUERQUE | AVON | DENVER | FORT COLLINS
303.278.3820 www ˛bgbuildingworks˛com
Project No. 9911.00 Copyright 2018
Sheet Title
M-311
ENLARGED
MECHANICAL
PLAN - TYP ONE
BR
09/21/18
SCALE: 1 MECH PLAN - ONE BR X16 @ LEVELS 1-3
1/4" = 1'-0"
D/W
SCALE:3 PLUMBING PLAN - ONE BR X16 @ LEVELS 1-4
1/4" = 1'-0"
D/W
1. RE: M501 FOR ALL APPLICABLE MECHANICAL
DIAGRAMS.
2. CEILING COORDINATION OF ALL MEP SYSTEMS
(LIGHTING, DUCTWORK, DIFFUSERS, ELECTRICAL,
FIRE PROTECTION, ETC.) MUST BE COMPLETED BY
THE CONTRACTOR PRIOR TO THE START OF ANY
INSTALLATIONS.
3. DO NOT ROUTE DUCTWORK OVER ELECTRICAL
PANELS; MAINTAIN N.E.C. CLEARANCES. COORDINATE
ROUTINGS WITH DIV. 26 CONTRACTOR.
4. PROVIDE FLEXIBLE DUCT AND PIPE CONNECTIONS TO
ALL MOTORIZED EQUIPMENT.
5. VERIFY ALL EQUIPMENT ACCESS PANELS WITH
MANUFACTURER AND ARCHITECT.
6. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE
FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED.
7. T-STATS AND OCCUPANCY SENSORS SHALL BE
LOCATED NEAR THE LIGHT SWITCH WITHIN THE
ROOM SHOWN. COORDINATE WITH ARCHITECT &
ELECTRICAL ENGINEER TO MATCH HEIGHT AND
LOCATION.
8. ALL DUCTWORK SHALL BE ROUTED AS HIGH AS
POSSIBLE IN THE CEILING SPACE. UTILIZE JOIST
SPACE WHEN POSSIBLE, ESPECIALLY WHERE
CROSSING PIPES AND ELECTRICAL.
9. ACCESS PANEL LOCATIONS SHOWN ARE
APPROXIMATE, EXACT LOCATIONS SHALL BE
COORDINATED WITH THE ARCHITECT'S DRAWINGS
AND WITH THE LOCATIONS OF THE EQUIPMENT OR
APPARATUS THAT THEY SERVE.
HVAC NOTES:
1. RE: M502 FOR ALL APPLICABLE PLUMBING DIAGRAMS.
2. REFER TO THE PLUMBING FIXTURE CONNECTION
SCHEDULE FOR PIPE SIZES TO INDIVIDUAL FIXTURES.
3. NOT ALL REQUIRED CLEANOUTS ARE NECESSARILY
SHOWN ON THESE PLANS. PROVIDE CLEANOUTS ON
WASTE, VENT AND STORM PIPING AS REQUIRED BY
CODE AND FOR REASONABLE MAINTENANCE BASED
ON ACTUAL FIELD INSTALLATION. COORDINATE
LOCATIONS WITH ARCHITECT/ENGINEER.
4. PIPING ON EXTERIOR WALLS OR PRE-CAST
CONCRETE WALLS TO BE ROUTED IN FRAMED WALL
ON INTERIOR SIDE OF INSULATION.
5. DO NOT ROUTE PIPING OVER ELECTRICAL PANELS;
MAINTAIN N.E.C. CLEARANCES. COORDINATE
ROUTINGS WITH DIV. 26 CONTRACTOR.
6. PROVIDE FLEXIBLE PIPE CONNECTIONS TO ALL
MOTORIZED EQUIPMENT.
7. ROUTE DOMESTIC HOT WATER RECIRC TO WITHIN 2
FEET OF ALL HOT WATER FIXTURES.
8. VERIFY ALL EQUIPMENT ACCESS PANELS WITH
MANUFACTURER AND ARCHITECT.
9. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE
FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED.
10. ALL VALVES SHALL BE INSTALLED WITH ACCESS
PANELS IN HARD-LID CEILINGS.
11. ALL PIPING SHALL BE ROUTED AS HIGH AS POSSIBLE
IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN
POSSIBLE, ESPECIALLY WHERE CROSSING OTHER
PIPES, DUCTS, AND ELECTRICAL.
12. ACCESS PANEL LOCATIONS SHOWN ARE
APPROXIMATE, EXACT LOCATIONS SHALL BE
COORDINATED WITH THE ARCHITECT'S DRAWINGS
AND WITH THE LOCATIONS OF THE EQUIPMENT OR
APPARATUS THAT THEY SERVE.
PLUMBING NOTES:
HWS/R TO BASEBOARDS IN UNIT
ABOVE, TYP. LEVEL 1-3. NO
HWS/R PIPING IN LEVEL 4 UNIT.
T
T
FLAG NOTES:
1 UNITS 216 & 316: PROVIDE BB-1, 9' TOTAL LENGTH.
UNITS 216 & 316: PROVIDE BB-1, 8.5' TOTAL LENGTH.
UNIT 114: PROVIDE BB-2, 13.5' TOTAL LENGTH.
UNIT 114: PROVIDE BB-2, 12' TOTAL LENGTH.
2
EF-1 EEXH8x8BDD 6"ØU.C.
3/4"
P1A
P4
P3
P2
1" CW, 1" HW
3/4" CW
1/2" HW 3/4"3/4"3/4"
3/4"
1/2"
HW
CW
3/4"
3/4"
3
4
1
2
SCALE: 2 MECH PLAN - ONE BR X16 @ LEVEL 4
1/4" = 1'-0"
D/W
T
T
EF-1EEXH8x8 BDD
6"ØU.C.
3/4"
3
4
BB IN UNIT 114 SUPPLIED
FROM CEILING TO AVOID
ROUTING PIPE OVER
UNCONDITIONED GARAGE.
BB SERVED FROM CEILING
OF UNIT BELOW.
Sheet Number
Date:VAIL, COLORADO953 S. Frontage Rd. West
Vail, Colorado 81657
tel: 970.476.1147
gpslarchitects.com
SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018
ALL SHEETS
VE PERMIT ISSUE
ALBUQUERQUE | AVON | DENVER | FORT COLLINS
303.278.3820 www ˛bgbuildingworks˛com
Project No. 9911.00 Copyright 2018
Sheet Title
M-312
ENLARGED
MECHANICAL
PLAN - ONE BR
X16
09/21/18
SCALE: 1 MECH PLAN - ONE BR X17 @ LEVELS 2-3
1/4" = 1'-0"
D/W
SCALE:3 PLUMBING PLAN - ONE BR X17 @ LEVELS 2-4
1/4" = 1'-0"
D/WEEXH8x8
EF-1
1. RE: M501 FOR ALL APPLICABLE MECHANICAL
DIAGRAMS.
2. CEILING COORDINATION OF ALL MEP SYSTEMS
(LIGHTING, DUCTWORK, DIFFUSERS, ELECTRICAL,
FIRE PROTECTION, ETC.) MUST BE COMPLETED BY
THE CONTRACTOR PRIOR TO THE START OF ANY
INSTALLATIONS.
3. DO NOT ROUTE DUCTWORK OVER ELECTRICAL
PANELS; MAINTAIN N.E.C. CLEARANCES. COORDINATE
ROUTINGS WITH DIV. 26 CONTRACTOR.
4. PROVIDE FLEXIBLE DUCT AND PIPE CONNECTIONS TO
ALL MOTORIZED EQUIPMENT.
5. VERIFY ALL EQUIPMENT ACCESS PANELS WITH
MANUFACTURER AND ARCHITECT.
6. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE
FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED.
7. T-STATS AND OCCUPANCY SENSORS SHALL BE
LOCATED NEAR THE LIGHT SWITCH WITHIN THE
ROOM SHOWN. COORDINATE WITH ARCHITECT &
ELECTRICAL ENGINEER TO MATCH HEIGHT AND
LOCATION.
8. ALL DUCTWORK SHALL BE ROUTED AS HIGH AS
POSSIBLE IN THE CEILING SPACE. UTILIZE JOIST
SPACE WHEN POSSIBLE, ESPECIALLY WHERE
CROSSING PIPES AND ELECTRICAL.
9. ACCESS PANEL LOCATIONS SHOWN ARE
APPROXIMATE, EXACT LOCATIONS SHALL BE
COORDINATED WITH THE ARCHITECT'S DRAWINGS
AND WITH THE LOCATIONS OF THE EQUIPMENT OR
APPARATUS THAT THEY SERVE.
HVAC NOTES:
1. RE: M502 FOR ALL APPLICABLE PLUMBING DIAGRAMS.
2. REFER TO THE PLUMBING FIXTURE CONNECTION
SCHEDULE FOR PIPE SIZES TO INDIVIDUAL FIXTURES.
3. NOT ALL REQUIRED CLEANOUTS ARE NECESSARILY
SHOWN ON THESE PLANS. PROVIDE CLEANOUTS ON
WASTE, VENT AND STORM PIPING AS REQUIRED BY
CODE AND FOR REASONABLE MAINTENANCE BASED
ON ACTUAL FIELD INSTALLATION. COORDINATE
LOCATIONS WITH ARCHITECT/ENGINEER.
4. PIPING ON EXTERIOR WALLS OR PRE-CAST
CONCRETE WALLS TO BE ROUTED IN FRAMED WALL
ON INTERIOR SIDE OF INSULATION.
5. DO NOT ROUTE PIPING OVER ELECTRICAL PANELS;
MAINTAIN N.E.C. CLEARANCES. COORDINATE
ROUTINGS WITH DIV. 26 CONTRACTOR.
6. PROVIDE FLEXIBLE PIPE CONNECTIONS TO ALL
MOTORIZED EQUIPMENT.
7. ROUTE DOMESTIC HOT WATER RECIRC TO WITHIN 2
FEET OF ALL HOT WATER FIXTURES.
8. VERIFY ALL EQUIPMENT ACCESS PANELS WITH
MANUFACTURER AND ARCHITECT.
9. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE
FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED.
10. ALL VALVES SHALL BE INSTALLED WITH ACCESS
PANELS IN HARD-LID CEILINGS.
11. ALL PIPING SHALL BE ROUTED AS HIGH AS POSSIBLE
IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN
POSSIBLE, ESPECIALLY WHERE CROSSING OTHER
PIPES, DUCTS, AND ELECTRICAL.
12. ACCESS PANEL LOCATIONS SHOWN ARE
APPROXIMATE, EXACT LOCATIONS SHALL BE
COORDINATED WITH THE ARCHITECT'S DRAWINGS
AND WITH THE LOCATIONS OF THE EQUIPMENT OR
APPARATUS THAT THEY SERVE.
PLUMBING NOTES:
HWS/R TO BASEBOARDS IN UNIT
ABOVE, TYP. LEVELS 2 & 3. NO
HWS/R PIPING IN LEVEL 4 UNIT.
T
T 6"ØBDD
U.C.
3/4"
P2
P4
P3
P1A
1/2"
1" CW, 1" HW
3/4" CW
1/2" HW
3/4"
3/4"CW
HW
3/4"3/4"
3/4"
FLAG NOTES:
1 UNITS 217 AND 317: PROVIDE BB-1 9.5' TOTAL
LENGTH.
UNITS 217 AND 317: PROVIDE BB-1 8.5' TOTAL
LENGTH.
UNITS 417: PROVIDE BB-2, 14' TOTAL LENGTH.
UNITS 417: PROVIDE BB-2, 12' TOTAL LENGTH.
2
3
4
1
2
SCALE: 2 MECH PLAN - ONE BR X17 @ LEVEL 4
1/4" = 1'-0"
D/W EEXH8x8EF-1
T
T 6"ØBDD
U.C.
3/4"
3
4
3/4"BB SERVED FROM CEILING
OF UNIT BELOW.
Sheet Number
Date:VAIL, COLORADO953 S. Frontage Rd. West
Vail, Colorado 81657
tel: 970.476.1147
gpslarchitects.com
SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018
ALL SHEETS
VE PERMIT ISSUE
ALBUQUERQUE | AVON | DENVER | FORT COLLINS
303.278.3820 www ˛bgbuildingworks˛com
Project No. 9911.00 Copyright 2018
Sheet Title
M-313
ENLARGED
MECHANICAL
PLAN - ONE BR
X17
09/21/18
D/WSCALE: 1 MECHANICAL PLAN - ONE BR X02 @ LEVEL 1
1/4" = 1'-0"D/WSCALE:2 PLUMBING PLAN - ONE BR X02 @ LEVEL 1
1/4" = 1'-0"
1. RE: M501 FOR ALL APPLICABLE MECHANICAL
DIAGRAMS.
2. CEILING COORDINATION OF ALL MEP SYSTEMS
(LIGHTING, DUCTWORK, DIFFUSERS, ELECTRICAL,
FIRE PROTECTION, ETC.) MUST BE COMPLETED BY
THE CONTRACTOR PRIOR TO THE START OF ANY
INSTALLATIONS.
3. DO NOT ROUTE DUCTWORK OVER ELECTRICAL
PANELS; MAINTAIN N.E.C. CLEARANCES. COORDINATE
ROUTINGS WITH DIV. 26 CONTRACTOR.
4. PROVIDE FLEXIBLE DUCT AND PIPE CONNECTIONS TO
ALL MOTORIZED EQUIPMENT.
5. VERIFY ALL EQUIPMENT ACCESS PANELS WITH
MANUFACTURER AND ARCHITECT.
6. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE
FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED.
7. T-STATS AND OCCUPANCY SENSORS SHALL BE
LOCATED NEAR THE LIGHT SWITCH WITHIN THE
ROOM SHOWN. COORDINATE WITH ARCHITECT &
ELECTRICAL ENGINEER TO MATCH HEIGHT AND
LOCATION.
8. ALL DUCTWORK SHALL BE ROUTED AS HIGH AS
POSSIBLE IN THE CEILING SPACE. UTILIZE JOIST
SPACE WHEN POSSIBLE, ESPECIALLY WHERE
CROSSING PIPES AND ELECTRICAL.
9. ACCESS PANEL LOCATIONS SHOWN ARE
APPROXIMATE, EXACT LOCATIONS SHALL BE
COORDINATED WITH THE ARCHITECT'S DRAWINGS
AND WITH THE LOCATIONS OF THE EQUIPMENT OR
APPARATUS THAT THEY SERVE.
HVAC NOTES:
1. RE: M502 FOR ALL APPLICABLE PLUMBING DIAGRAMS.
2. REFER TO THE PLUMBING FIXTURE CONNECTION
SCHEDULE FOR PIPE SIZES TO INDIVIDUAL FIXTURES.
3. NOT ALL REQUIRED CLEANOUTS ARE NECESSARILY
SHOWN ON THESE PLANS. PROVIDE CLEANOUTS ON
WASTE, VENT AND STORM PIPING AS REQUIRED BY
CODE AND FOR REASONABLE MAINTENANCE BASED
ON ACTUAL FIELD INSTALLATION. COORDINATE
LOCATIONS WITH ARCHITECT/ENGINEER.
4. PIPING ON EXTERIOR WALLS OR PRE-CAST
CONCRETE WALLS TO BE ROUTED IN FRAMED WALL
ON INTERIOR SIDE OF INSULATION.
5. DO NOT ROUTE PIPING OVER ELECTRICAL PANELS;
MAINTAIN N.E.C. CLEARANCES. COORDINATE
ROUTINGS WITH DIV. 26 CONTRACTOR.
6. PROVIDE FLEXIBLE PIPE CONNECTIONS TO ALL
MOTORIZED EQUIPMENT.
7. ROUTE DOMESTIC HOT WATER RECIRC TO WITHIN 2
FEET OF ALL HOT WATER FIXTURES.
8. VERIFY ALL EQUIPMENT ACCESS PANELS WITH
MANUFACTURER AND ARCHITECT.
9. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE
FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED.
10. ALL VALVES SHALL BE INSTALLED WITH ACCESS
PANELS IN HARD-LID CEILINGS.
11. ALL PIPING SHALL BE ROUTED AS HIGH AS POSSIBLE
IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN
POSSIBLE, ESPECIALLY WHERE CROSSING OTHER
PIPES, DUCTS, AND ELECTRICAL.
12. ACCESS PANEL LOCATIONS SHOWN ARE
APPROXIMATE, EXACT LOCATIONS SHALL BE
COORDINATED WITH THE ARCHITECT'S DRAWINGS
AND WITH THE LOCATIONS OF THE EQUIPMENT OR
APPARATUS THAT THEY SERVE.
PLUMBING NOTES:
FLAG NOTES:
1 UNIT 102: PROVIDE BB-1, 10.5' TOTAL LENGTH.
UNIT 102: PROVIDE BB-1, 13' TOTAL LENGTH.2
P2
P4
P3
P1A 3/4"3/4"1/2"
1" CW, 1" HW
3/4" CW
1/2" HW
3/4"
3/4"
3/4"
3/4"CW
HW
HWS/R TO BASEBOARDS IN UNIT
ABOVE.T
T 6"ØEF-1
BDD
U.C.
3/4"
2
1
Sheet Number
Date:VAIL, COLORADO953 S. Frontage Rd. West
Vail, Colorado 81657
tel: 970.476.1147
gpslarchitects.com
SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018
ALL SHEETS
VE PERMIT ISSUE
ALBUQUERQUE | AVON | DENVER | FORT COLLINS
303.278.3820 www ˛bgbuildingworks˛com
Project No. 9911.00 Copyright 2018
Sheet Title
M-314
ENLARGED
MECHANICAL
PLAN - ONE BR
X02 LEVEL 1
09/21/18
SCALE: 1 MECH PLAN - TWO BR X04 @ LEVELS 1-3
1/4" = 1'-0"
D/W
SCALE:3 PLUMBING PLAN - TWO BR X04 @ LEVELS 1-4
1/4" = 1'-0"
D/WU.C.3/4"1. RE: M501 FOR ALL APPLICABLE MECHANICAL
DIAGRAMS.
2. CEILING COORDINATION OF ALL MEP SYSTEMS
(LIGHTING, DUCTWORK, DIFFUSERS, ELECTRICAL,
FIRE PROTECTION, ETC.) MUST BE COMPLETED BY
THE CONTRACTOR PRIOR TO THE START OF ANY
INSTALLATIONS.
3. DO NOT ROUTE DUCTWORK OVER ELECTRICAL
PANELS; MAINTAIN N.E.C. CLEARANCES. COORDINATE
ROUTINGS WITH DIV. 26 CONTRACTOR.
4. PROVIDE FLEXIBLE DUCT AND PIPE CONNECTIONS TO
ALL MOTORIZED EQUIPMENT.
5. VERIFY ALL EQUIPMENT ACCESS PANELS WITH
MANUFACTURER AND ARCHITECT.
6. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE
FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED.
7. T-STATS AND OCCUPANCY SENSORS SHALL BE
LOCATED NEAR THE LIGHT SWITCH WITHIN THE
ROOM SHOWN. COORDINATE WITH ARCHITECT &
ELECTRICAL ENGINEER TO MATCH HEIGHT AND
LOCATION.
8. ALL DUCTWORK SHALL BE ROUTED AS HIGH AS
POSSIBLE IN THE CEILING SPACE. UTILIZE JOIST
SPACE WHEN POSSIBLE, ESPECIALLY WHERE
CROSSING PIPES AND ELECTRICAL.
9. ACCESS PANEL LOCATIONS SHOWN ARE
APPROXIMATE, EXACT LOCATIONS SHALL BE
COORDINATED WITH THE ARCHITECT'S DRAWINGS
AND WITH THE LOCATIONS OF THE EQUIPMENT OR
APPARATUS THAT THEY SERVE.
HVAC NOTES:
1. RE: M502 FOR ALL APPLICABLE PLUMBING DIAGRAMS.
2. REFER TO THE PLUMBING FIXTURE CONNECTION
SCHEDULE FOR PIPE SIZES TO INDIVIDUAL FIXTURES.
3. NOT ALL REQUIRED CLEANOUTS ARE NECESSARILY
SHOWN ON THESE PLANS. PROVIDE CLEANOUTS ON
WASTE, VENT AND STORM PIPING AS REQUIRED BY
CODE AND FOR REASONABLE MAINTENANCE BASED
ON ACTUAL FIELD INSTALLATION. COORDINATE
LOCATIONS WITH ARCHITECT/ENGINEER.
4. PIPING ON EXTERIOR WALLS OR PRE-CAST
CONCRETE WALLS TO BE ROUTED IN FRAMED WALL
ON INTERIOR SIDE OF INSULATION.
5. DO NOT ROUTE PIPING OVER ELECTRICAL PANELS;
MAINTAIN N.E.C. CLEARANCES. COORDINATE
ROUTINGS WITH DIV. 26 CONTRACTOR.
6. PROVIDE FLEXIBLE PIPE CONNECTIONS TO ALL
MOTORIZED EQUIPMENT.
7. ROUTE DOMESTIC HOT WATER RECIRC TO WITHIN 2
FEET OF ALL HOT WATER FIXTURES.
8. VERIFY ALL EQUIPMENT ACCESS PANELS WITH
MANUFACTURER AND ARCHITECT.
9. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE
FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED.
10. ALL VALVES SHALL BE INSTALLED WITH ACCESS
PANELS IN HARD-LID CEILINGS.
11. ALL PIPING SHALL BE ROUTED AS HIGH AS POSSIBLE
IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN
POSSIBLE, ESPECIALLY WHERE CROSSING OTHER
PIPES, DUCTS, AND ELECTRICAL.
12. ACCESS PANEL LOCATIONS SHOWN ARE
APPROXIMATE, EXACT LOCATIONS SHALL BE
COORDINATED WITH THE ARCHITECT'S DRAWINGS
AND WITH THE LOCATIONS OF THE EQUIPMENT OR
APPARATUS THAT THEY SERVE.
PLUMBING NOTES:
T
T
T
P1A
P2
P4
P3
FLAG NOTES:
1 UNIT 104: PROVIDE BB-1, 10.5' TOTAL LENGTH.
UNITS 204 & 304: PROVIDE BB-1, 5.5' TOTAL LENGTH.
UNIT 104: PROVIDE BB-1, 12' TOTAL LENGTH.
UNITS 204 & 304: PROVIDE BB-1, 7' TOTAL LENGTH.
UNIT 104: PROVIDE BB-1, 13' TOTAL LENGTH.
UNITS 204 & 304: PROVIDE BB-1, 8' TOTAL LENGTH.
UNIT 404: PROVIDE BB-2, 10' TOTAL LENGTH.
UNIT 404: PROVIDE BB-2, 11.5' TOTAL LENGTH.
UNIT 404: PROVIDE BB-2, 12' TOTAL LENGTH.
2
3
EF-1
E EXH
8x8 BDD6"Ø
HWS/R TO BASEBOARDS IN
UNIT ABOVE, LEVEL 3. NO
HWS/R PIPING IN LEVEL 4 UNIT.
HW
CW1/2"P2
HW1/2"3/4"4
5
6
SCALE: 2 MECH PLAN - TWO BR X04 @ LEVEL 4
1/4" = 1'-0"
D/W U.C.3/4"T
T
T
EF-1
E EXH
8x8 BDD6"Ø
3
2
1
4
5
6
3/4" CW
3/4" HWCW3/4"3/4"3/4"1" CW, 1" HW
3/4"
BB SERVED FROM CEILING
OF UNIT BELOW.
BB SERVED FROM CEILING
OF UNIT BELOW.
BB SERVED FROM CEILING
OF UNIT BELOW.
Sheet Number
Date:VAIL, COLORADO953 S. Frontage Rd. West
Vail, Colorado 81657
tel: 970.476.1147
gpslarchitects.com
SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018
ALL SHEETS
VE PERMIT ISSUE
ALBUQUERQUE | AVON | DENVER | FORT COLLINS
303.278.3820 www ˛bgbuildingworks˛com
Project No. 9911.00 Copyright 2018
Sheet Title
M-315
ENLARGED
MECHANICAL
PLAN - TWO BR
X04
09/21/18
SCALE: 1 MECHANICAL PLAN - ONE BR X10 @ LEVEL 2
1/4" = 1'-0" SCALE: 2 PLUMBING PLAN - ONE BR X10 @ LEVEL 2
1/4" = 1'-0"
1. RE: M501 FOR ALL APPLICABLE MECHANICAL
DIAGRAMS.
2. CEILING COORDINATION OF ALL MEP SYSTEMS
(LIGHTING, DUCTWORK, DIFFUSERS, ELECTRICAL,
FIRE PROTECTION, ETC.) MUST BE COMPLETED BY
THE CONTRACTOR PRIOR TO THE START OF ANY
INSTALLATIONS.
3. DO NOT ROUTE DUCTWORK OVER ELECTRICAL
PANELS; MAINTAIN N.E.C. CLEARANCES. COORDINATE
ROUTINGS WITH DIV. 26 CONTRACTOR.
4. PROVIDE FLEXIBLE DUCT AND PIPE CONNECTIONS TO
ALL MOTORIZED EQUIPMENT.
5. VERIFY ALL EQUIPMENT ACCESS PANELS WITH
MANUFACTURER AND ARCHITECT.
6. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE
FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED.
7. T-STATS AND OCCUPANCY SENSORS SHALL BE
LOCATED NEAR THE LIGHT SWITCH WITHIN THE
ROOM SHOWN. COORDINATE WITH ARCHITECT &
ELECTRICAL ENGINEER TO MATCH HEIGHT AND
LOCATION.
8. ALL DUCTWORK SHALL BE ROUTED AS HIGH AS
POSSIBLE IN THE CEILING SPACE. UTILIZE JOIST
SPACE WHEN POSSIBLE, ESPECIALLY WHERE
CROSSING PIPES AND ELECTRICAL.
9. ACCESS PANEL LOCATIONS SHOWN ARE
APPROXIMATE, EXACT LOCATIONS SHALL BE
COORDINATED WITH THE ARCHITECT'S DRAWINGS
AND WITH THE LOCATIONS OF THE EQUIPMENT OR
APPARATUS THAT THEY SERVE.
HVAC NOTES:
1. RE: M502 FOR ALL APPLICABLE PLUMBING DIAGRAMS.
2. REFER TO THE PLUMBING FIXTURE CONNECTION
SCHEDULE FOR PIPE SIZES TO INDIVIDUAL FIXTURES.
3. NOT ALL REQUIRED CLEANOUTS ARE NECESSARILY
SHOWN ON THESE PLANS. PROVIDE CLEANOUTS ON
WASTE, VENT AND STORM PIPING AS REQUIRED BY
CODE AND FOR REASONABLE MAINTENANCE BASED
ON ACTUAL FIELD INSTALLATION. COORDINATE
LOCATIONS WITH ARCHITECT/ENGINEER.
4. PIPING ON EXTERIOR WALLS OR PRE-CAST
CONCRETE WALLS TO BE ROUTED IN FRAMED WALL
ON INTERIOR SIDE OF INSULATION.
5. DO NOT ROUTE PIPING OVER ELECTRICAL PANELS;
MAINTAIN N.E.C. CLEARANCES. COORDINATE
ROUTINGS WITH DIV. 26 CONTRACTOR.
6. PROVIDE FLEXIBLE PIPE CONNECTIONS TO ALL
MOTORIZED EQUIPMENT.
7. ROUTE DOMESTIC HOT WATER RECIRC TO WITHIN 2
FEET OF ALL HOT WATER FIXTURES.
8. VERIFY ALL EQUIPMENT ACCESS PANELS WITH
MANUFACTURER AND ARCHITECT.
9. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE
FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED.
10. ALL VALVES SHALL BE INSTALLED WITH ACCESS
PANELS IN HARD-LID CEILINGS.
11. ALL PIPING SHALL BE ROUTED AS HIGH AS POSSIBLE
IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN
POSSIBLE, ESPECIALLY WHERE CROSSING OTHER
PIPES, DUCTS, AND ELECTRICAL.
12. ACCESS PANEL LOCATIONS SHOWN ARE
APPROXIMATE, EXACT LOCATIONS SHALL BE
COORDINATED WITH THE ARCHITECT'S DRAWINGS
AND WITH THE LOCATIONS OF THE EQUIPMENT OR
APPARATUS THAT THEY SERVE.
PLUMBING NOTES:
FLAG NOTES:
1 UNIT 210: PROVIDE BB-1, 8.5' TOTAL LENGTH.
UNIT 210: PROVIDE BB-1, 6.5' TOTAL LENGTH.2 3/4"3/4"CW
P2
P4
P3
P1A
1" CW, 1" HW
3/4" CW
1/2" HW
3/4"
3/4"
3/4"
1/2"
HW 3/4"
HWS/R TO BASEBOARDS IN UNIT
ABOVE.
T
T 6"ØEF-1
BDD
U.C.
3/4"
2
1
Sheet Number
Date:VAIL, COLORADO953 S. Frontage Rd. West
Vail, Colorado 81657
tel: 970.476.1147
gpslarchitects.com
SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018
ALL SHEETS
VE PERMIT ISSUE
ALBUQUERQUE | AVON | DENVER | FORT COLLINS
303.278.3820 www ˛bgbuildingworks˛com
Project No. 9911.00 Copyright 2018
Sheet Title
M-316
ENLARGED
MECHANICAL
PLAN - ONE BR
X10 LEVEL 2
09/21/18
ENTRY VESTIBULE
COMMON LOBBY
MANAGEMENT OFFICE
E. CORRIDOR
W. CORRIDOR
SCALE: 1 MECHANICAL PLAN - LOBBY/OFFICE/ENTRY - LEVEL 1
1/4" = 1'-0"
FLAG NOTES:
1 MANAGEMENT OFFICE: PROVIDE BB-1, 4.5' TOTAL
LENGTH.
COMMON LOBBY: PROVIDE BB-1, 19.5' TOTAL
LENGTH.
HWS/HWR TO BASEBOARDS
SERVING OFFICE.
T
T
2
21
HWS/HWR TO BASEBOARDS
SERVING COMMON LOBBY.
1. RE: M501 FOR ALL APPLICABLE MECHANICAL
DIAGRAMS.
2. CEILING COORDINATION OF ALL MEP SYSTEMS
(LIGHTING, DUCTWORK, DIFFUSERS, ELECTRICAL,
FIRE PROTECTION, ETC.) MUST BE COMPLETED BY
THE CONTRACTOR PRIOR TO THE START OF ANY
INSTALLATIONS.
3. DO NOT ROUTE DUCTWORK OVER ELECTRICAL
PANELS; MAINTAIN N.E.C. CLEARANCES. COORDINATE
ROUTINGS WITH DIV. 26 CONTRACTOR.
4. PROVIDE FLEXIBLE DUCT AND PIPE CONNECTIONS TO
ALL MOTORIZED EQUIPMENT.
5. VERIFY ALL EQUIPMENT ACCESS PANELS WITH
MANUFACTURER AND ARCHITECT.
6. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE
FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED.
7. T-STATS AND OCCUPANCY SENSORS SHALL BE
LOCATED NEAR THE LIGHT SWITCH WITHIN THE
ROOM SHOWN. COORDINATE WITH ARCHITECT &
ELECTRICAL ENGINEER TO MATCH HEIGHT AND
LOCATION.
8. ALL DUCTWORK SHALL BE ROUTED AS HIGH AS
POSSIBLE IN THE CEILING SPACE. UTILIZE JOIST
SPACE WHEN POSSIBLE, ESPECIALLY WHERE
CROSSING PIPES AND ELECTRICAL.
9. ACCESS PANEL LOCATIONS SHOWN ARE
APPROXIMATE, EXACT LOCATIONS SHALL BE
COORDINATED WITH THE ARCHITECT'S DRAWINGS
AND WITH THE LOCATIONS OF THE EQUIPMENT OR
APPARATUS THAT THEY SERVE.
HVAC NOTES:
1. RE: M502 FOR ALL APPLICABLE PLUMBING DIAGRAMS.
2. REFER TO THE PLUMBING FIXTURE CONNECTION
SCHEDULE FOR PIPE SIZES TO INDIVIDUAL FIXTURES.
3. NOT ALL REQUIRED CLEANOUTS ARE NECESSARILY
SHOWN ON THESE PLANS. PROVIDE CLEANOUTS ON
WASTE, VENT AND STORM PIPING AS REQUIRED BY
CODE AND FOR REASONABLE MAINTENANCE BASED
ON ACTUAL FIELD INSTALLATION. COORDINATE
LOCATIONS WITH ARCHITECT/ENGINEER.
4. PIPING ON EXTERIOR WALLS OR PRE-CAST
CONCRETE WALLS TO BE ROUTED IN FRAMED WALL
ON INTERIOR SIDE OF INSULATION.
5. DO NOT ROUTE PIPING OVER ELECTRICAL PANELS;
MAINTAIN N.E.C. CLEARANCES. COORDINATE
ROUTINGS WITH DIV. 26 CONTRACTOR.
6. PROVIDE FLEXIBLE PIPE CONNECTIONS TO ALL
MOTORIZED EQUIPMENT.
7. ROUTE DOMESTIC HOT WATER RECIRC TO WITHIN 2
FEET OF ALL HOT WATER FIXTURES.
8. VERIFY ALL EQUIPMENT ACCESS PANELS WITH
MANUFACTURER AND ARCHITECT.
9. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE
FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED.
10. ALL VALVES SHALL BE INSTALLED WITH ACCESS
PANELS IN HARD-LID CEILINGS.
11. ALL PIPING SHALL BE ROUTED AS HIGH AS POSSIBLE
IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN
POSSIBLE, ESPECIALLY WHERE CROSSING OTHER
PIPES, DUCTS, AND ELECTRICAL.
12. ACCESS PANEL LOCATIONS SHOWN ARE
APPROXIMATE, EXACT LOCATIONS SHALL BE
COORDINATED WITH THE ARCHITECT'S DRAWINGS
AND WITH THE LOCATIONS OF THE EQUIPMENT OR
APPARATUS THAT THEY SERVE.
PLUMBING NOTES:
Sheet Number
Date:VAIL, COLORADO953 S. Frontage Rd. West
Vail, Colorado 81657
tel: 970.476.1147
gpslarchitects.com
SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018
ALL SHEETS
VE PERMIT ISSUE
ALBUQUERQUE | AVON | DENVER | FORT COLLINS
303.278.3820 www ˛bgbuildingworks˛com
Project No. 9911.00 Copyright 2018
Sheet Title
M-317
ENLARGED
MECHANICAL
PLAN - LAUNDRY
AND
LOBBY/OFFICE
09/21/18
SCALE:
HYDRONIC RISER DIAGRAMS
NONE
LEVEL 4
ROOF
LEVEL 3
LEVEL 2
LEVEL 1
GARAGE
LEVEL 4
ROOF
LEVEL 3
LEVEL 2
LEVEL 1
GARAGE
1 2 3 4 5 6RISER TOTALS:
30.5 MBH
8 GPM
RISER TOTALS:
17.3 MBH
4 GPM
RISER TOTALS:
28.1 MBH
8 GPM
RISER TOTALS:
11.9 MBH
4 GPM
RISER TOTALS:
17.6 MBH
4 GPM
RISER TOTALS:
19.6 MBH
4 GPM
HWS
HWR
HWSHWRHWSHWRHWS
HWR
BB-1
6.5'
2.7 MBH
1 GPM
BB-1
9'
3.8 MBH
1 GPM
HWS
HWR
BB-2
13.5'
4.5 MBH
1 GPM
3/4"3/4"1"1"BB-2
9.5'
3.1 MBH
1 GPM
HWS
HWR
BB-1
10.5'
4.4 MBH
1 GPM
BB-1
13'
5.5 MBH
1 GPM 1"1"BB-1
6.5'
2.7 MBH
1 GPM
BB-1
9'
3.8 MBH
1 GPM HWSHWRHWSHWRBB-1
9.5'
3.8 MBH
1 GPM 3/4"3/4"1"1"BB-2
14'
4.7 MBH
1 GPM
HWS
HWR
HWS
HWR
BB-1
12'
5.0 MBH
1 GPM 3/4"3/4"BB-1
9.5'
3.8 MBH
1 GPM HWSHWRHWR BB-1
5'
2.1 MBH
1 GPM
BB-1
9'
3.8 MBH
1 GPM
BB-2
13.5'
4.5 MBH
1 GPM
BB-2
7.5'
2.5 MBH
1 GPM
BB-1
9'
3.8 MBH
1 GPM
BB-1
13'
5.5 MBH
1 GPM
BB-1
5'
2.1 MBH
1 GPM
BB-1
9'
3.8 MBH
1 GPM
HWS 1"1"1"1"3/4"3/4"HWSHWRBB-1
5.5'
2.2 MBH
1 GPM 3/4"3/4"1"1"BB-2
10'
3.2 MBH
1 GPM
BB-1
10.5'
4.3 MBH
1 GPM 3/4"3/4"BB-1
5.5'
2.2 MBH
1 GPM
BB-1
9.5'
3.9 MBH
1 GPM
BB-2
14'
4.7 MBH
1 GPM
BB-1
12'
5.1 MBH
1 GPM
BB-1
9.5'
3.9 MBH
1 GPM
BB-1
11.5'
4.4 MBH
1 GPM
BB-2
15.5'
5.2 MBH
1 GPM
BB-1
13.5'
5.6 MBH
1 GPM
BB-1
11.5'
4.4 MBH
1 GPM
7 8RISER TOTALS:
21.2 MBH
4 GPM
RISER TOTALS:
17 MBH
4 GPM
9 RISER TOTALS:
25.8 MBH
10 GPM
BB-1
11.5'
4.8 MBH
1 GPM
BB-2
17'
5.6 MBH
1 GPM
BB-1
15'
6.0 MBH
1 GPM
BB-1
11.5'
4.8 MBH
1 GPM
BB-1
9.5'
4.0 MBH
1 GPM
BB-2
15'
5.0 MBH
1 GPM
BB-1
9.5'
4.0 MBH
1 GPM
BB-1
9.5'
4.0 MBH
1 GPM
BB-1
11.5'
4.7 MBH
1 GPM 3/4"3/4"1"1"BB-2
17'
5.5 MBH
1 GPM
BB-1
4.5'
1.9 MBH
1 GPM 3/4"3/4"BB-1
11.5'
4.7 MBH
1 GPMHWSHWRHWSHWR
HWSHWRHWSHWRHWSHWRHWSHWRHWSHWRHWSHWRHWSHWRHWSHWRHWSHWR1-1/4" HWS/HWR 1" HWS/HWR
HWS
HWR
HWS
HWR
HWS
HWR
1-1/4" HWS/HWR
HWS
HWR
HWS
HWR
HWS
HWR
HWS
HWR
BB-2
4.5'
1.5 MBH
1 GPM
HWS
HWR
HWS
HWR
BB-2
4.5'
1.5 MBH
1 GPM
HWS
HWR
BB-2
4.5'
1.5 MBH
1 GPM
1" HWS/HWR
HWS
HWR
1" HWS/HWR
HWS
HWR
HWS
HWR
HWS
HWR
3/4"3/4"1"1"3/4"3/4"HWS
HWR
1" HWS/HWR
HWS
HWR
HWS
HWR
HWS
HWR
3/4"3/4"1"1"3/4"3/4"HWS
HWR
1" HWS/HWR
HWS
HWR
HWS
HWR
HWS
HWR
3/4"3/4"1"1"3/4"3/4"HWS
HWR
1" HWS/HWR
HWS
HWR
HWS
HWR
HWS
HWR
3/4"3/4"1"1"3/4"3/4"HWS
HWR
1" HWS/HWR
HWS
HWR
HWS
HWR
HWS
HWR
BB-1
3.5'
1.5 MBH
1 GPM
BB-1
3.5'
1.5 MBH
1 GPM
BB-1
3.5'
1.5 MBH
1 GPM
Sheet Number
Date:VAIL, COLORADO953 S. Frontage Rd. West
Vail, Colorado 81657
tel: 970.476.1147
gpslarchitects.com
SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018
ALL SHEETS
VE PERMIT ISSUE
ALBUQUERQUE | AVON | DENVER | FORT COLLINS
303.278.3820 www ˛bgbuildingworks˛com
Project No. 9911.00 Copyright 2018
Sheet Title
M-401
HYDRONIC
RISER
DIAGRAMS
09/21/18
LEVEL 4
ROOF
LEVEL 3
LEVEL 2
LEVEL 1
GARAGE
LEVEL 4
ROOF
LEVEL 3
LEVEL 2
LEVEL 1
GARAGE
11 14 17 201216
SCALE:
HYDRONIC RISER DIAGRAMS
NONE
10 RISER TOTALS:
24 MBH
8 GPM
RISER TOTALS:
27.8 MBH
7 GPM
RISER TOTALS:
16.3 MBH
4 GPM
RISER TOTALS:
40.9 MBH
10 GPM
RISER TOTALS:
30.5 MBH
8 GPM
RISER TOTALS:
16.1 MBH
8 GPM
RISER TOTALS:
23.3 MBH
6 GPM
BB-1
5.5'
2.1 MBH
1 GPM
BB-1
8.5'
3.6 MBH
1 GPM
BB-2
13'
4.3 MBH
1 GPM
BB-2
8'
2.6 MBH
1 GPM
1"1"BB-1
5.5'
2.1 MBH
1 GPM
BB-1
8.5'
3.6 MBH
1 GPM
BB-1
5.5'
2.2 MBH
1 GPM
BB-1
8.5'
3.5 MBH
1 GPM
HWS
HWR
BB-2
13'
4.3 MBH
1 GPM
3/4"3/4"1"1"BB-2
9'
3.0 MBH
1 GPM
HWS
HWR 1"1"BB-1
6.5'
2.6 MBH
1 GPM
BB-1
8.5'
3.6 MBH
1 GPM
BB-1
19.5'
8.1 MBH
1 GPM
BB-1
9.5'
3.9 MBH
1 GPM 3/4"3/4"1"1"BB-2
14'
4.7 MBH
1 GPM
HWS
HWR
BB-1
9.5'
3.8 MBH
1 GPM 3/4"3/4"BB-1
9.5'
3.9 MBH
1 GPM
BB-1
9.5'
3.9 MBH
1 GPM 3/4"3/4"1-1/4"1-1/4"BB-2
14'
4.7 MBH
1 GPM
BB-1
9.5'
5.1 MBH
1 GPM 1"1"BB-1
9.5'
3.9 MBH
1 GPM
HWS
HWR
20
1"
1"
BB-1
8.5'
3.5 MBH
1 GPM
BB-1
9'
3.7 MBH
1 GPM
HWS
HWR
BB-2
13.5'
4.4 MBH
1 GPM
3/4"3/4"1-1/4"1-1/4"BB-2
12'
3.9 MBH
1 GPM
1"1"HWS
HWR
BB-1
12.5'
5.2 MBH
1 GPM
BB-1
13'
5.4 MBH
1 GPM
BB-2
12'
4.0 MBH
1 GPM
BB-2
11.5'
3.8 MBH
1 GPM
BB-1
7'
2.8 MBH
1 GPM
BB-1
8'
3.3 MBH
1 GPM
BB-1
12'
5.0 MBH
1 GPM
BB-1
13'
5.5 MBH
1 GPM
HWS
HWR
BB-1
8.5'
3.5 MBH
1 GPM
BB-1
9.5'
3.9 MBH
1 GPM
HWS
HWR
BB-2
14'
4.6 MBH
1 GPM
1"1"3/4"3/4"BB-2
12'
3.9 MBH
1 GPM
HWS
HWR
14
1"
1"HWSHWRHWSHWRHWSHWRHWSHWRHWSHWRHWSHWRHWSHWRHWSHWRHWSHWRHWSHWRHWSHWRHWSHWRHWSHWRHWSHWRBB-1
6.5'
2.6 MBH
1 GPM
BB-1
8.5'
3.6 MBH
1 GPM
BB-1
8.5'
3.5 MBH
1 GPM
BB-1
9'
3.7 MBH
1 GPM
BB-1
7'
2.8 MBH
1 GPM
BB-1
8'
3.3 MBH
1 GPM
BB-1
8.5'
3.5 MBH
1 GPM
BB-1
9.5'
3.9 MBH
1 GPM
13 RISER TOTALS:
17.6 MBH
4 GPM
BB-1
9.5'
3.9 MBH
1 GPM 3/4"3/4"1"1"BB-2
14'
4.7 MBH
1 GPM
HWS
HWR
HWS
HWR
BB-1
12'
5.1 MBH
1 GPM 3/4"3/4"BB-1
9.5'
3.9 MBH
1 GPM
15 HWSHWRHWSHWRHWS
HWR
1-1/4" HWS/HWR 1"1"3/4"3/4"HWS
HWR
HWS
HWR
HWS
HWR
HWS
HWS
HWR
HWR
1" HWS/HWR
HWS
HWR
HWS
HWR
HWS
HWR
HWS
HWR
HWS
HWR
HWS
HWR
1-1/4" HWS/HWR
HWS
HWR
HWS
HWR
HWS
HWR
HWS
HWR
HWS
HWR
1"1"HWS
HWR
1-1/4" HWS/HWR1"1"3/4"3/4"HWS
HWR
HWS
HWR
HWS
HWR
HWS
HWR
Sheet Number
Date:VAIL, COLORADO953 S. Frontage Rd. West
Vail, Colorado 81657
tel: 970.476.1147
gpslarchitects.com
SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018
ALL SHEETS
VE PERMIT ISSUE
ALBUQUERQUE | AVON | DENVER | FORT COLLINS
303.278.3820 www ˛bgbuildingworks˛com
Project No. 9911.00 Copyright 2018
Sheet Title
M-402
HYDRONIC
RISER
DIAGRAMS
09/21/18
SCALE:
DOMESTIC WATER RISER DIAGRAMS
NONE
LEVEL 4
ROOF
LEVEL 3
LEVEL 2
LEVEL 1
GARAGE
P
1
GARAGE
P
2
P
4
P
9
RE: ENLARGED PLANS FOR
UNIT BRANCH SIZING AND
DHW BALANCE VALVE
LOCATIONS.CWHWHWCCW
HW
CW
HW
TO
BATHROOM
GROUP
CW
HW
CW
HW
TO
BATHROOM
GROUP
CW
HW
CW
HW
TO
BATHROOM
GROUP
CWHWHWCCWHWHWCCW
HW
CW
HW
TO
BATHROOM
GROUP TO
KITCHENETTE
W/ DISHWASH
TO
KITCHENETTE
W/ DISHWASH
TO
KITCHENETTE
W/ DISHWASH
TO
KITCHENETTE
W/ DISHWASH
3/4"1-1/2"1-1/2"3/4"1-1/4"1-1/4"3/4"1-1/4"1-1/4"1"1"1/2"P
3
P
10
P
16 CWHWHWCCW
HW
CW
HW
TO
BATHROOM
GROUP TO
KITCHENETTE
CW
HW
CW
HW
TO
BATHROOM
GROUP TO
KITCHENETTE
CW
HW
CW
HW
TO
BATHROOM
GROUP TO
KITCHENETTE
CWHWHWCCWHWHWCCW
HW
CW
HW
TO
BATHROOM
GROUP TO
KITCHENETTE3/4"1"1/2"1" 1-1/4" 3/4" 1-1/4"1-1/4"3/4"3/4"1-1/2"1-1/4"P
5
P
6
P
7
P
12
P
13
P
15 CWHWHWCCW
HW
CW
HW
TO
BATHROOM
GROUP
PLUS LAV TO
KITCHENETTE
W/ DISHWASH
CW
HW
CW
HW
CW
HW
CW
HW
CWHWHWCCWHWHWCTO
KITCHENETTE
W/ DISHWASH
TO
KITCHENETTE
W/ DISHWASH1"1"1/2"1-1/4"1-1/4"3/4"1-1/4"1-1/4"3/4"TO
BATHROOM
GROUP
PLUS LAV
TO
BATHROOM
GROUP
PLUS LAV
P
8
CW
HW
CW
HW TO
KITCHENETTE
W/ DISHWASH
TO
BATHROOM
GROUP
PLUS LAV
LEVEL 4
ROOF
LEVEL 3
LEVEL 2
LEVEL 1 CWHWHWCCW
HW
CW
HW
TO
BATHROOM
GROUP TO
KITCHENETTE
CW
HW
CW
HW
TO
BATHROOM
GROUP TO
KITCHENETTE
CW
HW
CW
HW
TO
BATHROOM
GROUP TO
KITCHENETTE
CWHWHWC3/4"1"1/2"1"1-1/4"3/4"1-1/4"1-1/4"3/4"3/4"1-1/2"1-1/2"0.58 GPM 0.50 GPM 0.74 GPM 0.40 GPM
Sheet Number
Date:VAIL, COLORADO953 S. Frontage Rd. West
Vail, Colorado 81657
tel: 970.476.1147
gpslarchitects.com
SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018
ALL SHEETS
VE PERMIT ISSUE
ALBUQUERQUE | AVON | DENVER | FORT COLLINS
303.278.3820 www ˛bgbuildingworks˛com
Project No. 9911.00 Copyright 2018
Sheet Title
M-403
DOMESTIC
WATER RISER
DIAGRAMS
09/21/18
SCALE:
DOMESTIC WATER RISER DIAGRAMS
NONE
LEVEL 4
ROOF
LEVEL 3
LEVEL 2
LEVEL 1
GARAGE
LEVEL 4
ROOF
LEVEL 3
GARAGE
P
20
P
11
RE: ENLARGED PLANS
FOR BRANCH SIZING
AND DHW BALANCE
VALVE LOCATIONS.
LEVEL 2
LEVEL 1 CWHWHWCCW
HW
CW
HW
TO
BATHROOM
GROUP
CW
HW
CW
HW
TO
BATHROOM
GROUP
CW
HW
CW
HW
TO
BATHROOM
GROUP
CWHWHWCTO
KITCHENETTE
W/ DISHWASH
TO
KITCHENETTE
W/ DISHWASH
TO
KITCHENETTE
W/ DISHWASH
3/4"1-1/4"1-1/4"3/4"1-1/4"1-1/4"1"1"1/2"CWHWHWCCW
HW
HWC
CW
HWTO
CLOTHES
WASHER
CW
HW
CWHWHWCCWHWHWCTO
CLOTHES
WASHER
TO
CLOTHES
WASHER
3/4"3/4"1/2"1"1"3/4"1-1/4"1-1/4"3/4"CW
HW
HWC
TO
CLOTHES
WASHER
P
18
P
19CWHWHWCCW
HW
CW
HW
TO
BATHROOM
GROUP
CW
HW
CW
HW
TO
BATHROOM
GROUP TO KITCHENETTE
W/ DISHWASHER
CW
HW
CW
HW
TO
BATHROOM
GROUP
CWHWHWCCWHWHWCCW
HW
CW
HW
TO
BATHROOM
GROUP 1"1"1/2"1-1/4"1-1/4"3/4"1-1/2"1-1/2"3/4"3/4"1-1/2"1-1/2"P
14
P
20
3/4"
1-1/4"
1-1/4"CWHWHWCCW
HW
CW
HW
TO
BATHROOM
GROUP
CW
HW
CW
HW
TO
BATHROOM
GROUP
P
14
CW
HW
CW
HW
TO
BATHROOM
GROUP CWHWHWC1"1"1/2"1-1/2" CW, 1-1/2" HW
1-1/4"
1-1/4"
3/4"1-1/4"1-1/4"3/4"TO KITCHENETTE
W/ DISHWASHER
TO KITCHENETTE
W/ DISHWASHER
TO KITCHENETTE
W/ DISHWASHER
TO KITCHENETTE
W/ DISHWASHER
TO KITCHENETTE
W/ DISHWASHER
TO KITCHENETTE
W/ DISHWASHER
1-1/2" CW, 1-1/2" HW, 1/2" HWC
CWHWHWC1"1"3/4"0.46 GPM 0.95 GPM 0.10 GPM
0.41 GPM
Sheet Number
Date:VAIL, COLORADO953 S. Frontage Rd. West
Vail, Colorado 81657
tel: 970.476.1147
gpslarchitects.com
SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018
ALL SHEETS
VE PERMIT ISSUE
ALBUQUERQUE | AVON | DENVER | FORT COLLINS
303.278.3820 www ˛bgbuildingworks˛com
Project No. 9911.00 Copyright 2018
Sheet Title
M-404
DOMESTIC
WATER RISER
DIAGRAMS
09/21/18
SCALE:
WASTE AND VENT RISER DIAGRAMS
NONE
W
1
W
2
W
4
W
9
W
SHOWER
W
KITCHEN
SINK
LAV
W.C.
W
SHOWER
KITCHEN
SINK
LAV
W.C.
W
SHOWER
KITCHEN
SINK
LAV
W.C.
W
SHOWER
KITCHEN
SINK
LAV
W.C.
DISH
WASHER
DISH
WASHER
DISH
WASHER
DISH
WASHER3"2"3" 2" 3" 2" 3" 2" 1-1/2"4"
W
3
W
10
W
16
W
5
W
6
W
7
W
8
W
12
W
13
W
15
W
SHOWER W W
KITCHEN
SINK
LAV
W.C.
W
SHOWER
KITCHEN
SINK
LAV
W.C.
W
SHOWER
KITCHEN
SINK
LAV
W.C.
W
SHOWER
KITCHEN
SINK
LAV
W.C. 3"2"3" 2" 3" 2" 3" 2" 4"
W
SHOWER
KITCHEN
SINK
W.C.
W
SHOWER
KITCHEN
SINK
W.C.
W
SHOWER
LAV
W.C.
LAV
LAV
W
SHOWER
KITCHEN
SINK
LAV
W.C.
DISH
WASHER
KITCHEN
SINK
3" 2" 1-1/2"V 3"2"3" 2" 3" 2" LAV1-1/2" 1-1/2"1-1/2" 1-1/2"1-1/2" 1-1/2" 1-1/2"V W V 1-1/2"V DISH
WASHER 1-1/2" V LAV 1-1/2" V DISH
WASHER 1-1/2" V LAV 1-1/2" V DISH
WASHER 1-1/2"V LAV 1-1/2"V W
SHOWER
KITCHEN
SINK
LAV
W.C.
W
SHOWER
KITCHEN
SINK
LAV
W.C.
W
SHOWER
KITCHEN
SINK
LAV
W.C.1-1/2" 1-1/2" 1-1/2"W 3" 2"2" 2" V 3"3" 3" W LEVEL 4
ATTIC
LEVEL 3
LEVEL 2
LEVEL 1
GARAGE
LEVEL 4
ATTIC
LEVEL 3
LEVEL 2
LEVEL 1
GARAGE
FLAG NOTES:
1 RE: ATTIC & ROOF PLAN FCT.
RE: SHEET M-200 FCT OF WASTE PIPING TO
FOUNDATION.
1 1 1 1
2
2
2 4"
W 4"
2 4"
W3"
23"
Sheet Number
Date:VAIL, COLORADO953 S. Frontage Rd. West
Vail, Colorado 81657
tel: 970.476.1147
gpslarchitects.com
SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018
ALL SHEETS
VE PERMIT ISSUE
ALBUQUERQUE | AVON | DENVER | FORT COLLINS
303.278.3820 www ˛bgbuildingworks˛com
Project No. 9911.00 Copyright 2018
Sheet Title
M-405
WASTE AND
VENT RISER
DIAGRAMS
09/21/18
SCALE:
WASTE AND VENT RISER DIAGRAMS
NONE
LEVEL 4
ATTIC
LEVEL 3
LEVEL 2
LEVEL 1
GARAGE
LEVEL 4
ATTIC
LEVEL 3
LEVEL 2
LEVEL 1
GARAGE
CLOTHES
WASHER
CLOTHES
WASHER
CLOTHES
WASHER
FLOOR
DRAIN
CLOTHES
WASHER
W
FLOOR
DRAIN
FLOOR
DRAIN
CLOTHES
WASHER
FLOOR
DRAIN
CLOTHES
WASHER
CLOTHES
WASHER
CLOTHES
WASHER1-1/2" 3" 1-1/2"3"1-1/2"2" 2" 3"1-1/2"WW2" 3"1-1/2"W W 3" 3"
W
17
W
18
W
19
W
14
W
14
W
SHOWER W W
KITCHEN
SINK
LAV
W.C.
W
SHOWER
KITCHEN
SINK
LAV
W.C.
W
SHOWER
KITCHEN
SINK
LAV
W.C.3"2"3" 2" 3" 2" 3"
W
20
W
SHOWER W W
KITCHEN
SINK
LAV
W.C.
W
SHOWER
KITCHEN
SINK
LAV
W.C.
W
SHOWER
KITCHEN
SINK
LAV
W.C.
W
SHOWER
KITCHEN
SINK
LAV
W.C. 3"2"3" 2" 3" 2" 3" 2" 4" 1-1/2"1-1/2" 1-1/2" 1-1/2"V W V W
20W3" V W W VVDISH
WASHER
DISH
WASHER 1-1/2"1-1/2" 1-1/2"W
SHOWER W KITCHEN
SINK
LAV
W.C.
W
SHOWER
KITCHEN
SINK
LAV
W.C.
W
SHOWER
KITCHEN
SINK
LAV
W.C. 3"2"3" 2" 3" 2" DISH
WASHER
W
11V DISH
WASHER 1-1/2" DISH
WASHER 1-1/2"1-1/2"W 3" 1 1 1 11
2 2 2
FLAG NOTES:
1 RE: ATTIC & ROOF PLAN FCT.
RE: SHEET M-200 FCT OF WASTE PIPING TO
FOUNDATION.
2
W3"
23"
Sheet Number
Date:VAIL, COLORADO953 S. Frontage Rd. West
Vail, Colorado 81657
tel: 970.476.1147
gpslarchitects.com
SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018
ALL SHEETS
VE PERMIT ISSUE
ALBUQUERQUE | AVON | DENVER | FORT COLLINS
303.278.3820 www ˛bgbuildingworks˛com
Project No. 9911.00 Copyright 2018
Sheet Title
M-406
WASTE AND
VENT RISER
DIAGRAMS
09/21/18
NO SCALE
DUCTWORK DIAGRAM
DUCT CLAMP, OR STRAP AS
REQUIRED FOR SQUARE OR
ROUND DUCTWORK. IF
DUCTWORK IS INSULATED,
INSULATION SHALL BE
CONTINUOUS THRU CLAMP.
ROOF MOUNTED
UPRIGHT
GALVANIZED
CHANNEL
GALVANIZED
CHANNEL
DURA-BLOK OR
EQUIVALENT BASE
SUPPORTS.
NOTES:
1. BASE SUPPORTS SHALL BE
RUBBER.
2. SPACING OF BASE SUPPORTS
AND INSTALLATION SHALL BE
PER MFG'S RECOMMENDATIONS.
3. ADJUST HEIGHT OF HORIZONTAL CHANNEL TO
MATCH ELEVATION OF DUCTWORK. BOTTOM OF
DUCT SHALL BE A MIN 18" ABOVE FINISHED
ROOF TO ALLOW FOR FUTURE ROOF WORK.AIR FLOWNO SCALE
USE DUCT SEALANT OR
GASKETED FITTING ON HIGH
VELOCITY DUCT.
CONICAL SPIN-IN FITTING W/
MANUAL DAMPER, HANDLE,
& LOCK NUT.
FLEX DUCT.
WORM DRIVE S.S. CLAMP.
NOTE:
DIAGRAM FOR LOW & HIGH VELOCITY
DUCTWORK EXCEPT UPSTREAM OF
VAV BOXES. OMIT DAMPER & FLEX
DUCT UPSTREAM OF VAV BOXES.
ROUND DUCT
TAKE-OFF DIAGRAM
THRU ROOF DIAGRAM
DRYER VENT
NO SCALE
STORM COLLAR/
COUNTER
FLASHING. SEAL
TO DUCT.
LONG RADIUS ELBOW.
FULLY WELDED CURB CAP,
SIMILAR TO TRANSITION.
TIGHT TO, BUT NOT
FASTENED TO DUCT.
PREFAB, INSULATED
ROOF CURB WITH
TREATED WOOD
NAILER.
SUPPORT DUCT FROM
STRUCTURE.
DRYER VENT CAP W/
BACKDRAFT DAMPER.
DUCT HANGER DIAGRAM
NO SCALE
NUT, WASHER & ALL
THREAD BY M.C.
BAR JOIST OR OTHER
STRUCTURE BY G.C.
1/4" ALL THREAD.
ROD EYE (SOCKET)
GRINNEL 110 R, OR
EQUAL.
SHEET METAL STRAP
BY M.C.
SPIRAL DUCT.
GARAGE EXHAUST FAN DIAGRAM
NO SCALE
WIRE GUARD.
WALL.
EXHAUST FAN.
EXTERIOR LOUVER.
SECURELY MOUNT
FAN IN WALL.
MOTORIZED SHUT-OFF
DAMPER.
2-WAY COIL PIPING DIAGRAM
NO SCALE
COIL
NOTES:
1. FLEXIBLE PIPE CONNECTOR REQ'D FOR EQUIPMENT
CONTAINING FANS OR COMPRESSORS, NOT REQ'D FOR
EQUIPMENT SUCH AS DUCT COILS.
2. PIPE ALL MULTI-ROW COILS FOR COUNTERFLOW (WATER
ENTERS MOST DOWNSTREAM COIL, LEAVES MOST
UPSTREAM COIL).
3. REFER TO CONTROLS DRAWINGS FOR ADDITIONAL
INFORMATION.
4. 2-WAY VALVE NORMALLY OPEN FOR HEATING AND
NORMALLY CLOSED FOR COOLING.
G
STRAINER WITH
BLOWDOWN
AND CAP.
MANUAL AIR VENT
AT HIGHEST POINT
IN PIPING.
RETURN
SUPPLY
D
COIL PIPING DIAGRAM
NO SCALE
COIL
NOTES:
1. FLEXIBLE PIPE CONNECTOR REQ'D FOR EQUIPMENT
CONTAINING FANS OR COMPRESSORS, NOT REQ'D FOR
EQUIPMENT SUCH AS DUCT COILS.
2. PIPE ALL MULTI-ROW COILS FOR COUNTERFLOW (WATER
ENTERS MOST DOWNSTREAM COIL, LEAVES MOST
UPSTREAM COIL).
3. REFER TO CONTROLS DRAWINGS FOR ADDITIONAL
INFORMATION.
4. 3-WAY VALVE WITH COIL RETURN PIPED TO NORMALLY OPEN
PORT FOR HEATING AND NORMALLY CLOSED PORT FOR
COOLING.
BASEBOARD RADIATION DIAGRAM
NO SCALE HWSHWR( DOWNFEED )
PLANS
UP IN WALL
UP IN WALL
MANUAL AIR VENT AT HIGH
POINTS. PROVIDE ACCESS
PANEL OR ROUTE 3/8"
TUBING WITH VALVES TO
BASEBOARD ENCLOSURE.
ALTERNATE
ROUTING FOR SAME
END CONNECTIONS.
CONTINUE AS PER PLANS
CONTROL VALVE IN
ENCLOSURE ON RETURN
SIDE (AS APPLICABLE)
RISE IN DIRECTION OF FLOW
LENGTH PER PLANS
MOUNTING HEIGHT
AS PER EQUIPMENT
LIST OR MANUFACTURERS
LISTING
SNOWMELT MANIFOLD PIPING DIAGRAM
NO SCALE SMRSMSMANUAL AIR VENT
AT HIGHEST POINT
IN PIPING.
STRAINER WITH
BLOWDOWN
VALVE AND
CAP.
MANIFOLD BOX (WALL
MOUNTED FOR
RADIANT; LOCATED IN
SLAB FOR
SNOWMELT).
MANUFACTURER'S
MANIFOLD ASSY.
LOOP
BALANCE/ISOLATION
VALVE
SUPPLY
MANUFACTURER'S
MANIFOLD ASSEMBLY
WITH REVERSE
RETURN PIPING.
RETURN
3-WAY (DIVERTING VALVE)
RADIANT/SNOWMELT
TUBING. LOOP
QUANTIITY AS
REQUIRED.
NOTES:
1. PROVIDE MANUFACTURER'S MANIFOLDS AND ISOLATION VALVES WITH PIPING.
2. FOR EXTERIOR MANIFOLD LOCATIONS PROVIDE WATERPROOF MANIFOLD BOX OR
WATERPROOF CONTROL VALVE.
TO PIPING MAINS
APPLIES TO ALL L4 CUH
AIR VENT AT HIGH
POINTS, TYPICAL.
MANIFOLD BALANCE
VALVE.
SNOWMELT CONNECTION: STAIR TO WALK DIAGRAM
NO SCALE
STAIR #2
STAIR #1 & 3
5/8" POLYETHYLENE HEAT
PIPE.
5/8" POLYETHYLENE AT
STAIRS & LANDINGS.
3" SANDSTONE AT STAIR
& LANDING.
CONCRETE AT STAIR &
LANDING.
NOTE:
REFER TO ARCH. DWG #___ FOR STAIR DIMENSIONS.
9" O.C. TYP. FOR ALL
LANDINGS & WALKS.
312" 3 12"
412" 412"
412"
4"
3"
212" MAX
14"1
HEAT TAPE DIAGRAM
NO SCALE
RE: ELECTRICAL
FOR CONT.
THERMOSTAT
UNDER COVER.
TRACE ENTIRE LENGTH OF EXTERNAL
EXPOSED PIPING WITH 7 WATTS PER
LINEAL FOOT HEAT TAPE. PROVIDE
STRAP ON __________ MODEL __ STAT
TO LOCKOUT HEATING ABOVE 4O°F
AMBIENT TEMP. PROVIDE COLD LEADS
TO ELECTRICAL CONNECTION.
ALUMINUM JACKET.
3" THICK PIPE INSULATION
(1) PIPE SIZE LARGER
THAN PIPE.
EXTERNAL EXPOSED PIPING
REQUIRING FREEZE
PROTECTION .NOTE:
MECHANICAL CONTRACTOR PROVIDE
AND INSTALL, ELECTRICAL
CONTRACTOR TO POWER.
SNOWMELT TUBING LAYOUT DIAGRAM
NO SCALE
SERPENTINE LAYOUT
NOTES:
1. INSTALL ALL SNOWMELT TUBING IN REVERSE RETURN
FASHION FOR SURFACE TEMPERATURE UNIFORMITY.
2. CONVENTIONAL SERPENTINE LAYOUT NOT PERMITTED.
L
REVERSE-RETURN LAYOUT
CF K
J E B
AH M
RADIUSED DUCT SPLIT DIAGRAM
NO SCALE
RADIUS IS = TO SIZE A.
RADIUS IS 2 X SIZE A.
RADIUS IS 0.75 X SIZE C.
RADIUS IS SIZE B + 0.75 X SIZE C.
1
2
3
4
A
C
B
A
2
1
4
3
BALL-IN -SOCKET ROD GUIDE
WITH SET SCREEN.
HINGES
1"HW TURNED
BACK SMOOTH.
16 GAUGE DAMPER BLADE,
2xB" LONG, FULL DEPTH OF
DUCT.
NOTE:
PROVIDE TWO ADJUSTING
RODS FOR DUCTS OVER
24" DEEP.
45°
NO SCALE
W
H
1/4 OF "W" OR 6"
MINIMUM.
END
BEARING.
SINGLE BLADE DAMPER
IF H<8" OPPOSED BLADE
DAMPER IF H>=8"
SEAL AIRTIGHT AROUND
ENTIRE TAKE-OFF.
WATERTIGHT INTAKE DUCT CONNECTION DIAGRAM
NO SCALE
12" MIN 3"1"
2-
3/
4
"
2"
MASTIC.
WEEPHOLES.
20 GAUGE
ALUMINUM.
WALL.
DRAINABLE
LOUVER.
GROUT.
THIS PORTION OF DUCTWORK
SHALL BE ALUMINUM.
PROVIDE
WATERPROOFING
ON BOTTOM &
SIDES.
NOTE:
REFER TO MANUFACTURER'S INSTRUCTIONS
FOR SPECIFIC MOUNTING DETAILS. COOR'D
WITH ARCITECTURAL REQUIRMENTS.
LINTELS.
DRAINABLE LOUVER
& SCREEN.
RETURN SHEET METAL
UNDER WALL BOX &
EXTEND 2" BEYOND
FACE OF WALL TO
DRIP LIP.
WRAP INSULATION PER OUTDOOR
DUCT REQ'MTS 24" INBOARD OF
ENVELOPE.
MOTORIZED
SHUT-OFF DAMPER.
M
24" MIN
N
P
Q APPLIES TO ALL HEATING EXCEPT L4 CUH'S 6" MIN.4"
NOTE: COORD. ROOF
PENETRATION AND
SEALING WITH ROOF
MFTR & INSTALLING
CONTRACTOR.
CONTROL VALVE
Sheet Number
Date:VAIL, COLORADO953 S. Frontage Rd. West
Vail, Colorado 81657
tel: 970.476.1147
gpslarchitects.com
SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018
ALL SHEETS
VE PERMIT ISSUE
ALBUQUERQUE | AVON | DENVER | FORT COLLINS
303.278.3820 www ˛bgbuildingworks˛com
Project No. 9911.00 Copyright 2018
Sheet Title
M-501
MECHANICAL
DIAGRAMS
09/21/18
M
B-1
600 MBH
730 CFH
3082 MBH
3758 CFH
TOTAL
PRV SET TO 2 PSI
MIN DISCHARGE
PRESSURE.
MECHANICAL GAS PIPING DIAGRAM
NO SCALE
NOTES:
1. PROVIDE ACCESSIBLE OR KEYED
SHUT OFF VALVE AT EACH GAS
APPLIANCE.
2. GAS SYSTEM BASED ON 810
BTUH/CFH.
3. THIS DIAGRAM PROVIDES ALL
SIZING AND VALVE INFORMATION.
CONTRACTOR TO COORDINATE
ACCESSIBLE PLACEMENT OF
SHUT-OFF VALVES AT EACH
APPLIANCE, FIREPLACE, AND
PIECE OF EQUIPMENT.
4. PROVIDE SEDIMENT TRAP AT
EACH APPLIANCE.
5. PROVIDE STRAINER UPSTREAM
OF EACH REGULATOR.
6. VENT REGULATORS TO
OUTDOORS IN ACCORDANCE
WITH MANUFACTURER'S
REQUIREMENTS.
7. PROVIDE 1/2" GAS CONNECTION
INTO EACH INDIVIDUAL DRYER
UNIT.
L4 LAUNDRY ROOM
(3 DRYERS @ 25 MBH EA)
75 MBH; 92 CFH
FURTHEST DRYER @ 65'
MAU-1
180 MBH
220 CFH
MAU-2
205 MBH
250 CFH
85'
CLEANOUT DIAGRAMS
FLOOR CLEANOUT (FCO)
NO SCALE
SLOPE DN @ 1/4"/L.F.
CLEANOUT TO GRADE (COTG)
WASTE LINE
FINISHED GRADE
6"
ADJUSTABLE GRADE CLEANOUT AND ACCESS ENCLOSURE WITH ANCHOR FLANGE,
HEAVY DUTY TOP, AND VANDAL PROOF FASTENERS, ZURN, Z-1400-HD-KBRASS
CLEANOUT PLUG W/COUNTER SUNK HEAD.
ADJUSTABLE CLEANOUT
AND ACCESS COVER ZURN
ZB-1400. TOP OF COVER TO
BE FLUSH W/ TOP OF FLOOR.
16" CONC. PAD TROWEL
SMOOTH & EDGE.
1/8 C.I. BEND
BALANCE OF PIPING SAME
AS CLEANOUT TO GRADE.
FLOOR LINE
1/8 C.I. BEND
C.I. WASTE LINE.
LGTH TO SUIT.
1/8 BEND IF CLEANOUT
OCCURS AT END OF LINE.
PROVIDE FOLLOWING OPTIONS AS APPROPRIATE
CARPET MARKER - FOR CARPETED AREAS.
SQUARE TOP - FOR CERAMIC TILE OR
SIMILAR SQUARE PATTERN FLOOR.
FLASHING CLAMP - FOR ABOVE GRADE
WATER PROOFED AREAS.
WALL CLEANOUT
DIAGRAM
NO SCALE 1'-0"MAY EXTEND AS A
WASTE OR VENT.
CHROME WALLCOVER
AND SCREW.
PLUGGED TEE WITH
CLEANOUT.
WALL.
FLOOR LINE.
1/8 C.I. BEND.
BALANCE OF PIPING
SAME AS CLEANOUT
TO GRADE.
WASTE LINE
SLOPE DN @ 1/4"/L.F.
TWO-WAY CLEANOUT TO GRADE DIAGRAMS
NO SCALE
6"
FINISHED GRADE
ADJUSTABLE GRADE CLEANOUT AND ACCESS ENCLOSURE
WITH ANCHOR FLANGE, HEAVY DUTY TOP, AND VANDAL
PROOF FASTENERS, ZURN, Z-1400-HD-KBRASS CLEANOUT
PLUG W/COUNTER SUNK HEAD.
24" X1 6"Ø CONC. PAD TROWEL
SMOOTH & EDGE.
C.I. WASTE LINE.
LGTH TO SUIT.
1/8 C.I. BEND
DRAIN THRU WALL DIAGRAM
SANITARY OR STORM BLDG.
SLOPE 1/4"/L.F.
NO SCALE
C.O.T.G SEE DIAGRAM .
BASEMENT WALL.
COORDINATE WALL OPENING SIZE
WITH PIPE MATERIAL AND SIZE AND
MANUFACTURER REQUIREMENTS.
STORM OR SANITARY
BLDG. DRAIN.
LINK-SEAL OR EQUIVALENT.
-
GRADE
TRENCH DRAIN DIAGRAM
NO SCALE
CROSS BAR, 12"DIA.
BEARING BAR
11 2" x 1 14".
ANGLE IRON POURED IN
CONCRETE FLOOR.
MEDIUM DUTY FLOOR
DRAIN.
12"
2" MIN.
DIAGRAM
TRAP PRIMER CONNECTION
NO SCALE
FLOOR
MIN. HEIGHT
PER MFR.
BALL VALVE.
TAKE-OFF FROM
TOP OF CW PIPE.
TRAP PRIMER VALVE,
SIOUX CHIEF PRIME
PERFECT OR EQUAL.
DISTRIBUTION UNIT
(FOR MULTIPLE
DRAINS).
12" TYPE K SOFT
COPPER LINE(S) TO
FLOOR DRAIN(S).
QUANTITY AS
REQUIRED. NO
JOINTS BELOW
GRADE.1/2"EQUIP. RAIL FOR
ROOF MOUNTING
NO SCALE
PIPE SUPPORT
SADDLE STAND.
COUNTER FLASHING
OVER TREATED
WOOD NAILER.
GALVANIZED STEEL,
MIN. 18 GAGE, WITH
WELDED SEAMS.
DOMESTIC WATER ENTRANCE SCHEMATIC
NO SCALE
N.C.
M
S
D1-1/4"CW TO IRRIGATION. ESTIMATED
FLOW=30GPM PER IRRIGATION
CONSULTANT, CONFIRM FINAL FLOW
AND SIZE WITH IRRIGATION
DESIGN/BUILD CONTRACTOR.
3" CW TO BUILDING.
PRESSURE REDUCING
VALVE WATTS #LF223, TYP.
BY-PASS VALVE.
RELIEF VALVE-PIPE
INDIRECT TO FLOOR
DRAIN.
SECURE TO REINFORCED
WALL. COOR'D W/ G.C.
BACKFLOW PREVENTER (REDUCED
PRESSURE TYPE) WATTS #LF909, TYP.
WATER METER WITH
REMOTE READOUT, 3"
WATER SERVICE
SHUT-OFF VALVE.
3"CW SERVICE
FROM MAIN.
PIPE TO FLOOR DRAIN.
SET PRV #1 @ 60 PSI, 3"
SET PRV #2 @ 60 PSI., 1"
THRUST BLOCK DIAGRAM
NO SCALE
BEARING AREA OF BLOCK IN SQ. FT.
UNDISTURBED EARTH.
FITTING
SIZE
TEE &
END
90°
BEND
45°
BEND
22.5°
BEND
11.25°
BEND
3"
4"
6"
8"
10" 10.3
6.7
5.75
1.67
1.0 1.33
2.4
5.4
9.5
15.0 7.0
5.2
2.5
1.1
0.67 0.4
0.67
1.5
2.7
4.1 2.0
1.33
0.8
0.4
0.25
SOIL BEARING PRESSURE MULTIPLIER
1000
1500
2000
3000
2.0
1.33
1.0
0.67
BEARING AREA
PLACE DOUBLE LAYER OF TAR
PAPER BETWEEN CONC.
BLOCKING & PLUG TO PERMIT
EASY REMOVAL FOR FUTURE
EXTENSION.
REFER TO SOILS
REPORT FOR SOIL
BEARING PRESSURE
AND BLOCK SIZING
AND INSTALLATION
REQUIREMENTS.
NOTE:
WATER &/OR FIRE ENTRY DIAGRAM
NO SCALE
FLANGED CAST IRON TO
WATER &/OR FIRE
SERVICE VALVES.
PIPE SLEEVE; CAST
IN PLACE.
BLDG. FLOOR SLAB.
CAULK.
COORDINATE WALL OPENING SIZE
WITH PIPE MATERIAL AND SIZE AND
MANUFACTURER REQUIREMENTS.
TIE RODS; TYP.
THRUST
BLOCK.
CAST IRON HUB TO
FLANGED ADAPTER.
FOUNDATION WALL OR
GRADE BEAM.
GRADE.
LINK-SEAL OR
EQUIVALENT.
SERVICE FROM
STREET.NOTE:
COORDINATE SEISMIC RESTRAINT(S) AND
OPENING SIZE REQUIREMENTS WITH LOCAL
AHJ AND/OR STRUCTURAL ENGINEER.TYPICAL HANGER DIAGRAM
NO SCALE
ANCHOR,
REFER TO
STRUCTURAL.
THREADED
ROD.
HANGER.
PIPE.
CONCRETE
STRUCTURE.
NOTE:
ALL PIPING WITH
INSULATION TO HAVE
INSULATION RUN FULL
SIZE THROUGH
HANGER WITH SHIELD
AND INSERT.
FOR WATER DIAGRAM
TYPICAL PIPE SIZE CHANGE
TOP OF PIPE
NO SCALE
PIPE
PIPE
INVERTED ECCENTRIC
REDUCER.
A
B
D
C
E
F
G
H MP
L N
Q J
L3 LAUNDRY ROOM
(3 DRYERS @ 25 MBH EA)
75 MBH; 92 CFH
FARTHEST DRYER @ 50'
L2 LAUNDRY ROOM
(3 DRYERS @ 25 MBH EA)
75 MBH; 92 CFH
FARTHEST DRYER @ 35'
GAS CONTENT:
820 BTU/CF
MED PRESSURE:
IFGC 2015 TABLE 402.4(5)
LOW PRESSURE:
IFGC 2015 TABLE 402.4(2)
B-1
600 MBH
730 CFH
B-1
600 MBH
730 CFH
PRV SET TO 11 IN
WC MIN DISCHARGE
PRESSURE.
PRV SET TO 11 IN
WC MIN DISCHARGE
PRESSURE.
FIRE ENTRY PIPING DIAGRAM
NO SCALE
D FSDDF
FIRE DEPT. CONNECTION.
EXTERIOR BLDG. WALL.
TO FIRE PROTECTION SYSTEMS.
TEST VALVE; PIPE TO OUTSIDE.
FLOW SWITCH TO ALARMS, SEE SPECS.
DRAIN VALVE; PIPE INDIRECT TO FLOOR DRAIN
PER NFPA 25 REQUIREMENTS, TYP.
SHUT-OFF VALVE.
DOUBLE CHECK TYPE BACKFLOW PREVENTER.
TAMPER SWITCHES ON VALVES.
FIRE SERVICE
FLANGE. FLOOR SINK
BALL DRIP
VALVE.
C.W. SERVICE
DESIGNER NOTE:
1. VERIFY WITH AHJ BACK FLOW REQUIREMENTS (SOME REQUIRE
DOUBLE CHECK, SOME REQUIRED REDUCED PRESSURE)
2. VERIFY WITH AHJ IF SINGLE WATER ENTRY IS ALLOWED
3. VERTICAL BACKFLOWS CAN BE USED IF SPACE IS LIMITED BUT
IT DOES REQUIRE A SPECIAL VERTICAL TYPE BACKFLOW.
4. VERIFY FLOOR DRAIN REQUIREMENT WITH NFPA 25
REQUIREMENTS, MIN 4" FLOOR DRAIN PREFERRED MAY REQUIRE
LARGER.
5. VERIFY IF PRV IS REQUIRED.
DIAGRAM SHOWN FOR REFERENCE ONLY, CONFIRM FINAL REQUIREMENTSWITH
FIREPROTECTIONDESIGN BUILD CONTRACTOR AND ENGINEER OF RECORD.
PRV SET @
150 PSI
PIPE THRU ROOF DIAGRAM
NO SCALE 6" MIN.24 GA. GALV. ROOF JACK W/
6" FLANGE BY M.C., SET IN
PLASTIC CEMENT BY G.C.
PIPE BY M.C.
24 GA. GALV. STORM COLLAR
BY M.C., CLAMP IN PLACE &
CAULK WEATHERTIGHT.
FINISHED ROOF FELTS BY
G.C.
SOLDERED LAP SEAM
PIPE SLEEVE & CAULKING BY
M.C.
2" MIN.
ROOF
2 LAYERS OF FELT BY
G.C.
NOTE:
COOR'D ROOF PENETRATION
AND SEALING WITH ROOF
MANUFACTURER AND
INSTALLING CONTRACTOR.
K
GENERATOR
600 MBH
730 CFH
192'
L1 LAUNDRY ROOM
(3 DRYERS @ 25 MBH EA)
75 MBH; 92 CFH
FARTHEST DRYER @ 20'
1-1/4" 1-1/4"
1-1/2"
3/4"
3/4"
3/4"
3/4" 2"2" 2" 1" 2"
3" 2-1/2" 2'2"2"1"
1-1/2"
2"
Sheet Number
Date:VAIL, COLORADO953 S. Frontage Rd. West
Vail, Colorado 81657
tel: 970.476.1147
gpslarchitects.com
SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018
ALL SHEETS
VE PERMIT ISSUE
ALBUQUERQUE | AVON | DENVER | FORT COLLINS
303.278.3820 www ˛bgbuildingworks˛com
Project No. 9911.00 Copyright 2018
Sheet Title
M-502
MECHANICAL
DIAGRAMS
09/21/18
1.
COALESCING TYPE AIR SEPARATOR WITH
WITH AUTOMATIC RELIEF FLOAT. 1
AND SMALLER: SPIROTHERM SPIROVENT JR,
B&G EASB JR, OR TACO VORTEC. 2" PIPE AND
LARGER: SPIROTHERM SPIROVENT SR, B&G
CRS, OR TACO 4900. OR EQUIVALENT.
2.
EXTEND DRAIN TO NEAREST FLOOR SINK
FOR INDIRECT CONNECTION. DO NOT
COMBINE DRAIN WITH OTHERS.
3.
PROVIDE ALL STRAINERS WITH BLOWDOWN
BALL VALVE, HOSE END THREAD,
GASKETED CAP AND CHAIN.
4.
PROVIDE GASKETED CAP AND CHAIN FOR
DRAINS.
5.
EXTEND ALL SAFETY RELIEF VALVES TO
DRAIN PER VALVE MFG's
RECOMMENDATIONS WITHOUT PIPE BELLIES
OR UPWARD SLOPE. DO NOT COMBINE
WITH OTHERS.
6.
INDICATES UNION OR FLANGE
CONNECTION FOR SERVICE PURPOSES.
DIELECTRIC UNIONS NOT PERMITTED
EXCEPT AT DOMESTIC WATER
CONNECTIONS TO WATER HEATERS.
PROVIDE DIELECTRIC NIPPLES OR FLANGES
AT FERROUS TO NON-FERROUS PIPING
MATERIAL TRANSITIONS.
7.
THREE-WAY VALVE WITH PORTS
IDENTIFIED:
C = COMMON
NC = NORMALLY CLOSED
NO = NORMALLY OPEN
8. DIAGRAM IS SCHEMATIC IN NATURE. NOT ALL
APPURTENANCES REQ'D ARE NECESSARILY SHOWN.
PROVIDE SYSTEM ACCESS, VALVING, AND DRAINAGE
AS REQ'D FOR PROPER SYSTEM MAINTENANCE AND
PURGE/FILL PROCEDURES.
9. PROVIDE MANUAL AIR VENT AT ALL HIGH POINTS AND
MANUAL DRAIN VALVES AT ALL LOW POINTS. PIPE
DRAIN VALVES TO A SUITABLE LOCATION WHEN
DRAINS ARE IN A LOCATION IN WHICH THEIR
DRAINAGE WILL BE A NUISANCE OR CAUSE DAMAGE.
10. ALL PARALLEL EQUIPMENT SUCH AS BOILERS, PUMPS,
TANKS, ETC. SHALL BE PIPED IN TRUE REVERSED
RETURN FASHION FOR AUTOMATIC FLOW BALANCING
BETWEEN THE PARALLEL ITEMS.
11. PROVIDE 4" HIGH CONCRETE SHOP KEEPING PAD IN
ADDITION TO MFG's BASE FOR ALL FLOOR MOUNTED
EQUIPMENT. COORDINATE EXACT PAD SIZES AND
LOCATIONS WITH PIPING SHOP DRAWINGS AND
CONCRETE CONTRACTOR.
12. ALL ISOLATION VALVES SHALL BE FULL PORT VALVES
EQUIVALENT TO PIPE SIZE SHOWN.
13. ROUTE COMBUSTION EQUIPMENT AND VENT STACK
TEE CONDENSATE DRAIN LINES AND INDIRECT
CONNECT TO CONDENSATE NEUTRALIZATION BASIN
SIZED PER COMBUSTION EQUIPMENT MFG's
RECOMMENDATIONS. INDIRECT CONNECT BASIN
OUTLET TO NEAREST WASTE RECEPTOR.
14. RE: R/M301 FOR POT FEEDER CONNECTION.
15. REFER TO CONTROLS DRAWINGS FOR ADDITIONAL
DEVICE REQUIREMENTS SUCH AS PRESSURE AND
TEMPERATURE PICKUP LOCATIONS.
16. RE: Q/M301 FOR PIGTAIL PRESSURE GAUGE
CONNECTION.
17. PROVIDE DOWNWARD GAS FLOW INTO
SEDIMENT/DRIP LEG TEES.
PLANT PIPING NOTES:
S
NOD DWH-1
SCALE:
HEATING PLANT PIPING DIAGRAM
NONE DB-1B-1
P-3
P-2
P-2
ET-1
P-1
P-1
HWS
HWR
HWS
AS
HWS/R TO BUILDING
DISTRIBUTION, RE:
M-201 FCT.
DD
TO CONDENSATE
NEUTRALIZER, TYP.
S
DS DAIR VENT ALL HIGH
POINTS, TYP.
TO GLYCOL FEEDER
GF-1.
CP CP
VFD
VFD
TE
S DET-3
P-4
CW, HW, HWR TO
PIPE RACK, RE:
M-201 FCT.
WH-1D
TE
S
REVERSE/RETURN
PIPING, TYP.
SCALE:1 HYDRONIC HEATING PLANT PIPING DIAGRAM & DDC CONTROL SCHEMATIC
NONE
CENTRAL PLANT SEQUENCE OF CONTROL
DESCRIPTION
The Central Plant consists of three modulating,
condensing boilers serving building heat, hot water,
and snowmelt; two indirect-fired instantaneous
water heaters serving domestic hot water heating;
and associated pumps, heat exchanger, and
controls components.
SCHEDULING
Operation of the Central Plant is not scheduled, and
shall be based on demand for heating water
production.
HEATING WATER
Enable boilers and associated boiler injection pumps
upon a call for heat from space heating, snowmelt,
or domestic water heating. The boilers shall be
staged and operate only as needed through the
boiler manufacturer's control system to maintain
heating water supply temperature of 140°F. Hot
water supply temperature shall vary between 140°F
to 110°F as outside air temperature rises from 20°F
to 60°F (outdoor air reset). Disable boilers and
associated boiler injection pumps when a call for
heat is no longer present.
Pumps P-1 shall enable and modulate per
manufacturer-integral controls to maintain system
differential pressure and temperature. Alternate
lead/lag pump per manufacturer controls to achieve
equal run time on both pumps.
DOMESTIC HOT WATER
On a call for domestic hot water priority from a
tank-mounted aquastat set at 140°F, associated
boiler shall enable to provide 140°F HWS
temperature, associated boiler injection pump P-2
shall be off, and water heater lead circulation pump
P-3 shall enable to divert heating water to water
heater.
SNOWMELT
Upon a call for snowmelt from slab
temperature+moisture sensor, snowmelt HX-1
control valve shall open, snowmelt zone control
valve shall open, and snowmelt circulation pump P-5
shall enable.
BOILER ROOM EMERGENCY POWER OFF
Boiler manufacturer shall provide control wiring
schematic for boiler shutdown switch located at
boiler room exit door. Shutdown control system shall
comply with ASME-CDS-1, latest edition "Controls
and Safety Devices for Automatically Fired Boilers."
Contractor shall provide switch and control wiring in
conduit. A clear polycarbonate hinged cover shall be
provided to prevent accidental operation of switch.
Switch shall have engraved nameplate to identify as
"BOILER EMERGENCY SHUTDOWN."1"P-3
110°
THERMOSTATIC MIXING
VALVE.120°
HX-1
SMS
SMR
AS
P-5
SMS/R TO SNOWMELT
DISTRIBUTION PIPING.
RE: M-201 FCT.
ET-2D
B-1
P-2
D
S DCP
G
HWR
HWS
GAS PIPE, RE: GAS
PIPING DIAGRAM,
M502, FOR SIZING
& FFI.
3"
3"
2"
2"
2"
2"2"2"2"2"3"
3"
4"
4"
3"2"2"2"
TO GLYCOL FEEDER
GF-1.
3"2"2"Sheet Number
Date:VAIL, COLORADO953 S. Frontage Rd. West
Vail, Colorado 81657
tel: 970.476.1147
gpslarchitects.com
SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018
ALL SHEETS
VE PERMIT ISSUE
ALBUQUERQUE | AVON | DENVER | FORT COLLINS
303.278.3820 www ˛bgbuildingworks˛com
Project No. 9911.00 Copyright 2018
Sheet Title
M-601
MECHANICAL
CONTROLS
09/21/18
THE SYSTEM CONSISTS OF A MAKE UP AIR UNIT COMPLETE WITH SUPPLY FAN, GAS
HEATING SECTION, AND INTERNAL OPERATING CONTROLS.
SCHEDULING:
THE MAKE UP AIR HANDLING UNIT OPERATION SHALL OPERATE CONTINUOUSLY.
TEMPERATURE CONTROL:
DISCHARGE AIR TEMPERATURE SHALL BE MAINTAINED AT ROOM TEMPERATURE
SETPOINT (75°F ADJ.) BY THE MAKE UP AIR UNIT INTERNAL CONTROLS. DISCHARGE
AIR TEMPERATURE MAY BE RESET BY THE MAKE UP AIR UNIT CONTROL SYSTEM.
WHEN OSA TEMP IS HIGHER THAN ROOM SETPOINT, GAS HEATING SECTION SHALL BE
OFF. GAS HEATING SECTION CONTROL WILL BE THROUGH THE MAKE UP AIR UNIT'S
INTERNAL CONTROLS.
CP
SCALE:1 CORRIDOR VENTILATION UNIT CONTROL DIAGRAM
NONE
OSA SA
MS
SCALE:3 SWITCH CONTROL SCHEMATIC
NONE
EXHAUST FAN WALL
UNIT MOTOR STARTER.
BDD
MAIN TRUNK EXHAUST
DUCT, TO EXHAUST LOUVER.
GRAVITY OPERATED
NON-MOTORIZED BACK
DRAFT DAMPER.
SCALE:2 EXHAUST FAN
NONE
OCCUPANCY SENSOR
APPLIES TO ALL EXHAUST FAN IN RESTROOMS.
OCCUPANCY SENSOR PROVIDED WITH LIGHTING CONTROLS SYSTEM TO BE
USED FOR FAN CONTROL IN OFFICE RESTROOMS; PROVIDE
CEILING-MOUNTED OCCUPANCY SENSOR FOR FAN CONTROL IN UNIT
RESTROOMS. START EXHAUST FAN UPON DETECTION OF OCCUPANCY. FAN
TO CONTINUE TO RUN FOR 10 MINUTES (ADJ.) AFTER OCCUPANCY IS NO
LONGER DETECTED.
MS
OS
BDD
MAIN TRUNK EXHAUST
DUCT, TO EXHAUST LOUVER.
GRAVITY OPERATED NON-MOTORIZED
BACK DRAFT DAMPER, LOCATED AT
WALL LOUVER FOR INDIVIDUALLY-
DUCTED FANS; LOCATED PRIOR TO
CONNECTION TO COMMON DUCT FOR
COMBINED EXHAUST DUCTS.
TSTAT
APPLIES TO MECHANICAL, ELECTRICAL & IT ROOM EXHAUST FANS.
EXHAUST FAN SHALL BE CONTROLLED BY INDIVIDUAL SPACE MOUNTED COOLING
THERMOSTAT SET AT 80°F (ADJ). UPON A RISE IN SPACE TEMPERATURE ABOVE
SETPOINT PLUS DIFFERENTIAL, EXHAUST FANS SHALL ENABLE. CONVERSELY, UPON
A DECREASE IN SPACE TEMPERATURE BELOW SETPOINT PLUS DIFFERENTIAL,
EXHAUST FANS SHALL DISABLE.
MANUAL OVERRIDE WALL SWITCH TO BE PROVIDED. WHEN SWITCH IS IN ON
POSITION, FAN SHALL OPERATE. WHEN SWITCH IS IN OFF POSITION, FAN SHALL BE
CONTROLLED BY SPACE MOUNTED THERMOSTAT AS DESCRIBED ABOVE.
M
HWR
HWR
SCALE: 4 CUH AND UH CONTROL SCHEMATIC
NONE
APPLIES TO ALL CABINET AND UNIT HEATERS.
UPON A DROP IN TEMPERATURE BELOW SETPOINT PLUS DIFFERENTIAL, FAN
SHALL ENERGIZE AND HEATING WATER CONTROL VALVE SHALL OPEN.
CONVERSELY, UPON A RISE IN TEMPERATURE ABOVE SETPOINT PLUS
DIFFERENTIAL, FAN SHALL BE DE-ENERGIZED AND HEATING WATER CONTROL
VALVE SHALL CLOSE.
UNIT-MOUNTED
THERMOSTAT
TSTAT
SCALE:5 BASEBOARD HEATING CONTROL
NONE
SPACE MOUNTED
THERMOSTAT.
SEQUENCE:
UPON A DROP IN TEMPERATURE BELOW SETPOINT PLUS
DIFFERENTIAL THE HEATING WATER CONTROL VALVE SHALL OPEN.
APARTMENT, MAIL ROOM, AND SKI ROOM THERMOSTATS TO HAVE
ON/OFF FUNCTION, AND COLDER/WARMER CONTROL WITH UPPER
AND LOWER LIMIT SET BY FACILITY STAFF, NOT OCCUPANTS.
LOBBY THERMOSTAT TO BE SEVEN DAY PROGRAMMABLE TYPE,
ACCESSIBLE ONLY TO FACILITY STAFF EITHER VIA CLEAR
LOCKBOX, OR REMOTE LOCATION WITH SPACE-MOUNTED
TEMPERATURE SENSOR.
CONFIRM ALL THERMOSTAT LOCATIONS, TYPES, AND PROTECTION
WITH OWNER PRIOR TO RELEASE.
TSTAT
SCALE:6 LAUNDRY MAKE-UP AIR CONTROL
NONE
APPLIES TO MAU-2, LAUNDRY MAKE-UP AIR UNIT
SYSTEM CONSISTS OF INDIRECT-FIRED GAS MAKE-UP AIR UNIT, FAN WITH VFD,
MOTORIZED MODULATING ZONE DAMPERS, MAU BYPASS DAMPER, SPACE PRESSURE
SENSORS FOR EACH LAUNDRY ROOM, DUCT STATIC PRESSURE & LEAVING AIR
TEMPERATURE CONTROL.
SYSTEM SHALL NOT BE SCHEDULED, BUT SHALL OPERATE WHENEVER DEMAND
EXISTS. SYSTEM SHALL OPERATE TO MAINTAIN EACH LAUNDRY AT SLIGHTLY NEGATIVE
RELATIVE TO ADJACENT CORRIDOR.
UPON A DROP IN SPACE PRESSURE RELATIVE TO ADJACENT CORRIDOR ON ANY LEVEL,
ASSOCIATED ZONE DAMPER SHALL MODULATE OPEN. FAN SHALL MODULATE TO
MAINTAIN DUCT STATIC PRESSURE. WHEN FAN IS AT LOWEST AVAILABLE SPEED, IF
DUCT PRESSURE IS ABOVE SETPOINT, MODULATE OPEN BYPASS DAMPER.
FURNACE SECTION SHALL OPERATE PER MANUFACTURER CONTROLS TO MAINTAIN
LEAVING AIR TEMPERATURE AT 75°F (ADJ.) IN THE WINTER AND 68°F (ADJ) IN THE
SUMMER.
SCALE:7 CONTROL SEQUENCES
NONE
MISCELLANEOUS SYSTEMS
CP-1, DOMESTIC HOT WATER RECIRCULATION PUMP:
DOMESTIC RECIRC PUMP SHALL OPERATE TO MAINTAIN RECIRC LINE
TEMPERATURE SETPOINT WHEN DEMAND FOR HOT WATER IS
DETECTED, THROUGH PUMP-PACKAGED CONTROLS.
SP-1, ELEVATOR PIT SUMP PUMP
SUMP PUMP WILL BE EQUIPPED WITH FLOAT SWITCH TO ACTIVATE
THE PUMP WHEN WATER LEVEL IN THE SUMP RISES ABOVE THE
ACTIVATION LEVEL. A HIGH-WATER FLOAT SWITCH WILL SOUND A
LOCAL, AUDIBLE ALARM IF THE WATER LEVEL IN THE SUMP RISES
ABOVE THE ACTIVATION LEVEL.
CONTINUOUS OPERATION EXHAUST FAN:
APPLIES TO TRASH ENCLOSURE EXHAUST FAN. FAN SHALL OPERATE
CONTINUOUSLY, AND BE EQUIPPED WITH A MANUAL OVERRIDE OFF
SWITCH MOUNTED AT THE FAN.
EF-3 & EF-4, GARAGE EXHAUST FANS & GAS DETECTION SYSTEM:
EF-4 SHALL OPERATE CONTINUOUSLY.
PROVIDE NO2 & CO SENSORS ON BOTH EAST AND WEST PARKING
LEVELS OF PARKING GARAGE. EF-3 PURGE FAN SHALL BE
CONTROLLED BY THE GAS DETECTION SYSTEM TO MEET THE IMC
VENTILATION REQUIREMENTS FOR ENCLOSED PARKING GARAGES.
UPON DETECTION OF GAS LEVELS ABOVE SETPOINT PER 2015 IMC
AT EITHER LOCATION, EF-3 SHALL BE ON, ASSOCIATED GARAGE
DOOR NOTED ON PLANS SHALL OPEN TO 12" ABOVE CLOSED
POSITION, AND ASSOCIATED UNIT HEATER FANS NOTED ON PLANS
SHALL ENABLE TO CIRCULATE GARAGE AIR TO PURGE FAN
LOCATION.
WHEN CALL FOR VENTILATION FROM THE GAS DETECTION SYSTEM
IS NO LONGER PRESENT, EF-3 SHALL BE OFF, GARAGE DOOR SHALL
CLOSE, AND ASSOCIATED UNIT HEATER FANS SHALL REVERT TO
OPERATION PER UNIT HEATER SCHEDULE.
PROVIDE AUDIBLE ALARM AND REMOTE NOTIFICATION TO FACILITY
ENGINEERING IF GAS LEVELS RISE ABOVE HIGH LIMIT AT EITHER
PARKING LEVEL.
OSA
SA
MAU CONTROL
PANEL
FILTER SECTION
SA
PE
DPT
ADJACENT
CORRIDOR
LAUNDRY ROOM,
TYP. 4
VFD
DUCT PRESSURE SENSOR
LOCATED 2/3 DISTANCE
FROM MAU TO FURTHEST
DIFFUSER.
TE
CP
CP
Sheet Number
Date:VAIL, COLORADO953 S. Frontage Rd. West
Vail, Colorado 81657
tel: 970.476.1147
gpslarchitects.com
SOLAR VAIL501 NORTH FRONTAGE ROAD WESTLOT 8B, BLK 2, VAIL POTATO PATCH24 JUL. 2018
ALL SHEETS
VE PERMIT ISSUE
ALBUQUERQUE | AVON | DENVER | FORT COLLINS
303.278.3820 www ˛bgbuildingworks˛com
Project No. 9911.00 Copyright 2018
Sheet Title
M-602
MECHANICAL
CONTROLS
09/21/18