B14-0240_G004_1414509600.pdf
4.04 F kiivollt 4*.is tat to ic 93 0 Of) el* Construction Sequence#1 CONSTRUCTION SEQUENCE LEGEND q Construction Sequence#2 The purpose of this work is to make 3 existing OB rooms available for use as overflow PCU rooms during the period of time that the PCU is being renovated,while maintain security for the existing OB/Nursery area. 1 0/28/14 Re-assign one existing Observation room for use as a temporary ICU room. Scope of work will include humidification as required by code. Temporary re-assignment will remain in effect until such time as the Install lockset on two existing doors between the existing PCU(west side)and the existing OB/Nursery(east side). Door to be normally locked from the existing PCU side to provide security for the existing Nursery,but to allow free egress final ICU rooms are constructed in a future project. 2 or access controlled egress from the OB/Nursery. Lockset shall be inter-connected with fire alarm system to allow free egress from both directions in the event of alarm. CL AREA OF WORK \\\\\\\ Re assign one existing Observation room for use as a temporary Negative Pressure ICU room. Scope of work will include humidification as required by code and the addition of a roof-top exhaust fan. O Add one pair of doors,frame and hardware with hardware to function as noted above. Temporary re-assignment will remain in effect until such time as the final ICU room is constructed in a future project. Construct a temporary Ante-Room to serve as a staff gowning room to serve the negative pressure ICU room. This room will remain in use until such time as the final negative pressure ICU room is HEERY design co EXIT Re-assign one existing patient room for use as a temporary Nourishment Station. No construction work is required. Anticipated duration of temporary re-assignment is approximately three months until such time as the final Nourishment constructed. Station is constructed. This sequence involves the selective demolition and new construction required to construct a new east-west Corridor,Nourishment Alcove,Linen Closet,Soiled Utility Room,Housekeeping Closet and Patient EXIT ACCESS Re-assign one existingpatient room for use as a temporary Staff Lounge. No construction work is required. Temporary re-assignment will remain in effect until such time as the final Staff Lounge is constructed in a future project. Toilet Room. Anticipated duration of this sequence is approximately three months. 9 p Y 9 q P ry 9 9 p l Co Re-assign one existingoffice for use as a temporarySoiled room. See construction documents for scope of work.Anticipated duration of temporaryre-assignment is approximatelythree months until such time as the final Soiled Utilit Construction Sequence#3 TEMPORARY PARTITION Utility Y OD room is constructed. ti 3 5/8"METAL STUD FRAMING WITH This sequence involves the selective demolition and new construction required to construct a new Cardiac Cath Lab and associated support spaces. It also includes the conversion of a suite of offices into two ONE LAYER 5/8"GYPSUM BOARD Re-assign two existing patient rooms for use as a temporary ICU rooms. Scope of work will include addition of medical gas outlets and humidification as required by code. Temporary re-assignment will remain in effect until such time as Patient Rooms. Anticipated duration of this sequence is approximately three months. HeeryInternational ON CORRIDOR SIDE PER NFPA the final ICU rooms are constructed in a future project. 241,(2009 SECTION 8.6.2.4 AND Convert temporary Soiled Utility Room to Office after the final Soiled Utility room is completed. Anticipated duration of this work is approximately one month. 555 1 7th Street, Suite 500 2000 SECTION 8.6.2.4) Denver, CO 80202 720.946.0276 REDUCED CORRIDOR WIDTH project number 13026.01 VAIL VALLEY MEDICAL CENTER CATH LAB 181 WEST MEADOW DRIVE VAIL, CO N NOTE: TRAVEL DISTANCE NOTE: TRAVEL DISTANCE owner's project number TO SMOKE COMPARTMENT TO SMOKECOMPARTMENT 1 \®o no �r�t�� DOOR IS APPROXIMATELY , DOOR IS APPROXIMATELY 230' FOR A DURATION OF 222' FOR A DURATION OF consultants/construction managers THREE MONTHS. THREE MONTHS. STRUCTURAL: I STRUCTURAL CONSULTANTS INC. imi U 1 .1.1 3400 EAST BAYAUD AVE.,DENVER, COLORADO 0209UITE 300 303.399.5154 1L \ 1 MEP: CE RUMA & ASSOCIATES, CO. 1 896 TABOR STREET 5' LAKEWOOD, CO 80401-4700 ij_. _ N.:: _ > 303.232.6200 RS: i1 - I \ 1 GAL UION SNOW 3 . \hill 171 _ II 1920 MARKET STREET, i 4 _ �5',I� 10' SUITE 201 DENVER CO 80202 > \ --- 5'-- 1 J I _ _ 303.433.9600 —1]Th — I \ • PHI OF 1 k 8p,� seal/signature I R.k \ ' F1. �' ti t® HMENT �O Q s 1-0Th 1 O e_. 4, 1 4. ) i--113 1 4. .1i--111 i--1 . gj 1 If• X40 O\�• ARS _ issued for date CONSTRUCTION DOCUMENTS 2ULY 08, 2014 CONSTRUCTION SEQUENCE #1 CONSTRUCTION SEQUENCE #2 CONSTRUCTION SEQUENCE #3 item date 1 PLAN REVIEW 07.08.2014 N _ ___--- ----- --1H XX Pick Sra#e=_-__-_-_- key plan sheet title CONSTRUCTION SEQUENCE OPTION 2 sheet number G004 This document is the property of Heery International,Inc.and Heery International Inc.retains all drawn by Author checked by Checker rights therein,including copyrights. It may only be used in a manner consistent with Heery International Inc.'s rights while Heery International,Inc.is providing services for the specific project Copyright©2013 by Heery International,Inc.all rights reserved. identified or referred to herein or extensions thereto. It may not be used for any other purpose WHEN PLOTTED AT FULL SIZE THIS SHEET MEASURES 30"x42" except with the express written agreement of,and compensation to,Heery International Inc.