Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Alternative Construction Notice.pdf
A DOLA COLORADO ATN Co Department of Local Affairs Division of Housing AC(alternative construction)INSPECTION REQUIRED NOTICE The following is based on information provided to the Codes Section and may be modified based on the actual findings of the field inspection. DATE: July 30,2018 MANUFACTURER: Structural Modulars, Inc. ID NO.: 3522 CONTACT: Jim Parkes I jparkes©smihomes.com FAX NO.: ( ) MODEL NO.: Q3593 Sturm—Vail REV P/A NO.: 514963AC INSPECTION REQUIREMENTS: Please check: 1) Sprinkler system should be locally reviewed, inspected and approved by the local Fire Marshall. 2) Separation of dwelling units as IRC 2-family dwellings (duplexes). This 2-family dwelling building is on a single property and therefore has a single owner. Because of this the Town of Vail is allowing an opening in the basement wall that separates the"secondary" unit from the multi-level main dwelling, IF the door opening is protected in accordance with IBC 716. No or non-approved sprinkler system (S.S.) —> 1-hr wall —> 45 min. door S.S. is approved —> 30-min wall —> 20-min door 3) Interconnected, battery backed-up smoke detection system for whole building. See page E1.02, FACP, circuit BL-43. 4) Dwelling/garage separation. 5) Elevator inspection(s). System should be reviewed, inspected, and approved by local AHJ or state AHJ (Div. of Oil& Public Safety, Colorado Dept. of Labor& Employment). 6) Check supply and return connections for factory installed hydronic under floor hydronic radiant heat system. Pressure test system after connections are made. (Warmboard system) Site Address: The local building department by signing this form takes responsibility for inspecting the site built construction stated above to approved plans and current codes. Normal permits and fees for these inspections are to be per the local jurisdiction. State approved plans for Factory Built Construction may be obtained from the Builder/Manufacturer Building Official Printed Name _ l.. • _ -74C—C141-- Governor John W.Hickenlooper I Iry Halter, Executive Director I Alison George, Division Director F 1313 Sherman St., Room 320 Denver,CO 80203 P 303.864.7836 F 303.864.7857 TDD/TTY 303.864.7758 www.dola.colorado.gov * * Strengthening Colorado Communities * % '- y 1876 Building Official Signature -7/, Date 9/)P/13 Local jurisdiction may check box to defer inspection to the Division of Housing. Initials A copy of this Notice must be included with the installation instructions and shipped with the unit. Please direct questions to DOH Engineer,@ 303-864-7835 Governor John W.Hickenlooper 1 Iry Halter, Executive Director 1 Alison George, Division Director fg, *_ : 1313 Sherman St., Room 320 Denver, CO 80203 P 303.864.7836 F 303.864.7857 TDD/TTY 303.864.7758 www.dola.colorado.gov '°� 5. .p Strengthening Colorado Communities + �+ X876