Loading...
HomeMy WebLinkAboutDRB18-0342_Approved Documents_1532618211.pdfACTION FORM Design Review Board (DRB) Department of Community Development 75 South Frontage Road West Vail, CO 81657 Tel: 970-479-2139 www.vailgov.com Project Name:Galvin/Sun Up Trust 2017 (Units 9 &10)Application Number: DRB18-0342 Application Type: Change to Approved Date Applied: 07/23/2018 Project Description:Exterior modifications including decks and railings. Utility closet plan change. Additional miscellaneous exterior changes. CONTACTS Contact Type: Applicant Full Name: Shepherd Resources Inc / AIA (S I) Address:PO Box 840 105 Edwards Village Blvd C103 Edwards, CO 81632 Phone: 9709493302 Contact Type: Property Owner Full Name: CHRISTOPHER B. GALVIN REVOCABLE TRUST Address: Phone: None Project Address: 303 GORE CREEK DR 9 (210108231003 9) (210108231003) Job Site Location: 9 Legal Description: Subdivision: VAIL VILLAGE FILING 1 Lot: 9 Block: 5 Parcel Number: 210108231003 BOARDS/STAFF ACTION Motion By: Action: Staff Approved Second By: Vote: Date: 07/26/2018 Conditions: - Design Review Board approval shall not become valid for 20 days following the date of approval, pursuant to the Vail Town Code, Chapter 12-3-3 Appeals. - No changes to these plans maybe made without the written consent of Town of Vail staff and/or the appropriate review committee(s). - Approval of this project shall lapse and become void one (1) year following the date of final approval, unless a building permit is issued and construction is commenced and is diligently pursued toward completion. Planner: Jonathan Spence PLANNING FEE RECEIPT Case # DRB18-0342 Date Printed: 07/26/2018 TOWN OF VAIL - FEES RECEIPT Planning Summary Type: Design Review Board (DRB) Submittal Date: 07/23/2018 Subcases: Change to Approved Bond Expire Date: Description of Work: Exterior modifications including decks and railings. Utility closet plan change. Additional miscellaneous exterior changes. Property Information Address: 303 GORE CREEK DR 9 (210108231003 9) Tax ID: 210108231003 Owner: CHRISTOPHER B. GALVIN REVOCABLE TRUST Contacts Contact Type: Applicant Company Name: Shepherd Resources Inc / AIA Full Name: S I Address: PO Box 840 105 Edwards Village Blvd C103 Edwards, CO 81632 Email: Project@sriarchitect.com Contact Type: Property Owner Full Name: CHRISTOPHER B. GALVIN REVOCABLE TRUST Address: Planning Fees Fee Information Account Amount Changes to Approved Fee 001-0000.31122.00 $20.00 Payment Information Date Paid Payment Type Amount Changes to Approved Fee 07/23/2018 Credit Card $20.00 Paid By: Web payment - Notes: Transaction ID: 40833856649 , auth code: 023270 FEE TOTAL $20.00 AMOUNT PAID $20.00 BALANCE DUE $0.00 07/26/2018 - 9:12:40 AM - Generated by: cgodfrey75 South Frontage Road West, Vail, Colorado 81657 1 / 1 July 23, 2 GALVIN PROJECT Galvin Resi Project #1 7/23/2018 Town of Design R 75 S. Fro Vail, CO 3 Sheet A-1 copper sh No.2 Flo to wall at Sheet A-1 connecte No.2 Ro removed. Sheet A-2 reconfigu Architectu timber pu No.2 Co cantilever deck timb purlins ha Sheet A-2 in plan alo beams an 018 RESIDENCE #1408.00 dence 408.00 Vail eview Board ntage Road 81657 03 GORE CRE Galvin Residen Modification to We have revis with updated Modifications t 01 – No.1 Fl ade removed or Plan Level grid 4. Railing 02 – No.1 Fl d to wall at gri of Plan; chimn Roof hatch a 00 – No.1 C red. The walls ral timber be rlins have bee mbined North over door de er beam and j ve been remo 01 – No.8 S ng the 8/9 pa d joists are no LO T 9 EK DR 9 (2101 ce Approved Pl ed the approv modifications t o Approved Pl oor Plan Level now just tim 4; half-wall at l arched in pla oor Plan Level d 4. Railing a ey moved nor dded for acce ombined Sout in plan along ams and joists n removed. Elevation – sign has been oists are now ved and woo outh Elevation rty wall has b w concealed i 08231003) ans ed drawings d o previously s ans March 12 3; Utility clos ber trellis. evel 4 south n at grid 5. 5; half-wall a rched in plan th side of ridg ss per TOV p h Elevation – the 8/9 party are now con Creek Side; le removed and concealed in d panel has b –DRB; Level een pulled bac n structural w ated with co ubmitted dra , 2018. et reduced in deck removed t south deck r at grid 5. e. South arch ermit review. Street; Level wall has been cealed in struc vel 2 rear doo woven metal structural wo een changed t 4 & 5 decks an k to allow be ood diaphrag mments July 2 wings; DRB Fi size to lessen . Railing syst emoved. Rail hed roof over 4 & 5 decks a pulled back t tural wood di r style has be l screen on tr od diaphragm o stucco. nd railings ha tter views for m. Level 5 ar 3, 2018 and c nal Review M view impact em arched in ing system ar hang reduced nd railings hav o allow better aphragm. Lev en updated. L ellis has been . Level 5 arc ve been recon Unit 8. Archi ched roof tim Pag louded on sh ay 15, 2017 for Unit 8. plan and conn ched in plan a and purlins e been views for Un el 5 arched r evel 2 trellis removed. Le hed roof timb figured. The tectural timbe ber purlins ha e 1 of 2 eets & Woven ected nd it 8. oof vel 4 er walls r ve Galvin Residence Project #1408.00 7/23/2018 Page 2 of 2 been removed. No.9 South Elevation Entry –DRB; Entry door has been changed to a pivot door and electrical closet door has been reconfigured. Sheet A-202 – No. 2 North Elevation –DRB; level 2 rear door has been updated. Level 2 trellis cantilever over door design has been removed and woven metal screen on trellis has been removed. Level 4 deck timber beam and joists are now concealed in structural wood diaphragm. Level 5 arched roof timber purlins have been removed and wood panel has been changed to stucco. Sheet A-203– No.1 East Elevation; Timber supports and enclosed deck updated. Sheet A-204 – No.1 West Elevation; Timber support and enclosed deck updated. Chimney moved back to north side of ridge. Railings at level 4 & 5 returned and connect to face of walls. Half walls removed to increase views for Unit 8. Please advise any comments or questions relative to the foregoing. By: Bert Willemse cc: Participants