Loading...
HomeMy WebLinkAboutB14-0240_B14-0240 VVMC Cath Lab_1421340360.pdf Department of Community Development 75 South Frontage Road TOWN OF VAIL ' Vail, CO 81657 Tel: 970.479.2128 www.vailgov.com Development Review Coordinator TRANSMITTAL FORM Use this form when submitting additional information for planning applications or building permits. This form is also used for requesting a revision to building permits. A two hour minimum building review fee of$110 will be charged upon reissuance of the permit. Application/Permit#(s) information applies to: Attention: 0 Revisions B14-0240 Martin Haeberle b Response to Correction Letter n attached copy of correction letter o�Deferred Submittal R i Other Structural Conformance Letter Project Street Address: 181 W. Meadow Dr. (Number) (Street) (Suite#) Building/Complex Name: Vail Valley Medical Center Description of Transmittal/List of Changes, Items Attached: Structural Conformance Letter Applicant Information (architect, contractor, owner/owner's rep) Contact Name: Haselden Construction Address: 6950 S. Potomac St. City Centennial State: CO Zip: 80112 Contact Name: Nick Rubino- Haselden Construction (use additional sheet if necessary) Contact Phone: 720-398-7831 Building Permits: haselden.com Revised ADDITIONAL Valuations (Labor&Materials) nickrubino Contact E-Mail: @ (DO NOT include original valuation) I hereby acknowledge that I have read this application,filled out Building: $ in full the information required,completed an accurate plot plan, and state that all the information as required is correct. I agree to Plumbing: $ comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according Electrical: $ to the town's zoning and subdivision codes, design review ap- proved, International Building and Residential Codes and other Mechanical: $ ordinances of the Town applicable thereto. XNick Rubino zo,=o„solo ode�oomo-��a�ae�.o�_�a,a�de� Total: $0 Owner/Owner's Representative Signature(Required) Date Received: For Office Use Only: Fee Paid: Received From: Cash Check# CC: Visa/MC Last 4 CC# exp. date: Authorization # STRUCTURAL CONSULTANTS 3400 East Bayaud Avenue,#300 Denver,CO 80209 INCORPORATED 303/399 5154 Fax 303/333 9501 January 14, 2015 Mr. David Friedman, RA CSI LEED BD+C Senior Associate HEERY DESIGN 555 17th Street, Suite 500 Denver, CO 80202 Re: Vail Valley Medical Center, CATH Lab Remodel Heery# 13026.01 SCI # 14-011-02 TOV Permit#B14-0240 State Permit#8749 Phase 7 Dear David: We are writing this letter in regard to the completed structural work performed at the Vail Valley Medical Center, West Wing building, CATH Lab remodel described in the construction documents dated July 28, 2014. Structural Consultants, Inc. acted as the structural engineer of record for the remodel project. Based on our field visits to the site during construction, and review of the Unistrut shop drawings submitted to us for review, we represent and acknowledge that to the best of our knowledge, belief and opinion,the structural systems for the CATH Lab remodel have been completed and integrated into the project in general conformance with the construction drawings, Sheets S100, S102, and S103 prepared by Structural Consultants, Inc. and our field recommendations. Please contact us with any questions Sincerely, STRUCTURAL CONSULTANTS, INC. '11016 Nwi, 700 REGysil> *UPi+tG�* ` �� i I Frank E. Bu ner, P.E. II I :h = Managing Principal/Vice President j 36269 OjIA: 114-15 • • :. 1- FEB/cab - ,0i lilt, cc: David Gebel/HEERY � Shareholders Frank E.Bumgarner,P.E. Bruce R.Wolfe,P.E. R.Wayne Muir,P.E. Heath C.Stein,P.E. Paul J.Hause,P.E.