HomeMy WebLinkAbout4872 Meadow Lane Permit Worksheet.pdf Permit Fee Worksheet
ROW Use(min$50)
Construction Season(as defined by Town of Vail Municipal Code)
Fee Days Lft of Closure
Single Lane $ 0.15 x 3 x 100 = 5 45.00
Two Lane $ 0.45 x x = $
Three Lane $ 1.50 x x = $ -
Sidewalk/Bike Path $ 0.15 x x = $ -
Fee Months Sqft of Closure
Paved Surface $ 0.25 x x = $ -
Non-Paved Surface $ 0.05 x x = $ -
Fee Weeks Sqft of Closure
Core Areas Heated Streetscaper$ 0.25 x x I = $ -
Non-Construction Season(as defined by Town of Vail Municipal Code)
Fee Days Lft of Closure
Single Lane $ 1.00 x x = $Two Lane $ 3.00 x x = $ -
Three Lane $ 6.00 x x = $ -
Sidewalk/Bike Path $ 0.50 x x = $ -
Fee Months Sqft of Closure
Paved Surface $ 1.00 x x = $ -
Non-Paved Surface $ 0.20 x x = $ -
Fee Days Sqft of Closure
Core Areas Heated Streetscape I$ 0.50 x I x I = $ -
Sub-total S 50.00
Street Cut(min$50)
Non-Moratorium Streets
Surface Fee - Sqft of Cut
ACC/PCC $ 0.30 x 60 = $ 18.00
Brick Paver $ 1.00 x = $ -
Pothole(each) $ 50.00 x _ $ -
Non-Paved Surface $ 0.05 = $ -
Moratorium Streets
Surface Fee _Sqft of Cut _
ACC/PCC $ 8.00 x = $ -
Brick Paver $ 15.00 x = $ -
Pothole(each) $ 200.00 x = $ -
Non-Paved Surface $ 0.25 = $ -
Sub-Total $ 50.00
Application/Inspection Fee $ 100.00
Total Permit Fee $ 200.00
to k (0 -= 6o a0 r (, ao
to 1-144-10t 6 = 3Zxto r_. ,320
7 z a'. t3tir---
F.IPWISpeclricationslRDWY StandardslPermit Fee Worksheet.xls
(1 9 Z fri4At 41tCd (^'.
4— VouLt