Loading...
HomeMy WebLinkAboutEpoxy Dowel Inspection 175 Forest 18-7-555 (09-17-18) steel.pdf H-P KU MAR5020 County Road 154 Glenwood Springs, CO 81601 Geotechnical Engineering Engineering Geology Phone: (970)945-7988 Materials Testing I Environmental Fax: (970)945-8454 Email: hpkglenwood@kumarusa.com Office Locations: Parker, Glenwood Springs, and Silverthorne, Colorado REINFORCEMENT STEEL INSPECTION REPORT Client: Paragon Homes Denver Project No.: 18-7-555 Day: Monday Attn: Ed Venerable Date: 9/17/18 6460 S. Quebec Street#400 Page: 1 of 1 Englewood, Colorado 80111 Project: Proposed New Eastern Half Duplex Addition, Lot 27, Block 7, Vail Village 1st Filing, 175 Forest Road, Vail, Colorado Area of Inspection: Epoxy Dowel Inspection, G Line Walls and 6 Line Footings. Reference Documents Contractor provided plans, Sheets S100 & S200, Dated 7/13/18. Used: Inspection Notes: Holes were pre-drilled and blown free of debris with compressed air prior to epoxy dowel installation. Inspection Status: ❑ Preliminary ® Final ® Concrete reinforcement as noted above was judged to be in reasonable conformance with the referenced construction documents. ❑ Exceptions Noted: Verbal Jim Meehan with Mountain Home Construction was advised of our Communication: inspection results. Distribution: Paragon Homes Denver-Ed Venerable(ed(a naranonhomesdenver.com) Jay Nobrega (jayt vailconstructiongroup.com) Mountain Home Construction—Jim Meehan(Imeehan-mhc(a?comcast.net) Philip Orgill David A. Young, P.E. Field Technician Reviewed By