HomeMy WebLinkAboutB18-0403_approved documents_1540236566.pdf 75 South Frontage Road Construction
0West, TOWN OF VAIL B18-0403
TOWN
Vail,CO 81657 Issued: 10/22/2018
TOWN Or VAIL Office:970.479.2139
Inspections:
inspections@vailgov.com
Property Information
Address: 1081 VAILVIEWDR(210301411999)(210301411999)
Unit#:
Parcel Number: 210301411999
L egalDescription:
Contacts
Contact Type:Applicant
Full Name:Rich Carroll
Address: 40690 US Highway 6 Unit C-1 Avon,CO 81620 Phone: 9704090281
Contact Type:Applicant
Full Name:Paul Hughes
Address: 3800 XanthiaSt Denver,CO 80238 Phone: 303.785.6834
Contact Type:Property Owner
Full Name:Common Area
Address: Phone: None
Contractor
Contractor Type:Mechanical
Company: RKMechanicallnc.
State License#: Phone: 303-355-9696
Projectlnformation
Project Name:Homestake Condos Flue Chase Bldg A 2018
Project Description: Replacing boilers in mechanical room for building A.Extending the flue chase per the structural drawings.
Fees Paid
Account#: 110-0000.31060.00Construction Use Tax Fee Fee Amount: $3,180.00
Account#:001-0000.31111.00-Mechanical Permit Fee Fee Amount: $3,380.00
Account#:001-0000.31123.00 MechanicalPlan Review Fee Fee Amount: $845.00
Account#:001-0000.31128.00 Will Call Fee(Mechanical Scope) Fee Amount: $5.00
Total Paid: $7,410.00
Conditions
CONDITIONS UNDER WHICH PERMITS BECOME VOID:
If construction is not begun within 6 months from the date permitwas issued.
If more than 5 months elapses betweeninspections.
If incorrectinformationis given on the application at the time the permitwas issued.
Alof
Christopher Jarecki-Town of Vail Building Official
NOTICE:By issuance of this Permitthe applicant agrees to complywith all Titles of the Town of Vail Code and all applicable State and Federal
law.Failure to do so will void this Permit and the applicant shall forfeit all applicablefees.
rk SERVICE
HOMESTAKE CONDO's
Project:B18-0403
October 2, 2018
This is the R K update to the Changemark details from the Town of Vail
TOV Comment: "Please provide the exterior finish materials and colors including
exhaust pipe terminations"
R K Response: The exterior finish materials will be stucco to match the existing
stucco on the existing building. The stucco will be painted with Glidden Satin with the
color content as provided below or equivalent to match the existing color of the stucco.
STnitl 625
GLIDDEN . _ '
B !SE:GL6911
•
lir!. ' gG Ildc a:rl Prem Ext LTJSATIN
7
38411 moa pm 6
rAI.LON-!h'''41-.6:111: :IV1
6/15/2018 (Ms)
111
1
NOT RETURI LAB ' -
\All IS I;SIII ' - 4
The exhaust flu terminations will be approximately a 180 degree flue bend, ala a
candy cane shape. There will be a coupling inside the flue that will hold a screen from
debris entering the flue. The opening will extend 3 feet above the roof line so that the
flue's are above the potential snow line.
rk SERVICE
TOV Comment: Please provide: 1. Catalog cut for lighting fixtures. 2. Detail of
proposed exterior treatment.
R K Response: 1. The cu rrentplan is that Homestake condos will reuse the
existing light fixture. Homestake Condo's states that sometime in approximately the
next two (2) years all the exterior lighting will be upgraded. Robert Shaneen the
property manager can be contracted on this issue if desired.
2. The proposed exterior treatment finish materials will be stucco to match the
existing stucco on the existing building. The stucco will be painted with Glidden Satin
with the color content as provided below or equivalent to match the existing color of the
stucco.
P
ibb
G LIDDE
s- 1525
N
s
!BE:GL6911
Glide Qin Prem Ext LA/SATIN
F{ � f
.011112.14113.11.
7
0 Cry 5 3
38411 MOB 21 61
GAIL I - 6/1512018 (M5)
WAIN
l
152518 258 871
NOT RETURNAB '
Hopefully this fully addresses all the comments.
Thank You
Rich Carroll, R K Mechanical
970.409.0281
Richard.carroll@rkmi.com
Design ReviewBoard(ORB)
Departmentof Community Development
75 South Frontage Road West
(0)
TOWN F VAILACTION FORM Vail,CO 81657
Tel: 970-479-2139
www.vailgov.com
Project Name: Homestake Condos Flue Application Number: DRB 18-0269
Chase Bldg A 2018
Application Type: Exter iorAlteration Date Applied: 06/22/2018
RK Mechanical is replacing the boiler sin BuildingA of Homestake Condos.This
will requireRKto extend the flu chase approximately 10'. The new flu chase will
be painted to match the building. It will be built using concrete blocksimilarto
Project Description: existing. BuildingA is the Existingfluin the pictures that will be provided. Building
"B" has a similar flu to chase to what we are proposing for BuildingA. The
pictures that we will submitfor"Proposed" are of the existing Building"B"flu
chase.
CONTACTS
Contact Ty pe: Applicant
Full Name: RK Services(Rich Carroll)
Address: 40690 US Highway 6 40690 US Highway 8 Unit C-1 Phone: 9704090281
Avon,CO 81620
Contact Ty pe: Property Owner
Full Name: CommonArea
Address: Phone: None
Project Address: 1081 VAIL VIEW DR (210301411999) (210301411999)
Job Site Location:
Legal Description: Subdivision: FIILING LING 1 RIDGE SUBDIVISION Lot: A6 Block:A
F
Parcel Number: 210301411999
BOARDS/STAFF ACTION
Motion By: Action: Approved
Second By:
Vote: Date: 08/20/2018
Conditions:
- Approval of this project shall lapse and becomevoid one (1) year following the date of final approval, unless
a building permit is issued and construction is commenced and is diligently pursued toward completion.
- Design Review Boar dapproval does not constitute a per mitfor building.Please consultwith Town of Vail
building personnel priorto construction activities.
- Design Review Boar dapproval shall not become valid for 20 days following the date of approval, pursuant
to the Vail Town Code, Chapter12-3-3 Appeals.
- No changes to these plans maybe made without the wr ittenconsent of Town of Vail staff and/or the
appropriate reviewcommittee(s).
- The applicant shall demonstrate on the building per mitapplication that the proposed light fixtures meet TOV
requirements.
Planner:Jonathan Spence
61::)
PLANNING FEE RECEIPT
TOWN OF VAIL Case # DRB18-0269
Date Printed: 07/24/2018
TOWN OF VAIL - FEES RECEIPT
Planning Summary
Type: Design Review Board(DRB) Submittal Date: 06/22/2018
Subcases: Exterior Alteration
Bond Expire D ate:
RK Mechanical is replac ing the boilers in Building A of Homestake Condos.This will require RK to
extend the flu chase approximately 10'. The new flu chase will be painted to match the building. It will
Description of Work: be built using concrete block similar to existing.Building A is the Existing flu in the pictures that will be
provided. Building "B"has a similar flu to chase to what we are proposing for Building A. The pictures
that we will submit for"Proposed"are of the existing Building "B"flu chase.
Property Information
Address: 1081 VAIL VIEW DR(210301411999) Tax ID: 210301411999
Owner: Common Area
Contacts
Contact Type: Applicant
Company Name: RK Services
Full Name: Rich Carroll
Address: 40690 US Highway 6 40690 US Highway 8 Unit C-1 Avon,CO 81620
Email: richard.carroll@rkmi.com
Contact Type: Property Owner
Full Name: Common Area
Address:
Planning Fees
Fee Information Account Amount
DRB-Exterior Alteration 001-0000.31122.00 $250.00
Payment Information Date Paid Payment Type Amount
DRB-Exterior Alteration 06/22/2018 Credit Card $250.00
Paid By:Web payment-Notes:Transaction ID:40777682061 ,auth code:022373
FEE TOTAL $250.00
AMOUNT PAID $250.00
BALANCE D UE $0.00
75 South Frontage Road West,Vail,Colorado 81657 07/24/2018-3:55:30 PM-Generated by:sbellm
1/1
Homestake Condominiums
1081 Vail View Drive
Vail, CO 81657
The complex includes two buildings, building a and building b. The existing boiler intake and
exhaust are enclosed in partial height c one reteenc losures.The two enc losures are currently
different in height and exterior material:
• Building a is constructedof cmu, painted to match the stuccq has pvc piping for the
intake and exhaust and extents approximately 12' above grade.
• Building b is assumed to be concrete,coveredwith matching stuccq has a metal intake
lover on the north and extents approximately 4' above grade.
The proposed work will make the enclosures for each building the same. The scope of work
includes:
• Extending the height of the existing footprint of the enclosures to match the adjacent
roof
• The boiler exhaust will be extended to discharge from the top of the enclosureand
painted to match the existing coping
• The finish will be stucco,painted to match the existing adjacent building
• A new air intake louver will be installed on the east face
• The existing light will be relocated
Brian Sipes recently spoke with Justin about presentation requirements. It was discussed that
elevations aren't required, and Justin would consider photo overlays. Justin requests enough
information to show the materials, the extent of the changes and the component
materials/fixtures that are being added.