Loading...
HomeMy WebLinkAboutB18-0057_approved plans_1529097015.pdf1 ROOF REVISED SPECIFICATIONS Potato Patch Clubhouse 2018 06/15/18 2 SUBMITTED TO: August 7, 2017 McNeil Property Management 2077 N. Frontage Road Suite D Vail, CO 81657 PROJECT: 770- Potato Patch Clubhouse SCOPE OF WORK: PVC 1. Create job site safety plan and keep Material Safety Data Sheets on site. Provide roofing permit. Perform the state required asbestos testing. 2. Furnish onsite toilet, dumpster, trash to be disposed of. 3. Remove exiting perimeter flashings, inspect drainage crickets and roof decking. Damaged decking or crickets to be replaced as needed under add change order. Only as much roof that can be replaced in one day will be removed. Roof to be left watertight at the end of each work day. 4. UL Class A: Install ½” densdeck (flat roof only), mechanically attached to structural deck. 4 layers of Atlas FR10 on the barrel roof portion. 5. Reuse metal copings. 6. Mechanically attach 50 mill Duro-Last colored membrane. 7. Flash in all roof penetrations as per manufacturer’s specifications. 8. Specifications to meet or exceed the manufacturer’s recommendations to achieve the manufacturer’s 15 year no dollar limit warranty. 06/15/18 06/15/18 06/15/18