Loading...
HomeMy WebLinkAboutDRB18-0269_Approved Documents_1534779997.pdfACTION FORM Design Review Board (DRB) Department of Community Development 75 South Frontage Road West Vail, CO 81657 Tel: 970-479-2139 www.vailgov.com Project Name:Homestake Condos Flue Chase Bldg A 2018 Application Number: DRB18-0269 Application Type: Exterior Alteration Date Applied: 06/22/2018 Project Description: RK Mechanical is replacing the boilers in Building A of Homestake Condos. This will require RK to extend the flu chase approximately 10'. The new flu chase will be painted to match the building. It will be built using concrete block similar to existing. Building A is the Existing flu in the pictures that will be provided. Building "B" has a similar flu to chase to what we are proposing for Building A. The pictures that we will submit for "Proposed" are of the existing Building "B" flu chase. CONTACTS Contact Type: Applicant Full Name: RK Services (Rich Carroll) Address:40690 US Highway 6 40690 US Highway 8 Unit C-1 Avon, CO 81620 Phone: 9704090281 Contact Type: Property Owner Full Name: Common Area Address: Phone: None Project Address: 1081 VAIL VIEW DR (210301411999) (210301411999) Job Site Location: Legal Description: Subdivision:LION'S RIDGE SUBDIVISION FILING 1 Lot: A6 Block: A Parcel Number: 210301411999 BOARDS/STAFF ACTION Motion By: Action: Approved Second By: Vote: Date: 08/20/2018 Conditions: - Approval of this project shall lapse and become void one (1) year following the date of final approval, unless a building permit is issued and construction is commenced and is diligently pursued toward completion. - Design Review Board approval does not constitute a permit for building. Please consult with Town of Vail building personnel prior to construction activities. - Design Review Board approval shall not become valid for 20 days following the date of approval, pursuant to the Vail Town Code, Chapter 12-3-3 Appeals. - No changes to these plans maybe made without the written consent of Town of Vail staff and/or the appropriate review committee(s). - The applicant shall demonstrate on the building permit application that the proposed light fixtures meet TOV requirements. Planner: Jonathan Spence PLANNING FEE RECEIPT Case # DRB18-0269 Date Printed: 07/24/2018 TOWN OF VAIL - FEES RECEIPT Planning Summary Type: Design Review Board (DRB) Submittal Date: 06/22/2018 Subcases: Exterior Alteration Bond Expire Date: Description of Work: RK Mechanical is replacing the boilers in Building A of Homestake Condos. This will require RK to extend the flu chase approximately 10'. The new flu chase will be painted to match the building. It will be built using concrete block similar to existing. Building A is the Existing flu in the pictures that will be provided. Building "B" has a similar flu to chase to what we are proposing for Building A. The pictures that we will submit for "Proposed" are of the existing Building "B" flu chase. Property Information Address: 1081 VAIL VIEW DR (210301411999) Tax ID: 210301411999 Owner: Common Area Contacts Contact Type: Applicant Company Name: RK Services Full Name: Rich Carroll Address: 40690 US Highway 6 40690 US Highway 8 Unit C-1 Avon, CO 81620 Email: richard.carroll@rkmi.com Contact Type: Property Owner Full Name: Common Area Address: Planning Fees Fee Information Account Amount DRB - Exterior Alteration 001-0000.31122.00 $250.00 Payment Information Date Paid Payment Type Amount DRB - Exterior Alteration 06/22/2018 Credit Card $250.00 Paid By: Web payment - Notes: Transaction ID: 40777682061 , auth code: 022373 FEE TOTAL $250.00 AMOUNT PAID $250.00 BALANCE DUE $0.00 07/24/2018 - 3:55:30 PM - Generated by: sbellm75 South Frontage Road West, Vail, Colorado 81657 1 / 1 Homestake Condominiums 1081 Vail View Drive Vail, CO 81657 The complex includes two buildings, building a and building b. The existing boiler intake and exhaust are enclosed in partial height concrete enclosures. The two enclosures are currently different in height and exterior material: · Building a is constructed of cmu, painted to match the stucco, has pvc piping for the intake and exhaust and extents approximately 12’ above grade. · Building b is assumed to be concrete, covered with matching stucco, has a metal intake lover on the north and extents approximately 4’ above grade. The proposed work will make the enclosures for each building the same. The scope of work includes: · Extending the height of the existing footprint of the enclosures to match the adjacent roof · The boiler exhaust will be extended to discharge from the top of the enclosure and painted to match the existing coping · The finish will be stucco, painted to match the existing adjacent building · A new air intake louver will be installed on the east face · The existing light will be relocated Brian Sipes recently spoke with Justin about presentation requirements. It was discussed that elevations aren’t required, and Justin would consider photo overlays. Justin requests enough information to show the materials, the extent of the changes and the component materials/fixtures that are being added.