HomeMy WebLinkAboutB14-0240_2014-130 CCD2TOC 0918.14_1411771260.pdf CCD2 18 SEPTEMBER 2014
TABLE OF CONTENTS
CONSTRUCTION CHANGE DIRECTIVE#2
DIVISION 22— PLUMBING
22 60 00 Gas and Vacuum Systems for Laboratory& Healthcare Facilities
DIVISION 23— HEATING, VENTILATING AND AIR CONDITIONING
23 09 93 Sequence of Operations
23 36 00 Air Terminal Units
23 80 00 Decentralized HVAC Equipment
13026.01 /Vail Valley Medical Page 1 of 1 TABLE OF CONTENTS
Center Cath Lab