Loading...
HomeMy WebLinkAboutDRB18-0398_Approved Documents_1536261448.pdfACTION FORM Design Review Board (DRB) Department of Community Development 75 South Frontage Road West Vail, CO 81657 Tel: 970-479-2139 www.vailgov.com Project Name:Vail Golf CourseBridge Replacement 2018 Application Number: DRB18-0398 Application Type: Exterior Alteration Date Applied: 08/13/2018 Project Description: Replace 2 bridges on Vail Golf Course (#'s 14 & 15" CONTACTS Contact Type: Applicant Full Name: Vail Recreation District (Scott O'Connell) Address: 700 South Frontage Rd East Vail, CO 81657 Phone: 9703909731 Contact Type: Property Owner Full Name: TOWN OF VAIL FINANCE DEPT Address: Phone: None Project Address: 1775 SUNBURST DR (210109101012) (210109101012) Job Site Location: Legal Description: Subdivision: SUNBURST FILING 3 Lot: 3 Block:No Data Parcel Number: 210109101012 BOARDS/STAFF ACTION Motion By: Cahill Action: Approved Second By: Campbell Vote: 5-0-0 Date: 09/05/2018 Conditions: - Design Review Board approval shall not become valid for 20 days following the date of approval, pursuant to the Vail Town Code, Chapter 12-3-3 Appeals. - No changes to these plans maybe made without the written consent of Town of Vail staff and/or the appropriate review committee(s). - Approval of this project shall lapse and become void one (1) year following the date of final approval, unless a building permit is issued and construction is commenced and is diligently pursued toward completion. Planner: Jonathan Spence To: Vail Design & Review Board From: Scott F. O’Connell Date 08/13/2018 RE: Vail Golf Course Bridge Replacement Town of Vail Design & Review Board, The Vail Recreation District and The Town of Vail are currently planning the replacement of 2 bridges currently located by holes #14 and #15 on the east side of the Vail golf course. Both bridges are original to the Vail golf course and are need of replacement. Some of the issues associated with their current condition are: 1) Abutments and decking are cracking / eroding and were built without protective wing walls. 2) Streambank has significantly eroded and has been temporarily stabilized using sand bags 3) The beam, rails and plates are either severely weathered, missing or broken 4) The bridges currently create a constriction on Gore Creek We are proposing to rebuild these bridges using a similar design as the existing. We successfully replaced 2 other bridges on the Vail golf course in the fall of 2010. We are providing some photos of the existing conditions that exist on the bridges as well as some photos of the bridges built in 2010. We look forward to answering any questions you may have regarding our project. Scott F. O’Connell Director of Operations Vail Recreation District (970) 390-9731 soconnell@vialrec.com Existing Conditions Bridge #14 South side of bridge by #14 Green Bridge #15 Bridge #15 Railings Proposed Bridges (as documented on bridges #11 & #17) Railing on #17 Bridge #11 Rip Rap on #11 Concrete Apron on bridge #11