Loading...
HomeMy WebLinkAboutB18-0116_Approved Plans_1524499653.pdfCONSTRUCTION TYPE: V-B R-3 2-hour minimum fire separation at party walls in non-sprinklered townhouse. May be two 1-hour walls. 04/23/18 04/23/18 04/23/18 Load calculation – Capstone #4 2,536 sq ft x 3W/ft 7608W Small appliance – 1500W x 2 3000W Dishwasher - 1200W Disposal 600W Refrigerator 1200W Range 8000W Water heater 5000W Circ pump 200W Laundry 1500W Dryer 5000W Heat tape 1500W Total 34,808W 34,808W – 8,000W = 26,808W 26,808W x 40% = 10,723W 10,723W + 8,000W = 18,723W total calculated general load 60’ baseboard heat x 250W = 15,000W 18,723W + 15,000W electric heat = 33,723W 33,723W / 240V = 140.5A calculated service load Author – Andrew Krings – A K Electric 04/23/18