HomeMy WebLinkAboutB18-0398_Approved Documents_1539293033.pdf75 South Frontage Road
West,
Vail, CO 81657
Office: 970.479.2139
Inspections:
inspections@vailgov.com
Construction
B18-0398
Issued: 10/11/2018
TOWN OF VAIL
Property Information
Address: 610 W LIONSHEAD CIR 213 ( 210106330033 )
Unit #: 213
Parcel Number: 210106330033
Legal Description: Subdivision: LANDMARK-VAIL CONDOMINIUMS Unit: 213
Contacts
Contact Type: Applicant
Full Name: Harold Sullivan
Address: 6133 n kilpatrick ave chicago, IL 60646 Phone: 8475302374
Contact Type: Property Owner
Full Name: HAROLD W. SULLIVAN, JR. DECLARATION OF TRUST
Address: 6133 N KILPATRICK AVE 213 CHICAGO, IL 60646-5042 Phone: None
Contractor
Contractor Type: Homeowner
Company: Family Financial Corp
State License #:Phone: 847-530-2374
Project Information
Project Name: Sullivan Remodel 2018
Project Description:
Owner seeks to remodel / improve first floor bathroom, as follows: 1. Install all new floor and wall tile; 2.
Install new vanity, sink, toilet; 3. Replace existing tub with stand-up shower; 4. Remove one non-weight
bearing wall between sink and toilet; 5. Add 2 new recessed ceiling lights; 6. Possibly replace sub flooring
upon inspection after demo; 7. Add new improved bath ventilation fan/light unit; 8. Add sound mitigation
matts in accordance w association policy.
Fees Paid
Account #: 001-0000.31111.00 - Building Permit Fee Fee Amount:$237.25
Account #: 001-0000.31123.00 - Building Plan Review Fee Fee Amount:$154.21
Account #: 110-0000.31060.00 - Construction Use Tax Fee Fee Amount:$64.00
Account #: 001-0000.31111.00 - Mechanical Permit Fee Fee Amount:$140.00
Account #: 001-0000.31123.00 - Mechanical Plan Review Fee Fee Amount:$35.00
Account #: 001-0000.31111.00 - Plumbing Permit Fee Fee Amount:$30.00
Account #: 001-0000.31123.00 - Plumbing Plan Review Fee Fee Amount:$7.50
Account #: 001-0000.31128.00 - Will Call Fee (Building Scope)Fee Amount:$5.00
Account #: 001-0000.31128.00 - Will Call Fee (Mechanical Scope)Fee Amount:$5.00
Account #: 001-0000.31128.00 - Will Call Fee (Plumbing Scope)Fee Amount:$5.00
Total Paid:$682.96
Conditions
CONDITIONS UNDER WHICH PERMITS BECOME VOID:
If construction is not begun within 6 months from the date permit was issued.
If more than 5 months elapses between inspections.
If incorrect information is given on the application at the time the permit was issued.
Christopher Jarecki - Town of Vail Building Official
NOTICE: By issuance of this Permit the applicant agrees to comply with all Titles of the Town of Vail Code and all applicable State and Federal
law. Failure to do so will void this Permit and the applicant shall forfeit all applicable fees.
PERMIT FEE RECEIPT
Case # B18-0398
Date Printed: 10/05/2018
TOWN OF VAIL - FEES RECEIPT
Permit Summary
Case Number: B18-0398 Status: Approved
Permit Number: Date Started: 09/11/2018
Permit Type: Construction Subcases Multi-Family
Lot Number: 1
Property: 610 W LIONSHEAD CIR 213 (210106330033)
Contacts
Contact Type: Applicant
Company Name: Family Financial Corp
Full Name: Harold Sullivan
Address: 6133 n kilpatrick ave chicago, IL 60646
Email: hws6133@gmail.com
Contact Type: Property Owner
Full Name: HAROLD W. SULLIVAN, JR. DECLARATION OF TRUST
Address: 6133 N KILPATRICK AVE 213 CHICAGO, IL 60646-5042
Permit Fees
Fee Information Account Amount
Permit Fee 001-0000.31111.00 $407.25
Construction Tax 110-0000.31060.00 $64.00
Will Call Fee 001-0000.31128.00 $15.00
Payment Information Date Paid Payment Type Amount
Permit Fee 10/05/2018 Credit Card $407.25
Paid By: - Notes: Visa-Harold Sullivan
Will Call Fee 10/05/2018 Credit Card $15.00
Paid By: - Notes: Visa-Harold Sullivan
Construction Tax 10/05/2018 Credit Card $64.00
Paid By: - Notes: Visa-Harold Sullivan
FEE TOTAL $486.25
AMOUNT PAID $486.25
BALANCE DUE $0.00
10/05/2018 - 8:36:52 AM - Generated by: sbellm75 South Frontage Road West, Vail, Colorado 81657
1 / 1
1
info@ecosenvironmental.com
www.ecosenvironmental.com
ASBESTOS INSPECTION REPORT
CLIENT: Sullivan, Harold
ADDRESS: 610 Lionhead Circle
Vail Colorado 81657
EMAIL: Hws6133@gmail.com
PHONE: 847-530-2374
ECOS JOB NUMBER G-18-536-AT
PROJECT LOCATION: 610 Lionhead Circle unit #213
DATE OF INSPECTION: 9-26-2018
ECOS Environmental – Glenwood Springs
6690 Hwy 82
Glenwood Springs, CO 81601
Office – (970) 945-4407
2
SUMMARY
ECOS Environmental & Disaster Restoration (ECOS) was retained to conduct an asbestos inspection at
the above location in reference to determining if there is asbestos containing material (ACM), in
building materials that are located in the bathroom and kitchen. The inspection was performed in
accordance with the Standards of Practice of the Colorado Regulation 8 Part B in effect at the time of
this Inspection. This inspection is not intended to be technically exhaustive. The inspection included all
accessible building materials in the bathroom and kitchen, however, should any additional building
materials be discovered during demolition, those materials must be sampled and analyzed prior to
continuing with the work. six (6) samples were collected of all suspect materials in the bathroom and
kitchen, as listed in the Lab Data Table located on Page 8 of this report.
The Inspector has prepared this written asbestos Inspection Report for the sole use and benefit of the
client. The asbestos inspection report shall identify, report, and make recommendations for future
evaluation. Client agrees to read the entire asbestos inspection report when received and shall
promptly call the inspector with questions or concerns regarding the report. The use of this report and
information contained herein by others, in whole or in part, is not authorized without the written
mutual consent of the client and ECOS Environmental.
INSPECTOR QUALIFICATIONS
This inspection was performed by Yuri Rivera, Colorado State Department of Public Health and
Environment Certification Number 24317.
SAMPLE ANALYSIS PROCEDURE
ECOS collected bulk samples of the homogenous materials in a random and representative manner, as
determined by the Inspector. A minimum of one composite core samples that included all layers within
the suspect material was obtained from each homogenous area. Samples of soft friable materials were
obtained by removing a small portion using wetting techniques. The sampler cleaned equipment
following collection of each sample to minimize cross-contamination between samples. The sampler
assumed that materials in inaccessible locations were similar to those in accessible locations, in order to
limit destruction during the sampling process. All samples were placed in sealed, labeled containers,
and the sample descriptions and locations were recorded. Samples were delivered under a chain of
custody for analysis to Aerobiology Laboratory in Denver, CO. Samples were analyzed by Polarized
Light Microscopy.
Performance of this asbestos inspection is intended to reduce, but not eliminate, uncertainty regarding
the presence of ACBM in connection with the above referenced property. No guarantee is expressed or
implied that all ACBM was identified in the inspection. Therefore, ECOS Environmental cannot be
held accountable for restrictions placed on us by the client, conditions or information that remained
unknown, or areas that were inaccessible at the time of the inspection.
3
TRANSMITTAL OF BUILDING
One (1) copy of the results of the building/structure asbestos survey shall be immediately transmitted
by the building/structure owner as follows:
• One copy of the completed asbestos survey shall be sent by the owner or their agent to the local
government entity charged with issuing a permit for such demolition, renovation, remodeling
or repair work under applicable State or local laws.
• The completed asbestos survey shall be kept on the construction site with the asbestos
notification and variance, if required, throughout the duration of the asbestos project and any
associated demolition, renovation, remodeling or repair project.
BUILDING/STRUCTURE ASBESTOS SURVEY INFORMATION
The asbestos survey shall, at a minimum, identify and assess with due diligence, the locations,
quantities, friability and conditions of all building material types at the affected portion of the
building/structure. The certified asbestos inspector is responsible for identification and assessment of
all type within the affected portion of the building/structure.
All building materials visually assessed shall be assumed to be asbestos containing building material
(ACBM), unless bulk sampling is conducted as per standard EPA and OSHA accepted methodologies.
The subsequent analysis is performed by a laboratory that meets the requirements and the analyses
satisfies both CO STATE ELAP and federal requirements, including multi- layered sample analyses, to
document non-asbestos containing material.
The building/structure asbestos survey shall also include the building/structure name, address, the
building/structure owner’s name and address, the name and address of the owner's agent, the name of
the firm performing the asbestos survey and a copy of the firm’s current asbestos handling license, the
names of the certified inspector(s) performing the survey and a copy of the current asbestos handling
certificate for each inspector utilized, the dates of the asbestos survey, a listing of homogeneous areas
identifying which ones are ACBM, all laboratory analysis reports for bulk samples collected, and copies
of the appropriate certifications for the laboratory used for analysis of samples taken during the
asbestos survey.
REMOVAL REQUIREMENT
If the building/structure asbestos survey finds that the portion of the building/structure to be
demolished, renovated, remodeled, or have repair work contains asbestos containing building material
(ACBM), which is impacted by the work, the owner or the owner’s agent shall conduct, or cause to
have conducted, asbestos removal performed by a licensed asbestos abatement contractor in
conformance with all standards set forth.
All ACBM impacted by the demolition, renovation, remodeling or repair project shall be removed,
prior to access or disturbance by other uncertified trades or personnel. No demolition, renovation,
remodeling or repair work shall be commenced by any owner or the owner’s agent prior to the
4
completion of the asbestos abatement in accordance with the notification requirements. For multi-
phased work, the access restriction for uncertified trades or personnel applies to each intermediate
portion of the entire project. Upon completion of the intermediate portion of the asbestos project, other
trades, or personnel may access that portion of the work site. For demolition projects that are exempt
from asbestos survey requirements due to being structurally unsound, the demolition is considered an
asbestos project.
All building/structure owners and asbestos abatement contractors on a demolition, renovation,
remodeling, or repair project shall inform all trades on the work site about the ACBM at the work site.
UNIDENTIFIED AND UNASSESSED ASBESTOS
When any construction activity, such as demolition, remodeling, renovation or repair work, reveals
suspect ACBM that has not been identified by the asbestos survey, or has not been identified by other
inspections as per current OSHA or EPA requirements, all activities shall cease in the area where the
suspect ACBM is found. Unassessed suspect miscellaneous ACBM shall be treated and handled as
ACBM and assumed to be ACBM, unless proven otherwise by standard EPA and OSHA accepted
methods. To document non-asbestos containing material, analysis must be performed by a laboratory
that meets the requirements of the DOH; and the analysis satisfies both CO STATE ELAP and federal
requirements.
ASBESTOS PROJECTS
An asbestos project is any work that involves the removal, encapsulation, enclosure, repair or
disturbance of friable or non-friable asbestos, or any handling of asbestos material that may result in
the release of asbestos fibers. For the purpose of compliance an asbestos project shall include any
disturbance of asbestos fibers, and the planning, asbestos survey, design, background air sampling,
inspection, air sampling and oversight of abatement work, cleanup, and the handling of all asbestos
material subject to abatement, as well as the supervising of such activities. An asbestos project starts
with Phase I when the planning, asbestos survey, and design work begins or is required to begin. The
project shall not be considered completed until Phase II D is complete. (See Table 1 below).
Phase I
(Prior to Asbestos
Abatement Contractor)
Phase II
Start -> Abatement -> End
A B A B C D
Asbestos
survey,
planning,
and design
Background
air sampling
Regulated
abatement
work area(s)
preparation
and enclosure
construction
Asbestos
handling
including gross
removal or
abatement, initial
cleans, and waste
Final
cleaning
and
clearance
air samples
Final waste
removal
from site
Start -> Asbestos Project ->Final Clearance
5
ASBESTOS RESULTS FLOW CHART
ASBESTOS PROJECT SIZE
Large asbestos project: An asbestos project involving the removal, disturbance, enclosure,
encapsulation, repair or handling of 160 square feet or more of ACBM, or 260 linear feet or more of
ACBM.
Small asbestos project: An asbestos project involving the removal, encapsulation, enclosure, repair,
disturbance or any handling of more than 10 and less than 160 square feet of ACBM or more than 25
and less than 260 linear feet of ACBM.
Minor asbestos project: An asbestos project involving the removal, disturbance, repair, encapsulation,
enclosure or handling of 10 square feet or less of ACBM or 25 linear feet or less of ACBM.
Homogenous areas sampling requirement: SF= Square Footage. LF= Linear Footage
Asbestos Test
0% - Non Detect
No Action
Required
< 1%
OSHA
Requirements
NO Permit
Required
ECOS provides
clearance (NOT
required)
>1%
Reg. 8
Requirements
Permit
Clearance Testing
Manifested
Disposal at
Approved Landfill
Additional Reg. 8
Requirements
>3,000 SF
Project Design
Project Manager
Oversight
6
HOMOGENOUS MATERIAL TYPE QUANTITIES MINIMUM # OF SAMPLES
SURFACING MATERIAL
0 TO < 1,000 SF 3
1,000 TO 5,000 SF 5
>5,000 SF 7
THERMAL SYSTEM INSULATION EACH MATERIAL 3
PATCH < 6 SF, LF 1
MISCELLANEOUS MATERIALS EACH MATERIAL 2
ASBESTOS REMOVAL CATEGORIES
Category I Non-Friable ACBM: NESHAP classification - Asbestos-containing packings, gaskets,
resilient floor covering, and asphalt roofing products, containing more than one percent (1%) asbestos,
that when dry, cannot be crumbled, pulverized, or reduced to powder by hand pressure.
Category II Non-Friable ACBM: NESHAP classification - Any material, excluding Category I Non-
Friable ACM, containing more than one percent (1%) asbestos that, when dry, cannot be crumbled,
pulverized, or reduced to powder by hand pressure.
Class I Asbestos Work: OSHA term meaning activities involving the abatement of Thermal Systems
Insulation (TSI) and surfacing ACBM and PACM.
Class II Asbestos Work: OSHA term meaning activities involving the abatement of ACBM which is not
TSI or surfacing material. This includes, but is not limited to, the removal of asbestos-containing
wallboard, floor tile and sheeting, roofing and siding shingles, and construction mastics.
Class III Asbestos Work: OSHA term meaning Repair and Maintenance operations, where no more
than a minor quantity of ACM, including TSI and surfacing ACBM and PACM, is likely to be
disturbed.
Class IV Asbestos Work: OSHA term meaning Maintenance and Custodial Activities during which
employees contact but do not disturb ACBM or PACM and activities to clean up non-ACBM dust,
waste and debris resulting from Class I, II and III activities.
DEFINITIONS
7
Abatement: Procedures to control fiber release from asbestos material. This includes removal,
encapsulation, enclosure, repair, and disturbance of friable asbestos or any handling of asbestos
material that may result in the release of asbestos fibers.
Amosite: An Asbestiform mineral of the amphibole group containing approximately
50% silicon and 40% Iron (II) Oxide, and is made up of straight brittle fibers, light gray to pale brown in
color.
Amphibole: One of the two major groups of minerals from which the Asbestiform minerals are
derived, distinguished by their chain-like crystal structure and chemical composition.
Asbestos: A generic name given to a number of naturally occurring hydrated mineral silicates that
possess a unique crystalline structure, are incombustible in air, and are separable into fibers. Asbestos
includes the asbesti-form varieties of chrysotile (serpentine); crocidolite
(riebeckite); amosite (cummington-grunerite); anthophyllite; and actinolite.
Asbestos Project: Work undertaken by a contractor which at any time involves any aspect of the
removal, encapsulation, enclosure or disturbance of friable asbestos, or any handling of asbestos
material that may result in the release of asbestos fiber, except work in an owner-occupied single-
family dwelling performed by the owner of such dwelling. An asbestos project shall include the
planning, design, monitoring, inspection, and air sampling of abatement work, as well as the
supervising of such activities.
Building Owner: The person in whom legal title to the premises is vested unless the premises are held
in land trust, in which instance building owner means the person in whom beneficial title is vested.
Electron Microscopy: A method of asbestos sample analysis which utilizes an electron beam to
differentiate between fibers.
Emergency: An unexpected, unanticipated or unforeseen occurrence, including but not limited to, a
steam, chemical, gas or water line rupture, a boiler failure, or a building collapse, which poses (a) an
imminent danger to the health and safety of the public, the response to which will constitute an
asbestos project; or (b) an asbestos- related risk to the health and safety of the public from exposure to
asbestos fibers.
Friable Asbestos : Any materials that contain asbestos and can be crumbled, pulverized, or reduced to
powder by hand pressure.
HEPA Filter Vacuum Equipment: Vacuuming equipment with a high efficiency particulate air
filtration system. This filter is capable of trapping and retaining 99.97 percent of asbestos fibers greater
than 0.3 microns equivalent aerodynamic diameter.
Homogenous: Evenly mixed and similar in appearance and texture throughout.
NESHAP: National Emission Standard for Hazardous Air Pollutants
OSHA: Occupational Safety and Health Administration
8
Operations and Management Plan (OMP): Specific procedures and practices developed for the
interim control of asbestos-containing materials in buildings until it is removed.
Polarized Light Microscopy (PLM): An optical microscopic technique used to distinguish between
different types of asbestos fibers by their shape and unique optical properties.
Repair: Corrective action using required work practices to control fiber release from damaged asbestos
material.
TSI: Thermal Systems Insulation
ACBM: Asbestos containing building material
Surfacing Material – material that is sprayed on, troweled on, or otherwise applied to
surfaces, such as acoustical plaster on ceilings and fireproofing materials on structural
members, or other materials on surfaces for acoustical, fireproofing, or other purposes.
Thermal System Insulation – material applied to pipes, fittings, boilers, breeching, tanks,
ducts, or other interior structural components to prevent heat loss or gain, or water
condensation, or for other purposes.
Miscellaneous Materials – interior building material on structural components, structural
members or fixtures, such as floor and ceiling tiles, and does not include surfacing material or
thermal system insulation.
9
HOMOGENOUS AREAS SAMPLED DURING INSPECTION
KEY:
CONDITION
G= NO VISIBLE DAMAGE
D= VISIBLE DAMAGE <10% OVER ENTIRE MATERIAL OR 25% LOCALIZED
SD= VISIBLE DAMAGE >10% OVER ENTIRE MATERIAL OR 25% LOCALIZEDSampleMaterial
LOCATION
DETECT?% ACBMFriabilityConditionPOT. FORDIST.# OFSAMPLESAPPR. SFA-1 Texture, paint,
fibrous mesh,
compound,
drywall
Shower walls N Y G L 6 1000sf
A-2 Paint, drywall Short wall on left of vanity N Y G L
A-3 Texture, paint,
fibrous mesh,
compound,
drywall
Wall behind vanity N Y G L
A-4 Fibrous mesh,
compound, paint,
drywall
kitchen N Y G L
A-5 Fibrous mesh,
paint, drywall
Wall behind refrigerator N Y G L
A-6 Texture, paint,
fibrous mesh,
compound,
drywall
Wall behind toilet N Y G L
10
FRIABLE CATEGORY
F= FRIABLE MATERIAL; MATERIALS THAT CAN CRUMBLE OR BE REDUCED TO POWDER BY HAND PRESSURE
NFI= CATEGORY I NON-FRIABLE MATERIAL; MATERIALS THAT CANNOT BE CRUMBLED OR REDUCED TO
POWDER BY HAND PRESSURE THAT DO NOT INCLUDE CATEGORY I NON-FRIABLE MATERIALS.
POTENTIAL FOR DISTURBANCE
L= LOW POTENTIAL FOR DAMAGE
D= POTENTIAL FOR DAMAGE
SD= POTENTIAL FOR SIGNIFICANT DAMAGE
INVENTORY
SAMPLELOCATION/FUNCTIONAL SPACES INCLUDED IN
HOMOGENOUS AREA
DESCRIPTION
A DRYWALL, TAPE, TEXTURE, JOINT COMPOUND, PAINT
FIBROUS MESH
ORANGE PEEL
CONCLUSION
Visual inspection was completed of building materials in the bathroom and kitchen. Six (6) samples
were collected and sent to Aerobiology Laboratories in Golden, CO, for analysis using Polarized Light
Microscopy (PLM). The samples came back non-detect for asbestos.
11
LAB RESULTS AND COC
12
13
14
CERTIFICATIONS
15
PHOTOS
16
17
18
19
FINAL NOTES
This report represents the opinion of the reporting asbestos inspector at the time of the asbestos
assessment survey. If you have any further questions, or if additional information is needed please do
not hesitate to call.
Sincerely,
Yuri Rivera
Colorado State EPA Asbestos Inspector #24317
ECOS Environmental & Disaster Restoration, Inc.
(970) 945-4407
Proposed rated enclosure around cans:
Cans will be in first floor ceiling with second floor of existing
unit directly above
Shower wall is fire rated wall between units please submit
detail of fire rated wet wall:
We will use sheetrock Firecode Core 5/8 in. Gypsum Board
then covered by ½” durarock