HomeMy WebLinkAboutB14-0240_10.28.14 - Engineered Review - Test & Balance report - phase 2,3_1414529340.pdf ____.,
, . . .
1
1 al1tC1 sesr,HG.AGdusTI*O AND OA AHG1HO St1REAU
THE PROfESSIONAL'S CHOICE"
IIa
11rEBB Certification # 3235 JEDI Balancing, Inc. Certifcation#BB009025C
568 Briggs Street
P.Q. Box 525
Erie, CO. 80516
Phone(720) 839-5333
Website: www.jedibalancing.com
Certified Test; Adjust; & Balance Report
Project Vail Valley Medical Center—Phase 1
Address 181 West Meadow Dr. Vail, CO
Architect Heery Design
Mechanical Engineer Cator Rurna&Associates,Co.
Contractor RK Mechanical
Balancing Supervisors Don Pittser&Greg Barnes
Date October 27, 2014
Job Number 2014-4894
p ,racE g a..A.No land Bryan 4
n.1"1
''S Dames --. "'S •,k,knil <'' 9 Wires 144Z
W1.0 1:15 12.4;t3 itTZ GREGOwr a awn
iw7zs ,,,, i Not valid lams a Sipr►ba r xs VOW Un�as - -.w % a Exp.Srrdtl7B
is ... t'37f201 •� •,w!! 't 7201 ,r`
� Ir''ira int 1 iti3 TB3 Orsr "' aisi i C�r3 �� (_
TM 'fM�f 1� y$ a1 MIEM ll 2Wa" ��, *�r 71r� Kd�cwT'9✓.MI
TABB Technician TABB Technician TABU Technician TABB Technician
Nantes Gregory Rxrxses Nimes amber.Roomer,o Mourietjaisoo terse Ham=Va.bau Smith
11.1311 ID:90105792W IABIB uch gr61049506T was JDt aava494697 14.11 3 I.ns9 f 1is,,a
Expiration llttitflawn Itc.e 22131/Ze1S �'ors 12!31!21135 r - A2131,2015 WI tbeParat9axxa#t=12!31/2014
Instrumentation:
Digital Manometer Alnor Balometer EBT-721
Flowhood Alnor Balometer EBT-72 I
Digital Pressure Gage Alnor Hydronic Manometer HM-680
Tachometer DT-36M
Digital Volt-Amp Meter Fluke 335
Thermometer Alnor Balometer EBT-721
Method of Balancing:
Supply, Return and Exhaust diffusers, grilles and registers were measured with an Alnor
Balometer EBT-721.
Heating and Chilled water flow rates were measured with an Alnor Hydronic Manometer
HM-680 connected to the installed flow meters.
Warranty Information:
This project was completed according to NEBB Procedural Standards.
The data presented in this report is a record of system measurements and final adjustments
that have been obtained in accordance with the current edition of the NEBB Procedural
Standards for testing, adjusting, and balancing environmental systems. Any variances from
design quantities,which exceed NEBB tolerances, are noted in the Test-Adjust-Balance
Report Project Summary. If a Test-Adjust-Balance Report Project Summary is not issued
directly following this cover page, all measurements met the design requirements as specified
by the design mechanical engineer.
This project has a one-year guarantee on all Testing, Adjusting& Balancing from the date
listed on this cover page.
NoNo ,
Esrcoption t�� It;«aka Corrections Noted C.
❑ Revise and Resu1
irai
Emil SPiad+tieci Item p
Don Pittser
nHECKING IS ONLY FOR GElYEFi
CEO c r of THE P cr ER LIAL I wiry rim H
NEBB Supervisor ro aci roTHE ONTR y # N �rjr•-
}=Ec�>cA ,. THF r Aloe
Fh,,rC AThJ r YJNTRACTO rS HE 5PO?S 3LE FOR OJMEM.S;GN.
,;t�vicA COMtPP Mal AND CO±4gE� AT TFIE JQB SITE
' PROCESSES AId TECs-mOt±Ey of CprySTRtlCTIGW,
„��l'it4T (w Hts Wt'Rk WITH THAT of AZL OTHg� UCT/E5.
sr O] r AC TO Y P6RFORAT of HtS rrEl-•
GATOR,IRI NA d A C TES. co
C
Illus nq ectnpl Engneo,
2V282 .
LL 7CS ORQUANTrrrEs !I
APE
I i
w
TESTNO,AII313STING BALANCINO SLIREAII
ma a THE PROFESSIONAL'S CHOICE.'
JEDI Balancing, Inc.
568 Briggs Street
P.O. Box 525
Erie, CO. 80516
NEBB Certification # 323 Phone (720) 839-5333 Certification#BB009025C
Web www.jedibalancing.com
ABBREVIATION INDEX
AHU: Air Handling Unit Motor FLA: Full Load Amperage
RTU: Roof Top Unit S.F.: Service Factor
MAU: Make Up Air Unit P.F.: Power Factor
FCU: Fan Coil Unit Nom. Eff.: Nominal Efficiency
CRAC: Computer Room Air Conditioning Unit RPM: Revolutions per Minute
VAV:Variable Air Volume TI: Terminal 1
K Factor: Correction Factor T2: Terminal 2
FPB: Fan Powered Box T3: Terminal 3
AK: Area Correction OD: Outside Diameter
CUH: Cabinet Unit Heater
UH: Unit Heater
ERV: Energy Recovery Ventilator TDH: Total Dynamic Head
ERU: Energy Recovery Unit PSI: Pounds per Square Inch
EF: Exhaust Fan BV: Balance Valve
KEF: Kitchen Exhaust Fan CS: Circuit Setter
SF: Supply Fan Valve D.P.: Discharge Pressure
RF: Return Fan Valve S.P.: Suction Pressure
TF:Transfer Fan Diff.: Differential
SEF: Smoke Exhaust Fan Design D.P.: Design Differential Pressure
SPF: Stairwell Pressurization Fan Actual D.P.: Recorded Differential Pressure
SP: Static Pressure Ind.Imp.Dia.Indicated Impeller Diameter
TSP:Total Static Pressure in.wc: Inches Water Column
ESP: External Static Pressure HW: Heating Water
VP:Velocity Pressure CHW: Cooling Water
SA: Supply Air CW: Condenser Water
RA: Return Air HX: Heat Exchanger
OSA: Outside Air DX: Direct Expansion
OA: Outside Air EAT: Entering Air Temperature
MA: Mixed Air LAT: Leaving Air Temperature
SD: Supply Diffuser EWT: Entering Water Temperature
CD: Ceiling Diffuser LWT: Leaving Water Temperature
SWD: Sidewall Diffuser
ER: Exhaust Register MVD: Manual Volume Damper
RG: Return Grille OBD: Opposed Blade Damper
CFM: Cubic Feet Per Minute NAC:No Access
FPM: Feet Per Minute NG: Not Given
NIC: Not in Contract
E: Existing
,s ..
:
■
■
"� .T.w� TE571NG,AOJVSTING Alio BALANCING evR EAU
la '9 THE PROFESSIONAL'S CHOICE'
JEDI Balancing, Inc.
568 Briggs Street
P.O. Box 525
Erie, CO. 80516
NEBB Certification#323 Phone (720) 839-5333 Cert jication#BB009O25C
Web www.jedibaiancing.corn
GENERAL NOTES
SEE ALL FIELD NOTES LOCATED BELOW EQUIPMENT DATA
r ///x\ 4,i/Eill a.�°.µ0. B3 es
f
BAL4NC72VG
..V.
#3235 #B9009025C
Air Handling Unit
PROJECT:VAIL VALLEY MEDICAL CENTER DATE: 10127/2014
LOCATION:VAIL,CO CONTACT:Trevor Quain
PROJECT#: AUTHOR:
SYSTEM/UNIT:E-AHU--SF-05
AREA:
* Notes
SYSTEM/UNIT:EAHU-SF 051 VAV 203 Tested By: Keenan Dubord
AREA: Test Date: October 25, 2014
Unit Data
VAV Address 5
Box Inlet Size 8
K Factor 2.0
Test Data
Max Design CFM 230 CFM
Max Actual CFM 225 CFM
Min Design CFM -CFM
Reheat Design CFM 230 CFM
Reheat Actual CFM 225 CFM
E-AHU-SF-05 I VAV-203 Supply Outlet Summary
System l Unit I Outlet Face Area AK Factor Design % Prelim %Final Final
Type Reading Prelim Reading Deviatia Reading
Outlet-01 TOTAL 230 78 180 98 225
Totals: - [ 230 1 78% 180 98% I 225
* Notes
JEDI Balancing, Inc.
..
i ,
4:5 4
arm
tJtJI'USSlG, A
BALANCING
#3235 #880090250
Air Handling Unit
PROJECT:VAIL VALLEY MEDICAL CENTER DATE: 10/2712014
LOCATION:VAIL,CO CONTACT:Trevor Quan
PROJECT#: AUTHOR:
SYSTEM/UNIT:E-AHU-SF-05 I VAV-204 Tested By: Keenan Dubord
AREA: Test Date: October 25, 2014
t Data
VAV Address 4
Box Inlet Size 8
K Factor 1.95
Max Design CFM 230 CFM
Max Actual CFM 235 CFM
Min Design CFM -CFM
Reheat Design CFM 230 CFM
Reheat Actual CFM 235 CFM
E-AHU-SF-05/VAV-204 Supply Outlet Summary
System 1 Unit Outlet Face Area AK Factor Design % i Prelim %Final 1 Final
Type Reading Prelim Reading Devtatio Reading W
Outlet-01 TOTAL 230 102 235 107 235
Totals: I 230 102% 235 102% 235
* Notes
JEDI Balancing, Inc.
cr
0. 11111
11BAwsTTa Of
� . BALANCEVG
#3235 #BB009025C
Fan Unit
PROJECT: VAIL VALLEY MEDICAL CENTER DATE: 10/27/2014
LOCATION:VAIL,CO CONTACT:Trevor Quain
PROJECT#: AUTHOR:
SYSTEMILINIT:EF-O7 Tested By: Keenan Dubord
AREA: Test Date: October 26, 2014
T Unit Data Motor Data
Fan Manufacturer GREENI-IFCK Motor Manufacturer VERI-GREEN
Fan Model Number SWD-8-V6-5-CW Motor HP 1/2
Fan Serial Number 13864180 Motor RPM 300-2500
Rated CFM 600 Motor Rated Volts 120
Total SP Design 1.5 in.we Motor Phase 1
Total Connected CFM 600 Motor FL Amps 6.9
Motor Service Factor 1.0
Test Data -
Total CFM Actual 595 Sheave Data
Fan RPM Actual DIRECT DRIVE Motor Sheave Model DIRECT DRIVE
Motor Volts 1 Actual 121
Motor Amps 1 Actual 5.8
J
E 01 Exhaust Inlet Summary
F
System f Unit ( Outlet Type of 1 Face Area 1 AK ) Design Prelim �%Prelim Final %Final
Type Reading Factor Reading Reading Deviation Reading Deviatio
Inlet-01 I CR 80 330 41:3 85 106 -
inlet-07 ER 520 700 146 510 98
Totals: • - - - 600 1,490 1132.% 585 99%
Notes
JEDI Balancing, Inc.