Loading...
HomeMy WebLinkAboutPEC18-0019_tc approved plans_1538172194.pdf April 27, 2018 .4041 F 4,4 Mr.Jonathan Spence Town Planner Town of Vail 75 South Frontage Road Ifj N Vail, CO 81632 10/30/2018 9:29:53 AM RE: Launch Development Project/534 East Lionshead Circle Dear Jonathan: As owner of an undivided one-half interest in the access parcel that serves the two-level parking structure at 534 East Lionshead Circle (commonly referred to as Parcel F,to be identified as Track K by the proposed Minor Subdivision), I authorize Launch Development, Inc.to include the 3,310 square feet of Parcel F as part of their"development site". It is my understanding that this additional site area will be used to evaluate development standards and allowable development. As per my agreement with Launch,they will limit the Gross Residential Floor Area proposed for their project to not exceed what would otherwise be permitted by the site area of their adjoining Parcel C(to be identified as Lot 2A on the proposed Minor Subdivision). I also authorize the submittal of the Minor Subdivision and code amendment (Parking Pay in Lieu Map) applications that affect our property and authorize Tom Braun of Braun Associates, Inc.to represent my interests in these applications. Please contac ,rie with an .uestions. B•`% Lazier J 40 OF boiBattle Mountain LLC/534 East Lionshead Circle °�}? fINEva' Parking Structure Re-Development April 30, 2018 10/30/2018 9:29:53AM I. INTRODUCTION The purpose of this report is to provide information on Battle Mountain LLC's proposed development of a residential condominium at 534 East Lionshead Circle. Information provided herein has been prepared in accordance with procedures prescribed by the Town of Vail development review process. The proposed development is located on a parcel of land (Lot 2A as depicted on the proposed Minor Subdivision), that for many decades included a portion of a two-level parking structurelocated along East Lionshead Circle. This parking structure will be removed in order to facilitate this redevelopment. The project includes three levels of underground parking,a six-level residential building and related site and landscape improvements. The adjoining propertyto the west (Lot 1A as depicted on the proposed Minor Subdivision), is pursuing a similar residential development. While separate projects,these two land owners have been coordinating their design and redevelopment efforts and two of the applications submitted herein pertain to both of these properties. Four development applications have been submitted: • Exterior Alteration application for the proposed condominium building and site improvements, • Minor Subdivision application to formalize the division of land for the subject parcel and two surrounding parcels, • Variance application for a rear setback variance, and • Amendment to the Town's Parking Pay in Lieu map. Each of these applications are described in detail below. Information provided in this report is presented in the following sections: I. Introduction II. Project Overview and Background III. Description of Project IV. Conformancewith Applicable Review Criteria 1. Exterior Alteration 2. Minor Subdivision 3. Variance Request 4. Amendment to Parking Pay in Lieu V. Appendix 1. Minor Subdivision Battle Mountain LLC/534 East Lionshead Circle Development Applications Page 1 4.0 OF 41,4 -4 p 4' The Exterior Alteration and Variance applications have been submitted on behalf of Tf0 ' Battle Mountain LLC(BMLLC). These applications pertain to proposed Lot 2A. Applications for a Minor Subdivision and Parking Pay in Lieu Map amendment have beA30120189:29:53AM submitted on behalf of both BMLLCand Lazier Lionshead LLC(Bob and Diane Lazier, herein referredto as Lazier), owners of the adjoining parcel. These applications pertain to proposed lots 1A and 2A. The project vicinity map below depicts the properties affected by these applications. A site plan of the BMLLCdevelopment is found on the following page. .- I- . f4 *Mil IN k • S' C - A LJ I r4prig,,,,,„ M' . ' ,4111111 .1* it IWestwind cc,° Vantag /0 t 1 iiir!:_rv.,Il '_ '1 lbw A'erf ''f 1 e � LOT2A � � wI LOT1A1 / 17 Sunbird ' t Park # i' pa1.11 1, r COMMON ACCESS�� • TRACT A i i 4 'ad 21 ,�; Liithouse P I t .. R / lir. . to 1111- • • onshead E . rcade 't4 r. I• . 1 '� y1 .r�. .411(r. .. . . i- •' `' mi Project Vicinity Map Battle Mountain LLC/534 East Lionshead Circle Development Applications Page 2 0 OF i1/46:6;019111gfe. 5'-r6'PPM CONCRETE h VANTAGE POINTS n,S WALKWAYCaPhCRETE f VAIL. GONOOMiNIUMS As N13:Dm, SARK MULCH PL.4mNs =OE OF ROOT= 5• RE,cmL MEC AEIOVE s.R,+aE L10N5NEAp +.. CIRCLE • a�.a' w' ., °"` 10/30/2018 9:29:53AM `"-•,... PROPERTY LINE .. w mr.mu,. 56 'r. 1I — — itrt; J - �.; I $ carJc✓ +5- -,- pV j I �` sm.,so S NEEDED '-- II ,���-a1T1c-'-y, 3P7ilrce TRIS AsNo-/Er01 N D. ' .--- r�cmA. ''- -- ---__ I S;Id II'y I1"-------- IAA EXsrrNssrYDE 1GChL'RETE PAN 4., 7 ■�� , of I' p l'. __'.Of,! EKIEEN5 5'-RDE L ! ;FIS, rr-t I� f' PAVER sr wALx 7E PLAN7ER, - 42"HIEN �� , �'' G 'f� if,ML60 SITE FUTURE CIO r •IV �Ud 'N;s0 -,-,, l.1 in \ ';+' I SEE crvi4 EXrs-n1.19 pp ■� cam.-,--cam"' - '� a¢ExK.Y RAI Nrs+r+CTAI. - i� Oy, �]i'°�� - ' r__ �.; -_ s spar PLANTER RAlLlNs ? rc r �� - f 1. .55 i eLevnnous _ PAVER ,, K J A1f.0•rX��_7�8'.HIGH --' � ! ; . 18'N16 Hw I 'LEWE Oro LOPER weer. / 06 -LEVEL .4-ry , _ 11.1t pR.. �� °4IG1 Ye /� lt p1 " � pRF caN rFk7e / ,f_ ,� ., �G �� ,t TRES 1111 J , l`;7. / " �/1Y•• FI� YfJ : !%! lS/ R �L'}�i�lV " �.iLcr-• 415 . ^ TlO J !E`Hi6N I«4T c.a.i em e, 1r \ Y4:._ .., i ; 449_411P4 50 \ CONCRETE a.Re NC� GOnLSAND 11110 EXI5TIM5 SPRUCE W/1LL NEIN A PW-LT IW - i1 - TREES r0 REMAIN - - - - - - - • ir- PARCEL F t. Ir.: !ss � � �;, F PARCEL 8 — Al A; .A.111181,MIT T� t i T ] ) �"" f EXI55 CH AND feTE ^ S \ I + � tiii ` f � I MEIN CURB AND i u w. .. .1.P...e J S a EA5r!N5 PAVER... �r� 1 .. s9m VAIL 21 ..ALo e, r-.ro ' Illustrative site plan of proposed BMLLC/534 development Battle Mountain LLC/534 East Lionshead Circle DevelopmentApplications Page 3 40 OF LowII. PROJECT OVERVIEW and BACKGROUND °� ct }? Tf1' Background on Parking Structure and Division of Land 10/30/2018 9:29:53AM The existing parking structure was developed in the early 1970's and over the years has provided parking for the Lionshead Arcade,Vail 21, Lifthouse Lodge and other individuals. The structureis located on two parcels of land that were described and deeded in the 1970's based on legal descriptions. These parcels were originally part of Lots 1, 2, 3 and Tract F, Block 1 of the Vail Lionshead Subdivision, but this division of land did not go through a formal subdivision process. The western 2/3rd of the parking structureis owned by Lazier and the eastern 1/3rd is owned by BMLLC. BMLLCand Lazier own equal interests in proposed Tract A, a common access parcel that provides access to both development parcels. The proposed Minor Subdivision will formalize the subdivision of the two development sites and the commonly owned access parcel. Redevelopment Coordination BMLLCand Lazier have been coordinating over the past year on the redevelopment of there respective parcels. This collaboration will result in the demolition of the top deck of the existing parking structurethis spring. Subject to obtaining approvals from the Town, BMLLCintends to initiate construction of their redevelopment in the Spring of 2019. Lazier intents to submit development applications in the near future but has no definitive timeline for their redevelopment. The BMLLCand Lazier projects will share a common access drive off East Lionshead Circle. This access is proposed in the same location as the drive aisle that serves the existing parking structure. Both projects will include below grade parking and condominium buildings located above the parking. The parking level of the BMLLC project has been designed with a 0' setback on the rear,or west side of the site which will allow for the Lazier project to build to the same 0' setbackline. Once constructed, each project will include outdoor spaces above the parking level. Zoning and Surrounding Land Use The Launch project is zoned Lionshead Mixed Use — 1 (LHMU1)and except for the 0' rear setback (for the parking level only), has been designed in compliance with development standards prescribed by the LHMU1 zone district. The two development parcels (Lots 1A and 2A on the proposed minor subdivision) both comply with the minimum lot size as prescribed by LHMU1. The BMLLCpropertyis bordered by LHMU1 zoned lands on the north,south and west sides. Each of these properties have been developed with residential or mixed-use projects. To the east is the Town of Vail Lionshead Parking Structure. Battle Mountain LLC/534 East Lionshead Circle Development Applications Page 4 4,0 OF boiSite Area °� f14 Eva As per the Town Zoning Code, the definition of"lot or site" is: A parcel of land occupied or intended to be occupied by a use, building, or 10/30/2018 9:29:53AM structure under the provisions of this title and meeting the minimum requirements of this title. A lot or site may consist of a single lot of record, a portion of a lot of record, a combination of lots of record or portions thereof, or a parcel of land described by metes and bounds. For the purposes of this development application, the "lot or site"for the BMLCC development includes both Lot 2A and Tract A. This results in a total site area of 13,677 square feet(10,367 square feet from Lot Al and 3,310 square feet from Tract A). This means all development standards for the project are based on the total site area and boundary of both parcels. A letter from Lazier that authorizes BMLLC's use of Tract A as part of its "lot or site" has been provided under separate cover. Note that an agreement between BMLLCand Lazier stipulates that BMLLCwill limit its Gross Residential Floor Area (GRFA)to what is permitted based on the site area of Lot 2A. Battle Mountain LLC/534 East Lionshead Circle Development Applications Page 5 liks OF if : III. DESCRIPTION OF PROJECT 10/30/2018 9:29:53AM Four development applications have been submitted for this project: Exterior Alteration This review process is prescribed by the LHMU1 zone district and applies to any new development that among other things adds dwelling units or more than 1,000 square feet of floor area. The Exterior Alteration review process evaluates the project's compliance with the purpose of the LHMU1 zone district and applicable development standards of the zone district, how the project complies with applicable elements of the Lionshead Redevelopment Master Plan and potential impacts of the project on the surrounding neighborhood. Minor Subdivision The sub ject properties were divided in the early 1970's and have been under separate ownership since that time, but they were not formally subdivided. The Minor Subdivision has been proposed to formalize this division of land and is essentially a housekeeping item. The main considerations in evaluating a minor subdivision is to ensure that the parcels to be created meet minimum lot size standards, have access, will allow for orderly development and that the subdivision is in compliance with the Town's development objectives. Rear Setback Variance As described above, coordination between BMLLCand Lazier has been ongoing for the past year. Upon completion these two projects will provide a unified design solution. They will, however, be developed on independent timelines. It is expected that BMLLCwill be the first to move forward. The uppermost level of the parking facility is located at the grade with the common access drive. The western end of this level is proposed at the project propertyline, or with a 0' side setback. This has been done to allow the design of Lazier's top parking level to be located at its easterly property line, or with a 0' side setback. The benefit of this approach is that it eliminates a 20' separation between parking structures. The two abutting parking structures will allow for development of outdoor space on Lazier's project that will link to outdoor space on the BMLLC site. A rear setback variance is necessary to allow for this solution. Amendment to Parking- Pay in Lieu Map The Town's parking regulations establish Pay in Lieu Parking Zones that identify properties that are required to "pay in lieu" of providing on-site parking. Such properties are identified in Vail Village and Lionshead and in most cases include propertiesthat do not have frontage on a public right of way (like the Lionshead Arcade) or are located along pedestrian streets(like the Wall Street Building in Vail Village) where vehicular trafficis undesirable. Even though they have direct Battle Mountain LLC/534 East Lionshead Circle Development Applications Page 6 40 OF boi -4 - p access on a public right-of-way, both the Launch and Lazier properties are Wr, mapped as pay in lieu properties. A code amendment is proposed to amend the Parking Pay in Lieu Map to remove these two properties from the designation. 10/30/2018 9:29:53AM Below is a description of the main elements of the proposed project. The project's conformance with applicable review criteria for each of the four development applications described above is found in Section IV. of this report Dev elopment Program The development program for the project includes: Residential Condominiums Nine residential condominiums unit with a total of 23,800 square feet of GRFA are proposed. Employee Housing Units Three employee housing units (EHU's) comprised of 2,810 square feet are proposed. This exceeds the Inclusionary Housing requirement by 430 square feet. Lobby and Common Areas 2,980 square feet of common area including lobby space, sitting room,fitness center,owner's storage and ski lockers is proposed. Office space for building management and short-term rentals is also provided. Parking The existing structures and surface parking located on Lot A2 provides approximately 54 parking spaces. Proposed parking includes 29 spaces on each of three below-grade levels and 6 other interior spaces for a total of 93 on-site parking spaces. These spaces replace the 54 existing spaces, provide 17 spaces for the new development (9 condominiums and 3 EHU's) and provide 22 additional parking spaces. This number is subject to change as the design of below grade parking is finalized. An automated parking system is proposed. This system allows for increased efficiency,particularly on a project with a relatively small building footprint. Users of the parking will enter the parking garage and if needed park in one of six short-term spaces to unload their vehicle (or check into their condominium), then move their vehicle into what is essentially an elevator. Users then exit their vehicle and signal the system to park the car. The automated system then lowers the car to one of the three parking levels where the car is moved via "trays"to an available parking space. The car is returned when the owner Battle Mountain LLC/534 East Lionshead Circle Development Applications Page 7 4,0 OF 41,4 19 11116"e -4 � p cie signals the system to do so. While new to Vail, the anticipated system provider if clod for this project has designed and installed 60,000 automated parking spaces in 13 countries. 10/30/2018 9:29:53AM Site Design The building's primary pedestrian orientation is to the east with an entry stairs and front door located along East Lionshead Circle. Landscaping along the road is proposed to define spaces and "soften" the building. Pedestrian access is also provided on the south side of the building. Vehicular access will be via the existing access corridor. This corridor will serve two purposes: • Provide vehicle access to the BMLLCproject,to Lazier's future project to the west and to the Lifthouse Lodge and a small surface parking lot adjacent to Vail 21, and • Improve the existing east/west pedestrian route between East Lionshead Circle and Lionshead. To enhance the pedestrian aspect of this corridor,landscaping on both sides of the drive and a decorative paving pattern to define a pedestrian walkway are proposed. The lobby or main level of the BMLLCproject includes an outdoor space or terrace on the west side of the building. The uppermost parking/car entry level is one floor below this terrace level. Lazier's project will have a similar outdoor space on the east side of its building. The BMLLCterrace is design such that when Lazier's project is constructed, the terraces will "merge"the two projects and create a unified outdoor plaza space. Battle Mountain LLC/534 East Lionshead Circle Development Applications Page 8 0 OF i1/41:h Ail1011iFir. IC' -+ ir --1Q r '� LOT 2 8LK 1 '; ¢'. -,/ i . +ruv_NONs+ExO • / -, 10/30/2018 9:29:53AM —..� 2 B. „NGS wGL. qo I xxx�u i ,3 rti i N.55'Sc-07-E 117.00' 1rn¢ar'A. e.r *MU. �J1 wu1. ..,r �`+.r .'. rx ars>J n.. �„ ! 1. , -"-r".—5cueu..\: NF1• r'�]f' LNNDSCxrvf s '// •' U my tii rrs 7.. ..nr. r.r1ra. Y C - CdNwE _ -P..., PARCEL C,NO.4 3 { ca cirrE * s ss O'z36 acREs Oa,37N sort) as P I,/If� ,..kr n ..NGscxrr.:' •r} ,w: MIFi 3N `:".7 • / I ' Yy }` SL 1 Mpfg S ArRSj ✓'ARrING PA.1117) 1 RICA . • 1 M O � N,Vy /._ 15G' -LY N6551'OYE 12b-G6' 4+ i \\:\ + �ti LIT; __la_ to ro wwxa PARCEL^NO. I �rxr °'Ss'W1E ass' xcxss[xs[N[N1 I wr,�1 rkpl OaarFp IBoa.9ay.PAGE u11 0.076 ORES \1\ "' mmN (3,323 SOFT) { .0 •54.071, 120.IS G n 7 ,,,,,.,1,,,, I .... P.x� ~.' NxN R I MAO aox�lc l au•p - xxoscxv[MCA e 1 1 '��.,_, y «—�{ I MUMS Cr(1:1T.1' 13�. (Bm.TIBC SACC N aRNw 6' rl,,' Proposed Lot A2 I I _�,I -21A.,1:,..7.=:=.7,41.-.4=7,1,-.,-,..7.-- II I ' I t 1 I .�.. I� t� - _•11111 I /x,1 _ ,\ 1;4 -.` } pi �I1 1w �1 .. I .... - _,..rte: ....1....1... �' _ _ , M% 11 r. mem nirsaminc. Battle Mountain LLC/534 East Lionshead Circle DevelopmentApplications Page 9 4,0 OF : DevelopmentStandards .07irtv A summary of development standards as prescribed by the LHMU1 zone district and development standards proposed by this project are provided below. 10/30/2018 9:29:53AM Gross Residential Floor Area LHMU1 allows for 250 square feet of GRFA for every 100 square feet of site area. The proposed site area of .314 acres would allow for 34,192 square feet of GRFA. An agreement with Lazier limits GRFA on Lot A2 to what is allowable based on the area of Lot A2, .238 acres or 25,917 square feet. 23,800 square feet of GRFA is proposed. Density LHMU1 allows 35 dwelling units per acre. The .314 acre site allows for 10.99 dwelling units. Nine dwelling units are proposed. Building Height Maximum allowable absolute height is 82.5' and maximum average height is 71'. The proposed building has an absolute maximum height of 81.0 and average height of 70.8'. Setbacks Setbacksin LHMU1 are 10' on all sides. Proposedsetbacksare: • Front(along East Lionshead Circle)— 10' • Side — 10' on north, 36' on south • Rear—0' (this variance is discussed further in Chapter4-Comformance with Applicable Review Criteria) Site Coverage LHMU1 allows for 70% site coverage,or 10,941 square feet. Proposed site coverage is 7,400 square feet,or 54% Landscaping LHMU1 requires 20% of a site to be landscaped, or 2,735 square feet. Proposed landscape area is 2,780 square feet. Note that this landscape area is softscape area only, it does not reflect any decorative hardscape areas. Parking and Loading Proposed development requires 17 new spaces. 93 parking spaces are proposed. This will accommodate the new demand, replace existing parking and provide 20 additional parking spaces. There is no commercial development in the project and as such loading needs will be very minimal, limited to move in/move out of the residential units. The Battle Mountain LLC/534 East Lionshead Circle Development Applications Page 10 OF if .9‘,;1119111gfe in; lr loading facility at the Arrabelle was over-sized to provide loading for adjacent *1:2e Tf � A' properties. If needed, the Arrabellefacility could be utilized. 10/30/2018 9:29:53AM Diagrams depicting building height, site coverage,setbacks and landscaping are found in the project plan set that has been provided under separate cover. Employee Housing Section 12-24-2 Employee Housing Requirements establishes a mitigation rate of 10% of the total new GRFA proposed by a project. 23,800 square feet of GRFA are proposed, resulting in an inclusionary employee housing requirement of 2,380 square feet. The code requires that a minimum of 50% of this requirement be provided on-site. Employee Housing Mitigation Plan Three on-site EHU's totaling 2,810 square feet are proposed. This mitigation will provide 100%of required housing on-site and will exceed code requirements by 430 square feet. Parking— Pay in Lieu Parking Map The purpose of this provision in the parking section of the zoning code is for properties that do not have access to a public street or are located where the Town does not want to generate trafficto pay into a fund for any new parking demand in lieu of providing parking on-site. For unknown reasons,the parcels on which the parking structureis located are included on the Pay in Lieu Parking Map, meaning that by code on-site parking is not permitted. For the following reasons, it is assumed that this mapping was done in error: • The subject properties have legal access to East Lionshead Circle, • Vehicle access to the site does not directly interfere with established pedestrian corridors, • Parking was in place on the subject parcels when the map was prepared, and • The Lionshead Redevelopment Master Plan suggests that with the redevelopment of the subject propertiesthat on-site parking be retained, and a ground rule of the master planning process was that there be no net loss of existing parking in Lionshead. The proposed amendment would remove the subject propertiesfrom the Parking Pay in Lieu Parking Map and would allow the propertiesto provide parking on-site. The properties proposed to be removed include Lot 1A, Lot 2A and Tract K as depicted on the proposed Minor Subdivision. A map of the proposed amendment is found on the following page. Battle Mountain LLC/534 East Lionshead Circle DevelopmentApplications Page 11 _a0OFif 4%.1:h;;111191111,11Fir.. 0 'Ir —+ —1 Q 42. ?f nn 10/30/2018 9:29:53AM r }I Vantage Point --u.i- , wig. ,ri Westwind . 1 r'. ' 4016,J -4 &I f I 11=• L r__>,4 . —. rk 11%. ( o�i ic -,; jt;ii ' Lift House 1 r_-_ + Vail 21 r 1ArbelI ''I r 'Lim de `{' shead C .r)/ at J .. , d i —Vail quare, ' _ ', +fI 'Lionshead Center r 711C\-\ k.,2/, .,...--.... . _,.,.., Amendment to Parking Pay in Lieu Zones 1 Core Area Parking Map , v f1q,-4.4',til! --�, 4,,,g c...,„ j.,?!..j_______;,vi_,..A\---;.__T___,:f____ -- ,,,,,t__.7,,,,........... . .............„....L.,....._,...,__ —t: ulrs_l L L P i�•� r , 0� --- ,'`- -a _fie { r ! ru ' p�zvi ',q paJ�' ole_ ! I 11 �a! 1 I1 1 I ) I it � _—'4, 7,1 of .— A� VProposed Commercial Core Area(EverVail) � �t�� ,•., ge Commercial Core Area : Pay-in-Lieu Properties Existing Pay in Lieu Parking Zones Battle Mountain LLC/534 East Lionshead Circle DevelopmentApplications Page 12 4,0 OF Low -4 p IV. CONFORMANCE WITH APPLICABLE REVIEW CRITERIA W IN(Iv Below is a summary of how the proposed project conformsto applicable review criteriN/30120189:29:53AM for each of the four development applications. EXTERIOR ALTERATION It shall be the burden of the applicant to prove by a preponderance of the evidence before the planning and environmental commission and the design review board that the proposed exterior alteration or new development is: 1. In compliance with the purposes of the Lionshead mixed use 1 district, Response The purpose of the LHMU1 district is: The Lionshead mixed use 1 district is intended to provide sites for a mixture of multiple-family dwellings, lodges,hotels,fractionalfee clubs,timeshares, lodge dwelling units,restaurants, offices, skier services, and commercial establishments in a clustered, unified development. Lionshead mixed use 1 district, in accordance with the Lionshead redevelopment master plan,is intended to ensure adequate light,air,open space and other amenities appropriate to the permitted types of buildings and uses and to maintain the desirable qualities of the zone district by establishing appropriate site development standards. This zone district is meant to encourage and provide incentives for redevelopment in accordance withthe Lionshead redevelopment master plan. The proposed project is the initial phase of redevelopment of a distressed propertythat is identified by the Lionshead Redevelopment Master Plan (the Plan) as a priority for redevelopment. The project is very much consistent with the purpose of the LHMU1 zone district. 2. That the proposal is consistent with applicable elements of the Lionshead Redev elopment Master Plan, and Response The Lionshead Redevelopment Master Plan (LRMP)is an extensive and detailed planning document. Below are highlights of how the proposed project is consistent with main elements of the Plan from Chapter 2 — Policy Objectives, Chapter 4—Overall Study Area Recommendations, Chapter 5 — Detailed Plan Recommendations and Chapter6 —Site Design Guidelines. Chapter 2— Policy Objectives Of the six broad policy objectives outlined in the Plan, three are applicable to this project: Battle Mountain LLC/534 East Lionshead Circle Development Applications Page 13 4,0 OF Low -4 IP p 2.3.1 Renewal and RedevelopmentIN(Iv We 1 The project will replace a dilapidated above grade parking structure with below grade parking and a new residential building. 10/30/2018 9:29:53AM 2.3.4lmprovedAccessand Circulation An outcome of this project is the removal of a vehicular access point on East Lionshead Circleand significant aesthetic enhancement to the east/west pedestrian corridor south of the proposed building. 2.3.5 Improved Infrastructure The project will restore parking that had been provided in the two-level parking structure. Chapter 4—Overall Study Area Recommendations This chapter of the LRMP addresses broad level considerations that affect Lionshead as a whole. Examples of these include view corridors,Lionshead's main "hubs",connection with Gore Creek and the natural environment, connection with Vail Village, public transportation and other considerations. Most of these considerations are not directly relevant to the proposed development. This is likely due to two factors—the limited scope of the proposed redevelopment and the fact that the project is located outside of the Lionshead core area and major pedestrian streets. One relevant consideration is with respect to live beds. Consistent with the LRMP,the proposed project includes typical hotel facilities such as a lobby,sitting room and work out room. Project covenants will allow for short-term rentals of condominiums and an office to assist with rentals is provided in the lobby. Chapter 5— Detailed Plan Recommendations Chapter5 examines individual parcels and groups of parcels and identifies important functional relationships and objectives to be considered in redevelopments. Specific considerations from the LRMP relevant to this proposal include: 5.7.5 Lions Pride Building and Parking Deck The Lions Pride building and the parking deck across the alley are not in primary locations in the retail core but,because they are in very questionable condition (both visually and physically), their redevelopment and compliance with the Master plan should be considered a priority. An opportunity exists to convert the existing alleyway into a true arrival point for these properties and an enhanced pedestrian walkway. The existing parking must be replaced, most likely underneath a new structure, and could be accessed directly from East Lionshead Circle or from the alley. Battle Mountain LLC/534 East Lionshead Circle Development Applications Page 14 40 OF boi -4 - p Wr, The proposed project addresses this objective. Landscaping and decorative ° Tf pavers are proposed to create a more pleasing pedestrian walkway while also providing for vehicular use. 10/30/2018 9:29:53AM The LRM specifically identifies this property as not being an appropriate site for retail, nor fora gateway, portal or other urban design features that may be appropriate elsewhere in Lionshead. Chapter 6—Site Design Guidelines This chapter described detailed design elements will lend character and quality to the overall fabric of public spaces and to the desired hierarchy of pedestrian spaces. The proposed project is not located within the Primary Pedestrian Mall nor the Secondary Pedestrian Mall area. There are no Primary Pedestrian Streets adjacent to the site. As such, many elements of this chapter are not applicable to this site. The existing alley on the south side of the project is a Primary Pedestrian Walk. This corridor will include a decorative walking surface to define pedestrian flow. The height of some landscape walls will allow for seating. As suggested by the LRMP, trash and recycling facilities are located within the building. C hapter 8—Architectural Design Guidelines Note —this chapter will be addressed in subsequent refinement to this project description. 3. That the proposal does not otherwise havea significant negativeeffecton the character of the neighborhood,and that the proposal substantially complies with other applicable elements of the Vail comprehensiveplan. Response Neighborhood character in terms of the built environment is established by the development standards prescribed by the LHMU1 zone district. These standards were created to implement the goals of the Lionshead Redevelopment Master Plan. The project has been designed to conform to these standards and as such the project will be consistent with the character of the neighborhood. The proposed project will not have significant negative effects on the character of the neighborhood. MINOR SUBDIVISION The following are review criteria for a minor subdivision, as outlined in Section 13-3-4, Commission Review of Application; Criteriaand Necessary Findings, Vail Town Code: Battle Mountain LLC/534 East Lionshead Circle Development Applications Page 15 .401 OF 4.9,411011111ife cie 1. The extent to which the proposed subdivision is consistent with all the A' El applicable elements of the adopted goals,objectives and policies outlined in the Vail comprehensive plan and is compatible with the development 10/30/2018 9:29:53AM objectives of the town;and Response The proposed subdivision is consistent with applicable elements of the adopted goals,objectives, and policies outlined in the Vail Comprehensive Plan and is compatible with the development objectives of the town. By way of example, Goal 1.3 of the Vail Land Use Plan states "the quality of development should be maintained and upgraded whenever possible." If approved, the proposed subdivision will facilitate the upgrading and redevelopment of this property. 2. The extent to which the proposed subdivision complies with all of the standards of this title, as well as,but not limited to,title 12, "Zoning Regulations,"of this code,and other pertinent regulations that the planning and environmental commission deems applicable;and Response The proposed subdivision is in compliance withthe standards of Title 12, Zoning Regulations, Vail Town Code,and Title 13, Subdivision Regulations, Vail Town Code. Lots 2A and 28 are both consistent withminimum lot size as prescribed by the LHMU zone district. Track K, the common access parcel is necessary to provide access to East Lionshead Circle. 3. The extent to which the proposed subdivision presents a harmonious, convenient, workable relationship among land uses consistent with municipal development objectives; and Response These parcels were established by legal descriptions and deed and have been in existence for many decades. This subdivision will formalize the status of these parcels and in doing so the proposed subdivision presents a harmonious, convenient, workable relationship among land uses consistent with municipal development objectives. The proposed subdivision will not negativelyimpact the existing relationship among surrounding land uses. 5. The extent of the effects on the future development of the surrounding area;and Response Formalizing the subdivision of these parcels that have been in place for many decades will have no effect on the future development of the surrounding area. 6. The extent to which the proposed subdivision is located and designed to avoid creating spatial patterns that cause inefficiencies in the delivery of public services, or require duplication or premature extension of public facilities, or result in a "leapfrog"pattern of development;and Battle Mountain LLC/534 East Lionshead Circle Development Applications Page 16 OF 4 :;i1111911g;* in; Ott' Cie ResponseEly f � ' The proposed subdivision will not cause any inefficiency in the delivery of public services and will not require duplication or premature extension of public servic€3J3012018 9:29:53AM and will not result in a leapfrog development pattern because the applicant is proposing a subdivision of existing plattedlots already served by public facilities. 7. The extent to which the utility lines are sized to serve the planned ultimate population of the service area to avoid future land disruption to upgrade undersized lines;and Response The proposed subdivision is currently served by appropriately sized utility lines,resulting in no future land disruptions to upgrade undersized lines. 7. The extent to which the proposed subdivision provides for the growth of an orderly viable community and serves the best interests of the community as a whole;and Response The proposed subdivision formalizes previous divisions of land and in doing so will provide for the growth of an orderly viable community and serves the best interests of the community as a whole. 8. The extent to which the proposed subdivision results in adverse or beneficial impacts on the natural environment, including, but not limited to, water quality, air quality,noise,vegetation, riparian corridors, hillsides and other desirable natural features; and Response Thesubject property is currently developed with parking facilities. The proposed subdivision will not result in any adverse impacts on the natural environment, including, but not limited to, water quality, air quality, noise, vegetation, riparian corridors, hillsides and other desirable natural features. 9. Such other factors and criteria as the commission and/or council deem applicable to the proposed subdivision. Response n/a VARIANCE Factors Enumerated: Before acting on a variance application, the planning and environmental commission shall consider the following factors with respect to the requested variance: 1. The relationship of the requested variance to other existing or potential uses and structuresin the vicinity. Battle Mountain LLC/534 East Lionshead Circle Development Applications Page 17 OF if .9‘,;1119111gfe in; Oter'r Cie ResponseEly Tf � ' The level of the building proposed to be within the rear setback is below grade at the east and north sides of the site and partially above grade on the west. This 10/30/2018 9:29:53AM setback encroachment presents no adverse impacts on other existing or potential uses and structuresin the vicinity. To the contrary,the proposed 0' will allow for a unified plaza design when the Lazier project is developed. 2. The degree to which relief from the strict or literal interpretation and enforcement of a specified regulation is necessary to achieve compatibility and uniformity of treatment among sites in the v icinity,or to attain the objectives of this title without grant of special privilege. Response Design of the BMLLCand Lazier projects are being coordinated to allow for outdoor plaza space to be provided between the two projects. The 0' setback proposed for the respective parking level below the outdoor space will allow for coordinated design of this space. The Lazier project will propose the same 0' setback. Literal enforcement of the 10' setb ackwould not allow for this design solution and result in basically20' of unusablespace between the two projects. 3. The effect of the requested varianceon light and air, distribution of population,transportation and trafficfacilities,public facilities and utilities, and public safety. Response The proposed setback will have no adverse effect on the considerations listed above. 4. Such other factors and criteria as the commission deems applicable to the proposed variance. Response Town development standards in Vail Village and Lionshead allow for and at times encourage 0' setback solutions when the result will allow for a design that provides appropriate and desirable solutions. The proposed 0' setb ack will allow for unified design between the BMLLCand Lazier properties and as such is consistent with other examples where the Town has encouraged 0' setback solutions. CODE AMENDMEN/PAY IN LIEU PARKING ZONE The following are review criteria for a minor subdivision, as outlined in Section 13-3-4, Commission Review of Application; Criteriaand Necessary Findings, Vail Town Code: 1. The extent to which the text amendment furthers the genera'and specific purposes of the zoning regulations; Battle Mountain LLC/534 East Lionshead Circle Development Applications Page 18 OF 4.9,411011111ife Response Tf � ' The proposed amendment will simply remove the three subject parcels from the Parking— Pay in Lieu Map. The inclusion of these properties on this map 10/30/2018 9:29:53AM precludes the redevelopment and replacement of existing parking. This is not consistent with the purposes of the pay in lieu provision of the zoning code. It is assumed that the map was done in error for the following reasons: • The subject properties have legal access to East Lionshead Circle, • Vehicle access to the site does not directly interferewith established pedestrian corridors, • Parking was in place on the subject parcels when the map was prepared, and • The Lionshead Redevelopment Master Plan suggests that with the redevelopment of the subject propertiesthat on-site parking be retained, and a ground rule of the master planning process was that there be no net loss of existing parking in Lionshead. This amendment will allow for the redevelopment of these parcels. 2. The extent to which the text amendment would betterimplement and better achieve the applicable elements of the adopted goals,objectives, and policies outlined in the Vail comprehensive plan and is compatible with the development objectives of the town; Response On-site parking is appropriate on the subject properties. The existing parking structureis unsightly, and the Lionshead Redevelopment Master Plan identifies this property for redevelopment. This amendment will allow for the redevelopment of these parcels. 3. The extent to which the text amendment demonstrates how conditions have substantially changed since the adoption of the subject regulation and how the existing regulation is no longer ap p rop riateor is inapplicable; Response The Parking Pay in Lieu Map in its currentform is not appropriate nor is it applicable to the subject properties. 4. The extent to which the text amendment provides a harmonious, convenient, workable relationship among land use regulations consistent with municipal development objectives; and Response Removing the subject propertiesfrom the map is necessary in order for parking to be main on the site. Removing the subject properties from the map will provide a harmonious, convenient and workable relationship among land use regulations that will be consistent with the town's development objectives. Battle Mountain LLC/534 East Lionshead Circle DevelopmentApplications Page 19 .40 OF -4 � p 5. Such other factors and criteria the planning and environmental commission ! ,,' and/or council deem applicable to the proposed text amendment. Response 10/30/2018 9:29:53 AM N/A Battle Mountain LLC/534 East Lionshead Circle Development Applications Page 20 4,0 OF 10411111111111i,V. APPENDIX 10/30/2018 9:29:53AM Minor Subdivision Plat Battle Mountain LLC/534 East Lionshead Circle Development Applications Page 21 OF f 4FbilifilINFe CI —J p ``�K FINAL PLAT 0 -, EAGLE COUNTY FILE NO. GENERAL NOTES: 1f,}41 0 VAIL/T JO \ S HE AD 1. DATE OF SURVEY: 10/30/20189:29:53AM INTERSTATE 'D A RESUBDIVISION O 1 A P A_-. T OF LOTS 1 , A_\ D 'RAC H LO C K 1 2. BASIS 2658 ONF AENo.INGS:5 REBARIS SURVEY IS AND A FOUND BASED2" BRASS CAPE ATO THEDCENTERLINEETWEEN APOIINTFOUND OF CURVE VAIL/LIONSHEAD FIRST FILING, BEING (STATE PLANE COORDINATES) S 60'08'42"W — 1515.59' VAIL/LIONSHEAD FIRST FILING TO WN OF VAIL COUNTY OF EAGLE S TATE OF COLORADO CALCULATED ROTATION = +00'30'05" RECORD —STATE PLANE COORDINATES. DISTANCES SHOWN HEREON ARE SITE4111- --1)1141r9 SURFACE VALUES DERIVED USING A SCALE FACTOR OF 1.00041186. r 3. LINEAL UNITS OF MEASUREMENT ARE GIVEN IN US SURVEY FOOT. EAST LIONSHC4. THE SOLE PURPOSE OF THIS FINAL PLAT IS TO COMBINE PARCELS C NO. 4, F NO. 3 AND L INTO LOT 1A, 2A, AND TRACT K. lEllaW_4 111 -� r� y 5 SO -r1-1 5. THERE ARE NO PUBLIC ROAD WAYS, PUBLIC IMPROVEMENTS, OR EASEMENTS BEING DEDICATED TO THE PUBLIC wall l( F �� ■■vio AS TO AN UNDIVIDED 1/2 INTEREST IN TRACT A BY THIS PLAT. 4q� WEST MEADOW DRIB 6. PROPERTY IS ZONED "LIONSHEAD MIXED USE LMU 1 DISTRICT" TOWN OF VAIL CODES: TITLE 12 CHAPTER 7 .,� I OWNER: ROBERT T. LAZIER ADDRESS: ARTICLE H. THE MINIMUM BUILDING SETBACKS SHALL BE TEN FEET (10') UNLESS OTHERWISE SPECIFIED IN THE LIONSHEAD REDEVELOPMENT MASTER PLAN ASA BUILD TO LINE. (ORD. 29(2005)§ 24: ORD. 3(1999) § 1) N. 3 � `, 7. THE SUBJECT PROPERTY IS LOCATED WITHIN FLOOD ZONE DESIGNATION "X" (AREA OUTSIDE 0.2% ANNUAL a •1011111111111 CHANCE FLOOD PLAIN) BY THE SECRETARY OF HOUSING AND URBAN DEVELOPMENT, ON FLOOD INSURANCE W 111111111.10 I STATE OF COLORADO ) RATE MAP NO. 08037C0469D, WITH A DATE OF IDENTIFICATION OF DECEMBER 4, 2007, IN EAGLE COUNTY, c� 3 SS STATE OF COLORADO, WHICH IS THE CURRENT FLOOD INSURANCE RATE MAP FOR THE COMMUNITY IN WHICH z . ) I- ',-■.■. COUNTY OF EAGLE ) SAID PROPERTY IS SITUATED. • .■. 8. PEAK LAND CONSULTANTS, INC. DID NOT PERFORM A TITLE SEARCH OF THE SUBJECT PROPERTY TO ESTABLISH ',�,■.• THE FOREGOING CERTIFICATE OF DEDICATION AND OWNERSHIP WAS ACKNOWLEDGED BEFORE ME THIS OWNERSHIP, EASEMENTS OR RIGHTS—OF—WAY OF RECORD. RECORD DOCUMENTS UTILIZED ON THIS SURVEY FOREST ROAD ..■.� DAY OF , A.D., 20 BY WERE PROVIDED BY LAND TITLE GUARANTEE COMPANY, ORDER No. ABC500501107, HAVING AN EFFECTIVE DATE I ;-� AS OF OF MARCH 5, 2018, AT 5:00 P.M. VICINITY MAP 9. EASEMENTS, CONDITIONS, COVENANTS, RESTRICTIONS, RESERVATIONS AND NOTES ON THE PLAT OF SCALE: 1"=1000' MY COMMISSION EXPIRES: VAIL/LIONSHEAD FIRST FILING RECORDED MAY 10, 1970 UNDER RECEPTION NO. 113260.(AS SHOWN HEREON) WITNESS MY HAND AND OFFICIAL SEAL. 10. TERMS, CONDITIONS AND PROVISIONS OF EASEMENT AGREEMENT RECORDED JUNE 08, 1973 IN BOOK 229 AT PAGE 481. (AS SHOWN HEREON) NOTARY PUBLIC 11. TERMS, CONDITIONS, PROVISIONS, BURDENS AND OBLIGATIONS AS SET FORTH IN WARRANTY DEED RECORDED CERTIFICATE OF DEDICATION AND OWNERSHIP FEBRUARY 10, 1972 IN BOOK 223 AT PAGE 134. (AS SHOWN HEREON) 12. TERMS, CONDITIONS, PROVISIONS, BURDENS AND OBLIGATIONS AS SET FORTH IN EASEMENT AGREEMENT KNOW ALL MEN BY THESE PRESENTS THAT BATTLE MOUNTAIN, LLC, A MISSOURI LIMITED LIABILITY AS TO AN UNDIVIDED 1/2 INTEREST IN TRACT A RECORDED JUNE 08, 1973 IN BOOK 229 AT PAGE 481. (AS SHOWN HEREON) COMPANY, AS TO PARCEL C NO.4 AN UNDIVIDED 1/2 INTEREST IN PARCEL F NO.3; ROBERT T. LAZIER, DIANE J. LAZIER AND KATHLEEN S. ALEXANDER, AS TO AN UNDIVIDED 1/2 OWNER: DIANE J. LAZIER ADDRESS: 13. TERMS, CONDITIONS, PROVISIONS, BURDENS, OBLIGATIONS AND EASEMENTS AS SET FORTH AND GRANTED IN INTEREST IN PARCEL F NO. 3 OF WARRANTY DEED RECORDED FEBRUARY 16, 2017 UNDER RECEPTION EASEMENTS RECORDED FEBRUARY 21, 1984 IN BOOK 378 AT PAGE 907. (AS SHOWN HEREON) NO. 201702746; AND LAZIER LIONSHEAD, LLC, A WYOMING CLOSE LIMITED LIABILITY COMPANY AS TO 14. TERMS, CONDITIONS, PROVISIONS, BURDENS, OBLIGATIONS AND EASEMENTS AS SET FORTH AND GRANTED IN PARCEL L OF SPECIAL WARRANTY DEED RECORDED JULY 3, 2007 UNDER RECEPTION NO. 201717699, PARKING EASEMENT AGREEMENT RECORDED OCTOBER 28, 2008 UNDER RECEPTION NO. 200823067. (FOR USE OF BEING SOLE OWNERS IN FEE SIMPLE, MORTGAGEE OR LIENHOLDER OF ALL THAT REAL PROPERTY STATE OF COLORADO ) VAIL 21 CONDOMINIUM OWNERS (NOT ABLE TO PLOT) SITUATED IN THE TOWN OF VAIL, EAGLE COUNTY, COLORADO DESCRIBED AS FOLLOWS: ) SS COUNTY OF EAGLE ) 15. TERMS, CONDITIONS AND PROVISIONS OF ORDER FOR APPOINTMENT OF RECEIVER RECORDED OCTOBER 28, THOSE PARTS OF LOTS 1, 2, 3 AND TRACT E, BLOCK 1, VAIL/LIONSHEAD, FIRST FILING ACCORDING 2010 AT RECEPTION NO. 201021776. (NOT ABLE TO PLOT) TO THE PLAT THEREOF RECORDED MAY 10, 1970 AT RECEPTION NO. 113260 IN THE OFFICE OF THE THE FOREGOING CERTIFICATE OF DEDICATION AND OWNERSHIP WAS ACKNOWLEDGED BEFORE ME THIS EAGLE COUNTY, COLORADO, CLERK AND RECORDER, DESCRIBED AS FOLLOWS: DAY OF , A.D., 20 , BY , 16. TERMS, CONDITIONS, PROVISIONS, BURDENS AND OBLIGATIONS AS SET FORTH IN LEASE DATED AUGUST 1, AS OF . 2012 BY AND BETWEEN LAZIER LIONSHEAD, LLC, A WYOMING LIMITED LIABILITY COMPANY AND DAVID S. COHEN, BEGINNING AT THE SOUTHWEST CORNER OF SAID LOT 1; THENCE NORTH 4 DEGREES 5 MINUTES 53 AS RECEIVER, APPOINTED PURSUANT TO THAT CERTAIN ORDER FOR APPOINTMENT OF RECEIVER DATED OCTOBER 20, SECONDS WEST 40.00 FEET; THENCE NORTH 85 DEGREES 54 MINUTES 7 SECONDS EAST 305.00 FEET MY COMMISSION EXPIRES: 2010, LANDLORD, AND RESIDENTIAL LIONSHEAD ARCADE BUILDING CONDOMINIUM ASSOCIATION, INC., A COLORADO TO A POINT OF CURVE; THENCE 59.63 FEET ALONG THE ARC OF A CURVE TO THE RIGHT WHOSE NON—PROFIT CORPORATION, TENANT, AS MEMORIALIZED BY INSTRUMENT RECORDED SEPTEMBER 05, 2012 UNDER RADIUS IS 217.01 FEET AND WHOSE CENTRAL ANGLE IS 15 DEGREES 44 MINUTES 37 SECONDS; WITNESS MY HAND AND OFFICIAL SEAL. RECEPTION NO. 201217721. (NOT ABLE TO PLOT) THENCE SOUTH 10 DEGREES 4 MINUTES 13 SECONDS EAST A DISTANCE OF 56.90 FEET; THENCE 17. NOTICE: ACCORDING TO COLORADO LAW YOU MUST COMMENCE ANY LEGAL ACTION BASED UPON ANY DEFECT SOUTH 85 DEGREES 54 MINUTES 7 SECONDS WEST 129.18 FEET; THENCE SOUTH 4 DEGREES 5 NOTARY PUBLIC IN THIS SURVEY WITHIN THREE YEARS AFTER YOU FIRST DISCOVER SUCH DEFECT. IN NO EVENT, MAY ANY ACTION MINUTES 53 SECONDS EAST A DISTANCE OF 30.00 FEET; THENCE SOUTH 85 DEGREES 54 MINUTES 7 BASED UPON ANY DEFECT IN THIS SURVEY BE COMMENCED MORE THAN TEN YEARS FROM THE DATE OF SECONDS WEST A DISTANCE OF 179.77 FEET; THENCE NORTH 4 DEGREES 5 MINUTES 53 SECONDS CERTIFICATION SHOWN HEREON. WEST A DISTANCE OF 106.00 FEET TO THE POINT OF BEGINNING, COUNTY OF EAGLE, STATE OF COLORADO. CONTAINING 0.934 ACRES MORE OR LESS; HAVE BY THESE PRESENTS LAID OUT, PLATTED AND AS TO AN UNDIVIDED 1/2 INTEREST IN TRACT A PLANNING AND ENVIRONMENTAL COMMISSION CERTIFICATE TITLE CERTIFICATE SUBDIVIDED THE SAME INTO 2 LOTS AND BLOCKS AS SHOWN ON THIS FINAL PLAT UNDER THE NAME DOES HEREBY CERTIFY THAT IT HAS EXAMINED THE AND STYLE OF: OWNER: KATHLEEN S. ALEXANDER ADDRESS: THIS FINAL PLAT WAS APPROVED BY THE TOWN OF VAIL PLANNING AND ENVIRONMENTAL TITLE TO ALL LANDS SHOWN UPON THIS PLAT AND THAT TITLE TO SUCH LANDS IS VESTED IN COMMISSION THIS ____ DAY OF , A.D. 20____. VAIL/LIONSHEAD FIRST FILING, A RESUBDIVISION OF A PART OF LOTS 1, 2, 3 AND TRACT E, BLOCK 1 ATTEST: FREE AND CLEAR OF ALL LIENS, AND ENCUMBRANCES, EXCEPT AS FOLLOWS: A SUBDIVISION IN THE TOWN OF VAIL, EAGLE COUNTY, COLORADO; AND DO HEREBY ACCEPT THE STATE OF COLORADO ) RESPONSIBILITY FOR THE COMPLETION OF REQUIRED IMPROVEMENTS; AND DO HEREBY DEDICATE AND ) SS SET APART ALL OF THE PUBLIC ROADS AND OTHER PUBLIC IMPROVEMENTS AND PLACES AS SHOWN COUNTY OF EAGLE ON THE ACCOMPANYING PLAT TO THE USE OF THE PUBLIC FOREVER; AND DO HEREBY DEDICATE TOWN CLERK CHAIR THOSE PORTIONS OF SAID REAL PROPERTY WHICH ARE INDICATED AS EASEMENTS ON THE TOWN OF VAIL, COLORADO TOWN OF VAIL PLANNING AND ACCOMPANYING PLAT TO AS EASEMENTS FOR THE PURPOSES SHOWN HEREON: AND DO HEREBY THE FOREGOING CERTIFICATE OF DEDICATION AND OWNERSHIP WAS ACKNOWLEDGED BEFORE ME THIS ENVIRONMENTAL COMMISSION GRANT THE RIGHT TO INSTALL AND MAINTAIN NECESSARY STRUCTURES TO THE ENTITY RESPONSIBLE DAY OF , A.D., 20 , BY , FOR PROVIDING THE SERVICES FOR WHICH THE EASEMENTS ARE ESTABLISHED. AS OF . DATED THIS DAY OF , A.D., 20 . EXECUTED THIS DAY OF , A.D., 20 . MY COMMISSION EXPIRES: CLERK AND RECORDER'S CERTIFICATE AGENT WITNESS MY HAND AND OFFICIAL SEAL. AS TO LOT 2A AND AN UNDIVIDED 1/2 INTEREST IN TRACT A THIS PLAT WAS FILED FOR RECORD IN THE OFFICE OF THE CLERK AND RECORDER AT ADMINISTRATOR CERTIFICATE NOTARY PUBLIC O'CLOCK , ON THIS DAY OF , 20 AND IS DULY OWNER: BATTLE MOUNTAIN, LLC ADDRESS: 9744 CONANT AVE. RECORDED AT RECEPTION No. . A MISSOURI LIMITED LIABILITY COMPANY KANSAS CITY, MISSOURI 64153 THIS FINAL PLAT WAS APPROVED BY THE TOWN OF VAIL ADMINISTRATOR THIS CERTIFICATE OF DEDICATION FOR MORTGAGE HOLDER OR , DAY OF , A.D. 20___. DEED OF TRUST HOLDER CLERK AND RECORDER BY: ATTEST: BY: , TITLE: KNOW ALL MEN BY THESE PRESENTS THAT FIRST MIDFIRST BANK BEING THE HOLDER OF A MORTGAGE DEPUTY OR DEED OF TRUST ON THE REAL PROPERTY SITUATED IN THE TOWN OF VAIL, EAGLE COUNTY, COLORADO DESCRIBED AS FOLLOWS: TOWN CLERK ADMINISTRATOR STATE OF ) TOWN OF VAIL, COLORADO SS THOSE PARTS OF LOTS 1, 2, 3 AND TRACT E, BLOCK 1, VAIL/LIONSHEAD, FIRST FILING ACCORDING COUNTY OF ) TO THE PLAT THEREOF RECORDED MAY 10, 1970 AT RECEPTION NO. 113260 IN THE OFFICE OF THE EAGLE COUNTY, COLORADO, CLERK AND RECORDER, DESCRIBED AS FOLLOWS: THE FOREGOING CERTIFICATE OF DEDICATION AND OWNERSHIP WAS ACKNOWLEDGED BEFORE ME THIS BEGINNING AT THE SOUTHWEST CORNER OF SAID LOT 1; THENCE NORTH 4 DEGREES 5 MINUTES 53 DAY OF , A.D., 20 , BY , SECONDS WEST 40.00 FEET; THENCE NORTH 85 DEGREES 54 MINUTES 7 SECONDS EAST 305.00 FEET AS OF . TO A POINT OF CURVE; THENCE 59.63 FEET ALONG THE ARC OF A CURVE TO THE RIGHT WHOSE CERTIFICATE OF TAXES PAID RADIUS IS 217.01 FEET AND WHOSE CENTRAL ANGLE IS 15 DEGREES 44 MINUTES 37 SECONDS; THENCE SOUTH 10 DEGREES 4 MINUTES 13 SECONDS EAST A DISTANCE OF 56.90 FEET; THENCE MY COMMISSION EXPIRES: SOUTH 85 DEGREES 54 MINUTES 7 SECONDS WEST 129.18 FEET; THENCE SOUTH 4 DEGREES 5 I, THE UNDERSIGNED, DO HEREBY CERTIFY THAT THE ENTIRE AMOUNT OF TAXES DUE MINUTES 53 SECONDS EAST A DISTANCE OF 30.00 FEET; THENCE SOUTH 85 DEGREES 54 MINUTES 7 AND PAYABLE AS OF THIS DAY OF , A.D., 20____ UPON WITNESS MY HAND AND OFFICIAL SEAL. SECONDS WEST A DISTANCE OF 179.77 FEET; THENCE NORTH 4 DEGREES 5 MINUTES 53 SECONDS ALL PARCELS OF REAL ESTATE DESCRIBED ON THIS PLAT ARE PAID IN FULL. WEST A DISTANCE OF 106.00 FEET TO THE POINT OF BEGINNING, COUNTY OF EAGLE, STATE OF COLORADO. LAND USE SUMMARY DATED THIS DAY OF , A.D., 20 . CONTAINING 0.934 ACRES MORE OR LESS; AS SHOWN ON THIS FINAL PLAT AS LOT 1A UNDER THE LOT AREA USAGE ADDRESS NOTARY PUBLIC NAME AND STYLE OF: 1A 0.620 ACRES MIXED USE 500 E. LIONSHEAD CIRCLE VAIL/LIONSHEAD FIRST FILING, A RESUBDIVISION OF A PART OF LOTS 1, 2, AND 3 AND TRACT E, 2A 0.238 ACRES MIXED USE 534 E. LIONSHEAD CIRCLE AS TO LOT 1A BLOCK 1 TRACT K 0.076 ACRES ACCESS (St UTILITIES _—_ E. LIONSHEAD CIRCLE TREASURER OF EAGLE COUNTY OWNER: LAZIER LIONSHEAD, LLC ADDRESS: P.O. BOX 1325 A WYOMING CLOSE LIMITED LIABILITY COMPANY VAIL, COLORADO 81658 A SUBDIVISION IN THE TOWN OF VAIL, EAGLE COUNTY, COLORADO; AGREES TO THE DEDICATION AND SETTING APART ALL OF THE PUBLIC ROADS AND OTHER PUBLIC IMPROVEMENTS AND PLACES AS BY: SHOWN ON THE ACCOMPANYING PLAT TO THE USE OF THE PUBLIC FOREVER; AND DOES HEREBY SURVEYOR'S CERTIFICATE AGREE TO THE DEDICATION OF THESE PORTIONS OF SAID REAL PROPERTY WHICH ARE INDICATED AS TITLE: EASEMENT ON THE ACCOMPANYING PLAT AS EASEMENTS FOR THE PURPOSE SHOWN HEREON; AND DOES HEREBY AGREE TO THE GRANTING OF THE RIGHT TO INSTALL AND MAINTAIN NECESSARY I, BRENT BIGGS, DO HEREBY CERTIFY THAT I AM A PROFESSIONAL LAND SURVEYOR LICENSED TO STRUCTURES TO THE ENTITY RESPONSIBLE FOR PROVIDING THE SERVICES FOR WHICH THE EASEMENTS PRACTICE LAND SURVEYING UNDER THE LAWS OF THE STATE OF COLORADO, THAT THIS ARE ESTABLISHED. SUBDIVISION PLAT IS A TRUE, CORRECT AND COMPLETE PLAT OF VAIL/LIONSHEAD A RESUBDIVISION STATE OF ) OF A PART OF LOTS 1, 2, AND 3 BLOCK 1 AS LAID OUT, PLATTED, DEDICATED AND SHOWN SS EXECUTED THIS DAY OF , A.D., 20 . HEREON, THAT SUCH PLAT WAS MADE FROM AN ACCURATE SURVEY OF SAID PROPERTY BY ME COUNTY OF ) AND/OR UNDER MY SUPERVISION AND ACCURATELY SHOWS THE LOCATION AND DIMENSIONS OF THE LOTS, EASEMENTS AND RIGHTS—OF—WAY OF SAID PLAT AS THE SAME ARE MONUMENTED UPON THE THE FOREGOING CERTIFICATE OF DEDICATION AND OWNERSHIP WAS ACKNOWLEDGED BEFORE ME THIS AS TO LOT 1A GROUND IN COMPLIANCE WITH APPLICABLE REGULATION GOVERNING THE SUBDIVISION OF LAND, DAY OF , A.D., 20 , BYTHAT SUCH PLAT IS BASED UPON THE PROFESSIONAL LAND SURVEYOR'S KNOWLEDGE, INFORMATION AS OF OWNER: MIDFIRST BANK ADDRESS: 501 NW GRAND BLVD. AND BELIEF, THAT IT HAS BEEN PREPARED IN ACCORDANCE WITH APPLICABLE STANDARDS OF OKLAHOMA CITY, OK 73118 PRACTICE, AND THAT SUCH PLAT IS NOT A GUARANTY OR WARRANTY, EITHER EXPRESSED OR MY COMMISSION EXPIRES: IMPLIED. WITNESS MY HAND AND OFFICIAL SEAL. Preliminary, this STATE OF COLORADO ) SS document shall not COUNTY OF EAGLE ) be recorded for any purpose and shall not �,671NOTARY PUBLIC be used or viewed or d THE FOREGOING CERTIFICATE OF DEDICATION AND OWNERSHIP WAS ACKNOWLEDGED BEFORE ME THIS DAY OF r A.D., 20 BY elied upon as a final AS OF BRENT BIGGS survey document. PROFESSIONAL LAND SURVEYOR 111 P.L.S. No. 27598 PEAK LAND CONSULTANTS, INC. MY COMMISSION EXPIRES: PEAK LAND SURVEYING, INC. WITNESS MY HAND AND OFFICIAL SEAL. DRAWN: KPJ REVIEWED: BB SHEET 1 OF 2 100 S6RI FAX 970-476-8616IL, CO17 DATE: 1000 LION'S RIDGE LOOP VAIL, CO 81657 NOTARY PUBLIC 04/23/18 PLC JOB#: 2081 �� OF � it iii II a rA I 1111 I I I I I I I I I I ihvl... - 11140. p FINAL PLAT °� f, VAIL/L I O I� S H E A li 10/30/2018 9:29:53 AM A RESUHDIVISION OF A SART OF LOTS 1 , 3 AND TRACT H: BLOCK 1 TOWN OF VAIL, COUNTY OF EAGLE, STATE OF COLORADO I \ \ \ I \ \ \ 1 1 I I / / / / \ \ \ 1 1 I /I \ \ \ o I Q )(1 ww U z Q O I \ \ \ oc J I— I J Q I > /I 1 / \ \ I VANTAGE POINT CONDOMINIUMS SUPPLEMENT TO VANTAGE POINT (R.N. 123718) CONDOMINIUMS (R.N. 133622) \ \\ / / FIRSTWESTWIND AT VAIL 1 CONDOMINIUM :> / (R.N. 112001) N85°54'07"E 305.00' 117.00' I I-, I 0=15°44'37" 188.00' VACATED BY R=217.01 ' L=59.63' A PART OF LOT 2 BLOCK 1 VAIL/LIONSHEAD ALOT LINE R=217. 11 'SL= 59.44' FOUND THIS PLAT NO. 3 I REBAR A PART OF LOT 1 BLOCK 1 VAIL/LIONSHEA I 1 � ) o b LOT LINES VACATED I I o BY THIS PLAT �' r --i \ POINT OF _� N 1 0 _ BEGINNING _ o � m PARCEL C, NO. 4 TITLE COMMITMENT) U v-1,-- ________ I j n = ( I o I o -1 rn LOT 1 A " �08 Z U' 0.238 ACRES w 15' I n (PARCEL L TITLE COMMITMENT) o SETBACK \----- 0.620 ACRES o (RECEPTION \ I a N 0. O I vonr k______\ ---' a \ 113260) I o I �► A PART OF LOT 3 BLOCK 1 VAIL/LIONSHEAD P I (BOOK 222, PAGE 258) MAGNAIL I �'� I LOT 3 BLK 1 FOUND'O4"E 0.53' ;� I FROM CORNER 118,23' VAIL/LIONSHEAD I \-- -- z 8.23' 126.46' U1 I S85°54'07"W p� C13 FOUND MAGNAIL TRACT K \ rn I S80°10'23"E 0.52' I FROM CORNER (PARCEL F, NO. 3 TITLE COMMITMENT) I Iv FOUND MAGNAIL II \ '3)0 0.076 ACRES o WITH BRASS TAG \ 01 °' zo N84'2O'25"E ACCESS EASEMENT I 0 0 0.43' FROM (BOOK 229, PAGE 481) CTI CORNER , I \ S85°54'07"\N 129.18 I I RST AMENDMENT) o `f' I \ (FI o THE LIFT HOUSE o u4 -N o FOUND CONSTAKE II — A CONDOMINIUM �' N88°05'43"E 0.54' I (R.N. 508759) FROM CORNER N04°05'53"W I S85°54'07"W m I 2.50' 90', SO4°05'53"E 60.00' — — — I 2.50' - - - - - - - - - - - - .) I VAIL 21 60.00' CEL E S85°54'07"W 179.77' (BOOK 229, PAGE 481) 1 PAR I A PART OF LOT 3 BLOCK 1 I VAIL/LIONSHEAD I I PLAZA EASEMENT --4 (BOOK 378, PAGE 907) I MONUMENT LEGEND I FOUND MAG NAIL WITH 1Y2" BRASS TAG \ STAMPED PEAK LAND CONSULTANTS LS 27598 i \ I I I \ -\- \ I N I 1 _--- 7 I I I N I \ I GRAPHIC SCALE I \ 20 0 10 20 40 I Preliminary, this N—____ -- - I document shall not ( IN FEET ) I be recorded for any Lir 1 inch = 20 ft. II beru�d ory iewall not ed or di IIII relied upon as a final II survey document. PEAK LAND CONSULTANTS, INC. PEAK LAND SURVEYING, INC. DRAWN: KPJ REVIEWED: BB 970-476-8644 FAX 970-476-8616 1000 LION'S RIDGE LOOP VAIL, CO 81657 DATE: 04/23/18 PLC JOB#: 2081 SHEET 2 OF 2