Loading...
HomeMy WebLinkAboutDRB18-0483_action_form_drb_10-02-2018_5bb3ede110d6e-0_1538519624.pdf Design Review Board (DRB) Department of Community Development 75 South Frontage Road West TOWN F VA 1 L ACTION FORM Vail, CO 81657 Tel: 970-479-2139 www.vailgov.com Project Name: AHST 70 LLC 2018 Application Number: DRB18-0483 Application Type: Exterior Alteration Date Applied: 09/24/2018 Project Description: replacing windows and door (same for same) CONTACTS Contact Type: Applicant Full Name: Burke Harrington Construction (Burke Harrington) Address: PO Box 2943 532A Taylor St Minturn, CO 81645 Phone: 9703762256 Contact Type: Property Owner Full Name: AHST 70 LLC Address: Phone: None Project Address: 4682 MEADOW DR Al (210112419001 A1) (210112419001) Job Site Location: Al Legal Description: Subdivision: MOUNTAIN MEADOW Lot: No Data Block: No CONDOMINIUMS PHASE II Data Parcel Number: 210112419001 BOARDS/STAFF ACTION Motion By: Action: Staff Approved Second By: Vote: Date: 10/02/2018 Conditions: - All new windows shall match the existing windows on the building in size, shape and color. - All exposed metal flashing, trim, flues, vents, and rooftop mechanical equipment shall be anodized, painted (adjacent facade/roof material color or flat black), or capable of weathering so as to be non-reflective pursuant to Section 14-10-5C, Building Materials and Design, Vail Town Code, pror to requesting final inspections. - Approval of this project shall lapse and become void one (1) year following the date of final approval, unless a building permit is issued and construction is commenced and is diligently pursued toward completion. - Design Review Board approval does not constitute a permit for building. Please consult with Town of Vail building personnel prior to construction activities. - Design Review Board approval shall not become valid for 20 days following the date of approval, pursuant to the Vail Town Code, Chapter 12-3-3 Appeals. - No changes to these plans maybe made without the written consent of Town of Vail staff and/or the appropriate review committee(s). Planner: Chris Neubecker