Loading...
HomeMy WebLinkAboutSteel report.pdf THUNDER MOUNTAIN TESTING 2970 N. Ronlin Avenue / Grand Junction, Colorado 81504 Office (970) 256-9965 / Cell (970) 210-7008 / Fax (970) 314-7067 E-Mail: kxkid39@aol.com / www.thundermountaintesting.com A4S, LLC October 26. 2017 41462 Highway 6 and 24 Avon, Colorado 81620 ATTN: Mr. Channing Lockaby RE: Milias Condo 413 Gore Creek Drive #15 Vail, CO 81657 *Field Inspection Dear Mr. Lockaby, As requested, structural steel special inspection was conducted per the IBC 2015 Edition - Chapter 17: Structural Tests and Special Inspection and Eagle County requirements. I arrived at your facility at 10:30 AM. I met with you to review project requirements and areas ready for inspection. The Welding Procedure Specifications (WPS) and Welder Qualification Test Reports (WQTR) for welders employed with A4S, LLC were reviewed and found to be in compliance with project specifications. Copies of certifications are on file with you. From there, I followed you to the above referenced jobsitc for shop and field inspection. Visual welding inspection was conducted utilizing structural drawings provided by Anthem Structural Engineering. I observed 3 each Beam to Column fillet welded connections at locations A, B, C, D and E (no grid lines were noted on the supplied drawings) utilizing the First & Second Floor Framing Plan Drawings # SI.1 & S1.2, as well as the shop fillet welded connection due to no inspection was conducted prior to installation. You also advised me of the addition of a connection plate at location C. Upon completion, all welding and on the items of inspection referenced above were observed to be in compliance with project specifications and the visual requirements stated in Clause 6 of AWS DI.1 Code: 2015 Edition. Page 2 of2 R •ye I Su. in-./ �/ 4. 71 if AWS CWI ' 1040201 ICC Certified #0863569-S1& S2 ASNT NDT Level III #30242 • Mountain Testing ia:2, CWI 91040201 INF I OC1 EXP. 4/1/202l