Project Name:Vail Golf CourseBridge
Replacement 2018 Application Number: DRB18-0398
Application Type: Exterior Alteration Date Applied: 08/13/2018
Project Description: Replace 2 bridges on Vail Golf Course (#'s 14 & 15"
CONTACTS
Contact Type: Applicant
Full Name: Vail Recreation District (Scott O'Connell)
Address: 700 South Frontage Rd East Vail, CO 81657 Phone: 9703909731
Contact Type: Property Owner
Full Name: TOWN OF VAIL FINANCE DEPT
Address: Phone: None
Project Address: 1775 SUNBURST DR (210109101012) (210109101012)
Job Site Location:
Legal Description: Subdivision: SUNBURST FILING 3 Lot: 3 Block:No
Data
Parcel Number: 210109101012
BOARDS/STAFF ACTION
Motion By: Cahill Action: Approved
Second By: Campbell
Vote: 5-0-0 Date: 09/05/2018
Conditions:
- Design Review Board approval shall not become valid for 20 days following the date of approval, pursuant
to the Vail Town Code, Chapter 12-3-3 Appeals.
- No changes to these plans maybe made without the written consent of Town of Vail staff and/or the
appropriate review committee(s).
- Approval of this project shall lapse and become void one (1) year following the date of final approval, unless
a building permit is issued and construction is commenced and is diligently pursued toward completion.
Planner: Jonathan Spence
To: Vail Design & Review Board
From: Scott F. O’Connell
Date 08/13/2018
RE: Vail Golf Course Bridge Replacement
Town of Vail Design & Review Board,
The Vail Recreation District and The Town of Vail are currently planning the replacement of 2 bridges
currently located by holes #14 and #15 on the east side of the Vail golf course. Both bridges are original
to the Vail golf course and are need of replacement. Some of the issues associated with their current
condition are:
1) Abutments and decking are cracking / eroding and were built without protective wing walls.
2) Streambank has significantly eroded and has been temporarily stabilized using sand bags
3) The beam, rails and plates are either severely weathered, missing or broken
4) The bridges currently create a constriction on Gore Creek
We are proposing to rebuild these bridges using a similar design as the existing. We successfully
replaced 2 other bridges on the Vail golf course in the fall of 2010. We are providing some photos of the
existing conditions that exist on the bridges as well as some photos of the bridges built in 2010.
We look forward to answering any questions you may have regarding our project.
Scott F. O’Connell
Director of Operations
Vail Recreation District
(970) 390-9731
soconnell@vialrec.com
Existing Conditions
Bridge #14
South side of bridge by #14 Green
Bridge #15
Bridge #15 Railings
Proposed Bridges (as documented on bridges #11 & #17)
Railing on #17
Bridge #11
Rip Rap on #11
Concrete Apron on bridge #11