HomeMy WebLinkAboutB14-0240_G003_1414509600.pdf oti OF v. s (4.7111110 CONSTRUCTION SEQUENCE LEGEND Construction Sequence #1 Construction Sequence #3 Construction Sequence #5 cc The purpose of sequence #1 is to make 3 existing OB rooms available for use as overflow PCU rooms Re-assign one existing Observation room on the east side of the north wing for use as an Convert two existing Patient Rooms into Patient Observation Rooms r74 AREA OF WORK \\\\ during the period of time that the PCU is being renovated, while maintaining security for the existing ICU room. Scope of work will include humidification as required by code. This re- Code implications: 90 ilvt OB/Nurseryarea. assignment will remain in effect until such time as the final ICU rooms are constructed in a Temporary reduction of corridor width from 8' to 5'. EXIT g p y � / future project. Install lockset on two existing doors between the existing PCU (west side) and the existing OB/Nursery Construction Sequence #6 10/28/14 EXIT ACCESS (east side). These doors will be normally locked from the existing PCU side to provide security for the Re-assign one existing Observation room on the east side of the north wing for use as a This sequence involves the selective demolition and new construction required to construct a new east- N existing Nursery, but to allow free egress or access controlled egress from the OB/Nursery. Locksets Negative Pressure ICU room. Scope of work will include humidification as required by west Corridor, Nourishment Alcove, Linen Closet, Soiled Utility Room, Housekeeping Closet and Patient N TEMPORARY PARTITION shall be inter-connected with smoke detection / fire alarm system as well as release of the locks by the code and the addition of a roof-top exhaust fan. This re-assignment will remain in effect until Toilet Room. Anticipated duration of this sequence is approximately three months. HEERY design T staff to allow free egress from both directions in the event of alarm as per 2012 NFPA 101 section such time as the final ICU room is constructed in a future project. Code implications: r 3 5/8"METAL STUD FRAMING N WITH ONE LAYER 5/8" 18.2.2.2.5.2, item #2 for "patient special need." Temporary reduction of corridor widths from 8' to 5'. a) GYPSUM BOARD 6 ON CORRIDOR SIDE PER Add one pair of cross corridor doors, frame and hardware with hardware to function as noted above. Construct a Wash/Gown Alcove to serve as a staff gowning area for the negative pressure Temporary lengthening of travel distance to a smoke barrier from 200' to 230'. NFPA 241,(2009 SECTION 8.6.2.4 AND 2000 SECTION ICU room. This alcove will remain in use until such time as the final negative pressure ICU Heery International 8.6.2.4) 555 17th Street, Suite 500 Code Implications: room is constructed in a future project. Anticipated duration is one month. Construction Sequence #7 Denver, CO 80202 Intermittent construction in a means of egress corridor. Code implications: This sequence involves the selective demolition and new construction required to construct a new 720.946.0276 Temporary reduction of corridor width from 8' to 5'. Cardiac Cath Lab and associated support spaces. Anticipated duration of this sequence is REDUCED CORRIDOR WIDTH Construction Sequence #2 approximately three months. project number Re-assign two existing patient rooms on the west side of the north wing for use as two ICU rooms. Construction Sequence #4 Code implications: 13026.01 Scope of work will include addition of medical air outlets and humidification as required by code. This Convert existing offices into two PCU Patient Rooms. Anticipate duration is one month. Temporary reduction of corridor widths from 8' to 5'. re-assignment will remain in effect until such time as the final ICU rooms are constructed in a future Code implications: Temporary lengthening of travel distance to a smoke barrier from 200' to 222'. VAIL VALLEY project. Temporary reduction of corridor width from 8' to 5'. MEDICAL CENTER Code implications: Construction Sequence #8 None Re-assign two existing patient rooms on the west side of the north wing for use as two ICU rooms. Scope of work will include addition of medical air outlets and humidification as required by code. This re- CATH LAB assignment will remain in effect until such time as the final ICU rooms are constructed in a future project. Code implications: None 181 WEST MEADOW DRIVE VAIL, CO Mal I Iiii4 =11-1 owner's project number consultants/construction managers U ) \ U 3 \3 STRUCTURAL: I \ � STRUCTURAL CONSULTANTS INC. F - T5'i