HomeMy WebLinkAboutEpoxy Dowel Inspection 175 Forest 18-7-555 (09-17-18) steel.pdf H-P KU MAR5020 County Road 154
Glenwood Springs, CO 81601
Geotechnical Engineering Engineering Geology Phone: (970)945-7988
Materials Testing I Environmental Fax: (970)945-8454
Email: hpkglenwood@kumarusa.com
Office Locations: Parker, Glenwood Springs, and Silverthorne, Colorado
REINFORCEMENT STEEL INSPECTION REPORT
Client: Paragon Homes Denver Project No.: 18-7-555 Day: Monday
Attn: Ed Venerable Date: 9/17/18
6460 S. Quebec Street#400 Page: 1 of 1
Englewood, Colorado 80111
Project: Proposed New Eastern Half Duplex Addition, Lot 27, Block 7, Vail Village 1st Filing, 175
Forest Road, Vail, Colorado
Area of Inspection: Epoxy Dowel Inspection, G Line Walls and 6 Line Footings.
Reference Documents Contractor provided plans, Sheets S100 & S200, Dated 7/13/18.
Used:
Inspection Notes: Holes were pre-drilled and blown free of debris with compressed air prior
to epoxy dowel installation.
Inspection Status: ❑ Preliminary ® Final
® Concrete reinforcement as noted above was judged to be in reasonable conformance with
the referenced construction documents.
❑ Exceptions Noted:
Verbal Jim Meehan with Mountain Home Construction was advised of our
Communication: inspection results.
Distribution:
Paragon Homes Denver-Ed Venerable(ed(a naranonhomesdenver.com)
Jay Nobrega (jayt vailconstructiongroup.com)
Mountain Home Construction—Jim Meehan(Imeehan-mhc(a?comcast.net)
Philip Orgill David A. Young, P.E.
Field Technician Reviewed By