HomeMy WebLinkAboutDRB18-0439_action_form_drb_09-14-2018_5b9c33b6d9e74-0_1536965587.pdfACTION FORM
Design Review Board (DRB)
Department of Community Development
75 South Frontage Road West
Vail, CO 81657
Tel: 970-479-2139
www.vailgov.com
Project Name:Egli Residence 2017 Application Number:DRB18-0439
Application Type:Change to Approved Date Applied:09/04/2018
Project Description:Minor revision of front porch roof; change from timber structure (approved) to
steel structure (proposed).
CONTACTS
Contact Type:Applicant
Full Name:Intention Architecture (Seth Bossung)
Address:1891 Eagle Ranch Road PO Box 3835 Eagle, CO
81631 Phone:9703066612
Contact Type:Property Owner
Full Name:EGLI, ROGER
Address:Phone:None
Project Address:4141 SPRUCE WY (210112207002) (210112207002)
Job Site Location:
Legal Description:Subdivision:BIGHORN SUBDIVISION 3RD
ADDITION Lot:8 Block:9
Parcel Number:210112207002
BOARDS/STAFF ACTION
Motion By:Action:Staff Approved
Second By:
Vote:Date:09/14/2018
Conditions:
- All exposed metal flashing, trim, flues, vents, and rooftop mechanical equipment shall be anodized, painted
(adjacent facade/roof material color or flat black), or capable of weathering so as to be non-reflective
pursuant to Section 14-10-5C, Building Materials and Design, Vail Town Code, pror to requesting final
inspections.
- Exposed metal brackets and cables shall be painted black or a dark color to match the building color.
- Approval of this project shall lapse and become void one (1) year following the date of final approval, unless
a building permit is issued and construction is commenced and is diligently pursued toward completion.
- Design Review Board approval does not constitute a permit for building. Please consult with Town of Vail
building personnel prior to construction activities.
- Design Review Board approval shall not become valid for 20 days following the date of approval, pursuant
to the Vail Town Code, Chapter 12-3-3 Appeals.
- No changes to these plans maybe made without the written consent of Town of Vail staff and/or the
appropriate review committee(s).
Planner: Chris Neubecker