HomeMy WebLinkAbout1345 WESTHAVEN CIR. RIGHT OF WAY for Window Delivery 10-30-2018.pdf MUST BE SUBMITTED MIN 3 BUSINESS DAYS PRIOR TO PERMIT ISSUANCE
APPLICATION FOR
RIGHT OF WAY USE-STREET CUT PERMIT
PRJ#: Town of Vail
PW#: Public Works Dept
Parcel#:210312106011 1309 Elkhorn Dr
Bldg Permit#: B - 180131 Vail, CO 81657
WARNING: Inclusion of false information in this permit application establishes an automatic denial for a Right of Way Use-Street Cut
Permit and forfeiture of application fees. By signing this permit,the applicant declares he/she has read all contents of this document,
Town of Vail Roadway Standards and chapters of Title 8—Public Ways and Property, of the Vail Municipal Code and is fully aware of
its requirements and agrees to pay all applicable fees. Application Fee:$100.00
Company
Company Name: ShaefferHyde Construction Phone: 970-845-5656
City/State/
Company Address:po box 373 Zip: vail co. 81658
Contractor
License Number: c000003084 Email: mitchs@shaefferhyde.com
Contact
Contact Name: Mitch Sturde Phone: 970-390-5605
ROW Use Location: 1345 WEWSTHAVEN CIR.
Requested ROW Requested
Use Dates: 10-30-2018 to 10-30-2018 Work Times: 7:00AM TO 7:00PM
Purpose for Request: Street Cut Dimension (if applicable
❑ Underground Utility Installation
❑ Landscaping Length:
❑ Temp Site Access
❑ Construction Staging Width (min 4'):
❑ Roadway Construction
❑ Other (explain): Total Square Footage:
Requested ROW Use:
❑ Single Lane Closure—Ift of closure (including taper)Concrete Pour 75'
I] Two Lane Closure—Ift of closure (including taper)W^dowoe eryw hforkha e
❑ Three Lane Closure—Ift of closure (including taper)
❑ Sidewalk/Bike Path— Ift of closure
❑ Other (explain):
1. Applicant shall submit a traffic control plan, and work site/staging plan with this application. Traffic Control
Plan shall be in compliance with the MUTCD and shall show streets with names, adjacent intersections,
advanced warning signage, taper lengths, buffer space and work zone dimensions. No full street closures
are allowed. {
II
2. Applicant must contact Public Works Department at 479-2198 24 hours prior to commencing of work. Failure
to notify the Town will result in forfeiture of bond money.
3. Applicant is responsible for obtaining approvals from all utility companies having an existing utility line within the
project site, applicant has option of routing application through the Public Works office to obtain the
necessary Town of Vail signatures. Please allow up to one week to process.
Xcel Enery (800-922-1987) Qwest (800-922-1987) _
Comcast (800-922-1987) Holy Cross Electric (800-922-1987)
Eagle River Water&Sanitation District (970-477-5453)
Town of Vail Electric (970-479-2158) Town of Vail Irrigation (970-479-2158)
Mitch Sturde 10-23-2018
Print Applicant Name Applicant Signature Date