Loading...
HomeMy WebLinkAboutDRB18-0416_Approved Documents_1541096092.pdfACTION FORM Design Review Board (DRB) Department of Community Development 75 South Frontage Road West Vail, CO 81657 Tel: 970-479-2139 www.vailgov.com Project Name: Antlers Renovation 2018 Application Number: DRB18-0416 Application Type: Addition Date Applied: 08/20/2018 Project Description: Addition of new elevator serving all levels of existing building, expansion of check-in and Lobby spaces, consolidation of existing office and management spaces into new space on new second level above existing lobby and offices. Conversion of existing conference room and offices on two levels of north wing into for-sale condo. CONTACTS Contact Type: Applicant Full Name: GPSL Architects (Henry Pratt) Address: 953 S. Frontage Road West 230 Vail, CO 81657 Phone: 9704761147 Contact Type: Property Owner Full Name: Common Area Address: Phone: None Project Address: 680 LIONSHEAD PL (210107206999) (210107206999) Job Site Location: Legal Description: Subdivision: VAIL LIONSHEAD FILING 3 Lot: 3 Block:No Data Parcel Number: 210107206999 BOARDS/STAFF ACTION Motion By: Cahill Action: Approved Second By: Rediker Vote: 5-0 Date: 10/17/2018 Conditions: - All exposed metal flashing, trim, flues, vents, and rooftop mechanical equipment shall be anodized, painted (adjacent facade/roof material color or flat black), or capable of weathering so as to be non-reflective pursuant to Section 14-10-5C, Building Materials and Design, Vail Town Code, pror to requesting final inspections. - Approval of this project shall lapse and become void one (1) year following the date of final approval, unless a building permit is issued and construction is commenced and is diligently pursued toward completion. - Design Review Board approval does not constitute a permit for building. Please consult with Town of Vail building personnel prior to construction activities. - Design Review Board approval shall not become valid for 20 days following the date of approval, pursuant to the Vail Town Code, Chapter 12-3-3 Appeals. - No changes to these plans maybe made without the written consent of Town of Vail staff and/or the appropriate review committee(s). - Prior to issuance of a building permit, the Applicant shall mitigate the employee housing impacts from the creation of one new dwelling unit of 1,357 square feet, as required by Title 12, Chapter 24, Inclusionary Zoning. - Prior to issuance of a building permit, the Applicant shall pay to the Town of Vail the required Transportation Impact Fee of $5,066.00. Planner: Chris Neubecker PLANNING FEE RECEIPT Case # DRB18-0416 Date Printed: 08/20/2018 TOWN OF VAIL - FEES RECEIPT Planning Summary Type: Design Review Board (DRB) Submittal Date: 08/20/2018 Subcases: Addition Bond Expire Date: Description of Work: Addition of new elevator serving all levels of existing building, expansion of check-in and Lobby spaces, consolidation of existing office and management spaces into new space on new second level above existing lobby and offices. Conversion of existing conference room and offices on two levels of north wing into for-sale condo. Property Information Address: 680 LIONSHEAD PL (210107206999) Tax ID: 210107206999 Owner: Common Area Contacts Contact Type: Applicant Company Name: GPSL Architects Full Name: Henry Pratt Address: 953 S. Frontage Road West 230 Vail, CO 81657 Email: henry@gpslarchitects.com Contact Type: Property Owner Full Name: Common Area Address: Planning Fees Fee Information Account Amount Addition Fee 001-0000.31122.00 $300.00 Payment Information Date Paid Payment Type Amount Addition Fee 08/20/2018 Check $300.00 Paid By: Antlers Condominium Association - Notes: ck#39237 FEE TOTAL $300.00 AMOUNT PAID $300.00 BALANCE DUE $0.00 08/20/2018 - 3:42:28 PM - Generated by: cgodfrey75 South Frontage Road West, Vail, Colorado 81657 1 / 1 24 August 2018 Re: DRB 18-0416, Antlers lobby expansion Members of the DRB: The Owners of the Antlers at Vail Condominiums are proposing to make changes to the building listed below. These have been approved by the PEC. The changes being proposed are as follow: 1. Addition of a new ADA compliant elevator serving all levels (new common area). 2. Expansion of the existing lobby / check-in area and addition of a second lobby (new common area). 3. Relocation of existing meeting room. 4. Consolidation of back-of- house offices and housekeeping (new business office area). 5. Addition of new accessible toilets to serve lobby and office spaces (new common area). 6. Conversion of existing board room and offices on two levels in the north wing into a salable condominium (new GRFA). Condo will have new deck on two levels. • The above changes do not increase Building height beyond what exists on the site. • The above changes do not increase the site coverage beyond what exists on the site. • The above changes have no impact on existing building setbacks. • The above changes do not affect the existing parking facilities or their operation. • The above changes have no impact on the existing landscaping, either hardscape or softscape. The original Antlers building was built sometime in the early/mid 70’s. A major expansion was completed in 2001 and is referred to in the TOV files as “Antlers 2000”. This expansion significantly increased the number of units in the rental pool (87 of 90 units are in the rental pool; one rents independently). Also, over the past 17 years, the patterns of guest arrival and departure have evolved toward shorter stays and therefore more intensive periods of arrival and departure. There are times when the lobby and check-in areas are simply overwhelmed with guests, sometimes detracting from the guest experience. And the need for increased marketing and sales has the current employees scattered all around the building; some even working in the hallways or at the front desk. Put simply, the goals of the proposed additions are to provide more space for a better guest experience and to, using a term coined by Vail Heath when they justified their current expansion to the PEC, “decompress” and consolidate the management and operations work areas. Antlers Condominiums, August 24, 2018 2 These changes will not generate new revenue so to offset some of the cost of the new common areas, the building owners are proposing to convert existing common/office space into a salable condominium. In order to make this condo consistent with the others in the building, we are adding new decks on two levels, one above the other. These decks will sit directly above an existing patio that is almost completely block by existing trees. To access these decks, we need to replace the existing windows with windows and doors that fit within the existing rough opening. New Elevator The existing elevator at the Antlers was part of the original building and has become old and unreliable. Maintenance is constant and the existing shaft is too small to accommodate a replacement that meets accessibility requirements. So far, no elevator company has been able to offer a replacement elevator. It also does not serve all the underground parking levels built in the Antlers 2000 expansion. Tearing out the existing precast walls to enlarge the shaft would make the original building unstable and is therefore not cost effective. As with the unit access corridors, the existing elevator’s landings are outdoors and exposed to the ambient temperatures of the seasons, putting even more stress on the existing elevator. Our proposal includes a new elevator tower that is ADA compliant, serves all levels and has enclosed/ heated lobbies. The existing elevator will remain operational as long as possible but will be reserved for use by housekeeping and other guest services departments. The hope is to extend the life of this elevator by reducing the demands on it. Expanded Check-in and Lobby Expansion There are times when guest arrivals and departures overwhelm the small area of the Front Desk and Lobby. Guests are forced to stand in a line that often fills the Lobby and sometime even overflows to the outdoors- not exactly a positive first impression. Our proposal includes a greatly expanded front desk area; one that is easily recognized from the arrival court by a new gabled roof and double-high space with large north facing windows. The desk will also include a dedicated station that is fully accessible as is required by the ADA. The existing lobby, while cozy and comfortable, is relatively small and can only accommodate a few guests at a time. There is no space for a concierge desk or an activities kiosk that management would like to provide for their guests. There are no toilet facilities for guests disembarking from the vans that bring them from EGE or DIA (apparently that is the first question asked upon arrival). By Code, these new facilities must be fully accessible. Our proposal is to keep the existing lobby and expand it eastward and northward on the ground level. This will make room for accessible toilet facilities, and create a second, separate “lobby” or common room next to the new elevator. This way guests can congregate for morning coffee or apres ski cookies in an area that will not impact arrivals and departures. This new lobby will take space from what is now an under-used outdoor bicycle storage and always shaded picnic area. An existing meeting room across the courtyard will be re-located to the new second floor to be built above the existing and expanded ground level lobby spaces. Antlers Condominiums, August 24, 2018 3 Consolidated Back-of-House offices As exists at the property, the back-of-house and operations offices are spread out in different locations. The space available for the different departments (Front Desk, Marketing, Group sales, various department Managers, etc) is no longer adequate and there are desks and work stations in the hallways. Across the courtyard in the Antlers 2000 addition are the accounting offices and an office for the Owner remodel coordinator. Engineering offices and Housekeeping storage are down in the lowest level. Our proposal is to consolidate all the management offices into new spaces to be constructed on a new floor above the existing lobby. Additionally, there will be a space for housekeeping and the building engineer. And so that the front desk manager and general manager are readily available to the guests when the need arises, there will be a small stair that connects the second level offices directly to the front desk area. Offices to Condominium Conversion None of the proposed changes above will generate or increase revenue; they only serve to enhance the guest experience and increase the management and operational efficiency of the property. And given that all this new construction must sit on top of existing construction and within the existing arrival courtyard, it will be expensive to build. To help offset the cost of construction, the property owners are proposing to convert the vacated meeting room and accounting offices into a salable two level, two bedroom condominium of approximately 1200 SF. We hope that you will consider this project as submitted and give us approval. The Building Owners are solidly behind this and ready to start construction early in 2019 and be ready for occupancy by December of 2019. Thank you. Antlers Condominiums, August 24, 2018 4 Proposed Design parameters: Lot area (from TOV files): 51,836 sf GRFA (allowable per LHMU-1): 129,590 sf GRFA (existing- based on TOV files): 89,887.4 sf GRFA (proposed): 91,087.4 sf = 70.33% of allowable Density (approved in 2001): 94 DU’s Density (existing): 90 DU’s (9 existing EHU’s on site do not count) Density (proposed): 91 DU’s Total building area (existing per TOV files): Total Building area (proposed): Common area (proposed increase): 3,467.0 sf Office area (proposed): 1,743.7 sf Office area (existing): 1,741.4 sf Office area (new): 2.3 sf Max Height above pre-existing grade: no change Setbacks: North: no change South: no change East: no change West: no change Site Coverage: no change Landscape area: no change Hardscape area: no change Parking (existing): 95 spaces (8 surface) Parking increase req’d: +1.4 => 2 spaces Parking (proposed): 98 (min) spaces (8 surface) Paved area: no change Snow storage required: no change Snow storage provided: no change