HomeMy WebLinkAboutB18-0367_Approved Documentsd_1535552822.pdf75 South Frontage Road
West,
Vail, CO 81657
Office: 970.479.2139
Inspections:
inspections@vailgov.com
Construction
B18-0367
Issued: 08/29/2018
TOWN OF VAIL
Property Information
Address: 275 BEAVER DAM RD (210107112017) ( 210107112017 )
Unit #:
Parcel Number: 210107112017
Legal Description:
Subdivision: VAIL VILLAGE FILING 1 Block: 7 Lot: 40 UNIT B BK-0461 PG-0235 DEC 04-20-87 R710528
DEC 09-30-99
Contacts
Contact Type: Applicant
Full Name: Debbie Cary
Address:
PO Box 810, 825-A Chambers Ave PO Box 810, 825-A Chambers Ave 825-
A Chambers Ave Eagle, CO 81631 Phone: 9703282699
Contact Type: Property Owner
Full Name: JESSICA S. FISCHER REVOCABLE TRUST
Address: Phone: None
Contractor
Contractor Type: Mechanical
Company: R & H Mechanical LLC
State License #: Phone: 970-328-2699
Project Information
Project Name: Fischer Boiler 2018
Project Description:
Remove Existing Boiler and Replace with Lochinvar WHN399, 399,000 BTU, 95% Efficient Natural Gas
Boiler with Stainless Steel Heat Exchanger. Vented through Existing Flues. Grundfos Circ Pump, Magmatic
Air Separator, Expansion Tank and Glycol Feeder. Add Tekmar Snow and Ice Melt Contoller and Slab
Sensor, Mounted on Wall
Fees Paid
Account #: 110-0000.31060.00 - Construction Use Tax Fee Fee Amount:$112.94
Account #: 001-0000.31111.00 - Mechanical Permit Fee Fee Amount:$320.00
Account #: 001-0000.31123.00 - Mechanical Plan Review Fee Fee Amount:$80.00
Account #: 001-0000.31128.00 - Will Call Fee (Mechanical Scope)Fee Amount:$5.00
Total Paid:$517.94
Conditions
CONDITIONS UNDER WHICH PERMITS BECOME VOID:
If construction is not begun within 6 months from the date permit was issued.
If more than 5 months elapses between inspections.
If incorrect information is given on the application at the time the permit was issued.
Christopher Jarecki - Town of Vail Building Official
NOTICE: By issuance of this Permit the applicant agrees to comply with all Titles of the Town of Vail Code and all applicable State and Federal
law. Failure to do so will void this Permit and the applicant shall forfeit all applicable fees.
PERMIT FEE RECEIPT
Case # B18-0367
Date Printed: 08/29/2018
TOWN OF VAIL - FEES RECEIPT
Permit Summary
Case Number: B18-0367 Status: Approved
Permit Number: Date Started: 08/24/2018
Permit Type: Construction Subcases Duplex
Lot Number: 40
Property: 275 BEAVER DAM RD (210107112017) (210107112017)
Contacts
Contact Type: Applicant
Company Name: R and H Mechanical, LLC
Full Name: Debbie Cary
Address: PO Box 810, 825-A Chambers Ave PO Box 810, 825-A Chambers Ave 825-A Chambers Ave Eagle, CO 81631
Email: debbiec@randhmechanical.com
Contact Type: Property Owner
Full Name: JESSICA S. FISCHER REVOCABLE TRUST
Address:
Permit Fees
Fee Information Account Amount
Construction Tax 110-0000.31060.00 $112.94
Permit Fee 001-0000.31111.00 $320.00
Will Call Fee 001-0000.31128.00 $5.00
Payment Information Date Paid Payment Type Amount
Will Call Fee 08/29/2018 Credit Card $5.00
Paid By: - Notes: visa-david young
Permit Fee 08/29/2018 Credit Card $320.00
Paid By: - Notes: visa-david young
Construction Tax 08/29/2018 Credit Card $112.94
Paid By: - Notes: visa-david young
FEE TOTAL $437.94
AMOUNT PAID $437.94
BALANCE DUE $0.00
08/29/2018 - 8:22:16 AM - Generated by: cgodfrey75 South Frontage Road West, Vail, Colorado 81657
1 / 1
KNIGHT
FIRE TUBE BOILER
Submital Sheet KHBWHB-Sub-01
Job Name: Location:
_______________________________________________ _______________________________________________
Engineer: Agent/Wholesaler:
_______________________________________________ _______________________________________________
Contractor: Type Gas:
_______________________________________________ _______________________________________________
Model #: Equipment Tag(s):
_______________________________________________ _______________________________________________
JOB NOTES:
KNIGHT FIRE TUBE BOILERS - FLOOR AND WALL MOUNT MODELS
Smart System Features
> Smart System Digital Operating Control
Multi-Color Graphic LCD Display w/Navigation
Dial, Soft Keys and Loch-N-Link USB programming
> Three Boiler Setpoint Temperature Inputs
Plus Domestic Hot Water Prioritization
> Built-in Cascading Sequencer for up to
8 Boilers, with Cascade Redundancy
Multiple Size Boiler Cascade
Lead Lag
Efficiency Optimization
Front End Loading Capability
> Outdoor Reset Control with Outdoor Air Sensor
Programmable for Three Reset Temperature Inputs
> Programmable System Efficiency Optimizers
SH Night Setback
DHW Night Setback
Anti-Cycling
Outdoor Air Reset Curve
Ramp Delay
Modulation Factor Control
Boost Temperature & Time
> Four Pump Control
System Pump with Parameter for Continuous
Operation
Boiler Pump with Variable Speed Control
Domestic Hot Water Pump
Domestic Hot Water Recirculation
> Domestic Hot Water Prioritization
DHW tank piped with priority in the boiler loop
DHW tank piped as a zone in the system with
the pumps controlled by the SMART SYSTEM
DHW Modulation Limiting
Separately Adjustable Space Heat/DHW
Switching Times
> Building Management System Integration
0-10 VDC Input to Control Modulation or Setpoint
0-10 VDC Modulation Rate Output
0-10 VDC Input to Enable/Disable Call for Heat
> Access to BMS Settings through Graphic LCD
Display
> High-Voltage Terminal Strip
120 VAC / 60 Hertz / 1 Phase Power Supply
Three Sets of Pump Contacts
> Low-Voltage Terminal Strip
DHW Recirculation Pump Start/Stop
24 VAC Device Relay
Configurable Proving Contacts
Flow Switch Contacts
Alarm on Any Failure Contacts
Runtime Contacts
DHW Thermostat Contacts
3 Space Heat Thermostat Contacts
System Sensor Contacts
DHW Tank Sensor Contacts
Outdoor Air Sensor Contacts
Cascade Contacts
0-10 VDC BMS External Control Contact
0-10 VDC Boiler Rate Output Contacts
0-10 VDC Variable Speed System Pump Signal Input
0-10 VDC Signal to Control Variable Speed Boiler Pump
Modbus Contacts
> Time Clock
> Data Logging
Hours Running, Space Heating
Hours Running, Domestic Hot Water
Ignition Attempts
Last 10 Lockouts
> Maintenance Reminder
Custom Maintenance Reminder with
Contractor Contact Information
Installer Ability to De-activate Service Reminder
> Low-Water Flow Safety Control & Indication
> Password Security
> Customizable Freeze Protection Parameters
Standard Features
> 95% DOE AFUE Efficiency (55-285)
> Modulating Burner with up to 10:1 Turndown**
Direct Spark Ignition
Low NOx Operation
> ASME Stainless Steel Heat Exchanger
30 PSI ASME Relief Valve
> Top and bottom water connections (MNPT, WHB
55-285 Only)
> Vertical & Horizontal Direct Vent
PVC, CPVC, Polypropylene or SS Venting up to 100 ft.
> Universal Vent Adapter
Built-in Combustion Analyzer Port
> SMART SYSTEM™ Control
> Condensate Trap
> ECM Variable Speed Boiler Circulating Pump
> 110V Convenience Outlet
> High Altitude Models Available
> Other Features
Automatic Reset High Limit
Adjustable High Limit w/Manual Reset
Zero Clearances to Combustible Materials
15-Year Limited Warranty (See Warranty for Details)
5-Year Limited Parts Warranty
Optional Equipment
CON·X·US Remote Connectivity
Modbus Communication
BACnet MSTP
Flow Switch
Low-Water Cutoff w/Manual Reset & Test
Alarm Bell
Concentric Vent Kit
Condensate Neutralization Kit
BMS Gateway to LON or BACnet IP
Multi-Temperature Loop Control
Sidewall Vent Termination
Wireless Outdoor Sensor
LP Gas Conversion Kit
> Firing Codes
M9 Standard Construction
**5:1 on WHB399
• Information subject to change without notice. Change “N” to “L” for LP gas models. • The Net AHRI Water Ratings shown are based on a piping and pickup allowance of 1.15.
• Lochinvar should be consulted before selecting a boiler for installations having unusual piping and pickup requirements, such as intermittent system operation, extensive
piping systems, etc. • The ratings have been determined under the provisions governing forced draft burners.
6/18—Printed in U.S.A.
Lochinvar, LLC
300 Maddox Simpson Parkway
Lebanon, Tennessee 37090
P: 615.889.8900 / F: 615.547.1000
Lochinvar.com
• Information subject to change without notice. Change “N” to “L” for LP gas models. • The Net AHRI Water Ratings
shown are based on a piping and pickup allowance of 1.15. • Lochinvar should be consulted before selecting a boiler for
installations having unusual piping and pickup requirements, such as intermittent system operation, extensive piping
systems, etc. • The ratings have been determined under the provisions governing forced draft burners.
WALL MOUNT
Input Heating Net AHRI Model Max. Min. Capacity Rating
Number MBH MBH AFUE % MBH MBH
WHB055N 55 8.3 95 51 44
WHB085N 85 8.5 95 79 69
WHB110N 110 11 95 102 89
WHB155N 155 15.5 95 144 125
WHB199N 199.9 19.9 95 185 161
WHB285N 285 28.5 95 264 229
WHB399N 399 80 94.4* 377# 328
* Thermal Efficiency%
# Gross Output MBH
**10:1 Turndown ratio and top and bottom water
connections are not included on WHB399.
WHB399 operates with a 5:1 turndown.
Shipping A B C D E F G H I J K L M N Gas Water Air Vent Wt. Conn. Conn. Inlet Size (lbs.)
40” 18-3/4” 16” 31-1/8” 8-1/2” 3-3/4” 4-1/2” 6-1/2” 7-1/4” 8-7/8” 3-1/2” 1-1/2” 1-1/2” 6” 1/2” 1” 2” 2” 139
39-3/4” 18-3/4” 16” 31-1/8” 8-1/2” 3-3/4” 4-1/2” 6-1/2” 7-1/4” 8-7/8” 3-1/2” 1-1/2” 1-1/2” 6 “ 1/2” 1” 2” 2” 142
41-1/4” 18-3/4” 19” 31-1/8” 10” 2-3/4” 5” 5-1/4” 11-1/2” 8-1/2” 5” 1 “ 1 “ 4-1/2” 1/2” 1” 3” 3” 159
41-1/4” 18-3/4” 19-1/8” 31-1/8” 10” 2-3/4” 5” 5-1/4” 11-1/2” 8-1/2” 5” 1 “ 1” 4-1/2” 1/2” 1” 3” 3” 166
41-1/4” 18-3/4” 19-1/8” 31-1/8” 10-1/2” 3” 5-1/4” 6” 11” 9-1/2” 6-1/4” 1-1/2” 1-1/2” 4-1/2” 1/2” 1-1/4” 3” 3” 175
41-3/4” 18-3/4” 21-1/8” 31-1/8” 15” 3” 3-3/4” 5-1/4” 12-1/4” 11” 6-1/4” 1-1/2” 1-1/2” 6-1/2” 1/2” 1-1/4” 3” 3” 184
43-1/4” 25-1/4” 21-7/8” 34” 3-1/2” 4-1/4” 22-1/2” 3-7/8” 8-7/8” 12-1/2 “ 9-1/4” 2” 2” 21-1/2” 3/4” 1-1/2” 4” 4” 213
FLOOR MOUNT
TOP
RIGHT SIDE
BOTTOM
TOP
FRONT LEFT SIDE
Model Number
Input MBH
AFUE%
Heating Capacity MBH
NetAHRI Rating MBH Gas
Conn.
Water
Conn.
Air
Inlet
Vent
Size
Shipping
Weight
(lbs.)Min Max A B C D E F G H I J K
KHB055N 8.3 55 95 51 44 3-1/2" 13-1/4" 6" 2-3/4" 37-2/3" 13-1/2" 8-1/3" 10-1/2" 15" 32-1/2” 8-1/3” 1/2" 1" 2" 2" 160
KHB085N 8.5 85 95 79 69 3-1/2" 13-1/4" 6" 2-3/4" 37-2/3" 13-1/2" 8-1/3" 10-1/2” 15” 32-1/2” 8-1/3” 1/2" 1" 2" 2" 165
KHB110N 11 110 95 102 89 2-3/4" 14-3/4" 7-1/2" 2-3/4" 38" 14-1/3" 9-3/4" 10-1/2” 15” 33" 8-1/3” 1/2" 1" 3" 3" 170
KHB155N 15.5 155 95 144 125 2-3/4" 14-3/4" 7-1/2" 2-1/2" 38" 14-1/3" 9-3/4" 10-1/2” 15” 33” 8-1/3” 1/2" 1" 3" 3" 175
KHB199N 19.9 199.9 95 185 161 3" 15-1/2" 7-1/2" 2-1/2" 38-1/3" 14-1/3” 10-1/2" 11-1/2” 15” 33” 8-1/3” 1/2" 1-1/4" 3" 3" 195
KHB285N 28.5 285 95 264 229 3" 15-1/2" 7-1/2" 2-1/2" 38-1/3" 14-1/3” 10-1/2" 11-1/2” 15” 33” 8-1/3” 1/2" 1-1/4" 3" 3" 205
J
43-3/8”
16”
19”
A
D
C
B
K
H
I
F
E
G
H Flue Vent
Air Intake Water
Inlet
Gas Inlet
Water Outlet
Condensate Drain
High Voltage
Electrical Connection Low Voltage
Electrical Connection
AC Outlet
F
E
B
G
I J
K
L
M
N
D
A
C
Flue Vent Water Inlet
Water Outlet
Air Intake
Gas Inlet
High Voltage
Electrical
Connection
Low Voltage
ElectricalConnection
Condensate
Drain
AC
Outlet