Loading...
HomeMy WebLinkAboutB14-0240_B14-0240 REV4 Test & Balance report_1416499800.pdf Engineering Solutions Since 1959 Mechanical"Electrical"Plumbing"Technology"Architectural Lighting"Commisioning CATOR I RUMA & ASSOCIATES, CO. Page 1 of 1 Construction Shop Drawings Transmittal Date 11/19/14 To: HEERY Attn: DAVID GEBEL DAVID FRIEDMAN Project: WMC CATH. LAB Cator, Ruma &Assoc. Project No.: 2014-130 Cator, Ruma &Assoc.Tracking No: 14.3575 NOTE: The Engineer's review of these shop drawings does not relieve the Contractor of his responsibility to comply with drawings or specifications. Any deviation from specified equipment or material must be called to the Engineer's attention in writing at the time of submission. The Contractor must secure written acceptance for said deviations. No Make Revise Submit Item&Section Number Copies* Manufacturer Exception Corrections Rejected And Specified Taken Noted Resubmit Item 230593 Test& Balance 1 X(1) Phase 4 and 6 Remarks: X(1)Clarify Phase 4 balancing- room numbers are needed for outlet information, and please correctly identify the air handlers(SF-1 and SF-2 serve this floor,SF-5 is not related to scope of this project). Exhaust balance for rooms 259, 260 and 265 are required. RA balance information needs to be provided for rooms 203 and 204. *We have retained one copy of each of the above items for our records. CATOR,ROMA&ASSOCIATES,CO. James Dickerson Xxx/x)o( \\CRA-SERVER07\Projects\WMC\2014-130 Cath Lab Remodel\CA\Submittals\2014-130 SEC230593 TRK 14.3575(JDD)11-19-14.doc Cator,Ruma&Associates,Co.Disclosure: Checking is only for general conformance with the design concept of the project and general compliance with the information given in the contract documents. Any action shown is subject to the requirements of the plans and specifications. Contractor is responsible for dimensions that shall be confirmed and correlated at the job sites;fabrication process and techniques of construction;coordination of their work with that of all other trades,and the satisfactory performance of their work. HASELDEN CONSTRUCTION,LLC TRANSMITTAL 6950 S POTOMAC ST SUITE 100 CENTENNIAL CO 80112 No 0063 USA PROJECT: VAIL VALLEY MEDICAL CENTER-CATH LAB DATE: 11/17/2014 TO: HEERY INTERNATIONAL RE: 230593-004-Phase 4 and 6 Test and Balance Report 555 17th Street 500 DENVER CO 80202 USA ATTN: David Friedman JOB: 1408-05 WE ARE SENDING: SUBMITTED FOR: ACTION TAKEN: Shop Drawings / Approval Approved as Submitted Letter Your Use Approved as Noted Prints As Requested Returned After Loan Change Order Review and Comment Resubmit Plans Submit Samples Returned Specifications Attached Separate Cover Returned for Corrections Other: Due Date: Other: Line Item Package Code Rev. Qty Date Description Status 1 Submittal 230593-004 1 1 11/17/2014 Test and Balance Report-Phases 4 and 6 REMARKS: CC: Signed: Joey Fritz ,- _.. . ._, .._ . Aril 1 1 :1:.„ JEaI I wt balancing . TESTING,ADJUSTING AND BALANCING BUREAU w ,I THE PROFESSIONAL'S CHOICE" NEBB Certification# 3235 JEDI Balancing, Inc. Certification#BB009025C 568 Briggs Street P.O. Box 525 Erie, CO. 80516 Phone (720) 839-5333 Website: www.jedibalancing.com Certified Test; Adjust; & Balance Report Project Vail Valley Medical Center Address 181 West Meadow Dr. Vail, CO Architect Heery Design Mechanical Engineer Cator Ruma&Associates, Co. Contractor RK Mechanical Balancing Supervisors Don Pittser& Greg Barnes Date November 14, 2014 Job Number 2014-4894 9' G 9C/4,o/L .O\�A i l t6.4 �Q‘gaiancb, o�8e11ancy % Barnes B800�C c g 1 '�j�'�BB009003C ` //���., Ng' �+� �3 GREGORY J.BARNES DONALD W.PITTSER Supervisor 213 Supervisor #0728 CEFMGREGORY CERTIFICATION Not Valid Unless O7gned Not Valid Unless S ned 5� 3235 519 Exp. 3 /18 r /7 _ Exp.3/31/18 �� _.5.. 2/31/'201 �j .12/31/201 �,�� �I� ��On '� t T-9 ���a no, drontc S a drone A�Certifiee,c BB Certified Co I[ 67--vs. ia VB3 a00Ns, ' iia VB3 LHS• Icy P B 7ze 40728 T..,I Ad nqbBIn=eu..0 �y�Y4rA=I rtel t�. w�� �=. T'nm�» ;a .wroB 6 au TABB Technician TABB Technician TABS Technician TABB Technician Names Ruben Romero n Name:Ethan Smith Name.Gregory Barnes TTBB ID:BB977727T TARE ID:BB1057927T TABS ID:BB1049506T Expiration Date:12/31/2014 1 Expiration Date: 12/31/2015 Expiration Date 12/31/2015Dane:12031/2015 P Instrumentation: Digital Manometer Alnor Balometer EBT-721 Flowhood Alnor Balometer EBT-721 Digital Pressure Gage Alnor Hydronic Manometer HM-680 Tachometer DT-36M Digital Volt-Amp Meter Fluke 335 Thermometer Alnor Balometer EBT-721 Method of Balancing: Supply, Return and Exhaust diffusers, grilles and registers were measured with an Alnor Balometer EBT-721. Heating and Chilled water flow rates were measured with an Alnor Hydronic Manometer HM-680 connected to the installed flow meters. Warranty Information: This project was completed according to NEBB Procedural Standards. The data presented in this report is a record of system measurements and final adjustments that have been obtained in accordance with the current edition of the NEBB Procedural Standards for testing, adjusting, and balancing environmental systems. Any variances from design quantities, which exceed NEBB tolerances, are noted in the Test-Adjust-Balance Report Project Summary. If a Test-Adjust-Balance Report Project Summary is not issued directly following this cover page, all measurements met the design requirements as specified by the design mechanical engineer. This project has a one-year guarantee on all Testing, Adjusting & Balancing from the date listed on this cover page. avi. Alk„, Don Pittser CEO NEBB Supervisor JEDI Balancing, Inc. APE J568 Briggs Street TESTING,ADJUSTING AND BALANCING BUREAU P.O. Box 525 THE PROFESSIONAL'S CHOICE" Erie, CO. 80516 NEBB Certification # 323 Phone (720) 839-5333 Certification#BB009025C Web www.jedibalancing.com ABBREVIATION INDEX AHU: Air Handling Unit Motor FLA: Full Load Amperage RTU: Roof Top Unit S.F.: Service Factor MAU: Make Up Air Unit P.F.: Power Factor FCU: Fan Coil Unit Nom.Eff.:Nominal Efficiency CRAC: Computer Room Air Conditioning Unit RPM: Revolutions per Minute VAV: Variable Air Volume Ti: Terminal 1 K Factor: Correction Factor T2: Terminal 2 FPB: Fan Powered Box T3: Terminal 3 AK: Area Correction OD: Outside Diameter CUH: Cabinet Unit Heater UH: Unit Heater ERV: Energy Recovery Ventilator TDH: Total Dynamic Head ERU: Energy Recovery Unit PSI: Pounds per Square Inch EF: Exhaust Fan BV: Balance Valve KEF: Kitchen Exhaust Fan CS: Circuit Setter SF: Supply Fan Valve D.P.: Discharge Pressure RF: Return Fan Valve S.P.: Suction Pressure TF: Transfer Fan Diff.: Differential SEF: Smoke Exhaust Fan Design D.P.: Design Differential Pressure SPF: Stairwell Pressurization Fan Actual D.P.: Recorded Differential Pressure SP: Static Pressure Ind.Imp.Dia.Indicated Impeller Diameter TSP: Total Static Pressure in.wc: Inches Water Column ESP: External Static Pressure HW: Heating Water VP: Velocity Pressure CHW: Cooling Water SA: Supply Air CW: Condenser Water RA: Return Air HX: Heat Exchanger OSA: Outside Air DX: Direct Expansion OA: Outside Air EAT: Entering Air Temperature MA: Mixed Air LAT: Leaving Air Temperature SD: Supply Diffuser EWT: Entering Water Temperature CD: Ceiling Diffuser LWT: Leaving Water Temperature SWD: Sidewall Diffuser ER: Exhaust Register MVD: Manual Volume Damper RG: Return Grille OBD: Opposed Blade Damper CFM: Cubic Feet Per Minute NAC:No Access FPM: Feet Per Minute NG: Not Given NIC:Not in Contract E: Existing s JEDI riiitL ,Ei vii III„ #3235 BB'J5J 'J1 6alancm Air Handling Unit PROJECT:VAIL VALLEY MEDICAL CENTER DATE: 11/14/2014 LOCATION:VAIL, CO CONTACT: Trevor Quain PROJECT#: AUTHOR: Greg Barnes SYSTEM/UNIT:E-AHU-SF-05(nic) AREA: Unit Data Total CFM Design -CFM Design SP -in.we Outside Air CFM Design -CFM Total Connected CFM -CFM E-AHU-SF-05(nic) Supply Outlet Summary System/Unit Outlet Face Area AK Factor Design % Prelim %Final Final Type Reading Prelim Reading Deviatio Reading Outlet-01/r 100 45 45 100 100 m209 Outlet-02/r 100 180 180 95 95 m210 Outlet-03 100 165 165 105 105 Outlet-04 180 239 430 97 175 Totals: I - - - 480 171 % 820 99% 475 E-AHU-SF-05(nic) Return Inlet Summary System/Unit Outlet Face Type of AK Design Prelim %Prelim Final %Final Type Area Readin Factor Reading Reading Deviation Reading Deviatio Inlet-01 150 280 187 145 97 Totals: - - - - 150 280 187% 145 97% E-AHU-SF-05(nic) Exhaust Inlet Summary System/Unit Outlet Type of Face Area AK Design Prelim %Prelim Final %Final Type Reading Factor Reading Reading Deviation Reading Deviatio Inlet-01 100 95 95 95 95 Inlet-02' 100 40 40 90 90 Totals: - - - - 200 135 68% 185 93% * Notes E-AHU-SF-05(nic)/Inlet-02 14-Nov-14 Keenan Dubord DAMPER IS 100%OPEN JEDI Balancing, Inc. { JED' mac-7h MS a 6alanonk• urn CIG #3235 ++yy++yy3+y5 #8pBp00 0 Air Handling Unit PROJECT:VAIL VALLEY MEDICAL CENTER DATE: 11/14/2014 LOCATION:VAIL, CO CONTACT: Trevor Quain PROJECT#: AUTHOR: Greg Barnes SYSTEM/UNIT:E-AHU-SF-05(nic)/VAV-203 Tested By: Keenan Dubord AREA: Test Date: October 25, 2014 Unit Data VAV Address 5 Box Inlet Size 8 K Factor 2.0 Test Data Max Design CFM 230 CFM Max Actual CFM 225 CFM Min Design CFM -CFM Reheat Design CFM 230 CFM Reheat Actual CFM 225 CFM E-AHU-SF-05(nic)/VAV-203 Supply Outlet Summary System/Unit Outlet Face Area AK Factor Design % Prelim %Final Final Type Reading Prelim Reading Deviatio Reading Outlet-01 TOTAL 230 78 180 98 225 Totals: - - - 230 78% 180 98% 225 Notes E-AHU-SF-05(nic)/ 30-Oct-14 Keenan Dubord HOT WATER COIL WAS SET TO 1.0 GPM VAV-203 SYSTEM/UNIT:E-AHU-SF-05(nic)/VAV-204 Tested By: Keenan Dubord AREA: Test Date: October 25, 2014 Unit Data VAV Address 4 Box Inlet Size 8 K Factor 1.95 Test Data Max Design CFM 230 CFM Max Actual CFM 235 CFM Min Design CFM -CFM Reheat Design CFM 230 CFM Reheat Actual CFM 235 CFM E-AHU-SF-05(nic)/VAV-204 Supply Outlet Summary System/Unit Outlet Face Area AK Factor Design % Prelim %Final Final Type Reading Prelim Reading Deviatio Reading Outlet-01 TOTAL 230 102 235 102 235 Totals: - - - 230 102% 235 102% 235 * Notes E-AHU-SF-05(nic)/ 30-Oct-14 Keenan Dubord HOT WATER COIL WAS SET TO 1.0 GPM VAV-204 JEDI Balancing, Inc. s JEDI , ..,,., rkt L BB lin III„ #3235 BB'J5J 'J1 6alancm Air Handling Unit PROJECT:VAIL VALLEY MEDICAL CENTER DATE: 11/14/2014 LOCATION:VAIL, CO CONTACT: Trevor Quain PROJECT#: AUTHOR: Greg Barnes SYSTEM/UNIT:E-AHU-SF-05(nic)/VAV-206 Tested By: Keenan Dubord AREA: Test Date: November 14, 2014 Unit Data VAV Address 5 Box Inlet Size 10 K Factor 1.005 Test Data Max Design CFM 460 CFM Max Actual CFM 475 CFM Min Design CFM -CFM Reheat Design CFM 460 CFM Reheat Actual CFM 475 CFM E-AHU-SF-05(nic)/VAV-206 Supply Outlet Summary System/Unit Outlet Face Area AK Factor Design % Prelim %Final Final Type Reading Prelim Reading Deviatio Reading Outlet-01 SD 85 135 115 106 90 Outlet-02 SD 110 214 235 105 115 Outlet-03 SD 115 161 185 104 120 Outlet-04 SD 150 60 90 100 150 Totals: - - - 460 136% 625 103% 475 * Notes E-AHU-SF-05(nic)/ 14-Nov-14 Keenan Dubord HOT WATER WAS SET TO 0.5 GPM ON A 1A VAV-206 NEXUS VALVE SYSTEM/UNIT:E-AHU-SF-05(nic)/VAV-207 AREA: Test Data Max Design CFM 300 CFM Min Design CFM -CFM Reheat Design CFM 300 CFM E-AHU-SF-05(nic)/VAV-207 Supply Outlet Summary System/Unit Outlet Face Area AK Factor Design % Prelim %Final Final Type Reading Prelim Reading Deviatio Reading Outlet-01 SD 150 Outlet-02 SD 150 Totals: - - - 300 0% - 0% - * Notes JEDI Balancing, Inc. { JEADI mar imcm.;;:h Mg a 6alanonk• urn CIG #3235 ++yy++yy++'yyi€ #89025' Air Handling Unit PROJECT:VAIL VALLEY MEDICAL CENTER DATE: 11/14/2014 LOCATION:VAIL, CO CONTACT: Trevor Quain PROJECT#: AUTHOR: Greg Barnes SYSTEM/UNIT:E-AHU-SF-05(nic)/VAV-213 Tested By: Keenan Dubord AREA: Test Date: November 14, 2014 Unit Data VAV Address 9 Box Inlet Size 8 K Factor 1.113 Test Data Max Design CFM 150 CFM Max Actual CFM 150 CFM Min Design CFM -CFM Reheat Design CFM 150 CFM Reheat Actual CFM 150 CFM E-AHU-SF-05(nic)/VAV-213 Supply Outlet Summary System/Unit Outlet Face Area AK Factor Design % Prelim %Final Final Type Reading Prelim Reading Deviatio Reading Outlet-01 TOTAL 150 120 180 100 150 Totals: - - - 150 120% 180 100% 150 * Notes E-AHU-SF-05(nic)/ 14-Nov-14 Keenan Dubord HOT WATER WAS SET TO 0.5 GPM ON A 1A VAV-213 NEXUS VALVE JEDI Balancing, Inc. { JEADI mar imcm.-th Mg 013_ VW 11111 rn a BA1A.ZTCING #3235 ++yy++yy++'yyi€ #89025' Fan Unit PROJECT:VAIL VALLEY MEDICAL CENTER DATE: 11/14/2014 LOCATION:VAIL, CO CONTACT: Trevor Quain PROJECT#: AUTHOR: Greg Barnes SYSTEM/UNIT:EF-01 Tested By: Keenan Dubord AREA: Test Date: October 26, 2014 Unit Data Motor Data Fan Manufacturer GREENHECK Motor Manufacturer VERI-GREEN Fan Model Number SWD-8-V6-5-CW Motor HP 1/2 Fan Serial Number 13864180 Motor RPM 300-2500 Rated CFM 600 Motor Rated Volts 120 Total SP Design 1.5 in.we Motor Phase 1 Total Connected CFM 600 Motor FL Amps 6.9 Motor Service Factor 1.0 Test Data Total CFM Actual 595 Sheave Data Fan RPM Actual DIRECT DRIVE Motor Sheave Model DIRECT DRIVE Motor Volts 1 Actual 121 Motor Amps 1 Actual 5.8 EF-01 Exhaust Inlet Summary System/Unit Outlet Type of Face Area AK Design Prelim %Prelim Final %Final Type Reading Factor Reading Reading Deviation Reading Deviatio Inlet-01 ER 80 330 413 85 106 Inlet-02 ER 520 760 146 525 101 Totals: - - - - 600 1,090 182% 610 102% * Notes JEDI Balancing, Inc. / \ / GENERAL LEGEND PLUMBING LEGEND DEMOLITION GENERAL NOTES: (Not all symbols listed below are used on these drawings) (Not all symbols listed below are used on these drawings) ABBR. SYMBOL DESCRIPTION ABBR. SYMBOL DESCRIPTION ABBR. SYMBOL DESCRIPTION ABBR. SYMBOL DESCRIPTION - - - 1. EXISTING ITEMS TO REMAIN ARE DENOTED LIGHTLY UNLESS OTHERWISE NOTED. ALL SECTION DESIGNATION D CAP END OF PIPE CW - DOMESTIC COLD WATER PIPING SCO (D SURFACE CLEANOUT ITEMS SHOWN HATCHED OR CROSS HATCHED SHALL BE REMOVED UNLESS OTHERWISE NOTED. iiii>lhheC SECTION DRAWN ON THIS SHEET XX PITCH DOWN IN DIRECTION OF ARROW HW ---- DOMESTIC HOT WATER PIPING FCO 0 FLOOR CLEANOUT x c42,.x� ----_ 2. CONTRACTOR SHALL NOT SHUT-OFF OR PUT-OUT OF SERVICE ANY SYSTEMS OR SECTION CUT ON THIS SHEET X PIPE ANCHOR HWCDOMESTIC HOT WATER CIRC. PIPING WCO 0-II WALL CLEANOUT SERVICE WITHOUT FIRST COORDINATING WITH THE OWNER. 411111 RISER DIAGRAM NUMBER = 1111 PIPE ALIGNMENT GUIDE UNION OR FLANGE C-SW ---SW- SOFTENED DOMESTIC COLD WATER PIPING H-SW ----SW- SOFTENED DOMESTIC HOT WATER PIPING COT LCO 0-I CLEANOUT TEE UNE CLEANOUT 3. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VISIT THE SITE AND f 1X T UNDERSTAND THE EXTENT OF THE REMODEL WORK REQUIRED PRIOR TO BID. NO E1: "'Adesign SHEET RISER IS DRAWN ONc-1-' EXTRAS WILL BE ALLOWED FOR WORK REQUIRED TO ACHIEVE THE END RESULT AS +�EQUIPMENT UNIT IDENTIFICATION CONCENTRIC PIPE REDUCER 140' HW ----140- DOMESTIC HOT WATER PIPING @ TEMPERATURE SHOWN FIXTURE OR DRAIN P-TRAP INDICATED BY THE CONTRACT DOCUMENT. EQUIPMENT UNIT NUMBER t ECCENTRIC PIPE REDUCER V VENT PIPING AD ® AREA DRAIN 4. CONTRACTOR SHALL DETERMINE AND COORDINATE THE EXACT EXTENT OF DEMOLITION TO FACILITATE ALL WORK INDICATED BY THE CONTRACT DOCUMENT. f DIFFUSER IDENTIFICATION PRV -ON- PRESSURE REDUCING VALVE AV - AV - ACID RESISTANT VENT PIPING FD 0 FLOOR DRAIN (ROUND GRATE) NECK DIFFUSER NECK DIAMETER 5. PRIOR TO COMMENCEMENT OF ANY DEMOLITION WORK, VERIFY EXISTING CONDITIONS © CFM DIFFUSER CFM PTRV AND NOTIFY ENGINEER OF ANY DISCREPANCIES FOR RESOLUTION. PRESSURE AND/OR TEMPERATURE RELIEF VALVE W W WASTE PIPING (ABOVE FLOOR IN BUILDING) FS ® FLOOR SINK (SQUARE GRATE) (E) EXISTING PLUG VALVE W -- W -- WASTE PIPING (BELOW FLOOR IN BUILDING) RD/OD O° ROOF DRAIN OR OVERFLOW DRAIN 6. ALL ITEMS IDENTIFIED TO BE REMOVED SHALL BE REMOVED IN THEIR ENTIRETY UNLESS OTHERWISE REMOVED ITEMS (N) NEW GV -1111- GATE VALVE AW - AW - ACID RESISTANT WASTE PIPING (ABOVE FLOOR IN BUILDING) 1 GAS PRESSURE REDUCING VALVE OWN RNLESSOTH OTHERWISE SHALL NOTED AND STOR DN THE AREA eery International DESIGNATED BY THE OWNER. REMOVE FROM SITE AND LEGALLY DISPOSE OF ALL ITEMS THE OWNER 555 17th Street, Suite 500 (R) RELOCATED VERTICAL PIPE VALVE AW -- AW -- ACID RESISTANT WASTE PIPING (BELOW FLOOR IN BUILDING) VB ATMOSPHERIC VACUUM BREAKER CHOOSES NOT TO ACCEPT. Denver, CO 80202 (F) FUTURE GLV -MI- GLOBE VALVE GD - GD - GREASE DRAIN (WASTE LINE TO GREASE INTERCEPTOR) RPBFP -117- REDUCED PRESSURE BACKFLOW PREVENTER 7. WHERE EXISTING PIPING, T.C. TUBING/WIRING ETC. ARE TO BE REMOVED FROM 720.946.0276 WALLS WHICH ARE REMAINING, THE WALLS SHALL BE REPAIRED TO MATCH ORIGINAL S POINT OF CONNECTION, NEW TO EXISTING BFVI- BUTTERFLY VALVE IW - IW - INDIRECT WASTE PIPING BFPO DOUBLE CHECK BACKFLOW PREVENTER CONDITIONS. f DIRECTION OF FLOW IN PIPE BV III BALL VALVE S -- S -- SANITARY SEWER PIPING (OUTSIDE BUILDING) SA 4, SHOCK ARRESTOR W/ISOLATION VALVE 8. WHERE EXISTING PIPING TO BE REMOVED PASSES THROUGH FLOORS, THEY SHALL project number �///////// DUCTWORK, PIPING AND EQUIPMENT TO BE REMOVED CV VT CHECK VALVE ST -- ST -- STORM SEWER PIPING (BELOW GRADE OUTSIDE BUILDING) GC GAS SHUT-OFF VALVE BEM CUT BACK EVENTWITHIN CONCRETE AND FILLED WITH GROUT TO ACHIEVE A 13026.01 �- SMOOTH AND FINISH WITH CONCRETE SURFACE. DIA 0 DIAMETER SOLENOID VALVE SSD --SSD-- SUB-SURFACE DRAIN PIPING 41 STOP AND DRAIN VALVE WAD WALL ACCESS DOOR Iql BUTTERFLY SOLENOID VALVE SD - SD - STORM DRAIN PIPING (ABOVE FLOOR IN BUILDING) FC . FLOW CONTROL VALVE VA I L VA L L E Y NIC NOT IN CONTRACT mil HOSE END DRAIN VALVE SD -- SD -- STORM DRAIN PIPING (BELOW FLOOR IN BUILDING) WH +•1- WALL HYDRANT GENERANOTES■ AFF ABOVE FINISHED FLOOR P/T T P/T PRESSURE/TEMPERATURE TAP OD - OD - OVERFLOW DRAIN PIPING (ABOVE FLOOR IN BUILDING) HB HOSE BIBS MEDICAL CENTER 1. WORK INCLUDED IN THE CONTRACT IS DENOTED IN BOLD. EXISTING CONDITIONS GC GENERAL CONTRACTOR I fI STRAINER OD -- OD -- OVERFLOW DRAIN PIPING (BELOW FLOOR IN BUILDING) YH ❑v YARD HYDRANT TO REMAIN ARE DENOTED LIGHTLY. MC MECHANICAL CONTRACTOR I�,I STRAINER W/BLOWDOWN A - A - COMPRESSED AIR MH MANHOLE 2. A DETAILED METHOD OF PROCEDURE IS REQUIRED WHEN A CONSTRUCTION ACTIVITY AFFECTS THE SAFETY OF THE OCCUPANTS, OWNER'S EQUIPMENT OR CATH LAB EC ELECTRICAL CONTRACTOR -KO- FLEXIBLE PIPE CONNECTOR G - G - NATURAL GAS PIPING CI CAST IRON VALUABLE CONTENTS OR ANY SYSTEM WHICH SUPPORTS THESE SYSTEMS; OR ESSENTIALLY AFFECTS THE BUILDING MANAGEMENT, OPERATIONS OR SECURITY. TCC TEMPERATURE CONTROL CONTRACTOR THERMOMETER VCP VITRIFIED CLAY PIPE 3. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATION OF ALL EXISTING KEC KITCHEN EQUIPMENT CONTRACTOR Q PRESSURE GAUGE CB CATCH BASIN CONDITIONS PRIOR TO COMMENCEMENT OF ANY WORK AND SHALL NOTIFY THE ENGINEER/ARCHITECT OF ANY DISCREPANCIES FOR RESOLUTION. C COMMON ISI SIGHT GLASS VTR VENT THRU ROOF ;- 4. COORDINATE WORK WITH ALL TRADES. 181 WEST MEADOW DRIVE NC NORMALLY CLOSED C.A.P. 1`%/1 CEILING ACCESS PANEL IE INVERT ELEVATION -- VAI L, CO NO NORMALLY OPEN PUMP PVC POLYVINYL CHLORIDE 5. CONTRACTOR IS RESPONSIBLE FOR SECURING AND WEATHERPROOFING ANY ROOF OPENING NOT COMPLETED DURING WORKING HOURS. TB lipTHRUST BLOCK 6. COORDINATE ALL DUCTWORK AND PIPING WITH EQUIPMENT, STRUCTURE, ETC. owner's project number 7. CONTRACTOR SHALL BE RESPONSIBLE FOR DEACTIVATION OF ROOF-MOUNTED / • / • EQUIPMENT AND ASSOCIATED INDOOR EQUIPMENT. ONLY ONE UNIT SHALL BE HVAC LEGEND LABORATORY/MEDICAL SERVICES LEGEND TAKEN OUT OF SERVICE AT ANY TIME, WITH REMAINDER OF UNITS LEFT OPERATIONAL. consultants/construction managers (Not all symbols listed below are used on these drawings) (Not all symbols listed below are used on these drawings) I 8. CONTRACTOR SHALL NOT SHUT DOWN / TAKE OUT OF SERVICE ANY SYSTEMS ABBR. I SYMBOL DESCRIPTION ABBR. SYMBOL DESCRIPTION ABBR. SYMBOL DESCRIPTION ABBR. SYMBOL DESCRIPTION WITHOUT FIRST COORDINATING WITH OWNER AND PREPARING M.O.P. STRUCTURAL: HWS -HWS- HEATING WATER SUPPLY PIPING MEN SUPPLY DUCT UP / SUPPLY DUCT DOWN 02 - 02 - OXYGEN PIPING t OXYGEN SERVICE OUTLET STRUCTURAL CONSULTANTS INC. HWR --HWR-- HEATING WATER RETURN PIPING Fri MO RETURN/EXHAUST DUCT UP / RETURN/EXHAUST DUCT DOWN VAC -VAC- VACUUM PIPING T VACUUM SERVICE INLET 3400 EAST BAYAU D AVE., SUITE 300 HTWS -HTWS- HIGH TEMPERATURE HOT WATER SUPPLY PIPING 1711 ROUND DUCT UP / ROUND DUCT DOWN N20 -N20- NITROUS OXIDE PIPING 7' WASTE ANESTHESIA GAS DISPOSAL INLET H VAC NOTES. DENVER, COLORADO 80209 303.399.5154 HIM --HTWR-- HIGH TEMPERATURE HOT WATER RETURN PIPING 48F12 INDICATES FLAT OVAL DUCTWORK N - N - NITROGEN PIPING T NITROUS OXIDE SERVICE OUTLET 1. ALL SUPPLY AIR DIFFUSERS ARE 4-WAY AIR PATTERN UNLESS SHOWN MEP: CWS -CWS- CHILLED WATER SUPPLY PIPING i 1111 i FLEXIBLE DUCT CONNECTION MA - MA - MEDICAL AIR PIPING Q NITROGEN SERVICE OUTLET OTHERWISE. CATOR RUMA & ASSOCIATES, CO. CWR --CWR-- CHILLED WATER RETURN PIPING BDD i i BACKDRAFT DAMPER CO2 -CO2- CARBON DIOXIDE 1 NATURAL GAS SERVICE OUTLET 2. DUCT SIZE OF BRANCH DUCT TO AIR DEVICE SHALL BE THE SAME SIZE AS NECK 896 TABOR STREET SIZE OF AIR DEVICE UNLESS NOTED OTHERWISE. LAKEWOOD, CO 80401-4700 D - D - COOLING COIL DRAIN PAN PIPING TCD 11 TEMP. CONTROL DAMPER-OPPOSED BLADE WAGD -WAGD- WASTE ANESTHESIA GAS DISPOSAL 4 LABORATORY/MEDICAL AIR SERVICE OUTLET 3. ALL HEATING WATER SUPPLY AND RETURN BRANCH PIPING TO TERMINAL BOXES 303.232.6200 C - C - CONDENSER WATER SUPPLY PIPING TCD 1'`\'`V TEMP. CONTROL DAMPER-PARALLEL BLADE DI - DI - DEIONIZED WATER PIPING Q CARBON DIOXIDE SERVICE OUTLET SHALL BE 3/4" UNLESS NOTED OTHERWISE. ALL PIPING TAKE-OFFS FROM MAINS INTERIORS: SHALL BOTTOM/TOP TAKE-OFFS WITH SWING JOINTS. CR -- CR -- CONDENSER WATER RETURN PIPING i i LOUVER WITH SCREEN H - H - HYDROGEN PIPING ZVB ZONE VALVE BOX GALLON-SNOW LPS -UDS- *LOW PRESSURE STEAM SUPPLY PIPING MVDMANUAL VOLUME DAMPER NL NL LIQUID NITROGEN PIPING MGO MEDICAL GAS OUTLET 4. BRANCH DUCT SIZE TO INLET OF ALL TERMINAL BOXES SHALL BE THE SAME 1920 MARKET STREET, (0-15#) I- SIZE AS THE INLET SCHEDULED UNLESS NOTED OTHERWISE. BRANCH DUCTS TO LPC LPC-- LOW PRESSURE CONDENSATE RETURN PIPING MOTOR OPERATED DAMPER LA - LA - LABORATORY COMPRESSED AIR PIPING AAP AREA ALARM PANEL TERMINAL BOXES EXCEEDING 15' OR TWO ELBOWS, SHALL BE UP-SIZED TO SUITE 201 NEXT STANDARD DIAMETER. MEDIUM PRESSURE STEAM SUPPLY PIPING DENVER, CO 80202 MPS -MPS- (16#-60#) D SPIN-IN FITTING WITH MVD G G NATURAL GAS PIPING I MAP MASTER ALARM PANEL 5. UNLESS OTHERWISE NOTED, ALL SUPPLY AIR DUCTWORK SHALL BE EXTERNALLY 303.433.9600 MPC --MPC-- MEDIUM PRESSURE CONDENSATE RETURN PIPING FD 0 DUCT FIRE DAMPER WRAPPED TO THICKNESS AS STATED IN SPECIFICATIONS. RETURN AND EXHAUST • / DUCTWORK IS NEITHER LINED NOR WRAPPED. I HIGH PRESSURE STEAM SUPPLY PIPING seal/signature HPS - PS- (81#-125#) FSD ® COMBINATION DUCT SMOKE & FIRE DAMPER 6. PROVIDE ROOM AIR BALANCE TO ACHIEVE POSITIVE (+) OR NEGATIVE (-) AT THE HPC --HPC-- HIGH PRESSURE CONDENSATE RETURN PIPING SD © DUCT SMOKE DAMPER r DIFFERENTIAL PRESSURE INDICATED ON THE DRAWINGS. PC - PC PUMPED CONDENSATE PIPING I DUCT SMOKE DETECTOR FIRE PROTECTION LEGEND 7. PROVIDE EOMD AT ALL LOW POINTS FOR STEAM SUPPLY PIPING AS REQUIRED (Not all symbols listed below are used on these drawings) WHICH MAY NOT NECESSARILY BE SHOWN. BBD -BBD- BOILER BLOWDOWN PIPING DAD ``y'; DUCT ACCESS DOOR ABBR. SYMBOL DESCRIPTION 1 1 ABBR. SYMBOL DESCRIPTION 8. ALL BRANCH STEAM SUPPLY AND CONDENSATE RETURN PIPING FROM MAINS BF - BF - BOILER FEED WATER PIPING RI• TURNING VANES IN DUCT ELBOW F F FIRE SERVICE PIPING 0 NEW SPRINKLER HEAD SHALL BE TOP TAKE-OFFS WITH SWING JOINTS. RL - RL - REFRIGERANT LIQUID PIPING U FS - FS - FIRE SPRINKLER PIPING 0 EXISTING SPRINKLER HEAD RS -- RS -- REFRIGERANT SUCTION PIPING EP ELECTRIC-PNEUMATIC CONTROL VALVE PLUMBING NOTES■ WSP -WSP- WET STANDPIPE e RELOCATED SPRINKLER HEAD RHG -RHG- REFRIGERANT HOT GAS PIPING PE -1 PNEUMATIC-ELECTRIC CONTROL SWITCH -114- O.S.&Y GATE VALVE W/TAMPER SWITCH D SIDEWALL SPRINKLER HEAD issued for date © TEMPERATURE SENSOR FS FLOW SWITCH D24 DRY SPRINKLER HEAD (SHAFT) 1. CONTRACTOR SHALL NOT SHUT-OFF/PUT OUT OF SERVICE ANY TT ®n THERMOSTATIC STEAM TRAP 0 WALL MOUNTED THERMOSTAT f� SYSTEMS/SERVICES WITHOUT FIRST COORDINATING WITH OWNER. CONST R U CT I O N PIV POST INDICATOR VALVE FHC FIRE HOSE CABINET F&T :.'FaeT FLOAT AND THERMOSTATIC STEAM TRAP WUNIT MOUNTED THERMOSTAT FH F6-I FIRE HYDRANT FVC FIRE VALVE CABINET 2• CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATION OF ALL EXISTING DOCUMENTS JULY 28, CONDITIONS PRIOR TO COMMENCEMENT OF ANY WORK AND SHALL NOTIFY THE 2014 IBT ❑T IBT INVERTED BUCKET STEAM TRAP QH HUMIDISTAT ARCHITECT/ENGINEER OF ANY DISCREPANCIES FOR RESOLUTIONS. FDC < FIRE DEPARTMENT CONNECTION A/S AUTOMATIC FIRE SPRINKLER TCV (2 OR 3-WAY) TEMPERATURE CONTROL VALVE -13-.-- UNDERCUT DOOR 3. THIS CONTRACTOR SHALL COORDINATE LOCATIONS OF PIPING WITH OTHER TRADES AND ADVISE ARCHITECT/ENGINEER OF ANY POSSIBLE CONFLICTS. item date -1 VENTURI METER -L- LOUVER '1/4 ! VERIFY EXACT LOCATIONS, ELEVATIONS AND DIMENSIONS OF STRUCTURAL y MEMBERS AND OPENINGS. T CAUBRATED BALANCING VALVE R DUCT RISE 4. SEE SPECIFICATIONS FOR WATER HAMMER ARRESTOR SIZING. ALL FLUSH VALVES 1 PLAN REVIEW 07.08.2014 RSV i REFRIGERANT SERVICE VALVE D DUCT DROP AND SOLENOID OPERATED EQUIPMENT SHALL HAVE A WATER HAMMER ARRESTOR. 2 CONSTRUCTION SET 07.28.2014 DPS ® DIFFERENTIAL PRESSURE SWITCH A.L. ACOUSTICALLY LINED DUCTWORK 5. SEE PLUMBING FIXTURE SCHEDULE FOR PIPE SIZING TO INDIVIDUAL PLUMBING MAV MANUAL AIR VENT TCOAD TEMPERATURE CONTROL OUTSIDE AIR DAMPER FIXTURES. AAV 41 AUTOMATIC AIR VENT TCRAD TEMPERATURE CONTROL RETURN AIR DAMPER 6. ALL EXISTING FIXTURES AND EQUIPMENT TO BE REMOVED SHALL HAVE ALL FS FLOW SWITCH TCEAD TEMPERATURE CONTROL EXHAUST AIR DAMPER ASSOCIATED PIPING CONTROLS, HANGERS, SUPPORTS AND ANY MISCELLANEOUS ASSOCIATED SERVICE OR PART REMOVED COMPLETELY. EJ -0 EXPANSION JOINT SP IN WC STATIC PRESSURE IN INCHES WATER COLUMN 7. ALL MEDICAL GAS PIPING SHALL HAVE TOP TAKE-OFFS WHENEVER POSSIBLE. BJ -.0- BALL JOINT EXPANSION COMPENSATOR SD 0 SUPPLY AIR DEVICE 8. REFER TO ARCHITECTURAL DRAWINGS FOR ROOF PENETRATION DETAILS. RG Q RETURN/EXHAUST AIR DEVICE 9. REFER TO ARCHITECTURAL DRAWINGS FOR FIXTURE ELEVATIONS AND LOCATIONS. • • cws,cwR/HWS,HWR t 10. INVERT ELEVATIONS SHOWN ARE BASED ON A GROUND FLOOR FINISH ELEVATION 1 OF XXXX.XX. SUPPLY & RETURN BRANCH 11. SEE ARCHITECTURAL CONSTRUCTION DOCUMENTS FOR DIMENSIONED LOCATION E E PIPING TO TERMINAL UNIT OF PLUMBING FIXTURES AND WALLS. I / 12. PROVIDE CLEANOUTS IN ACCESSIBLE LOCATIONS PER THE PROJECT SPECIFICATIONS AND LOCAL PLUMBING CODES. / 1 DOUBLE/SINGLE LINE DUCT LEGEND (Not all symbols listed below are used on these drawings) SINGLE LINE DOUBLE LINE SINGLE LINE DOUBLE LINE SINGLE LINE DOUBLE LINE SINGLE LINE DOUBLE LINE FIRE PROTECTION NOTES.• RIGID t \ z t tJ 7 T FLEX 1. FURNISH ALL LABOR, MATERIALS, EQUIPMENT AND SERVICES NECESSARY FOR SEE DUCT -0 TAKE-OFF THE INSTALLATION OF A COMPLETE AND PROPERLY FUNCTIONING FIRE Clij DETAIL 2 PROTECTION SYSTEM. 45' TEE (ROUND) 90' TEE (RECTANGULAR) FLEX DUCT I 90'RADIUS ELB 2. THE INFORMATION PRESENTED ON THESE DRAWINGS IS DIAGRAMMATIC. IT DOES t z t 2 F +4 NOT NECESSARILY REPRESENT ALL ELBOWS, OFFSETS, HANGERS, ETC., N CONICAL Z 2 I REQUIRED FOR A COMPLETE WORKING SYSTEM. 4' TEE 08' 6' 45' TEE (RECTANGULAR) 90' TEE (ROUND) MANUAL VOLUME DAMPER 90' ELB 3. ALL FIRE PROTECTION SYSTEMS INSTALLED SHALL BE IN ACCORDANCE WITH NFPA-13, 14, 20, ETC. AND LOCAL BUILDING CODES AND ORDINANCES. SCALE: 1/8"-1'-0" t z Milli4. FIRE PROTECTION CONTRACTOR SHALL COORDINATE THE LOCATION OF ALL NEW lel VOLUME DAMPER FIRE PROTECTION EQUIPMENT AND PIPING WITH ALL OTHER TRADES PRIOR TO SUBMITTAL OF SHOP DRAWINGS AND SYSTEM INSTALLATION, SO AS NOT TO III DUCT SPLIT SPIN IN REDUCER 45' ELB INTERFERE WITH THE ROUTING OF NEW DUCTWORK, PLUMBING PIPING, ETC. • / 5. PROVIDE ALL FITTINGS, RISER NIPPLES, ARM-OVERS, HANGERS, ETC. TO MAINTAIN CONFORMANCE WITH APPLICABLE STANDARDS AND TO POSITION THE SPRINKLERS IN THE PROPER LOCATIONS. 6. SEAL ALL PIPE PENETRATIONS THROUGH FIRE RATED WALLS AND CEILINGS WITH FIRE STOPPING MATERIALS AS REQUIRED. 7. FOR REMODEL AREAS NEW SPRINKLERS SHALL MATCH EXISTING SPRINKLERS. 8. HYDRAULICALLY CALCULATE THIS FIRE SPRINKLER SYSTEM PER NFPA-13. 9. PROVIDE FIELD COORDINATION OF PIPING AND SPRINKLER INSTALLATIONS WITH DUCTWORK, LIGHTS, SMOKE DETECTORS, DIFFUSERS, ETC. key plan sheet title MECHANICAL LEGENDS AND GENERAL NOTES sheet number M 0 0 1 J This document is the property of Heery International,Inc.and Heery International Inc.retains all drawn by JOD I checked by WAT Caton Rumo & Assoc. FILENAME:P: VVMC 2014-130 CATH LAB REMODEL CAD MECH P-MLSD.DWG _ M001 PLOT: 07/28/2014 © 9:19am REV: 07/24/2014 CAD: )Dickerson XREF: tb.dw S743-1 DUCTLESSSPLITAw S743-2 ACCU.dw S782-1 AHU.dw S810-1 ST HUMID.dw S830-8 DUCT HTR.dw S850-1 FAN.dw S932-1 AIR DVadw S440-1 PLMBG FIXT.dw S891-1 DUCT PSRAw rights therein,including copyrights. It may only be used in a manner consistent with Heery \ \ \ \ \ 9 g 9 9 9 9 9 9 9 9 International Inc.'s rights while Heery International,Inc.is providing services for the specific project Copyright©2013 by Heery International,Inc.all rights reserved. identified or referred to herein or extensions thereto. It may not be used for any other purpose WHEN PLOTTED AT FULL SIZE THIS SHEET MEASURES 30"x42" except with the express written agreement of,and compensation to,Heery International Inc. AIR DEVICE SCHEDULE PLUMBING FIXTURE & EQUIPMENT SCHEDULE DESIG. MFR. TYPE MODEL FRAME MATERIAL FINISH DAMPER REMARKS TYPE ELECTRICAL A TITUS CEILING SUPPLY TDV NOTE 4 STEEL WHITE NONE 1 FIXTURE FITTINGS ACCESSORY LEED CONNECTIONS SYMBOL REQUIREMENTS CEILING FIXTURE NAME MANUFACTURER MODEL TYPE SIZE 1 MANUFACTURER MODEL SUPPLY I.R./BATTERY GPM WASTE VENT CW HW REMARKS B TITUS EXHAUST/RETURN PAR NOTE 4 STEEL/ALUMINUM WHITE NONE 1,2 HEERY design HP OR GPF FLOOR SET, RE:ARCH.DWGS FOR MTG.HT.&LOC.PROVIDE C TITUS LAMINAR HEPA TLF-HEPA NOTE 4 ALUMINUM WHITE NONE 1,3 WC-1 WATER CLOSET AMERICAN STANDARD 3043.102 SIPHON JET ELONGATED SLOAN,ROYAL 111-YO N/A 4" 2" 1" N/A AMERICAN STANDARD 17"RIM HT. 1.6 GPF BOWL 5901.110 TOILET SEAT D TITUS SIDEWALL RETURN 350RL NOTE 4 STEEL WHITE NONE 1 L-1 WALL MOUNTED,VITREOUS T&S, B-0892-01 REMARKS: LAVATORY AMERICAN STANDARD 0355.012 20-1/2"X 18-1/4" RE:SPEC 2" 1 1/2" 1/2" 1/2" RE:ARCH.DWGS FOR MTG.HT.&LOC. 3 (ADA) CHINA BRASS W/B-0199-21 1.PROVIDE MODULE SIZE TO FIT CEILING TYPE;SEE PLANS FOR NECK SIZES. 2.PROVIDE ALUMINUM MATERIALS FOR ALL WET AREAS. 3.PROVIDE WITH HEPA FILTER. Heery International UNDERCOUNTER,VITREOUS T&S, B-0892-01 4.COORDINATE WITH ARCHITECTURAL PLANS FOR LAY-IN VS SURFACE MOUNT FRAMES. L-2 LAVATORY AMERICAN STANDARD OVALYN 0495.221 CHINA 17 1/8"X 14 1/8" BRASS W/B-0199-21 RE:SPEC 2" 1 1/2" 1/2" 1/2" RE:ARCH.DWGS FOR MTG.HT.&LOC. llllllllII//INIIIIIIIII P:\WMC\2014-130 Cath Lab Remodel\Cad\Mech\Mschedules\[M-2014-130.xlsx]S932-1 Air Dvc 555 17th Street, Suite 500 Denver, CO 80202 TERMINAL BOX SCHEDULE (HOT WATER HEAT) 720.946.0276 L-3 LAVATORY AMERICAN STANDARD OVALYN 0495.221 UNDERCOUNTER,VITREOUS 17 1/8"X 14 1/8" T&S, B-0892-01 RE:SPEC 2" 1 1/2" 1/2" 1/2" RE:ARCH.DWGS FOR MTG.HT.&LOC. CHINA BRASS W/B-0199-21 INTERIOR I AIR PRESS COOLING DESIGN CFM HEATING HEATING WATER COIL DATA MODULATING DESIG OR MFR MODEL INLET DROP MAX MAXIMUM MINIMUM DESIGN CFM EAT LAT MBH GPM WATER EWT CONTROL REMARKS PERIMETER DIA. (IN WC) ELEV FT ELEV FT ELEV FT °F °F P.D.MAX °F VALVE TYPE project number L-4 LAVATORY AMERICAN STANDARD 0355.012 WALL MOUNTED,VITREOUS 20-1/2"X 18-1/4" SLOAN OPTIMA RE:SPEC I.R BATTERY 2" 1 1/2" 1/2" 1/2" RE:ARCH.DWGS FOR MTG.HT.&LOC. CHINA EBF-650-BDT-ETF ZONE (IN.) (SEA LEVEL) 8150 8150 8150 (FT WC) 1 3026.01 201 PERIMETER PRICE SDV 8 8 0.64 230 N/A 230 55 90 7.1 0.6 3.00 180 2-WAY ALL S-1 2 COMPT.SINK ELKAY DLR432210 W/ SELF-RIMMING,STAINLESS 43"X 22" T&S, B-2855 RE:SPEC 2" 1 1/2" 1/2" 1/2" RE:ARCH.DWGS FOR MTG.LOC. 3-HOLE PUNCH STEEL X 10" BRASS 202 PERIMETER PRICE SDV 8 8 0.64 230 N/A 230 55 90 7.1 0.6 3.00 180 2-WAY ALL \//\I L VALLEY FLUSHING RIM WALL HUNG, SLOAN(ROYAL), SLOAN 117, 203 PERIMETER PRICE SDV 8 8 0.64 230 N/A 230 55 90 7.1 0.6 3.00 180 2-WAY ALL MEDICAL CE N T E R CSS-1 SERVICE SINK AMERICAN STANDARD 9512.013 BLOW OUT FLUSHING ACTION, 24 1/2"X 20" T&S BRASS, T&S B-0665-BSTP N/A 4" 2" 1" N/A RE:ARCH.DWGS FOR MTG.HT.&LOC. WALL MTD. AND AMERICAN STANDARD AM.STD.7880.024 204 PERIMETER PRICE SDV 8 8 0.64 230 N/A 230 55 90 7.1 0.6 3.00 180 2-WAY ALL TERRAZO FLORESTONE 90/91/92 24"X 24" T&S, MSB-1 MOP SERVICE BASIN FIAT TSB 3000/3010 SERIES WALL INSTALLATION X12" BRASS B-0665-BSTP N/A 3" 2" 1/2" 1/2" RE:ARCH.DWGS FOR MTG.HT.&LOC. 205 PERIMETER PRICE SDV 8 8 0.64 160 N/A 160 55 90 5.0 0.5 3.00 180 2-WAY ALL CATH LAB 4-5000VT-X SHOWER VALVE 206 INTERIOR PRICE SDV 8 8 0.64 460 N/A 460 55 80 10.2 0.5 3.00 180 2-WAY ALL SH-1 TILED SHOWER BY PATIENT TOILET ROOM WITH H303-V HAND SPRAY(30" (ADA) ARCHITECT W/HAND HELD SHOWER SYMMONS BAR)W/ALSONS 6300WBX N/A 2" 1 1/2" 1/2" 1/2" RE:ARCH.DWGS FOR MTG.HT.&LOC. 207 INTERIOR PRICE SDV 8 8 0.64 300 N/A 300 55 80 6.6 0.5 3.00 180 2-WAY ALL HEAD SLIDE.PROVIDE WITH 1.5 GPM FLOW RESTRICTOR 181 WEST MEADOW DRIVE 208 INTERIOR PRICE SDV 8 8 0.64 365 N/A 365 55 80 8.1 0.5 3.00 180 2-WAY ALL VAI L, CO BT-1 2461.002 or AMERICAST BRAND I 32"X 60" 1-3170VT-H401-V RE:PLANS FOR RT OR LFT SIDE DRAIN OUTLET.SPECIFY GRIP 209 PERIMETER PRICE SDV 8 8 0.64 150 N/A 150 55 90 4.6 0.5 3.00 180 2-WAY ALL (ADA) BATH TUB AMERICAN STANDARD 2460.002 ENGINEERED X 17 3/4" SYMMONS W/B30 BAR N/A 2" 1 1/2" 1/2" 1/2" RAILS.ADA:SEAT AT HEAD END MATERIAL owner's project number 210 INTERIOR PRICE SDV 8 8 0.64 350 N/A 350 55 80 7.7 0.5 3.00 180 2-WAY ALL SS-1 SCRUB SINK OFCI STERIS FLEXMATIC WALL MOUNTED STAINLESS 2" 1 1/2" 1/2" 1/2" RE:ARCH.DWGS FOR MTG.HT.&LOC.OWNER STEEL FURNISHED,CONTRACTOR INSTALLED. 211 INTERIOR PRICE SDV 8 8 0.64 450 N/A 450 55 80 10.0 0.5 3.00 180 2-WAY ALL consultants/construction managers FS-1 FLOOR SINK JAY R.SMITH 3101 CAST IRON FLOOR SINK W/ 8 1/2" N/A N/A N/A RE: 2" - - ACID RESISTANT ENAMEL COATED,1/2 GRATE 212 INTERIOR PRICE SDV 16 16 1.00 2,800 N/A 2,800 55 80 61.9 0.5 9.00 180 2-WAY ALL STRUCTURAL: BUCKET STRAINER SQ. PLANS MIN. 213 INTERIOR PRICE SDV8 8 0.64 150 N/A 150 55 80 3.3 0.5 3.00 180 2-WAY ALL STRUCTURAL CONSULTANTS INC. SHOWER TRENCH STAINLESS STEEL TRENCH 2" 2" PROVIDE WITH STRAINER,SPACERS AND LEVELING AND 3400 EAST BAYAUD AVE., SUITE 300 TD-1 DRAIN QUICKDRAIN PROLINE PLD57 DRAIN 57" N/A N/A N/A MIN. MIN. PLACEMENT BRACKETS.RE:ARCH.DWGS FOR LOC. REQUIREMENTS APPLYING TO ALL TERMINAL BOXES: 6,105 0 69 DENVER, COLORADO 80209 A. PROVIDE BOX SELECTION TO MEET LAT,DESIGN CFM AND HEATING MBH. FINAL GPM SHALL BE SET DURING BALANCING TO FLOW RATES IN LISTED PRODUCT DATA SUBMITTALS. 303.399.5154 B. MAXIMUM STATIC PRESSURE IS BASED ON WIDE OPEN UNIT AT MAXIMUM FLOW FOR TERMINAL BOX WITH 2-ROW COIL. MEP: TD-2 SHOWER TRENCH QUICKDRAIN PROLINE PLD36 STAINLESS STEEL TRENCH 36" N/A N/A N/A 2" 2" PROVIDE WITH STRAINER,SPACERS AND LEVELING AND C. HEATING WATER SYSTEM CONTAINS 40%PROPYLENE GLYCOL. & DRAIN DRAIN MIN. MIN. PLACEMENT BRACKETS.RE:ARCH.DWGS FOR LOC. D. 2-ROW HEATING COIL CONDITIONS SHOWN AND PREFERED.1-ROW COIL NOT ACCEPTABLE. GATOR RU MA ASSOCIATES, CO. E. USE OF 3-&4-ROW COILS MUST BE SPECIFICALLY IDENTIFIED BY THE SUPPLIER&ACCEPTED BY THE ENGINEER FOR EACH LOCATION PROPOSED. 896 TABOR STREET F. TERMINAL BOX MAXIMUM AIR FLOW CAPABILITIES: 6"=450 CFM,8"=800 CFM,9"=1050 CFM,10"=1350 CFM,12"=2000 CFM,14"=3000 CFM,16"=4000 CFM&24"x16"=8000 CFM. LAKEWOOD, CO 80401-4700 1. REFER TO GENERAL SPECIFICATIONS FOR WATER CLOSETS,URINALS, LAVATORIES,SINKS AND MISC.FIXTURE REQUIREMENTS. G. MINIMUM 2-ROW COILS REQUIRED ON ALL PERIMETER BOXES. 2. GRAB BARS BY ARCHITECT. 303.232.6200 3. THIS SCHEDULE INCLUDES ITEMS THAT MAY NOT BE INCLUDED IN THE DRAWING DOCUMENTS. S440-1 REMARKS: INTERIORS: 1. VAV BOXES ARE TO BE INSTALLED FOR FUTURE VARIABLE AIRFLOW CONDITION.LOCK TERMINAL BOX OPEN AND DISABLE VOLUME DAMPER AS GALLU N-SNOW THE SYSTEM IS CONSTANT VOLUME AT THIS TIME.INSTALL CONTROL WIRING REQUIRED FOR FUTURE VARIABLE AIR VOLUME CONTROL. 1 920 MARKET STREET, FAN SCHEDULESUITE 201 9/17/2014 P:\WMC\2014-130 Cath Lab Remodel\Cad\Mech\Mschedules\[M-2014-130.x1sx]5933-2 Terrn Box HW DENVER, CO 80202 CFM S.P. TIP OUTLET I APPROX. ARRANGE. 303.433.9600 DESIG. MFR. MODEL FAN TYPE SERVICE AT IN.W.C. APPROX. SPEED VELOCITY MIN. DRIVE DAMPER THROAT & WEIGHT CONTROL REMARKS UNIT HEATER SCHEDULE (HYD RO N I C) ' [ 8150' AT 8150' RPM (FPM) (FPM) HP TYPE TYPE DIM. MOUNTING LBS. seal/signature PROJECT DESIGN HEATING PARAMETERS ELECTRICAL SIZE(INCHES) MAX BACKWARD INCLINED EF-1 GREENHECK SWD ISOLATION 600 1.5 2500 7281 714 1/2 DIRECT BDD 11 UPBLAST 80 BAS 1,2,3 DESIG. MFR MODEL CFM EWT WATER 1 GLYCOL EAT MBH LAT GPM WATER MOTOR HP OR L W H OPER MTG CONTROL REMARKS VENT SET 8,150 (°F) TEMP % (°F) (°F) PRESS TYPE WATTS WEIGHT HEIGHT VALVE TYPE A EF-2 GREENHECK SQ INLINE CENTRIFUGAL SMOKE 800 1 2200 6443 800 3/4 DIRECT BDD 12 INLINE 64 BAS 1,3 FEET DROP DROP (LBS) (FT) (°F) (FT HD) REMARKS: 2-WAY UH-201 TRANE S-18 395 180 30 40% 60 7.7 82.1 0.5 0.0 PSC 16W 9.4 14.6 15.0 26 8.0 ALL 1.UTILIZE ECM MOTOR.CONTROL WITH BAS. MODULATING 2.PROVIDE DISCONNECT ON UNIT. 3.PROVIDE BACKDRAFT DAMPER(BY FAN MANUFACTURER). 17/28/2014 9:14 P:\WMC\2014-130 Cath Lab Remodel\Cad\Mech\Mschedules\[M-2014-130.xlsx]S743-2 Air Cool REMARKS: 1. REFER TO ELECTRICAL DRAWINGS FOR POWER REQUIREMENTS. issued for date STEAM HUMIDIFIER SCHEDULE 2. MOTORS TO BE PROVIDED W/AUTOMATIC THERMAL OVERLOAD OR IMPENDANCE PROTECTION. 3. INTEGRAL FAN GUARD INLET. HORIZONTAL 4. DISCHARGE LOUVERS. CONSTRUCTION STEAM ENTERING ENTERING LEAVING AIR TEMP. LBS/HR DUCT/PLENUM MAX.VAPOR TRAIL DESIG. MFR. GENERATOR GENERATOR HUMIDIFIER CFM AT AIR TEMP. RELATIVE RELATIVE RISE CAPACITY HEIGHT AND ABSORBTION REMARKS DOCUMENTS JULY 28, MODEL KW MODEL 8150' °F HUMIDITY% HUMIDITY% °F WIDTH(IN,) DISTANCE(IN.) 2014 ULTRA-SORB 9/17/2014 6:48 P:\WMC\2014-130 Cath Lab Remodel\Cad\Mech\Mschedules\[M-2014-130.xIsx]S830-19A UH-H20 H-1 DRISTEEM VM-30 30LV 2600 55 10 84 3.1 82.6 20/14 15 ALL item date H-2 DRISTEEM VM-8 8 ULTRA500 500 55 10 84 4 18.6 20/14 15 ALL AIR COOLED CONDENSING UNIT SCHEDULE H-3 DRISTEEM VM-12 12 ULTRA-SORB 920 55 10 84 4 36 20/14 15 ALL 1 PLAN REVIEW 07.08.2014 LV MATCHED COOLING COND. AMBIENT LOW AMBIENT DESIG. MFR. MODEL SYSTEM CAPACITY TEMP. TEMP. CONTROL REMARKS 2 CONSTRUCTION SET 07.28.2014 H-4 DRISTEEM VM-10 10 ULTRA-SORB 760 55 10 84 3.8 26 20/14 15 ALL COMPONENT MBH AT 8150' °F °F °F LV 3 CCD-2 09.18.2014 REMARKS: ACCU-3 TECHNICAL 20ALS9 AHU-1 11,760 129 100 -20F ALL 4 CCD-4 09.29.2014 SYSTEMS 1.PROVIDE LOW PRESSURE STAINLESS STEEL RECTANGULAR DUCTWORK AS SCHEDULED FOR HUMIDIFIER.SEE HUMIDIFIER DETAIL. REMARKS: 2.CONDENSATE TO BE ROUTED TO POINT SHOWN ON DRAWINGS.PROVIDE DRAIN COOLER FOR CONDENSATE WASTE. 3.REFER TO ELECTRICAL DRAWINGS FOR POWER REQUIREMENTS. 1.UTILIZE R410A REFRIGERANT 4.LOW PRESSURE STEAM PIPE SIZE TO BE VERIFIED WITH MANUFACTURER BASED ON INSTALLED PIPE LENGTH. 2.MINIMUM 11.1 EER 5.UTILIZATION OF ANY OTHER MANUFACTURER OF HUMIDIFIER MAY REQUIRE UPSIZING OF STEAM PIPING TO 3".COST TO OWNER NOT TO INCREASE IN THIS SCENARIO. 7/28/2014 9:14 P:\WMC\2014-130 Cath Lab Remodel\Cad\Mech\Mschedules\[M-2014-130.xlsx]S743-2 Air Cool 9/9/2014 14:01 P:\VVMC\2014-130 Cath Lab Remodel\Cad\Mech\Mschedules\[M-2014-130.xlsx]S810-1 St Humid AIR HANDLING UNIT SCHEDULE FAN SECTIONS SUPPLY AIR COIL SECTIONS AIR FILTER SECTIONS UNITSIZE DESIG. AREA MFR& OUTDOOR OUTSIDE AIR DESIGN CAPACITY NO. WHEEL DRIVE I RPM HP HP NO. VIBRATION NET AT ELEV MBH MBH EAT LAT REFRIG FUNCTION AREA MERV-A AIR P.D. L W H OPER CONTROL REMARKS DESIG. DUCT PRESSURE CLASSIFICATION SCHEDULE SERVED MODEL OR AIR CFM STREAM AT ELEV 8150 FEET OF DIA. TYPE (BELT/ APPROX. EACH TOTAL OF ISOLATOR SERVICE FACE 8150 FEET SENS TOTAL °F °F °F °F MATCHED COIL SF RATING CLEAN . DIRTY (IN) (IN) (IN) WEIGHT INDOOR MINIMUM CFM ESP TSP FANS (IN) (AF/BI) DIRECT) FAN VFDS TYPE AREA CFM AIR DB WB DB WB SYSTEM (YES/ (IN WC) (IN WC) (LBS) CASING (IN WC) (IN WC) (SF) P.D. COMPONENT NO) DUCT TYPE PRESSURE CLASS REMARKS (IN WC) SUPPLY DUCT AIR SERVING CATH LAB 4" AHU-1 CATH LAB TEMTROL INDOOR 400 SUPPLY 2,800 2.00 2.40 1 14.0 BI DIRECT 3,030 1.6 1.6 1 SPRING COOLING 6 2,800 0.20 56 56 75.0 ---- 55.0 ---- I ACCU-3 YES PRE-FILTER 6.0 7 0.30 0.50 28 46 96 1,729 BAS ALL AHU-1 CUSTOM LOW PRESSURE SUPPLY AIR DUCT 2" COMMON NOTES(APPLIES TO ALL AIR HANDLERS): UNIT SPECIFIC REMARKS: >REFER TO ELECTRICAL DRAWINGS FOR POWER REQUIREMENTS. 1. FINAL FILTRATION IS HEPA FILTER(MERV 13 MINIMUM)PROVIDED IN LAMINAR FLOW GRILLES.SEE AIR DEVICE SCHEDULE. ALL RETURN, EXHAUST,OUTSIDE AIR ETC. 2" >UNIT HEIGHT DOES NOT INCLUDE HEIGHT OF CURB. >PROVIDE BASE RAIL OR CURB HEIGHT TO ACCOMMODATE CONDENSATE DRAIN P-TRAP. 7/28/2014 9:14 P:\VVMC\2014-130 Cath Lab Remodel\Cad\Mech\Mschedules\[M-2014-130.xlsx]5743-2 Air Cool >MINIMUM 2-ROW HEATING COIL. >MINIMUM 6-ROW COOLING COIL. 7/28/2014 9:14 P:\VVMC\2014-130 Cath Lab Remodel\Cad\Mech\Mschedules\[M-2014-130.xlsx]S743-2 Air Cool N 0 4' 8' 16' DUCTLESS SPLIT DX SYSTEM SCHEDULE --- SCALE: 1/8"=1'-0" INDOOR UNIT OUTDOOR UNIT SUPPLY FAN COOLING COIL-REFRIGERANT(AHRI) FILTER SIZE(INCHES) COOLING CAPACITY HEATING CAPACITY-HEAT PUMP ELECTRIC AHRI SOUND REFRIGERANT SIZE(INCHES) DESIG. MANUFACTURER MODEL MOUNTING CFM FAN HP OR SOUND TOTAL SENS SENS. ENTERING AIR STYLE TYPE L W H OPER POWER SOURCE REMARKS NOMINAL TOTAL AMBIENT LOW MBH MBH AHRI HEAT EFF POWER TYPE CHARGE L W H OPER MANUFACTURER MODEL OPERATING CONTROL REMARKS DESIG. STYLE (SL) SPEED WATTS POWER MBH HEAT MBH DB WB WEIGHT COMMENT TONS MBH AIR AMBIENT AT 47°F AT 17°F HSPF (KW) SEER (dBA) (LBS) WEIGHT FUNCTION (dBA) (SL) RATIO (SL) (°F) (°F) (LBS) (SL) (SL) (°F) (°F) AMBIENT AMBIENT (LBS) AC-1 MITSUBISHI PKA-A18HA HIGH WALL 425 HIGH 30W 43 18.0 0.68 12.2 80 67 WASH-ABLE SYNTHETIC 35.4 9.9 11.7 Y9 POWER FROM LINE 1.0 18.0 105°F 0°F ---- ---- ---- ---- 15.3 48 R410A 12.1 31.5 23.7 91 MITSUBISHI PUY-A18NHA COOLING ONLY WALL MTD WIRED REMOTE ACCU-1 VOLTAGE SOURCE CONTROLLER AC-2 MITSUBISHI PKA-A24KA HIGH WALL 775 HIGH 56W 45 24.0 0.77 18.5 80 67 WASH-ABLE SYNTHETIC 46.2 11.7 14.4 46 POWER FROM LINE 2.0 24.0 105°F 0°F ---- ---- ---- ---- 17.0 48 R410A 14.2 37.4 37.2 165 MITSUBISHI PUY-A24NHA COOLING ONLY WALL MTD WIRED REMOTE ACCU-2 VOLTAGE SOURCE CONTROLLER REMARKS: GENERAL: UNITS SUPPLIED ON THE PROJECT SHALL BE THE MOST RECENT SERIES CURRENTLY MANUFACTURED. F I NTU BE RADIATION SCHEDULE key REFER TO ELECTRICAL DRAWINGS FOR POWER REQUIREMENTS. plan 2. REFRIGERANT CHARGE VARIES DEPENDENT UPON SIZE&LENGTH OF RUN OF PIPING. / T \ sheet title 3. PROVIDE CONDENSATE PUMP. BTUH/LF GPM/ ELEMENT ENCLOSURE DESIG. MFR. MODEL NO. LF LF PIPE SIZE FIN SIZE FINS/ HEIGHT DEPTH DAMPER REMARKS 4. PROVIDE WIND BAFFLE TO ALLOW LOW AMBIENT PERFORMANCE AT-20F. ROWS ELEMENT ELEMENT MATERIAL MATERIAL FT (IN.) (IN.) REQUIRED MECHANICAL 5.PROVIDE WALL MOUNTING BRACKETS 6.UNIT WILL OPERATE AT 8150 FT ELEVATION. FTR-1 STERLING JVA-S14 1 630 .063 3/4"C.U. 3-1/4"SQ 50 18 4-3/8 NO RADIATOR SCHEDULES 7/28/2014 9:14 P:\WMC\2014-130 Cath Lab Remodel\Cad\Mech\Mschedules\[M-2014-130.xlsx]S743-2 Air Cool 1.HEATING CAPACITY BASED ON 170°F AWT,65°F EAT. 2.APPROXIMATELY 10'INSTALLED LENGTH.COORIDINATE WITH FIELD CONDITIONS TO EXTEND WALL TO WALL. 3.HEATING WATER SYSTEM CONTAINS 40%PROPYLENE GLYCOL MIXTURE.SELECT AT ELEVATION OF 8150 FT. 9/29/2014 9:57 P:\VVMC\2014-130 Cath Lab Remodel\Cad\Mech\Mschedules\[M-2014-130.xlsx]S830-12 Fintube sheet number M 701 J This document is the property of Heery International,Inc.and Heery International Inc.retains all drawn by J1x checked by WAT Caton, RumO & Assoc. FILENAME:P:\VVMC\2014 130 CATH LAB REMODEL\CAD\MECH\P MLSD.DWG _ M701 PLOT: 09/29/2014 rights therein,including copyrights. It may only be used in a manner consistent with Heery 10:OOam REV: 09/29/2014 CAD: JDickerson XREF: tb.dwg S743 1 DUCTLESSSPLIT.dwg S743 2 ACCU.dwg S782-1 AHU.dwg S810 1 ST HUMID.dwg S850 1 FAN.dwg S932-1 AIR DVC.dwg S440 1 PLMBG FIXT.dwg S891 1 DUCT PSR.dwg S933 2 TERM BOX HW.dwg S830 19A UH H2O.dwg S830 12 FTR.dwg International Inc.'s rights while Heery International,Inc.is providing services for the specific project Copyright©2013 by Heery International,Inc.all rights reserved. identified or referred to herein or extensions thereto. It may not be used for any other purpose WHEN PLOTTED AT FULL SIZE THIS SHEET MEASURES 30"x42" except with the express written agreement of,and compensation to,Heery International Inc. ,/--I \ / ,' % CD 0 4 0 0 CD ED___ GENERAL NOTES: 1,I ,1_ 1. ALL DIMENSIONS ARE GIVEN TO FINISHED FACE OF SURFACES, CENTERLINES OF DOUBLE DOORS, INTERIOR WINDOWS AND — FIXTURES,OR HINGE SIDE OF SINGLE DOORS,U.N.O. 2. WHEN TWO DIFFERENT PARTITION TYPES APPEAR ADJACENT TO d ARCIEACH OTHER,THEIR FINISHED WALL SURFACES MUST ALIGN 0) UNLESSOTHERWISE NOTED. N HEERY N design 1 I I I I I 3. PARTITION TYPE DESIGNATION SHALL BE CONTINUOUS UNTIL nj NOTEDOTHERWISE;CHANGES OCCUR AT WALL INTERSECTIONS PFIASI !JG O' LAN . _ AND/ORSTRUCTURAL ELEMENTS. x— CD CV 4. DENOTES PARTITION TYPE.REFER TO SHEETS AA-320&AA-321 CV _ 5. WHERE A RATED PARTITION IS INDICATED AND WHERE A RATING N- I HAS BEEN GIVEN TO A FLOOR/DECK ALL PENETRATIONS MUST BE - PROPERLY FIRE/SMOKE SEALED WITH A U.L.RATED FIRE HeeryInternational STOPPING ASSEMBLY PER THE ASSIGNED RATING REQUIREMENTS. = o 0 a 555 17th Street, Suite 500 `r� 6. AT ALL COLUMNS SHOWN FURRED OUT, USE PARTITION TYPE C-- Denver, CO 80202 © ay - I / UNLESS OTHERWISE NOTED. 720.946.0276 � -256A 7/ 7. FOR CURAD RVSNG NI CONFERENCE 2 BED ROOM STATES GYPSUMVED/ RMC( RECOMMENDATIONS 1\AR DI PERFRAMIGYPSUM PER BOARD UTED STAIR C 255I O 256 _ THICKNESS. project number 8. REFER TO CODE COMPLIANCE PLANS GV-100 THROUGH GV-102 13026.01 FORGENERAL SMOKE AND/OR FIRE RATING INFORMATION AND - _ 9. SPECIALSTRUCTURAL FIRE PROOFING AREAS. .L=/' ) 1• — — REFER TO"FIRE RESISTANCE DESIGN MANUAL,"LATEST O �- EDITIONPUBLISHED BY THE GYPSUM ASSOCIATION FOR ADDITIONAL d . 04 = INFORMATION.THE DESIGN MANUAL'S GENERAL EXPLANATORY VA I L VALLEY NOTES PERMIT MODIFICATIONS AND SUBSTITUTIONS WITHOUT I / DEGRADING THE FIRE RESISTANT GAUGES, RESULTING FROM MEDICAL CENTER INCREASING STUD DEPTHS,STUD GAUGGES,WALLBOARD THICKNESS, O 2 BED ROOM NUMBER OF LAYERS,AND CHASE WALL DIMENSIONS. 221 PI-IASE 8 _ _ I , _ 10. AT ALL STRUCTURAL STUD FRAMED EXTERIOR WALL CONDITIONS, P INTERIOR FINISH GYP BD(5/8"TYPE"X")SHALL EXTEND CONTINUOUS FROM FLOOR TO STRUCTURE ABOVE AT ALL LEVELS. CATH LAB MED/ - SUPPLY 11. MEET OR EXCEED THE PARTITION TYPE REQUIREMENTS INDICATED. 257B — 12. USE DIRECT ATTACHED SYSTEMS FOR UL TESTED FIRE RATED WALLBOARD SYSTEMS. /`,, ' I I ED 2 BED ROOM13. REFER TO THE LIFE SAFETY PLANS AND FLOOR TAG PLANS(AT 181 WEST MEADOW DRIVE 222 SERIES SHEETS) FOR PARTITION TYPE LOCATIONS.ALL NEW WALLS VAIL, CO TO BE TYPE A A UNLESS OTHERWISE NOTED. CHARTING IV SUPPLY I 257A 257C r.' IIA - , 14. WATER RESISTANT GYPSUM BOARD SHALL BE USED IN LIEU OF ��q V - STANDARD GYPSUM BOARD AT WALLS WITH TILE OR STONE VENEER owner's project number © - .�■,=�, FINISH.AT WET WALLS USE CEMENTITIOUS BACKER IN LIEU OF p j \ STANDARD GYPSUM BOARD. 1 15. SEE SPECIFIC DETAIL DRAWINGS AND SPECIFICATIONS FOR OFFSET ATTHE consultants/construction managers PI-IASE 2 . ... .... TOP OF THE PARTITION,PLAN CONFIGURATIONS AND PROJECT CONDITIONS. g In 16. PROVIDE BLOCKING AND SUPPORT FOR ALL WALL MOUNTED EQUIPMENT AND STRUCTURAL: u u ACCESSORIES. STRUCTURAL CONSULTANTS INC. Ei Ei I CTS 3400 EAST BAYAUD AVE., SUITE 300 257 \ 17. AT ALL PARTITION TYPES WHERE THE GYPSUM BOARD DOES NOT DENVER, COLORADO 80209 EXTENDTO STRUCTURE ABOVE PROVIDE 20 GA STUD DIAGONAL BRACING 303.399.5154 • ON ALTERNATE SIDES OF PARTITION TO STRUCTURE AT 72"O.C.MAXIMUM. ' 18. AT ALL DOOR FRAMES AND CASED OPENINGS 48"WIDE OR LESS PROVIDE MEP: I `,/ Nn • (2)20 GA STUDS FULL HEIGHT TO STRUCTURE EACH SIDE.AT ALL DOOR CATOR RUMA & ASSOCIATES, CO. • FRAMES AND CASED OPENINGS LARGER THAN 48"WIDE AND ALL LEAD 896 TABOR STREET LINED DOORS PROVIDE(2) IN GA STUDS EACHSIDE WITH 16 GA FRAMED Box HEADER. LAKEWOOD, CO 80401-4700 T 19. PATCH EXISTING FIRE PROOFING AS REQUIRED TO CONFORM TO FIRE 303.232.6200 o�� —I _ ` I RATING REQUIREMENTS.VERIFY EXTENT OF PATCHING. INTERIORS: 0 .• GALLUN-SNOW J SUPPLY/PYXIS m A 1920 MARKET STREET, I 5-1 1/4" 5-41/4" 5-01/2 N- — SUITE 201 zfl DENVER, CO 80202 2 BED ROOM 0 \ MECH I 303,433,9600 215 li_ \ 263 , CASE MANAGER • \ OFFICE(4) seal signature I � . e_ �d' PHAE 4 PHASE 64 ALIGN FACE OF , , __- , , 7 ° viiif r Eo NEW CORRIDOR WALL - /764 r� '� AS OCCURS,UNO WITH EXISTING JACENT 4 . . SYS ,^� S E 1 Ep ARAN N O -- �, �, �, \, \• all issued for date , \ ( 'kik MEDS/, CLEAN SUPPLY 45_g 1/�' CONSTRUCTION DOCUMENTS JULY 08, HOTELING 254 to '50 m. 2014 OFFICE I O ' 2 BED ROOM 2 BED ROOM 2 BED ROOM 253 I I 1 QUIPJORE 211 212 213 - u ;66 \\...\\ item date P HAS E �� , 1'-s��0 VI -� LOBBYI 1 PLAN REVIEW 07.08.2014 ' '_ " 1,j 1/_7 1 10-11TELCOM 280 1 1 3/3 g-8 3/4 1/4 267 OFFICE 6 B CTS \ 252 251 ii vv i ' CTIM 0 0 Se IT - - 1PED/CATH/EXAM 268 4'-3 7/3' O —1?)]_ —' „ -... .„ „ „ / / ' Mil. ® — — , t — himiiii 220 • - Nri _. - ■ e — - \ \ 1-01/2 ' " 3�" 5-91 ^" 1.'-7" 10'-2: 5-5 7/3' T-101/4" 7-6 7/8" 5-0 7/3 5-01/2 4-101/2' 5-7 3✓4 E ► m- n ain cord ,or _ �� / i'7\- 2-2'--) �2'-2' � 1'-1" `1'-51/2du I RIDOR 1'-81/4" 11/2' - = 4'-01/4" 4'-31/4" , 1'-01/4" • 1 .. LIK!i.; • • \ [ Y.71 D , - ' / � s_ - -I - �t� - - AL / 1 - - - I I -_ mid N. \ \ �• LNik- _ — - - .I - C 1i \ V ,SHOWER _ _ J 1 Ilk Ng0 00 � _ 0 , 0 00 \ , _\ ce, IL \ /\ \ [km 5 \El BATH_ ANTE 1 1 PED/OBS ' PED/OBS i C c-Y ' 2-6 ' 202 201 2_62_9 3, I PM , ' 2 BED ROOM 2 BED ROOM 2 BED ROOM 2 BED ROOM 2 BED ROOM - — - ll 208 207 205 204 203 th 0 ISOLATION 206 [ a) • _ _ , , _ N O Ii __ . , , . 1111111 0 4' 8' 16' � Wagr ® o -I' ti =��� b d �� - �� SCALE: 1/8"=1'-0 N v (1)1 ri _ --' . AsE 5 PCU .. . . . . . . . . L . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. • • • • • • • • • • • • • • • . • • • . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. , • • • • • • • • • • • • • • • • • • • .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. . . . . . . . . . . . . . . . . . . . • . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . • • • • • • • • • • • • • • • • • • • • . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . o■ . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . ... .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. • • _ • ■11 .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. . . . . . . . . . . . . . . . . . . . A key plan J i 0I o sheet title PHASE 7 , ARCHITECTURAL A. v FLOOR PLAN LEVEL TWO (z---1--- SECOND FLOOR FLOOR PLAN 1/8"=1'-0" sheet number Al 02 This document is the property of Heery International,Inc.and Heery International Inc.retains all drawn by Author checked by Checker rights therein,including copyrights. It may only be used in a manner consistent with Heery International Inc.'s rights while Heery International,Inc.is providing services for the specific project Copyright©2013 by Heery International,Inc.all rights reserved. identified or referred to herein or extensions thereto. It may not be used for any other purpose WHEN PLOTTED AT FULL SIZE THIS SHEET MEASURES 30"x42" except with the express written agreement of,and compensation to,Heery International Inc. ® 0 © 4 6 O 8C9 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I HEERY design L-1 E Heery International 555 17th Street, Suite 500 Denver, CO 80202 I I I I I I 720.946.0276 I I I I I I I I I project number O 13026.01 20/20 S.A. DOWN IF VAIL VALLEY MEDICAL CENTER I I I I I I I I I I I I I I I I I .1 CATH LAB DUCT TO FOLLOW SLOPE OF ROOF FINAL FIL1IE BO 181 WEST MEADOW DRIVE VAIL, CO © - - - - - - - - EF-O I owner's project number vn 12"0 ti EXISTING AIR EXISTING AIR consultants/construction managers HANDLING UNIT HANDLING UNIT SF-7 SF-4 STRUCTURAL: STRUCTURAL CONSULTANTS INC. 3400 EAST BAYAUD AVE., SUITE 300 DENVER, COLORADO 80209 303.399.5154 MEP: GATOR RUMA & ASSOCIATES, CO. 896 TABOR STREET LAKEWOOD, CO 80401-4700 O303.232.6200 INTERIORS: I I I I I I I I I GALLUN-SNOW 1920 MARKET STREET, SUITE 201 DENVER, CO 80202 303.433.9600 seal/signature I I I I I I I I I I I I I I O I I I I I I I I I I issued for date E-AHU-SF--05 I I CONSTRUCTION DOCUMENTS JULY 28, 2 I I I I I I \ 2014 EXISTING AIR item HANDLING UNIT date SF-5 I I I I I I I I I 1 PLAN REVIEW 07.08.2014 2 CONSTRUCTION SET 07.28.2014 I I I I I I I I I 3 CCD-2 09.18.2014 4111 I I I I I I I I I I I I I I I I I I I I I I I I I nn rn I I I I I I I I I I I I I I I I I I I I I I I I C A3�CC I I I I I I I I I I I I I I O + - - - - I I I I I I I B 1 — — — — — — — ) MRI CHILLER 0 4' 8' 16' r A SCALE: 1/8"=1'-0" I I I I I I I KACCL � /A C2CII� L___ (E)1 CU—R1 R— INSULATED RS AND RL PIPING I DOWN TO ASSOCIATED AC-1, I AC-2 & AHU-1. SIZE PER I MANUFACTURERS GUIDELINES. I I • • o ■ A ■ ' / key plan sheet title ROOF HVAC PLAN ROOF SCALE: 1/8"=1'-0" H VAC PLAN sheet number M 504 J This document is the property of Heery International,Inc.and Heery International Inc.retains all drawn by JDD checked by WAT Cator, Rumo & Assoc. FILENAME:P:\VVMC\2014-130 CATH LAB REMODEL\CAD\MECH\P—HVR.DWG _ M504 PLOT: 09/18/2014 © 6:52am REV: 09/17/2014 CAD: JDickerson XREF: tb.dwg bgr.dwg xbgr—A1—rpl.dwg bg2.dwg hvr.dwg KeyPlan.dwg rights therein,including copyrights. It may only be used in a manner consistent with Heery International Inc.'s rights while Heery International,Inc.is providing services for the specific project Copyright©2013 by Heery International,Inc.all rights reserved. identified or referred to herein or extensions thereto. It may not be used for any other purpose WHEN PLOTTED AT FULL SIZE THIS SHEET MEASURES 30"x42" except with the express written agreement of,and compensation to,Heery International Inc. .3/6197 '3/619 3/f 13A6197: 4 11110 6 O C-187 80I 9 NEW KEY NOTES: ■ / AJ 1010 ■ , \ 1240. r - 0 RELOCATE EXISTING THERMOSTAT. I I I I I I (0110, 2 1( ' EXISTING 20/20 EXHAUST DUCT UP TO EF-2. REBALANCE FAN AND SYSTEM. EXISTING DRAWINGS DO NOT INDICATE THIS DUCT SERVING ANY GRILLES NOT I I I I I I I SHOWN ON THIS FLOOR. HEERY design • c-H �:- © 14" ROUND ISOLATION DUCTWORK UP TO ROOF. O8"0 ! -" O BOTTOM OF GRILLES SHALL BE 8" A.F.F. 200 13/6197. d 10/10 f as•k10�` © RELOCATE EXISTING FCU/FTR AND RELATED HYDRONIC WATER, CONTROL, ETC. I 41 8 0 ' iu 20C TO ALIGN WITH NEW ARCHITECTURAL LAYOUT. I 200 6 PROVIDE AIR BLENDER BETWEEN OA/RA POINT AND CHILLED WATER COIL •I FCU-1 FCU-2 FCU-1 IN r _ ��„ ENTRY POINT. SEE AHU DETAIL ON M802. 111 rril l-I o �► Heery International © WI - 8 I�■, O ANESTHETIZING LOCATION SMOKE EXHAUST. "B" TYPE GRILLE, 800 CFM. SEE 555 17th Street Suite 500 trj q IIG� CO SEQUENCE OF OPERATIONS. Denver CO mi liplil LI 0 1 CONFERENCE 2 BED ROOM 10 22 8 OUTSIDE AIR DUCTWORK SHALL BE INSULATED STAINLESS STEEL OR STAIR C 2,r 0 �■ , ,f'� 256 FCU-2 W 201 720.946.0276 I 10"0 ALUMINUM WITH LOW POINT MOISTURE DRAIN. PIPE DRAINAGE TO FLOOR SINK 220 - 6"0 -I- IN ROOM. I - � IP' I 80 13/6197: ■����♦ -� 8X8oo ° 10,3 00 9 TEMPORARILY LIFT EXISTING DIFFUSER/GRILLE WITH WIRE HANGERS TO ALLOW 80 QQ MA �.7. CEILING GRID MODIFICATION. MOVE GRILLE TO COORDINATE WITH NEW CEILING project number O Ii. ■ 12» U1 I� 12„0 ■ ` - 1 I I GRID WHEN REINSTALLING. 3026.0■ 50350 10 INSTALL VAV FOR FUTURE VARIABLE VOLUME CONTROL OF SYSTEM. LOCK 11 I iv" I 8X81 °� ��� Ift VAV DAMPER OPEN. BAS TO CONTROL HEATING COIL FOR DESIRED LEAVING \ �� '� AIR TEMPERATURE. TYPICAL FOR ALL NEW VAV BOXES. 3 1 BED ROOM 80 ����__ ' , . 0 8 , ■ �y� �` IlI1♦,����7 INSTALL TWO 12X12 DAMPERS WITH MINIMUM 40% FREE AREA. ONE DAMPER I 10 2 �,a , .;� BED ROOM — 8 �� m VA I L VALLEY 0 230 ■�J O 50 '� _ ■�' ; �� . ♦ �1 FCU-2 ���.:�:,_ _I SHALL BE 12" A.F.F. AND ONE DAMPER SHALL BE 12" FROM CEILING PER 1 _ I 13/6197: �, 0m,, -IN. NFPA 99. MEDICAL CENTER 0 0 410 l ' FTR-1 el 1 mm- i�111 ®,jiugErmQI 8 0 * r \�/ 6„0 210 AL1► _ II S� IY SIO • ....I�.�� _ ii 2: 10/8 o r 6,, �� 221 CATH LAB �� liptr 0/12 UP�r1S/B tl► ■■I, I i 80 _�_ �114V1 I r , I 1 I 10 2 ROOM - :� 230 2 ._— jO► ' �I.' BED ROOM 10 ,2 . ' 8 _ — 6„0 22 FCU-2 0 �� 211 O .. FTR-1 0 150 8X8 t 100 E� I Yl 8It■■� I "LY8x8 I 181 WEST MEADOW DRIVE 1111 /� _11 i/At r If - 2W 180 801 1_ ,8 `� O '1 E— - �il� IPU!DHC-3 D0 -. - IW N _ _ ■. VAI L, CO pm.. �� 11I I■ '1 ■�� II F R 1 mini ' m1 0 - IL FI I _ o 8/8 •� 1 IrI' 8X8 . 12 16 O8X8 -,-Q owners project number 1 10 i _ I so soI © ill7 �,i ■ I♦ TEMP U _ "„ 1 0 230 TI IC 8 �, , ■_ V DHC-31J[1 8"0 22 ■ ! - 201 FTR-1 ` � 150rin � 14"0 I 14 10 190 300 �1 890 _ consultants/construction managersI —, 110590 •� F R 1C213 ��,�'mm� `. H � :3/6201■ 11 IL.. CTS ■ � �� ■ STRUCTURAL: �0► 25 �/ irm -- I STRUCTURAL CONSULTANTS INC. ■ .. r -2 0 4 I'. 10 10 _ ■ a, . 0 a ®�i — _ F R-1 3400 EAST BAYAUD AVE., SUITE 300 0 150 ■I �,■,■�,• ,�� 5 , 29 _get „ � ✓�\ 890 SL 3`,\ _ DENVER, COLORADO 80209 I zoo - -1--mgrp —M►,1_ '14"01■►�_i 1 303.399.5154 O10 ` IC' . r. `II 20/14 �' 20/14 hi R.� w� r i 1 3/x21! 230 ��� 10/10 1. SFC-1 R i , MEP: I , FTR-1 �■ 1 *� C214 © DHC-29 0 8"0 ��l1 SUPPLY �� ■ I #11 ■�■,�■ �■■■ttt■ -_III■IIt>•I X30 DHC-27 I 190 FAN ';■ 1 CATOR RUMA & ASSOCIATES, CO. so 12 AM ■ 12 14 8 8 FTAI- A 896 TABOR STREET I I• HC-2611 ' $ 1 / �1:1/t:A: LAKEWOOD CO 80401-4700 111/11Lit Lel ;1 _ I I ,O - me �t I IIS I ,� 0 a .. _■■ ■ ■ Iltt� L '� _ __ 303.232.6200 1 ii1j 11J/ I s. I / '.UPPPLY/ P XIS - III IN I 8X8 INN ^� — INTERIORS: .. ' -8X8 '58 135 lis H `�62c4= = GALLUN-SNOW All so v _� P. 1! 10 © I �1 -Ia 1920 MARKET STREET, 1 FCU-2 �!J■_���1L�JLJ I 2 BED �IOM ��' _ Mt �`�7©©' 1 �� .. OMECH I �� SUITE 201 215 a ' ■- C, �1! ��® O i' 0150 2782/12-\ t 26 ��SE MANAGER i DENVER, CO 80202 60 O. 6 ■ „� STORAG= /iv . © / OFFICE 303.433.9600 75 .-I c` i IIEE,50 , © RREF = 12"0 - 80 T 12"0 r l o n�r i11 111.1 � . C 1350 Ta' I I 350 .! t 1r M�: o■ 0d ■ omia writ seal/signature ® NKr 9 Am [ 1 i - NM . __ ,11, -s 1 /ili, _di, mow PHASE 4 WWI.- '`. --• 20/10 �� 2000 �U I (E) 12"0 ;� 1 FCU-2 , , ,� . VAV 2'1 3 I o i'L 1 14 12 1� ABANDONED "L 2 BED ROOM ■J1 L_-�_ 12 0 11 > 9■r 9 UP TO Ru -03-0 7 FCU 02 214 ; X I © �� 1111Pu.� GE 24 �� goo \� - , - 1,4Lei 8A 1A 20 1. DHC-25 A -laiiKr ` ] 8 O A — 206 �I_�0/10 _I1�®) 14 12 .r y r r—� r r r —. r p r r r r r r j Lt,A I■ �. ■■ I - I1UU .' .� '3/6201 II O ■■� I■�il �� �J I ■� El 11I $OLEIL illi �`1. •�II' I III .I _ir , ROOM �� I b,! —1I■ I� u lilkl� rl, ■1 � FCU-3 FCU-3 FCU-3 FCU-3 _ Q �. • PHASE .. 7■ /Ire 7rnrr®t, ® I 4/12 . �� r � ® Iii S As E �I 8 1 ■I r 8"° ������� _V 20 66 GAB issued for date LiMl I 1 , 6 O IHC 14- O 8 8nil P, I OURISH ei , ' 1111 !I 7 I r O ,;�', p ,00 TEL HOTELD2 ■ ■: � / �I �II���� IL��II1[.�1•IF;JI�� _ 1CONSTRUCTION a7 ,n ®� plim O OFFIC: ii�■■ �I■�� rn.i _ —�� I A VSFO T JULY 28ff M 80 CFM ROOM 2 BED R0/�„r1 CFM 80 # ICED ROOM I 253 r I1 60 20 �I EQ 1' I I ' 75 CFM , ■� / L. oR G: DOCUMENTS►��' ■ 212 1ti ��r r 40 CFM I■ 2014 �■' E ® ATIENT ROOM " -I -1 11,AII ■ l[---' _ I II r,�■ ® me R 1 r 100MI I IIL ��17ri, 0 p 6 r 0 'o' M (N) 8 1 231 CFM ,— �■- r�� �� M7f'i � 1 :i/t: � _ 2/12 230 CFMI 8 ., O 8 Mill - SII 20 CF4� item�� ■ I, IIII■._ r �� 1,0 _; ® �� /� date OI` IIII ' ;, p 80ro SII TELC01 ®� FF II 74'X12"ill 250 CFM 00 1 ��� ■�■ �� o IC i o - IN uP 1 PLAN REVIEW 07.08.2014 I ill , 1 1 •��1'3 '41-4111t �f ���s��[s�� � - 252 =—I II ,,►� �I Z— AAIL7 u I� s "' 2CONSTRUCTION SET 07.28.2014 1 r 0OJ120 CFM 325 CFM UC �It1�� - ■11 100 3 CCD-2 09.18.2014 O _ Il 11 t _ .. 9 150 CFM i Ill , I� Mi� co - 1111 '1 ��� 'f - 11711FIL ' - L. moil. CFM r� J1 Lu 0 "' 1 1 4 CCD-4 09.29.2014 _ 1 © 0 _ .ril i ,�.,. r i i r - i4 - __�►�-tet _ice _� � ■ .11 i. ii m ..via d g 0 14 18 4 Williffinijimik � ■f�:rtlr��►■� • »„ tog ®B ,Ii 1175 DHC-16 a I c 0 -w I `� 9 9 ■� �M 1= :fft:ME■E1 V -M�10 �.® 12 10C 3 ,m�L®1r • D O —� _®1i�■� 7 ” m% 2S0CFM 200 FM �it1 UK 1� . 'DHC 1390 3C, IHC-12 I _ ‘ :rt: 4 1 _ _- ` i Ni__ lillilibill- _ - • S ival _ - ■ _� �. _' �_fL1 ice_ :"` �.— mmomi _s �".o- �` _ _ ��1_ -■�C� *mw :Fr om IN :rAw 7� '20 FM ,'i 80 ��0 � ■ . ,8 TO 11,._`r„®.I11 �� � ,e D P7�L� 0 f0 0,7Nr_,,, �� ', L�111 �j5 \�..�' : x: I SHOWER ' _ � - -Mil ■ II I l� �1 QUIP. I r �; 205��f 50\ `: :L:M-.;. �.,.,-. :„X� � , AI 20/14 m .� sL. rii Il' 4. til 200A iii iq r m. I io omID ! 1_I .: LEC.o 0 ■�■ Ai o Alt o icam y �r� riJEDIbIlL 10 C295 �° (E)CD, 120 10 ILA is j 70 ■II D kid; l' LP I■ .A ■ CFM mar235 I I �� 0■, ■'a = e o p B, • • ■ 1 1: . PED/ OB' _ �I 230 ' �IMIIRMI� •1MI' I' . 'iJIL� "� fel - ■.VA.1------ TM hiPrr, .. ,' 0, 4 11. ill ► 1 OT � � lid � 2 s �.E■ I ( trig � � �O i N-r���rl i O mg ( O 100 9 ����!�ivora ■ , . `-■_lA ■ TI1 2 BED ROOM A D ROOM 1 2 BED ROOM 2 BED ROOM 2 BED ROOM - 7O ' �, ii !f►"il1f1 ,� I� 80 CFI u 141'k 208 •"0 , f�LlI� 8 ,,, 2064„ 8. M O O 80%F43 kill 7 OO - lf� I■ 1 . 0 _O 1 � � I—` �■� �_is;?�Illtlll■ ��■I17/:�■� 1 � � 1111■I■r'�I:� ■1 ® � � �2�© 100 �/ 1 — I� , . o . al a �■ (I / ■ air_a, 1,.x,.1 r0 1 1.-- k , 80 CF 80 CFS`M . I - 206CU 4 �� WI140 XX O , .lugili ��■ 20 14 ^ _ IF 1- 1 440 1C4FM CC;,-6 15"X15" I _ 1 �0 'IOIl; ��� 1 �� `� � >_� 11 FCU-4 FCU-4 FTR-1 0 CFIv FCU-4 FCU-4 FCU-4I FCU 4 FCU-4 II�] 01175 � ' I ` me, 1,0 I I'] 8 �I� 208 N INr r r r r r r I '-F—,—,—, r r r u u .-1-1-1 ■W r 1-1- 1- I. -'� 4 I�fr ■ I� '►it-8 I 1 , ,1■�®�11■[1� ■..�1��� 'J 4j `1 B 125 o a 8. 16' © © 24/10 I X11!!®�11 t� 1 8,NESSEll-) 0 0 rill� 11� PCU u�i;. SCALE: 1/8 =1'- cN il ,,,,,. tiil�rlr1llfr�r I�■_ - AL © ' O 150 �/18 L • hf (24) 1°5 gatia ■II . /Itrk I I IL. ----1, T2 ■ ' ,� E■MEIM I % Illhl Ii �f6 :3/62011 ® 10 I I I I , STORA;;� 28/14 .:.-7°78,71,:.'"_,;79_77.;........1,',/ .1 �i © I 325 CFM A. I I O 10 *. 274 H _ 200 ' OLD, * = r — II I Maim ,FI1 I O I I ■ o • h.. - `�`� ®� I • ■■ -� ■tt- ■ems = -ice MA \ ❑ r iYg }la i�� cwt / ■ ■�Im...■�=i , ,i i m. F 'L�'=MIEMI r=r=im i� ,_,rA,_,la -a I I I8 I 18X16 SMOKE PR © 10 0100 EXHAUST LOUV�R. 13A62011 - a!�''..� 18X16 OA LOUVER V. 200 I wil key plan I I .0 A $ I sheet title SECOND FLOOiR HVAC PLANI SECOND FLOOR SCALE: 1/8” -O" t3/16210” HVAC PLAN I sheet number M3O2 J This document is the property of Heery International,Inc.and Heery International Inc.retains all drawn by JDD I checked by WAT P: VV - - - M I TI - - M - rights therein,including copyrights. It may only be used in a manner consistent with Heery Caton, Rumo & Assoc. FILENAME MC�2014 130 CATH LAB REMODEL�CAD�MECH\P HV2.DWG _ M302 PLOT: 09/29/2014 1:55pm REV: 09/29/2014 CAD: JDickerson XREF: bg2.dwg xbg2-SECONDFLOORFLOORPLAN.dwg xbg2 SECONDFLOORDE OL ONPLAN.dwg xbg2-EXISTINGROOMNAMESFORSHEETAF 100.dwg xbg2 EXISTINGROOMNA ESFORSHEETAD100.dwg hv2.dwg tb.dwg KeyPlon.dwg xclg2 SECONDFLOORREFLECTEDCEILINGPLAN.dwg Copyright©2013b Hee International Inc.allrightsreserved. International Inc.'s rights while Heery International,Inc.is providing services for the specific projectY Heery identified or referred to herein or extensions thereto. It may not be used for any other purpose WHEN PLOTTED AT FULL SIZE THIS SHEET MEASURES 30"x42" except with the express written agreement of,and compensation to,Heery International Inc. 4 11110 6 O g 23/,61978 BBR-1 33/619 431E B3/161978 - \___/\___/ $ NEW KEY NOTES: xx 1 I \1 1/4" Q PROVIDE CONDENSATE PUMP AND 3/4" CONDENSATE DRAIN ROUTED AS I `. I INDICATED TO SINK TAILPIECE. TERMINATE WITH AIR GAP FITTING. 1 \ D 1 Q PROVIDE WALL MOUNTED PRESSURE MONITOR. INTEGRATE WITH BAS SYSTEM. Q ROUTE AHU-1 COIL CONDENSATE AND H-1 STEAM CONDENSATE TO NEW HEERY BBR-1L FLOORSINK IN THIS ROOM, UTILIZING A DRAIN COOLER FOR STEAM design 4' ICONDENSATE TO BRING DISCHARGE TEMPERATURE BELOW 140F, AND UTILIZING AIR GAP FITTINGS FOR BOTH DEVICES. REFER TO P202. • Q RELOCATE EXISTING FCU/FTR AND RELATED HYDRONIC WATER, CONTROL, ETC. - TO ALIGN WITH NEW ARCHITECTURAL LAYOUT. _ _ BBR-1 / 1 Q INSULATED RS AND RL PIPING UP TO ASSOCIATED ACCO ON SHEET M504. I I 6I I 4.5' f SIZE PER MANUFACTURERS GUIDELINES. FCU-1 FCU-2 FCU-1 u i - . ' ,,r a 11 6 ROUTE HUMIDFIER DUCT DRAIN TO HSK 22. Heery International - IIIII • 256A li �� �I Q ROUTE HUMIDFIER DRAINAGE AND DUCT DRAINAGE TO WASTE STANDPIPE IN 555 17th Street, Suite 500 4" " RAIN 2-1/2" I r1 CONFERENCE 1"MPS UP 2 BED ROOM - - BBR-1 ct i 1 I NEARBY MECHANICAL ROOM CONTAINING HUMIDIFIER STEAM GENERATOR. Denver, CO 80202 DOWN'IVC ASE _ I 3 4" 255 0 256 = I 720.946.0276 I _ N / 4 p' y 8 CONNECT HEATING COIL TO EXISTING HEATING WATER SUPPLY AND RETURN I PIPING. I - M� II II I I + FCU-2 1 l i g ROOM TSTAT TO JOINTLY CONTROL VAV HEATING COIL AND FIN TUBE 1 27 I 1 ,A project number RADIATION (TYPICAL). 3 p J 0 •- -.,� N T _ 13026.01 A �� ^^� '1 1 1/2" 1 + i 10 ROUTE HUMIDIFIER DRAINAGE AND DUCT DRAINAGE TO MECHANICAL ROOM. L - - LPC MPS BBR-1 Fli” FTR-1 amp — I 4.5'2196ED ROOM � 216 I VA I L VALLEY SPRINKLER SYSTEM , 1 2 BED ROOM 1 -_ -_ „ ' 1. CONTROL VALVE �- 1 221 FCU-2 �(7) FTR-2 -,,,,, ' 3 I - ,� , i ---, MEDICAL CENTER ® © � � 3/4" - 20_1 ::::,. - BBR-1 1 ■ 0 - I - 1 L— SUPPLY 4.5 1 II 3/4" -F■ , I257A 11 1 CATH LAB FTR-1 I- - --- 3/4" I ?)NIIII11 I / I2BEDROO � .. 1 .—, � :�� 3/4" CN UP21g MPs 2 BED RO • FCU-2 BBR 1 UP THRU FLOOR / , 3 4" YiI I i Iv SUPPLY 5'1 1 / 181 WEST MEADOW DRIVE II A - 2578 I 1 VAIL, CO .-mi 1 L r DHC-32 1111 z / II .^�-. l -HWR I I1 li `■ 1p HWS � — I i� I i' L . I 3/4 L — �1 3/4" HWII BBR-1 ,/,' owner's project number 1" IFTR_i II 6' �i FTR-1 •'� TEMP/ ICU ' TEMP/ ICUom____ �� - 3/4" DHC-31 I 1 223 Ij e' / [ consultants/construction managers - r -- - - - • FrR 1 �I g I i ®I I HWS 83/62001 --4- 3/4" + I _ �K 1.I1 1 1" II CTS 7 STRUCTURAL: I - - T --\.-4,-01, �= Ali I ��„ STRUCTURAL CONSULTANTS INC. 3/4" 1�1 F R-1I 3400 EAST BAYAUD AVE. SUITE 300 �_ Mr Ie �� L - -- �, DHS-29u1m - DENVER, COLORADO 80209 303.399.5154 FTR-1 TEMP/ ICU -1 \ 1 I I 1 h TEMP/ ICU 73/,620 I 216 \ DHC-29E - O `�\EGATIVE PRESSURE . MEP: C214 c © .\ 3/4„ I ��1 _ 3 C- — — — — J �` 224 II 1 DHC 26 ® — — ■� LPs F _ CATOR RUMA & ASSOCIATES CO. 1 VAV I y 896 TABOR STREET ■ RC2o5> PS 7717M-7 _ LPS lb CO 80401-4700 a �� 1-1/2"J/ \ LAKEWOOD, O � ■ I O 72+ L o - �„ - C - 303.232.6200 — /1' `, UPPLY/ PYXIS IN 1 / 1 �� INTERIORS: I NM\ k\\ ' /58 3 4' IN � ' ■ 63/i6200 J N GALLUN-SNOW 1I / 1-1/2 , , /'© i, _ 1-ri• • 1d- 1920 MARKET STREET, FCU-2 2 BED ROOM 0rill 1 . / 1-1/4" N Mg 1 • C� I a r SUITE 201 215 _ 1 SK ( /� J 275 DENVER, CO 80202 '+� �, ISTORAGE ASE MANAGER OFFIICE - �-�e © 303.433.9600 ;-_,\ \ 2" O \\ 262 L Mir 276 I / ----__L___ `` - _ TUB I seal/signature - - - -1:Z) I. 0 ME g oil 1-1/4" I 260 I -L- \'�- VAV Y L j LPC - - - FCU-2 MPS IL 2 BED ROOM L 213 I C212 I- HWS-HWR J - � 214 -I 1 —HwR- - - _1 2s �1� oil DHC-24 0 O I DHC-251111 I111I11IL �� ��0 11 1 �- I■D �`_a IEi _ •� 53/6201 •� ill PATIENT "' / I ■.r ir -3 FCU-3 `x FCU-3 FCU 3 FCU-3 I I 20" \ I imp ILC_14MEDS Ili 4" i RISERS I �CEAId UPPLY j LINE I-1 . iL ED UTILIT issued for date 1 NOURISH. I ' 1 _ I 254 I 263Q 3�� �L• -_- 2651 - - STRUCTIONi r HOTELINGIi \—I _ _I , OFFICE I n �; DOCUMENTS JULY 28, / I 2 BED ROOM 2 BED ROOM 2 BED ROOM 253 I F _ ® 2" EQUIP ••1 1 - i p 211 212 213 1 - 1.. ' I_I 1 x 266STO2014 2014 1ID , R PATIENT RO M L 11 111 210 \`lJ I �-� . ��1 - =1=; ii 1 Q I,,, item date OBBY ZT 0-11! I TELCOM 1-1/4" 1-1/4" ] • 80 OFFICE �' CI I 267 I\ (-) 1 PLAN REVIEW 07.08.2014 l 0 _'_ 0 0 " 252 I— - - - �/�' �I I 2 CONSTRUCTION SET 07.28.2014 u 3 11113/4„ 13/4 PED/ CATH/ t1�1 3 IT_ VI 3 CCD-2 09.18.2014 II J ) - - - I EXAMp © I 268 \ I 4 CCD-4 09.29.2014 _�1 � 11 =�, civ_ RC•� - 01 I 220 ��' Ihr I �- _ - 11-a. -111111I � © `l I I " �_ III=I ■ ■ i n i i ' -J + — a:. �u _A—_ _Ie ---_�� 1� I = —HWR- - 1t1 1-1/4„ 6I J ` L—HWS L I♦�� 1 3/4" I I \\ - 6 1 — — 3 4�— I 3/4'J 1 /X 1 CC)R'R1D0' LPS \ C.' OK i I / \ — 1 rt DHC-13 / I Q C29OB 'IOW �C290A i I I 1 g i I1 HIL i 1 1 i i �i�i 4I ,�. r - 0 © A �� .�, i _ - - t� - e� - pie_ n I ZIN _ revo---- W.-11 E']♦ 1 1 43/,6201 D om, �• c� '■�1� c� all 17—.! - mind - -ri QL1 _ _ I SHOWER _ _ _,`� �� I 0S�UIP I !__! I I= 'UBLI I \. III' A�ooISHu _ I � .. . , !taro ■ II1r_- IIELEC.0 0I 0 � 0 0 I _�_ il������ �I� �;�I31� �,..._ — iEI, r. \ 270 1 — Il�f■li�� �� �III III� [1 BATH ANTE PED/ OB' - OFFICECATH LAB ' STAF DRSSINGO OT PT 1 0 201 / 200 UBLII L 202 �) O 250 LI I!► 218 1 , I I . I / \ I �� II ��� / � ' I 2 BED ROOM 2 BED ROOM 2 BED ROOM 2 BED ROOM 2 BED ROOM / \ I I A) II ; 208 207 205 204 203 / / =1- LN t1.�nr■■._ LOCKER I / ii.1, =li =_ i__I` ALL I ��- Ank I . /ISOLATION i1 II I 11" - 1- �1 - j • �' i' WR UMI-- - [t95B ] 0 208 i r . �.,� � 2 206 1 1 I� , II FC,U 4 \ I� �r= .\ LI , 2 ---1�1j - O �c:::: ,- I•�I41 � i � i TI / En 1 FCU 4 FCU 4 ��i FTR 1 FCU-4 FCU 4 FCU-4 il 0 FCU-4 v / FCU-4 I- ! / = 209 __ _ lr /iLN BI1 1 1 uI 1 1 1--. 1 ili 1 1 i 11 1I 1. \ \ _ ■L � /� 1� 0 4' 8' 16' / JN I.1 / 1 I - �. \\ �' = 1M1 CAT LAB •TORAGE 4 4 - CONTROL" ' _ - �� i0 �� PCU �\ SCALE: 1/8"=1'-0" 1 1 1 I 200C I - 0 I 33/s200� - 1 1 1 11 1r le) I \ 1�_i `iiia -/ ; zu. �/ I O ._� 1� I 11 / Q 1 1 1 ' . ,nIIIa -Dc w 1 .1111 \\ �_ i© . .• ��Q ink _ '� 0 -ANI © 23/6200 - 1 x 1 / I HALL ��xx - 1° c ■AGF ® 1-1/2" EWA AIX "-' I ° 4.� J I ' 10� T1 1 \ \ I ` 1 1 1 FTR-3 (TYP) �- -- / 1-�1 / C I - - - - - - - - T 201 � � w _ — _ �, _ _. _ _ _ , I 1�1 1 1 1�1 1�1 1_I 1�1 1—J 1_I m1 1_I 1_I 1_I I O O 4 13r 02si 0T- - II A, 1 1 I j 1 key plan I sheet title 4 SECOND FLOOR HVAC PIPING PLANSECOND FLOOR SCALE: 1/8"=1'-0" HVAC PIPING PLAN sheet number M 4 0 2 _. This document is the property of Heery International,Inc.and Heery International Inc.retains all drawn by JDD I checked by WAT W rights therein,including copyrights. It may only be used in a manner consistent with Heery attar, Rama & Assoc. FILENAME:P: VVMC 2014 130 CATH LAB REMODEL CAD MECH P HP2.DWG _ M402 PLOT: 09/29/2014 © 7:51 am REV: 09/29/2014 CAD: JDickerson XREF: b 2.dw xb 2 SECONDFLOORFLOORPLAN.dw xb 2 SECONDFLOORDEMOLITIONPLAN.dw xb 2 EXISTINGROOMNAMESFORSHEETAF 100.dw xb 2 EXISTINGROOMNAMESFORSHEETAD100.dw hv2.dw tb.d h 2.dw Ke Plan.dw xcl 2 SECONDFLOORREFLECTEDCEILINGPLAN.dw � � � � � 9 9 9 9 9 9 9 9 9 9 9 9 p 9 Y 9 9 9 International Inc.'s rights while Heery International,Inc.is providing services for the specific project Copyright©2013 by Heery International,Inc.all rights reserved. identified or referred to herein or extensions thereto. It may not be used for any other purpose WHEN PLOTTED AT FULL SIZE THIS SHEET MEASURES 30"x42" except with the express written agreement of,and compensation to,Heery International Inc. II u ADJUSTABLE TYPE CLEANOUT FINISHED FLOOR \ / \ K,,_ / 11 ALL JOINTS AND SEAMS FLUSH W/FINISHED FLOOR CONDENSATE DRAIN TO BE SEALED IN THEIR SEE SPECIFICATIONS. ENTIRETY I I HEERY desi n INSIDE WALL CHILLED WATER SUPPLY SHEETMETAL COMBINATION Y & OUTSIDE WALL 8c RETURN PIPING DRIP PAN 1/8 BEND FITTING - INSULATION 1" MIN. - - AIR GAP H - 6" _- RIGID INSULATION • '/ JAY R. SMITH MODEL 3822 IIIFLOW FUNNEL AND TRAP ASSEMBLY DO NOT PROVIDE RIGID ^^ f INSULATION THIS SIDE v - - OR EQUAL Heery International ((.1) 0 0 • 3-3/4" MIN. re5n 17th Street, Suite 500 THREADED CONNECTION ver, CO 80202 OF PIPE WASTE/VENT PIPING FLOOR CLEANOUT (FCO) WASTE LINE TO RISER. O L PROVIDE EXTENSION IF GREATER \--- SEE PLAN FOR SIZE 720.946.0276 THAN 3" , ---) `I� rrr l -u f 9project number ] ,«I 13026.01 LABEL DRIP PAN AT EVERY 20' WATER DETECTION / ( ) J INTERVALS WITH PIPE SERVICE CABLE. INTERFACE / f 7- WALL PLATE, CHROME PLATED SEE SPEC'S WITH BAS & LEAK I _ / / DETECTION PANEL • WALL OPENING SHALL BE 1" LARGER VA I L VALLEY 1" ANGLE BRACING OR • THAN PLUG DIAMETER UNISTRUT SUPPORT AT r 1 6 FT. INTERVALS. THREADED BRASS ROD OR MACHINE SCREW MEDICAL CENTER SUPPORT FROM • STRUCTURE BELOW FOR PIPE RUNS BELOW RAISED FLOOR. • v`J CLEANOUT TEE W/TAPER THREADED CATH LAB WALL CLEANOUT (WCO) BRASS PLUG PIPE IN OUTSIDE WALL DETAIL PIPE DRIP PAN DETAIL CLEANOUT DETAIL HUB DRAIN DETAIL SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE 181 WEST MEADOW DRIVE VAIL, CO REFRIGERANT RECLAIM REFRIGERANT CHARGE SERVICE VALVE-N\ SERVICE VALVE HWR MAIN MAIN /rHWS owner's project number TE-IiI4 T-1114-D rt NOTE: consultants/construction managers CALIBRATED UNION OR FLANGE m ( MANUAL BALANCING FOR STEEL PIPE SUPPORT SHALL MEET THE APPROVAL VENT VALVE VALVEONLY. NOT REQUIRED OF THE ROOFING MANUFACTURER. STRUCTURAL: UNION OR FLANGENSTRUCTURAL CONSULTANTS INC. FOR STEEL PIPE AIR VENT ONLY. NOT REQUIRED HWR _ i___ __[ ___1 REFRIGERANT LINE 3400 EAST BAYAUD AVE., SUITE 300 FOR COPPER (TYP.) PITCH UP ELEMENT U-BOLT DENVER, COLORADO 80209 1 - iI� ' 303.399.5154 P/T 2—HWs - 111 I 1 .. _ I j,� MEP: HOT GAS BY-PASS SOLENOID FILTER- C I I Z- T.?._FFH__D CATOR RUMA & ASSOCIATES, CO. VALVE VALVE DRYER IHWR f I 60° n1_ _ � I 16 GAUGE GALV. SHEET 896 TABOR STREET ACCESS DOORS J j'• METAL TRIANGULAR PIPE LAKEWOOD, CO 80401-4700 SUPPORT 12" LONG 12" MIN. 303.232.6200 EXPANSION SIGHT �i INTERIORS: VALVE� GLASS AIR HOT BOLT JUNCTION TOGETHER f ROOF TREAD BY G.C. GALLUN-SNOW n N 1920 MARKET STREET, ‘- d FLOW COILR = NOTE: 1ENCLOSURE ROOF 60° 60° �� SECURE TO ROOFNOTE: ARRANGE PIPING TO 1 ` �'" DX INSTALL HWS PIPING ON ALLOW COIL REMOVAL. ,Vo�oVocd / ocaDo VoQSDoc ) 201 COOLING SOLENOID VALVE LEAVING AIR SIDE OF COIL. i DENVER, CO 80202 COIL P/T 303.433.9600 IIII NOTE: SEE PLANS FOR PIPE SIZES THERMAL BULB, LOCATE 45' i/-3/4" AND ARRANGEMENT. seal/signature ABOVE BOTTOM OF PIPE AS EQUALIZER LINE Yi CLOSE AS POSSIBLE TO COIL OUTLET DRAIN VALVE WITH DO NOT SECURE SUPPORT HOSE END CONNECTION AND CAP TO TREAD HOT WATER REHEAT FINTUBE RADIATION REFRIGERANT PIPING ON DX COIL PIPING DETAIL COIL PIPING DETAIL o PIPING DETAIL ROOF SUPPORT DETAIL SCALE: NONE SCALE: NONE 830-12 SCALE: NONE SCALE: NONE issued for date i/—(2) 45' ELBOWS, TYP. PITCH TOWARD SHORT ABSORPTION MANIFOLD TURN FLASHING FINISHED FLOOR CONSTRUCTION WITH INSULATED TUBES WALL CABINET AS SPECIFIED UP 1" (TYPICAL) TOPPING DOCUMENTS JULY 28, MANIFOLD 1/2"CW, SEE PLAN y 36 / 2014 AIR FLOW SAIL DUCT FLANGE FINISHED FLOOR FLOOR DRAIN WITH HIGH LIMIT HUMIDISTAT 1/2"HW, SEE COVERING FLASHING CLAMP SWITCH PITCH CONNECTION, SEAL MIXING VALVE ALUMINUM DUCTWORK SEALED WATERTIGHT PLAN i item date f t I,f U WATERTIGHT (TYP.) WITH SEAMS ON TOP OR AT LEAST 2" I - Mai SERVICE UNION ACCESS �- ABOVE BOTTOM OF DUCT _ DOOR J L `lmili�i�lji�ilipi (TYP.) l 1 PLAN REVIEW 07.08.2014 V \� I\ \\I 74 24" TO 36" �`� Alio M. I — f f 2 CONSTRUCTION SET 07.28.2014 :_: 1/2"CW TO /ONE POUR FLOOR 3 CCD-2 09.18.2014 --� LAVATORY/SINK TWO POUR FLOOR r- CONSTRUCTION CONSTRUCTION 1/2"TW TO :. (ABOVE GRADE) AIRS 1 i 6'' MIN MIN 54" LAVATORY/ SINK ©��-�� (7), WATERPROOF (ABOVE GRADE) MEMBRANE I � I � Lam__ �� \ �� CONCRETE FLOOR WASTE PIPING MIN 2" 36" / I THERMOSTATIC MIXING VALVE SLAB 4::::)\.. In DUCT DRAIN PIPING DETAIL FLOOR DRAIN FLASHING DETAIL I INSULATION TO FULLY n \\_ MINIMUM DISTANCE r COVER HUMIDIFER CASING SUMP TO FIRST FITTING AND HEAT EXCHANGER /� SCALE: NONE SCALE: NONE MIN 6" TAILPIECE J / MIN 5" f 36" PITCH IN DIRECTION INSULATED COPPER / / 28" OF STEAM FLOW STEAM AND DRAIN LINES, 2" THICK EQUAL TO DUCT STATIC PRESSURE 3/4" TO DRAIN WITH �� 4" TYP. I- /' CLASS (INCHES) DRAIN COOLER AND AIR 20" x / GAP AT FLOOR DRAIN, 3" TYP. I TO OUTLETS MOP BASIN OR AS 7 ro ro ro ro MIN 6" PITCH I SHOWN ON DRAWINGS. INTO BOX7 / f _ a-a- a.Cr C . Cr r t 1 T 1 _ _ MIN 5 /ROVIDE �� L 3/4" TO DRAIN AIR GAP FITTING AND _ _ _ FRONT VIEWTz o o WITH DRAIN COOLER � FILL CUP EXTENSION iANDAIRGAP o 6 GANG BOX o „J7.Q Q C.� XQ 1/2" WAGD FROM ANESTHESIA 1 /DRIP MAKE-UP WATER (WASTE ANESTHESIA GAS) W `4 6 2 l 1 TEE AT ANY SOLENOID VALVE CONNECT TO VACUUM ABOVE W 1 VERTICAL RISER / \ PROVIDED WITH UNIT CEILING. _ _ i i ZONE VALVE BOX DIMENSIONS N -- WATER HAMMER a 0 0 4' 8' 16' lell31 ARRESTOR RUN PIPING IN WALL 3 a (TYPICAL) w �" I :: I SCALE: 1/8"=1'0 w VALVE QUANTITY VALVE SIZE WALL BOX SIZE FRAME SIZE N Z W Q Z __ _ o-� 1/2" a ♦ I __ I M lam;`:;o. -_I f7 N »B» "C" CABINET 11 ' 1 I • I I 141 S p MOUNTED R7 I I a WIDTH HEIGHT DEPTH WIDTH HEIGHT REMARKS (71 ON WALL -_ W Z1 TO 3 1/2" TO 1-1/4" 10-7/8" 14" 3-5/8" 14" 17-3/16" SOLENOID DRAIN 1 I ;: n5a I VALVE PROVIDED 1 TO 3 1/2" TO 2" 10-7/8" 18-1/4" 4-1/8" 14" 21-3/8" WITH UNIT ci>......,..--- AIR GAP PROVIDED --WITH UNIT - J I II NOTE: INSTALL UNIT (FULL SIZE DRAIN PIPED 1 TO 6 1/2" TO 2" 10-7/8" 28" 3-21/32" 14" 30.81" PER MFR. INSTRUCTIONS ��� TO FLOOR DRAIN ` ) I/ NOTES: 1. VERIFY ALL DIMENSIONS WITH MANUFACTURER. REPLACEMENTCYLINDER TYPE HUMIDIFIER PIPING DETAIL0 10 1/4" 2. MINIMUM WALL ROUGH = 5-5/8" COORDINATE WITH GENERAL CONTRACTOR. key plan PRESSURE OR VACUUM GAUGE 3. MOUNTING HEIGHT OF VALVE BOX: 50" AFF TO CENTER LINE. (60" TO CENTERLINE OF OXYGEN VALVE) SCALE: NONE 810-08 SINGLE BOX / AS APPROPRIATE sheet title (PROVIDE 7 GANG BOX FRONT VIEW IAVAILABLE.) MECHANICAL _._ 40 F 3'-5" TO FLOOR DETAILS 4444444 ®�17®®® PLAN VIEW ®® "E" MINIMUMMUM • ! ZONE VALVE BOX DETAIL SCALE NONE / sheet number M 8 0 1 J This document is the property of Heery International,Inc.and Heery International Inc.retains all drawn by JDD I checked by WAT rights therein,including copyrights. It may only be used in a manner consistent with Heery International Inc.'s rights while Heery International,Inc.is providing services for the specific project Copyright©2013 by Heery International,Inc.all rights reserved. identified or referred to herein or extensions thereto. It may not be used for any other purpose WHEN PLOTTED AT FULL SIZE THIS SHEET MEASURES 30"x42" except with the express written agreement of,and compensation to,Heery International Inc. RA BALANCING DAMPER 1 NOTE: COOOA BALANCING DAMPER SUPPORT FROM WITH CEILING GIDTOINSTALLATION OF TERMINALABOX STRAPIHANGER SCREWEDO HEERY design WITH CEILING GRID TO ASSURE CLEAR ACCESS TO SIDE. DON'T BLOCK 20/14 SA OVERHEAD STRUCTURE i TO ACCESS PANELS. ACCESS SIDE OR BOTTOM. J .✓� PROVIDE 3-POINT DON'T TURN STRAPS 28/14 RA1 jND ::X. I., GUY WIRE SUPPORT LOW PRESSURE DISCHARGE SEE PLAN AT 8'-0" & 13'-0" UNISTRUT FOR SIZE ABOVE ROOF —_ 36" BETWEEN BEAMS \\ - ] 1 12/10 OA )/ BRACKET UPPER STACK ` �yy�— -- y� A `o TO DISCHARGE DUCT / \ SA N 1 17 I 15'-0" TOTAL 1" GAP ALL 1 Heery International 40/28 MIXED AIR�_ MECH. 273 I I I I AROUND I PLENUM \ I I EXHAUST I I STACK HEIGHT VAV BOX 555 17th Street, Suite 500 N I FAN I \ B O �/ FLEXIBLE CONNECTION CO 80202 Denver, �' ' �' 720.946.0276 1114 40/28 AIR BLENDER�� / I I APPROX. OUTLET DUCT SUPPORT ' � - ' ACCESS a FLEX CONNECTION 40/28 MIXED AIR-�-- DOORS EXHAUST - FAN SEE PLAN RUBBER IN SHEAR FAN project number 1 < FOR SIZES VIBRATION ISOLATORS .' 13026.01 HALL C295C / I CEILING ISOLATION u I SEE ARCH. FOR - IA / PER SPECS.��ly l ROOF DETAILS TRANSITION AS REQUIRED 1/ / ACCESS �'� l o SEE FLOOR PLAN - HVAC / DOORS �, PREFABRICATED ° VA I L VALLEY / . . ... ROOF CURB x MEDICAL CENTER / CONDENSATE / \TO FLOOR SINK EXHAUST GRILLE / i REMOVABLE CORE o FLEXIBLE CONNECTION a PROVIDE DRAIN AT 30" I' i BOTTOM OF FAN CATH LAB SCROLL REMOVABLE FILTER SECTION FULL SIZE DRAIN PAN CONTROL PANEL PROVIDE MINIMUM 30" CLEAR CONCRETE CURB PANEL ACCESS ON CONTROL 3 DIAMETERS 10/10 ACCESS PANEL SIDE OF TERMINAL BOX. I AIRHANDLING UNIT A H U- 1 DETAIL STRAIGHT DUCT ON BOTTOM SIDE AND SECTION IN-LINE EXHAUST FAN DETAIL ROOF EXHAUST FAN DETAIL TERMINAL BOX DETAIL I 1VAIL, CO 81 WEST MEADOW DRIVE SCALE: NONE SCALE: NONE SCALE: NONE 850-12 SCALE: NONE owner's project number DUCT INSULATION AND TALLA SN NOT : REPAIR ALL FIELD CUTS JACKETING PER M.C. SHALL PROVIDE & INSTALL AND WELDS WITH ZINC SPECIFICATIONS ADDITIONAL STEEL MULLIONS PER RICH PAINT, FINISH WITH STEEL FIRE DAMPER SLEEVE, MFR INSTALLATION INSTRUCTIONS consultants/construction managers TWO COATS OF OUTDOOR PROVIDE SLEEVE GAUGE FOR MULTIPLE FIRE DAMPER FINISH PAINT AS SELECTED THICKNESS PER MFR'S ASSEMBLIES. BY ARCHITECT INSTALLATION INSTRUCTIONS J_ STRUCTURAL: MAINTAIN EXPANSION INSULATE RUN-OUT PER �- CLEARANCE PER MFR'S STRUCTURAL CONSULTANTS INC. MAIN DUCT /- 16 GA. SHEET METAL SPEICIFCATIONS c INSTALLATION INSTRUCTIONS 3400 EAST BAYAUD AVE., SUITE 300 - SUPPLY AIR FLOW HOLD DOWN STRAP SECURED W/SHEET BELLMOUTH TYPE SPIN-IN D DENVER, COLORADO 80209 METAL SCREW WITH BUTTERFLY TYPE MVD, SUPPORT FROM OVERHEAD c ' c ` EXTEND QUADRANT HANDLE STRUCTURE ' BREAKAWAY JOINTS, 303.399.5154 . FASTENER THRU INSULATION AND SEAL MEP: AROUND INSULATION. BOTH SIDES OF FLEXIBLE DUCT (MAX. 6'-0")—*-111".- <> • \ SUPPORT ® 3'-0" O.C., DAMPER SLEEVE CATOR RUMA & ASSOCIATES, CO. CHANNEL STRUT. HOT INSULATED PER SPECIFICATIONS 896 TABOR STREET DIPPED GALVANIZED SHEET METAL 11111119 jIj o ' FIRE DAMPER LAKEWOOD, CO 80401-4700 AFTER FABRICATION DUCTWORK, > �� INSULATED PER PILONG RADIUS < AIR FLOW 303.232.6200 a SPECIFICATIONS ° PROVIDE MULTIPLE ACCESS DOORS N 45MAXIMUM INTERIORS: RETURN OR FOR DUCTWORK 60" OR WIDER OR GALLUN-SNOW EXHAUST o STAINLESS STEEL WORM ON SIDE OF DUCT WHEN REQUIRED 1920 MARKET STREET, AIR FLOW — `GEAR CLAMP ON BOTH PRE-FABRICATEDamii1TO PROVIDE ADEQUATE ACCESS TO 3/16" WELDED SOLE EQUIPMENT RAIL CEILING .� THE FLEX DUCT JACKET SUITE 201 FIRE DAMPER DENVER, CO 80202 / A / PLATE AND ` SUPPORT ANCHOR AND INNER CORE. ATTACHMENT BOLTS TO STRUCTURE PER �� BRANCH DUCT MFR'S INSTRUCTIONS 1 1 I `� ' ji �� I 303.433.9600 n n DIAGONAL BRACING RE: ARCH. FOR /� !! ANCHOR BOLTS, LOCATE IN DECK 7 r U U 1 I ROOFING DETAIL AND - - - MOUNTING/RETAINING ANGLES_ - ` rOR HORIZONTAL FIRE DAMPERSAS seal/signature WATER PROOFING LAY IN AIR T BAR OR LAY IN FRAME S LOCATE DUCT ACCESS DOOR FROM RETURN OR ��\ ENG NEERRED BY STRUCTURAL DEVICE FOR HARD CEILING. INSTALLATION INSTALLED RINSTR INSTRUCTIONS ACBOVE E TOSPRING ACCESS NEGATOR EXHAUST SUPPLY AIR FLOW \\\\\\\\\\\\\\� AIR FLOW NOTE: HARD CEILING INSTALLATIONS: ° CEILING DIFFUSER SHOWN; 1. PROVIDE LAY-IN FRAME TO ALLOW AIR DEVICE TO BE VOTE: VERTICAL TYPE FIRE DAMPER SHOWN. FOR ° o ° \ °. REGISTERS AND GRILLES SIMILAR. REMOVED. HORIZONTAL TYPE, TURN ASSEMBLY 90' AND Z 2. LOCATE MVD TO BE ACCESSIBLE. IF SPIN-IN IS NOT 0 0 ACCESSIBLE PROVIDE A SEPARATE MVD ACCESSIBLE BY PROVIDE W/NEGATOR CLOSURE SPRING. hL L. REMOVING THE GRILLE IN LIEU OF THE ONE AT THE L. p SPIN-IN. NOTE: DUCT SUPPORT ON EXTERNAL WALL SHALL BE PER SMACNA ROUND NECK FIRE DAMPER DUCT TAKE-OFF DETAIL ROOF DUCT SUPPORT DETAIL AIR DEVICE DETAIL INSTALLATION DETAIL issued for date SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE CONSTRUCTION DOCUMENTS ULY 28, 2014 HWS MAIN roro HWR MAIN item date 9.....---- MAIN LINE SHUTOFF VALVE PRESSURE GAUGE FLASHING METAL ROOF CURB 1 PLAN REVIEW 07.08.2014 CONDENSING UNIT - i - TERMINATE 1" VENT THROUGH HWR PRESSURE SWITCH 2 CONSTRUCTION SET 07.28.2014 ROOF WITH GOOSENECK AT ROOF MIN. 24" ABOVE ROOF. 3 CCD-2 09.18.2014 X" CONDENSTATE DN IN WALL '- -' HWS I I J I SILICON CAULKING UNION OR FLANGE TO SYSTEM SLEEVED PENETRATION AROUND PERIMETER FOR STEEL PIPE COUNTER TOP-N O • OF AHU I ONLY. NOT REQUIRED 1 1/2"LOW PRESSURE VENT 12 FOR COPPER (TYP.) ( (GAS MAIN) 1}I GAS MAIN LINE o r—o TER FLASHING I I L 1 HINGI J / L, i UNION / \K . STRIP — 18 GAUGE SIGNAL WIRES LINE PRESSURE RELIEF VALVE f / • • • • I I . TO MAP. SEE PLANS FOR o-Ij 4- - 1 I MORE INFO MANIFOLD �� MANIFOLD HEADER. 5m1 PLASTIC 1/2"HIGH PRESSURE VENT INSTALL ROOF CURB 11 ,1 � LEVEL AND PLUMB 2"W TO WALL _ _ ____ :�.�: 4" LIGHT WT. CONCRETE COIL JII HEADER SUPPORT BOLTED 8" �� TO WALL 4" HIGH DENSITY INSULATION 1 I f4 I 1� , I f 11- IL-1 --36"LONG PIGTAIL (TYP.) C— ►� 1111 � .-A � - fel, /- (I _- `. FLOOR CYLINDER SHUTOFF VALVE f } AND CHECK VALVE a ROOF CURB AND FLASHING SHALL BE INSTALLED * '�3/4" ....J ~ __.•.__ �\ -2x2 MANIFOLD SHOWN. BY THE NATIONAL ROOFING CONTRACTORS ASSOC. EXPAND TO ADDITIONAL LA w w w RECOMMENDATIONS AND DETAILS. 4'-7" z z z z CYLINDERS AS SHOWN U U U U DASHED. N (n (n (n CONDENSATE WASTE TO . . . . PROVIDE CHAIN SUPPORT ROOF MOUNTED CONDENSING HOT WATER UNIT FOR EACH CYLINDER UNIT SUPPORT ISOLATION DETAIL HEATER PIPING DETAIL SINK TAILPIECE PIPING DETAILFLOOR ATTACHED TO WALL. N I l l l a a ° 0 4' 8' 16' SCALE: NONE SCALE: NONE 830-08 SCALE: NONE " ° V leJ)IC ELECTRICAL NOTE: SCALE: 1/8"=1'-0" 3 FLOOR 0'-11" C-11" O'-11" 0'-11" 0'-11" 0'-11" 0'-11" 0'-9" PROVIDE 110V RECEPTICAL TO FRONT VIEW BEAM WARMER. 3 0'-11" 0'-11" 0'-11" 0'-11" 0'-11" 0'-11" 0'-11" 0'-9" N20 MANIFOLDS FOR BOTTLE r r_ r r r r r r 1 . liw ( 4 A A Q 4 A q a D A A WALL °I1P ' A ;4 a :� � VII ;� , ;1 2x2 MANIFOLD SHOWN. 1 , I , I EXPAND TO ADDITIONAL ,„ , ° "_ _ _ _ CYLINDERS AS SHOWN DASHED. RADIUS MANIFOLD TYPICAL CYLINDER key plan 0 e 4 & PLAN VIEW sheet title NOTE: DETAIL TYPICAL OF NITROUS OXIDE, CO2, AND NITROGEN MANIFOLDS. M E C H A N I CA L DUCT PASSING UNDER BEAM TYPICAL MEDICAL GAS MANIFOLD DETAIL DETAILS SCALE NONE SCALE: NONE sheet number M 8 0 2 J This document is the property of Heery International,Inc.and Heery International Inc.retains all drawn by JDD I checked by WAT rights therein,including copyrights. It may only be used in a manner consistent with Heery International Inc.'s rights while Heery International,Inc.is providing services for the specific project Copyright©2013 by Heery International,Inc.all rights reserved. identified or referred to herein or extensions thereto. It may not be used for any other purpose WHEN PLOTTED AT FULL SIZE THIS SHEET MEASURES 30"x42" except with the express written agreement of,and compensation to,Heery International Inc. it 1 JEDI Balancing, Inc. ANS w I 568 Briggs Street TESTING,ADJUSTING AND BALANCING BUREAU P.O. Box 525 THE PROFESSIONAL'S CHOICE" Erie, CO. 80516 NEBB Certification # 323 Phone (720) 839-5333 Certification#BB009025C Web www.jedibalancing.com GENERAL NOTES SEE ALL FIELD NOTES LOCATED BELOW EQUIPMENT DATA