Loading...
HomeMy WebLinkAboutDRB18-0422_Approved Documents_1536260547.pdfACTION FORM Design Review Board (DRB) Department of Community Development 75 South Frontage Road West Vail, CO 81657 Tel: 970-479-2139 www.vailgov.com Project Name: Schroeder Residence 2018 Application Number: DRB18-0422 Application Type: Exterior Alteration Date Applied: 08/21/2018 Project Description: Remove and Replace the existing 3 fireplaces. All fireplaces will vent vertically through the existing chimney chases and exit in their current locations. We will use new exterior vent terminations designed for the the new fireplaces. These will similar to the existing terminations. There interior will receive a minor remodels at the fireplace locations. The Living Room will get a thin stone surround extending form floor to ceiling. The Master Bedroom and Upper Bedroom will receive new tile surrounds to replace the existing tile. CONTACTS Contact Type: Applicant Full Name: ULF Built (Justin Wohlrabe) Address: 275 Main St. C-105 Edwards, CO 81632 Phone: 9706881781 Contact Type: Property Owner Full Name: SCHROEDER, BRETT R. & HEIDI S. Address: Phone: None Project Address: 950 RED SANDSTONE RD 14 (210106306014 14) (210106306014) Job Site Location: 14 Legal Description: Subdivision:POTATO PATCH CLUB CONDOMINIUMS Lot: No Data Block:No Data Parcel Number: 210106306014 BOARDS/STAFF ACTION Motion By: Action: Staff Approved Second By: Vote: Date: 09/06/2018 Conditions: - All exposed metal flashing, trim, flues, vents, and rooftop mechanical equipment shall be anodized, painted (adjacent facade/roof material color or flat black), or capable of weathering so as to be non-reflective pursuant to Section 14-10-5C, Building Materials and Design, Vail Town Code, pror to requesting final inspections. - Approval of this project shall lapse and become void one (1) year following the date of final approval, unless a building permit is issued and construction is commenced and is diligently pursued toward completion. - Design Review Board approval does not constitute a permit for building. Please consult with Town of Vail building personnel prior to construction activities. - Design Review Board approval shall not become valid for 20 days following the date of approval, pursuant to the Vail Town Code, Chapter 12-3-3 Appeals. - No changes to these plans maybe made without the written consent of Town of Vail staff and/or the appropriate review committee(s). Planner: Chris Neubecker PLANNING FEE RECEIPT Case # DRB18-0422 Date Printed: 08/29/2018 TOWN OF VAIL - FEES RECEIPT Planning Summary Type: Design Review Board (DRB) Submittal Date: 08/21/2018 Subcases: Exterior Alteration Bond Expire Date: Description of Work: Remove and Replace the existing 3 fireplaces. All fireplaces will vent vertically through the existing chimney chases and exit in their current locations. We will use new exterior vent terminations designed for the the new fireplaces. These will similar to the existing terminations. There interior will receive a minor remodels at the fireplace locations. The Living Room will get a thin stone surround extending form floor to ceiling. The Master Bedroom and Upper Bedroom will receive new tile surrounds to replace the existing tile. Property Information Address: 950 RED SANDSTONE RD 14 (210106306014 14) Tax ID: 210106306014 Owner: SCHROEDER, BRETT R. & HEIDI S. Contacts Contact Type: Applicant Company Name: ULF Built Full Name: Justin Wohlrabe Address: 275 Main St. C-105 Edwards, CO 81632 Email: justin@ulfbuilt.com Contact Type: Property Owner Full Name: SCHROEDER, BRETT R. & HEIDI S. Address: Planning Fees Fee Information Account Amount DRB - Exterior Alteration 001-0000.31122.00 $230.00 Payment Information Date Paid Payment Type Amount DRB - Exterior Alteration 08/29/2018 Check $230.00 Paid By: Ulf & Associates - Notes: ck#3287 FEE TOTAL $230.00 AMOUNT PAID $230.00 BALANCE DUE $0.00 08/29/2018 - 1:52:03 PM - Generated by: cgodfrey75 South Frontage Road West, Vail, Colorado 81657 1 / 1 PLANNING FEE RECEIPT Case # DRB18-0422 Date Printed: 08/22/2018 TOWN OF VAIL - FEES RECEIPT Planning Summary Type: Design Review Board (DRB) Submittal Date: 08/21/2018 Subcases: Exterior Alteration Bond Expire Date: Description of Work: Remove and Replace the existing 3 fireplaces. All fireplaces will vent vertically through the existing chimney chases and exit in their current locations. We will use new exterior vent terminations designed for the the new fireplaces. These will similar to the existing terminations. There interior will receive a minor remodels at the fireplace locations. The Living Room will get a thin stone surround extending form floor to ceiling. The Master Bedroom and Upper Bedroom will receive new tile surrounds to replace the existing tile. Property Information Address: 950 RED SANDSTONE RD 14 (210106306014 14) Tax ID: 210106306014 Owner: SCHROEDER, BRETT R. & HEIDI S. Contacts Contact Type: Applicant Company Name: ULF Built Full Name: Justin Wohlrabe Address: 275 Main St. C-105 Edwards, CO 81632 Email: justin@ulfbuilt.com Contact Type: Property Owner Full Name: SCHROEDER, BRETT R. & HEIDI S. Address: Planning Fees Fee Information Account Amount DRB - Exterior Alteration 001-0000.31122.00 $20.00 Payment Information Date Paid Payment Type Amount DRB - Exterior Alteration 08/22/2018 Check $20.00 Paid By: Ulf & Associates - Notes: 3230 - Ulf & Associates FEE TOTAL $20.00 AMOUNT PAID $20.00 BALANCE DUE $0.00 08/22/2018 - 11:11:48 AM - Generated by: dcouch75 South Frontage Road West, Vail, Colorado 81657 1 / 1 38 Initial Installation QUALIFIED INSTALLERS ONLY Step 4. Assemble the desired lengths of black pipe and elbows necessary to reach from the appliance adapter up through the Round Support Box. Insure that all pipe and elbow connections are in their fully twist-locked position. Figure 46. Vertical Vent Termination Step 4. With the hole now framed, the wall thimble installed, and the pipe extending into the wall, proceed to the outside. Attach the termination to the pipe using RTV and Mil-Pac or Rutland No 78 Stove and Gasket Cement to seal joints. The vent pipe must extend into the vent cap at least 1¼ inches (3.2 cm). Secure the connection between the vent cap and the pipe by attaching the two (2) sheet metal straps, which extend from the vent cap assembly to the outer wall of the vent pipe. Bend any remaining portion of the strap back towards the vent cap. Security Secure Vent uses a twist lock cap. Step 5. Position the horizontal vent termination in the center of the 10” (25.4 cm) square hole and attach to the exterior wall with the four screws provided. The arrow on the vent termination should be pointing up. Run a bead of non-hardening mastic around the edges of the vent cap, to make a seal with the wall. Ensure the proper clearances to combustibles have been maintained. VeRticaL teRmination: Step 1. Check the instructions for required clearances (air spaces) to combustibles when passing through ceilings, walls, roofs, enclosures, attic rafters, or other nearby combustible surfaces. Do not pack air spaces with insulation. Step 2. Set the gas appliance in the desired location. Drop a plumb bob down from the ceiling to the position of the appliance flue exit, and mark the location where the vent will penetrate the ceiling. Drill a small hole at this point. Next, drop a plumb bob from the roof to the hole previously drilled in the ceiling, mark the spot where the vent will penetrate the roof. Determine if ceiling joists, roof rafters, or other framing will obstruct the venting system. You may wish to relocate the appliance, or to offset, to avoid cutting load bearing members. Step 3. To install the Round Support Box/Wall Thimble in a flat ceiling, cut a 10 “ (25.4 cm) square hole in the ceiling, centered in the hole drilled in Step 2. Frame the hole as shown in Figure 26. Vertical Termination Storm Collar Flashing Roofing nails Elbow Strap Clearances in horizontal venting. Straight-through roof support configuration b) Flex bend configuration c) Termination mounting FDVVT40 -Restrictor- Remove for Runs Under 15 Feet 77 Page 11XG0213 - 151126 H*38DF-CLCR Corner Gas Fireplace Installation Section: Figure 9. Top vent, Roof mounted termination with no offset in vent run. Figure 9a. Top vent, Roof mounted with 1 offset (1 offset= two 90° bends). Figure 9b. Top vent, Roof mounted with 2 offsets (1 offset= two 90° bends). Roof mounted Terminations The following details are some possible configurations for Roof mounted terminations. Support ring Support plate Firestop 32’ max. 2’ min. Obstacle PVTK1 Termination Support ring Support plate Firestop 32’ max. 2’ min. PVTK1 Termination Support straps or support plate & ring 2’ min. Firestop Firestop Firestop 32’ max Support plate & ring Obstacle PVTK1 Termination This section applies to installations where the direct vent termi- nation will be roof mounted. Section 3-2-1: Venting Layout Selection of components and details of venting lay out should adhere to the following guidelines: „The maximum termination point is 32’ above the fireplace (NOTE: if the maximum termination height is used, the flame pattern may be affected). „The Vertical termination must be a minimum 2’ higher than where the termination exits the roofing materials, (asphalt shingles, cedar shakes, etc). This distance should be measured from the high side of the roof slope where the flue flashing intersects the roofing materials. (see Figures 9 to 9c). „Termination location must be a minimum 6’ from a mechanical air inlet. „ Termination location must be a minimum 18” from a parapet wall. „ For a more detailed diagram of allowed termination locations, see Appendix A. „A maximum of two offsets (each offset is made up of 2-90° bends) may be made for vertical vent runs. „Firestops must be installed as required by National & local codes „ Ensure all horizontal runs are supported with a minimum of 3 supports per 10’ of venting. „Install all roof flashing and storm collars as shown. Section 3-2: Installing a Roof Mounted Direct Vent Termination (PVTK-1)