HomeMy WebLinkAboutDRB18-0483_action_form_drb_10-02-2018_5bb3ede110d6e-0_1538519624.pdf Design Review Board (DRB)
Department of Community Development
75 South Frontage Road West
TOWN F VA 1 L ACTION FORM Vail, CO 81657
Tel: 970-479-2139
www.vailgov.com
Project Name: AHST 70 LLC 2018 Application Number: DRB18-0483
Application Type: Exterior Alteration Date Applied: 09/24/2018
Project Description: replacing windows and door (same for same)
CONTACTS
Contact Type: Applicant
Full Name: Burke Harrington Construction (Burke Harrington)
Address: PO Box 2943 532A Taylor St Minturn, CO 81645 Phone: 9703762256
Contact Type: Property Owner
Full Name: AHST 70 LLC
Address: Phone: None
Project Address: 4682 MEADOW DR Al (210112419001 A1) (210112419001)
Job Site Location: Al
Legal Description: Subdivision: MOUNTAIN MEADOW Lot: No Data Block: No
CONDOMINIUMS PHASE II Data
Parcel Number: 210112419001
BOARDS/STAFF ACTION
Motion By: Action: Staff Approved
Second By:
Vote: Date: 10/02/2018
Conditions:
- All new windows shall match the existing windows on the building in size, shape and color.
- All exposed metal flashing, trim, flues, vents, and rooftop mechanical equipment shall be anodized, painted
(adjacent facade/roof material color or flat black), or capable of weathering so as to be non-reflective
pursuant to Section 14-10-5C, Building Materials and Design, Vail Town Code, pror to requesting final
inspections.
- Approval of this project shall lapse and become void one (1) year following the date of final approval, unless
a building permit is issued and construction is commenced and is diligently pursued toward completion.
- Design Review Board approval does not constitute a permit for building. Please consult with Town of Vail
building personnel prior to construction activities.
- Design Review Board approval shall not become valid for 20 days following the date of approval, pursuant
to the Vail Town Code, Chapter 12-3-3 Appeals.
- No changes to these plans maybe made without the written consent of Town of Vail staff and/or the
appropriate review committee(s).
Planner: Chris Neubecker