HomeMy WebLinkAbout5185 Main Gore Drive Street cut bond worksheet_1.pdf Permit Fee Worksheet
ROW Use(min$50)
Construction Season(as defined by Town of Vail Municipal Code)
Fee Days Lft of Closure
Single Lane $ 0.15, x 13 x 100 = ' $ 195.00
Two Lane $ 0.45 x a x = $ -
Three Lane $ 1.50 x X = $ -
Sidewalk/Bike Path $ 0.15 x x = $ -
Fee Months Sqft of Closure
Paved Surface $ 0.25 x a x = $ -
Non-Paved Surface $ 0.05 x x = $ -
Fee Weeks Sqft of Closure
Core Areas Heated Streetscape $ 0.25 x x = $ -
Non-Construction Season(as defined by Town of Vail Municipal Code)
Fee Days Lft of Closure
Single Lane $ 1.00 x x = $ -
Two Lane $ 3.00 x x = $ -
Three Lane $ 6.00 x x = $ -
SidewalklBike Path $ 0.50 x x = $ -
r
Fee Months Sqft of Closure
Paved Surface $ 1.00 x x = $ -
Non-Paved Surface $ 0.20 x x = $ -
Fee Das Sqft of Closure
Core Areas Heated Streetscape $ 0.50 x x = $ -
Sub-total $ 195.00
Street Cut(min$50)
Non-Moratorium Streets
Surface Fee Sqft of Cut
ACC/PCC $ 0.30 x = $ -
Brick Paver $ 1.00 x = $ -
Pothole(each) $ 50.00 x = $ -
Non-Paved Surface $ 0.05 - $ -
Moratorium Streets
Surface Fee Sqft of Cut
ACC/PCC $ 8.00 x = $
Brick Paver $ 15.00 x = $ -
Pothole(each) $ 200.00 x = $ -
Non-Paved Surface , $ 0.25 = $ -
Sub Total $ -
Applicationlinspection Fee $ 100.00
Total Permit Fee $ 295.00
6-16)0c 7 C(A, Golle_. gr,
&f (A+ (30 'c
(o 5o 3 00 - 10 3POo,ov
x
FAPWISpecilcalionslRDWYSrandardslPermifFee Waksheef.xis s g 0
1
v + 5o t10 t3a- 4to1, la — TOnU-