Project Name:Galvin/Sun Up Trust 2017
(Units 9 &10)Application Number: DRB18-0342
Application Type: Change to Approved Date Applied: 07/23/2018
Project Description:Exterior modifications including decks and railings. Utility closet plan change.
Additional miscellaneous exterior changes.
CONTACTS
Contact Type: Applicant
Full Name: Shepherd Resources Inc / AIA (S I)
Address:PO Box 840 105 Edwards Village Blvd C103 Edwards,
CO 81632 Phone: 9709493302
Contact Type: Property Owner
Full Name: CHRISTOPHER B. GALVIN REVOCABLE TRUST
Address: Phone: None
Project Address: 303 GORE CREEK DR 9 (210108231003 9) (210108231003)
Job Site Location: 9
Legal Description: Subdivision: VAIL VILLAGE FILING 1 Lot: 9 Block: 5
Parcel Number: 210108231003
BOARDS/STAFF ACTION
Motion By: Action: Staff Approved
Second By:
Vote: Date: 07/26/2018
Conditions:
- Design Review Board approval shall not become valid for 20 days following the date of approval, pursuant
to the Vail Town Code, Chapter 12-3-3 Appeals.
- No changes to these plans maybe made without the written consent of Town of Vail staff and/or the
appropriate review committee(s).
- Approval of this project shall lapse and become void one (1) year following the date of final approval, unless
a building permit is issued and construction is commenced and is diligently pursued toward completion.
Planner: Jonathan Spence
PLANNING FEE RECEIPT
Case # DRB18-0342
Date Printed: 07/26/2018
TOWN OF VAIL - FEES RECEIPT
Planning Summary
Type: Design Review Board (DRB) Submittal Date: 07/23/2018
Subcases: Change to Approved
Bond Expire Date:
Description of Work:
Exterior modifications including decks and railings. Utility closet plan change. Additional miscellaneous
exterior changes.
Property Information
Address: 303 GORE CREEK DR 9 (210108231003 9) Tax ID: 210108231003
Owner: CHRISTOPHER B. GALVIN REVOCABLE TRUST
Contacts
Contact Type: Applicant
Company Name: Shepherd Resources Inc / AIA
Full Name: S I
Address: PO Box 840 105 Edwards Village Blvd C103 Edwards, CO 81632
Email: Project@sriarchitect.com
Contact Type: Property Owner
Full Name: CHRISTOPHER B. GALVIN REVOCABLE TRUST
Address:
Planning Fees
Fee Information Account Amount
Changes to Approved Fee 001-0000.31122.00 $20.00
Payment Information Date Paid Payment Type Amount
Changes to Approved Fee 07/23/2018 Credit Card $20.00
Paid By: Web payment - Notes: Transaction ID: 40833856649 , auth code: 023270
FEE TOTAL $20.00
AMOUNT PAID $20.00
BALANCE DUE $0.00
07/26/2018 - 9:12:40 AM - Generated by: cgodfrey75 South Frontage Road West, Vail, Colorado 81657
1 / 1
July 23, 2
GALVIN
PROJECT
Galvin Resi
Project #1
7/23/2018
Town of
Design R
75 S. Fro
Vail, CO
3
Sheet A-1
copper sh
No.2 Flo
to wall at
Sheet A-1
connecte
No.2 Ro
removed.
Sheet A-2
reconfigu
Architectu
timber pu
No.2 Co
cantilever
deck timb
purlins ha
Sheet A-2
in plan alo
beams an
018
RESIDENCE
#1408.00
dence
408.00
Vail
eview Board
ntage Road
81657
03 GORE CRE
Galvin Residen
Modification to
We have revis
with updated
Modifications t
01 No.1 Fl
ade removed
or Plan Level
grid 4. Railing
02 No.1 Fl
d to wall at gri
of Plan; chimn
Roof hatch a
00 No.1 C
red. The walls
ral timber be
rlins have bee
mbined North
over door de
er beam and j
ve been remo
01 No.8 S
ng the 8/9 pa
d joists are no
LO T 9
EK DR 9 (2101
ce
Approved Pl
ed the approv
modifications t
o Approved Pl
oor Plan Level
now just tim
4; half-wall at l
arched in pla
oor Plan Level
d 4. Railing a
ey moved nor
dded for acce
ombined Sout
in plan along
ams and joists
n removed.
Elevation
sign has been
oists are now
ved and woo
outh Elevation
rty wall has b
w concealed i
08231003)
ans
ed drawings d
o previously s
ans March 12
3; Utility clos
ber trellis.
evel 4 south
n at grid 5.
5; half-wall a
rched in plan
th side of ridg
ss per TOV p
h Elevation
the 8/9 party
are now con
Creek Side; le
removed and
concealed in
d panel has b
DRB; Level
een pulled bac
n structural w
ated with co
ubmitted dra
, 2018.
et reduced in
deck removed
t south deck r
at grid 5.
e. South arch
ermit review.
Street; Level
wall has been
cealed in struc
vel 2 rear doo
woven metal
structural wo
een changed t
4 & 5 decks an
k to allow be
ood diaphrag
mments July 2
wings; DRB Fi
size to lessen
. Railing syst
emoved. Rail
hed roof over
4 & 5 decks a
pulled back t
tural wood di
r style has be
l screen on tr
od diaphragm
o stucco.
nd railings ha
tter views for
m. Level 5 ar
3, 2018 and c
nal Review M
view impact
em arched in
ing system ar
hang reduced
nd railings hav
o allow better
aphragm. Lev
en updated. L
ellis has been
. Level 5 arc
ve been recon
Unit 8. Archi
ched roof tim
Pag
louded on sh
ay 15, 2017
for Unit 8.
plan and conn
ched in plan a
and purlins
e been
views for Un
el 5 arched r
evel 2 trellis
removed. Le
hed roof timb
figured. The
tectural timbe
ber purlins ha
e 1 of 2
eets
&
Woven
ected
nd
it 8.
oof
vel 4
er
walls
r
ve
Galvin Residence
Project #1408.00
7/23/2018 Page 2 of 2
been removed.
No.9 South Elevation Entry DRB; Entry door has been changed to a pivot door and electrical closet door has
been reconfigured.
Sheet A-202 No. 2 North Elevation DRB; level 2 rear door has been updated. Level 2 trellis cantilever over
door design has been removed and woven metal screen on trellis has been removed. Level 4 deck timber
beam and joists are now concealed in structural wood diaphragm. Level 5 arched roof timber purlins have
been removed and wood panel has been changed to stucco.
Sheet A-203 No.1 East Elevation; Timber supports and enclosed deck updated.
Sheet A-204 No.1 West Elevation; Timber support and enclosed deck updated. Chimney moved back to
north side of ridge. Railings at level 4 & 5 returned and connect to face of walls. Half walls removed to
increase views for Unit 8.
Please advise any comments or questions relative to the foregoing.
By: Bert Willemse
cc: Participants