HomeMy WebLinkAboutaction_form_drb_08-10-2018_5b6e2d0603d51-0.pdfACTION FORM
Design Review Board (DRB)
Department of Community Development
75 South Frontage Road West
Vail, CO 81657
Tel: 970-479-2139
www.vailgov.com
Project Name:Sego West LLC 2018 Application Number:DRB18-0346
Application Type:Exterior Alteration Date Applied:07/24/2018
Project Description:Replace all windows for better efficiency and code compliance.
CONTACTS
Contact Type:Applicant
Full Name:Sego West, LLC (David Cabin)
Address:P.O. Box 1533 0033B Gambel St Eagle, CO 81631 Phone:9703767807
Contact Type:Property Owner
Full Name:SEGO WEST LLC
Address:Phone:None
Project Address:2480 CHAMONIX LN K1 (210314106021 K1) (210314106021)
Job Site Location:K1
Legal Description:Subdivision:VAIL DAS SCHONE FILING 1 Lot:1 Block:B
Parcel Number:210314106021
BOARDS/STAFF ACTION
Motion By:Action:Staff Approved
Second By:
Vote:Date:08/10/2018
Conditions:
- All exposed metal flashing, trim, flues, vents, and rooftop mechanical equipment shall be anodized, painted
(adjacent facade/roof material color or flat black), or capable of weathering so as to be non-reflective
pursuant to Section 14-10-5C, Building Materials and Design, Vail Town Code, pror to requesting final
inspections.
- Approval of this project shall lapse and become void one (1) year following the date of final approval, unless
a building permit is issued and construction is commenced and is diligently pursued toward completion.
- Design Review Board approval does not constitute a permit for building. Please consult with Town of Vail
building personnel prior to construction activities.
- Design Review Board approval shall not become valid for 20 days following the date of approval, pursuant
to the Vail Town Code, Chapter 12-3-3 Appeals.
- No changes to these plans maybe made without the written consent of Town of Vail staff and/or the
appropriate review committee(s).
- Applicant shall ensure that all new windows match the existing windows in color, size and shape as the
existing windows being replaced on the building.
Planner: Chris Neubecker