HomeMy WebLinkAboutLionsquare Lodge drain permit worksheet.pdf Permit Fee Worksheet
ROW Use(min$50)
Construction Season(as defined by Town of Vail Municipal Code)
Fee Days Lft of Closure
Single Lane $ 0.15 x x = $ -
Two Lane $ 0.45 x x = $ -
Three Lane $ 1.50 x x = $ -
Sidewalk/Bike Path $ 0.15 x x = $ -
Fee Months Sqft of Closure
Paved Surface $ 0.25 x x = $ -
Non-Paved Surface $ 0.05 x 1 x 50 = $ 2.50
Fee Weeks Sqft of Closure
Core Areas Heated Streetscape $ 0.25 x 1 x 100 = $ 25.00
Non-Construction Season(as defined by Town of Vail Municipal Code)
Fee Days Lft of Closure
Single Lane $ 1.00 x x = $ -
Two Lane $ 3.00 x x = $ -
Three Lane $ 6.00 x x _ $ -
_
Sidewalk/Bike Path $ 0.50 x x = $ -
Fee Months LSqft of Closure
Paved Surface $ 1.00 x x = $ -
Non-Paved Surface $ 0.20 x x = $ -
Fee Days Sqft of Closure
Core Areas Heated Streetscape $ 0.50 x x = $ -
Sub-total s 50.00
Street Cut(min$50)
Non-Moratorium Streets
Surface Fee Sqft of Cut
ACC/PCC ( $ 0.30 x = $ -
Brick Paver $ 1.00 x $ -
Pothole(each) $ 50.00 x = $ -
Non-Paved Surface i $ 0.05 = $ -
Moratorium Streets
Surface Fee Sqft of Cut
ACC/PCC $ 8.00 x = $ -
Brick Paver $ 15.00 x 36 = $ 540.00
Pothole(each) $ 200.00 x = $ -
Non-Paved Surface $ 0.25 = $ -
Sub Total $ 540.00
ApplicatfoNfnspection Fee Ifi 100.00
Total Permit Fee $ 690.00
.0&* -- 6. 1•1-504•1-e--' Lp,Iscy-z--
6 kaK a-c_ ?x c w-t7-0'.--•
a A . Neo/J - .511W
F IPWISpedficatbns1RDWY StandardstPermit Fee Worksheetxis LU
2 X q-� 3b $ C = `�O 4 / 1000
1oo
12 +L( 7L12 (r -)zAC: '. 16a -
‘4 '�QIaD