Loading...
HomeMy WebLinkAboutJarrod King email on altering deck plans 080218.pdf1 Chris Neubecker From:Chris Neubecker Sent:Friday, August 3, 2018 3:54 PM To:'Jarrod King' Subject:RE: 4840 Meadow Lane - Vail Hi Dr. King,    OK, thanks for the update. We will modify the description of the permit application to remove the references to  extending the length of the deck.    Sincerely,     Chris Neubecker Interim Director Community Development Department 75 South Frontage Road Vail, CO 81657 Office: 970.479.2148 cneubecker@vailgov.com vailgov.com     From: Jarrod King [mailto:jarrodkingmd@gmail.com] Sent: Thursday, August 2, 2018 4:57 PM To: Chris Neubecker Subject: Re: 4840 Meadow Lane - Vail   Chris, after talking with you and Carolyn I am going to resurface the deck as is. I do not want to go through with the  hassle of getting a contractor permit. There will be no structural changes to the deck just a resurfacing. I could not find a  way to modify the original submission after I made it. Thanks and let me know if you need anything else,     Jarrod  Sent from my iPhone    On Aug 2, 2018, at 3:36 PM, Chris Neubecker <CNeubecker@vailgov.com> wrote:  2 Hi Dr. King,     I am reviewing your Design Review Board application (DRB18‐0299) for your deck at your property in  Vail. The description of the work states:      I have a 40'LX10'W second level deck that is in need of resurfacing due to warping and decay of the  natural wood decking boards. I plan to use Trex ("spiced rum") composite decking boards which are the  same color and style I used for a previous DRB approved deck project last year. Because i expect the new  composite decking boards to last forever, I plan to replace some of the existing joists which are showing  some signs, i.e. water staining, of their age.      I plan to extend the last 1/4 of the length of the deck to  a width of 12'.     If you plan to extend the deck, then we will need a site plan showing the location and dimensions of the  deck. This is required to verify setbacks. Please provide a site plan, which can be uploaded to Project  Dox, where your original plan set was submitted.      Please call me if you have questions.     Thank you,     Chris Neubecker  Interim Director  Community Development Department <image001.png> <image002.jpg>    75 South Frontage Road  Vail, CO 81657  Office: 970.479.2148  cneubecker@vailgov.com   vailgov.com    <image003.jpg> <image004.jpg> <image005.jpg>