Loading...
HomeMy WebLinkAboutB18-0488 approved plans.pdf V o i• O N CO MECHANICAL SPECIFICATIONS: 11. CLEANUP: 77. PERMANENT ACCESS TO EQUIPMENT SHALL BE PROVIDED,AIN MINIMUM OF 30' MECHANICAL LEGEND NOTE:ALL SYMBOLS SHOWN ON LEGEND ARE NOT NECESSARILY USED. yO. O • EAC UPON COMPLETION OF THE WORK UNDER THIS SECTION,THE CONTRACTOR CLEAR WORKING SPACE IN FRONT OF ACCESS PANELS TO THE COMPRESSOR. 7. GENERAL SHALL REMOVE ALL SURPLUS MATERIALS.EOUIPMENT AND DEBRIS BLOWER ASSEMBLY AND AIR FILTER SECTION OF THE EEQUIPMENT SHALL BE d •. FURNISH ALL LABOR.SUPERVISION.MATERIALS,EQUIPMENT AND —NNO S— HEATING WATER SUPPLY Oe OUTDOOR AIR y• U f0 O INCIDENTAL TO THIS WORK AND LEAVE THE PREMISES CLEAN AND PROVIDED BY GENERAL CONTRACTOR. _ >C G FACILITIES NECESSARY TO FURNISH,FABRICATE,DELIVER.STORE AND ORDERLY. —HRR— HEATING WATER RETURN RA RETURN AIR O .y C O U INSTALL ALL WORK NOTED ON THE DRAWINGS AND/OR SPECIFIED HEREIN. U) b. THE CONTRACTOR SHALL FURNISH AND INSTALL ALL WORK NECESSARY TO 19. ALL EOUIPMENT SHALL BE SECURELY FASTENED TO THE BUILDING STRUCTURE —CMS— CHILLED WATER SUPPLY SA SUPPLY AIR 12 MECHANICAL IDENTIFICATION WITH CODE APPROVED VIBRATION ISOLATORS. C C O —GWR— CHILLED WATER RETURN FA EXHAUST AIR0 MAKE A COMPLETE SYSTEM WHETHER OR NOT SUCH DETAILS ARE 0Cu j ,010 MENTIONED IN THESE SPECIFICATIONS OR SHOWN ON THE PLANS.BUT • EQUIPMENT NAMEPLATES:METAL,WTH DATA ENGRAVED OR STAMPED. —816— SNONNELT SUPPLY RAO RETURN AIR DAMPER U VI d Q N E FOR PERMANENT ATTACHMENT ON EOUIPMENT. 19. EACH PIECE OF EQUIPMENT AND ALL SYSTEMS SHALL BE ADJUSTED AND 0 G WHICH ARE OBVIOUSLY NECESSARY TO MAKE A COMPLETE SYSTEM. —SMR— SNOWMELT RETURN SAD SUPPLY AR DAMPER p CO b. PIPE MARKERS:PREPRINTED.COLOR CODED,WTH LETTERING INDICATING RE-ADJUSTED TO INSURE PROPER FUNCTION OF ALL CONTROLS.MAINTENANCE OF O) N Q EXCEPTING ONLY THOSE PORTIONS THAT ARE SPECIFICALLY MENTIONED 01W N fD 6) HEREIN OR PLAINLY MARKED ON THE ACCOMPANYING DRAW NGS AS BEING SERVICE,AND SHOWING DIRECTION OF FLOW. TEMPERATURE,ADEQUACY OF FLOWS AND CAPACITIES,ELIMINATION OF NOISE AND —RFS— RADIANT FLOOR SUPPLY SG SUPPLY GRILLE C_ 7— VALVE TAGS:STAMPED OR ENGRAVED WITH 1M'LETTERS FOR PIPING VIBRATION,AND SHALL BE LEFT IN PROPER OPERATING CONDITION. —ITER— RADIANT FLOOR RETURN RG RETURN GRILLE •L m.9.n� INSTALLED UNDER ANOTHER SECTION OF THE SPECIFICATIONS. c •a) SYSTEM ABBREVIATION AND 1?NUMBERS,OATH NUMBERING SCHEME. —0— GAS TG TRANSFER GRILLE O D U1 Tr PROVIDE 5132'HOLE FOR FASTENER. 2M TEST 8 BALANCING: —MPG— MEDIUM PRESSURE NATURAL GAS SD SUPPLY DIFFUSER d. VALVE TAG SCHEDULE:PREPARE A VALVE TAG SCHEDULE TO BE • 2 WORKMANSHIP: •. THE VENTILATING SYSTEM SHALL BE BALANCED BY AN INDEPENDENT c5 U M d • THE WORK SHALL BE ACCOMPLISHED IN A THOROUGH AND WORKMANL —IKE 0 PIPE RISER RD RETURN DIFFUSER CI) !0~ CO LO SUBMITTED TO THE MAINTENANCE ENGINEER FOR RECORD. CERTIFIED TEST AND BALANCE COMPANY. p C MANNER SATISFACTORY TO AND MEETING THE APPROVAL OF THE OWIVERC ..,-2w�+O b. 5 COPIES OF THEIR BALANCE REPORTS SHALL BE SUBMITTED TO THE —3 PIPE DROP TD TRANSFER DIFFUSER AND ARCHITECT. W W 3 t 13. DUCTWORK ENGINEER FOR REVIEW AND APPROVAL.ELECTRONIC DISTRIBUTION B PIPE TAKEOFF(FROM BOTTOM OF MAIN) O THERMOSTAT m J=ID •. DUCTWORK SHALL BE FABRICATED AND INSTALLED IN ACCORDANCE WTH PREFERRED. —0— PIPE TAKEOFF(FROM TOP OF MAIN) al WE. 0) 3. MATERIALS: THE 2015 IMC AND SMACNA STANDARDS. c ALL REQUIRED RESHEEVING AND ADJUSTING OF EQUIPMENT SHALL BE ® SENSOR(CALL OUT ON DRAWINGS) ,— ' D I— • ALL MATERIALS AND EQUIPMENT SHALL BE NEW AND THE BEST OF THEIR —3 PIP END CAP N?+ N. DUCTWORK SHALL BE GALVANIZED STEEL GAUGES TO MEET SMACNA MADE BY THE TEST 8 BALANCE CONTRACTOR. RESPECTIVE KIND,FREE FROM ALL DEFECTS AND OF THE MAKE AND PIPE CONTINUATION • M` FIRE/SMOKE DAMPER -`--' U O STANDARDS.DUCTWORK SIZES INDICATED ARE INSIDE TO INSIDE/OUTSIDE E. ALL FINAL MEASURED CAPACITIES SHALL BE WITHIN 10%OF THOSE =FINN 1..7 —CS QUALITY SPECIFIED. PIPE EXPARSION GUIDE N e O TO OUTSIDE]DIMENSIONS. INDICATED ON THE PLANS. Mr L O • FIRE DAMPER ALL DUCT JOINTS SHALL BE SEALED AR TIGHT WITH RCD CORP. 6 MASTIC —III-- PIPE UNION �� L d 0,- 4. SITE INSPECTION: cfD ADHESIVE WITH VERSA GRIP OR MESH. 21. THE GENERAL CONTRACTOR SHALL FURNISH&INSTALL ALL OF THE REQUIRED — PIPE ANCHOR •MMOTOR OPERATED DAMPER(MOD) 0 R •. CONTRACTOR SHALL VISIT THE SITE OF WORK PRIOR TO SUBMISSION OF '� ®��` L LI. ALL FINAL CONNECTIONS TO SUPPLY GRILLES SHALL BE COMPLETED WITH ACCESS PANELS IN THE DRYWALL CEILINGS TO GAIN SERVICE ACCESS TO THE CO HIS BID AND THOROUGHLY FAMILIARIZE HIMSELF WITH THE WORKING ACOUSTICAL FLEXIBLE DUCT UNLESS OTHERWISE NOTED ON THE PLANS EQUIPMENT.EQUIPMENT WITH MANUFACTURER MANDATED SERVICE f FLEXIBLE PIPE CONNECTION MANUALPER K BALANCING DAM CONDITIONS I.EXACT NATURE OF THE WORK PIPE EXPANSION JOINT 0 MINIMUM LENGTH IS 3',MAXIMUM LENGTH IS 5'. REQUIREMENTS INSTALLED WITHIN CRAWLSPACES MUST BE A MAXIMUM OF 2D FEET CO b. SUBMISSION OF A BID ACKNOWLEDGES FULL RESPONSIBILITY FOR CHANGE OF ELEVATION FURNISHING A COMPLETE AND FUNCTIONAL SYSTEM. a FLEXIBLE DUCT USED FOR CONDITIONED AIR SHALL BE UL APPROVED. FROM AN ACCESS PANEL. 9 POINT OF NEW CONNECTION �_� O VINYL COATED.WIRE REINFORCED FIBERGLASS.WITH MAXIMUM THERMAL —ill— PLUG VALVE (D)DROP(R)RISE 2 c. NO CHANGES IN CONTRACT WILL BE MADE TO ACCFROM OR ALLOW CONDUCTIVITY OF 0.35 BTU-INMR-FTS°F AND A MAXIMUM LENGTH OF FIVE 22. ALL EQUIPMENT SHALL BE INSTALLED ACCORDING TO THE MANUFACTURER'S ' FLEXIBLE DUCT CONNECTION EXTRA FUNDS FOR ANY OMISSION WHICH RESULTS FROM A FAILURE TD ��/}— CHECK VALVE FEET. INSTALLATION.OPERATION 8 MAINTENANCE MANUAL'S RECOMMENDATIONS .. . THOROUGHLY MAKE THE EXAMINATION — BALL VALVE TURNING VANES IN 90'ELBOW ••••''' '' µ ..k 1. DUCTWORK SHALL BE SIZED AT A MAXIMUM VELOCITY OF 1.000 FPM/.OB' ESPECIALLY FOR SERVICE CLEARANCES. • PRESSURE DROP PER 150 FEET. - BALANCING VALVE II DUCT SEES ARE NET FREE AREA C",(',HL 4.F,-_ 5. CODES AND PERMITS. +Thai 1ST NO.IS DUCT WIDTH. ,,c,,':." - _ c B. EACH MECHANICAL VENTILATION SYSTEM(SUPPLY AND/OR EXHAUST) 23.FILTERS: �'� FLOW REGULATOR VALVE 11 II 2ND NO.IS DUCT DEPTH. •. ALL MECHANICAL EQUIPMENT,INSTALLATION,ETC.,SHALL CONFORM TO �! E SHALL BE EQUIPPED WITH A MEANS OF SHUT-OFF WHEN VENTILATION IS •. SHALL BE UL RATED AND APPROVED. BUTTERFLY VALVE �y:4 I1Ir. THE 20151NT MECHANICAL CODE(IMC).20151H INTERPRETEONALD NOT REQUIRED,AND BACKDRAFT DAMPERS WHICH CAN BE CLOSED ON FAN b. PRESSURE DROPS SHALL NOT EXCEED.10'STATIC PRESSURE. ® SECTION THRU ROUND DUCT a E ENERGY CONSERVATION CODE(IECC)AND ORDINANCES AS INTERPRETED SHUTDOWN SHALL BE PROVIDED FOR AIR INTAKES AND/OR DISCHARGES. 1WW1 PRESSURE REDUCING VALVE _1i'r `�r By THE TOWN OF VAIL BUILDING DEPARTMENT. ® SECTION THRU SUPPLY AIR DUCT A/� Y` N. CLEAN OUT ALL DUCTS PRIOR TO SUPPLY AND RETURN GRILLE 2•.ELECTRICAL CONNECTIONS: 2-VVA.V CONTROL VALVE '.•.A.t V`, b. CONTRACTOR SHALL OBTNN AND PAY FOR ALL PERMITS AND INSPECTIONS INSTALLATION a. UNLESS OTHERWISE INDICATED ALL MAGNETIC MOTOR STARTERS, e. COPIES OF ALL PERMITS AND INSPECTION REPORTS SHALL BE SUBMITTED 74111111 SECTION THRU RETURN/EXHAUST NR DUCT i DOUBLE THICKNESS TURNING VANES SHALL BE USED ON ALL DUCT TURNS THERMAL OVERLOADS.LOW VOLTAGE THERMOSTATS.CONTROL RELAYS, SWAY CONTROL VALVE TO THE ARCHITECT. OF 90'. CONTROL TRANSFORMERS AND SOLENOID VALVES SHALL BY FURNISHED ROUND DUCT TURN DOWN BY THE MECHANICAL CONTRACTOR. +WAY CONTROL VALVE 8 AS-BUILTS: 14 TEMPERATURE CONTROL DEVICES: b. UNLESS OTHERWISE SPECIFIED.ALL MOTORIZED DAMPERS SHALL BE LOW � SUPPLY DUCT TURN DOWN •. CONTRACTOR SHALL PROVIDE A COMPLETE SET OF AS-BUILT DOCUMENTS CONTRACTOR SHALL PROVIDE CONTROLS CAPABLE OF MEETING THE VOLTAGE.ALL WRING AND POWER CONNECTIONS SHALL BE PROVIDED BY DIFFERENTIAL BYPASS VALVE 1 B WITH ALL CHARGES NOTED THEREON AT THE COMPLETION OFTHE • LLA RETURN/EXHAUST DUCT TURN DOWN Q 'S� SEQUENCE OF OPERATION DESCRIBED ON SHEET Mt.O. THE MECHANICAL CONTRACTOR V PROJECT AND PRIOR TO FINAL ACCEPTANCE AND PAYMENT. b. MECHANICAL CONTRACTOR TO COORDINATE ALL REQUIREMENTS WITH e. PROVIDE MOTORS AND EQUIPMENT FOR ONLY THOSE CURRENT —a-.1-- STRAINER i(- UNIT MANUFACTURERS PRIOR TO PURCHASING. CHARACTERISTICS INDICATED ON THE DRAWINGS. ) 6� SUPPLY REGISTER/DIFFUSERILOWER 7. GUARANTEE: COORDINATE CONTROL TIHNS WITH CONTROLS CONTRACTOR AS 8. IT IS THE INTENT OF THIS DIVISION TO REQUIRE A COMPLETE SYSTEM PER NATURAL GAS PRESSURE REGULATOR •. CONTRACTOR SHALL UNCONDITIONALLY GUARANTEE ALL LABOR AND c -'1+ �C � RETURN REGISTER/DIFFUSER/LOWER z r MATERIALS ON ALL WORK AGAINST DEFECTS IN WORKMANSHIP AND NECESSARY THE CONTRACT DOCUMENTS. MATERIALS FOR A PERIOD OF ONE YEAR AFTER COMPLETION. LI. ALL THERMOSTATS SHALL BE APPROVED BY THE OWNER •. COORDINATE ALL EQUIPMENT REQUIRING ELECTRICAL POWER. AIR VENT IECN SG1A OUTSIDE AIR REGISTER/DIFFUSERAOUVER J Q °c3) REGARDLESS OF VOLTAGE,WITH OTHER TRADES,SO THAT ALL SYSTEMS /r�•`J/� 15. BEFORE STARTING ANY WORK THE CONTRACTOR FOR THIS SECTION OF THE WORK ARE COMPLETE AND OPERATIONAL. -p PRESSURE-TEMP.TAP %20 EXHAUST REGISTER/DIFFUSER/LOUVER B. SUBMITTALS. r n r SHALL EXAMINE A COMPLETE SET OF DRAWINGS FOR ALL TRADES,INCLUDING f. ALL THREE PHASE MOTORS SHALL BE PROVIDED WITH PHASE LOSS ��8Q v V, •. CATALOG INFORMATION AND CUTS OF ALL EQUIPMENT AND DEVICES(WITH ARCHITECTURAL.STRUCTURAL,HVAC,ELECTRICAL,FIRE PROTECTION AND PROTECTION. PRESSURE GAUGE Uo-CFM DOOR UNDERCUT I I••+ti.I ALL OPTIONS CLEARLY MARKED)SHALL BE SUBMITTED TO THE ARCHITECT li — ....i PLUMBING.DIMENSIONS.SPACE REQUIREMENTS AND POINTS OF CONNECTION TO B. ALL SINGLE AND THREE PHASE MOTORS,STARTERS AND DISCONNECTS ` _ FOR REVIEW(SIX COPIES OF EACH) ELECTRONIC SUBMITTALS THERMOMETER (A)SECTION CUT LINE ) ALL EQUIPMENT SHALL BE VERIFIED,AND ANY MINOR ADJUSTMENTS NECESSARY TO PROVIDED BY MECHANICAL CONTRACTOR AND WIRED BY THE ELECTRICAL (--) PREFERRED. AVOID CONFLICT WITH THE BUILDING STRUCTURE AND THE WORK OF THE OTHER CONTRACTOR. �� (B)SHEET SHOWN ON TRADES SHALL BE MADE.CONTRACTOR SHALL NOTIFY ARCHITECT IMMEDIATELY IF M 9 COORDINATION: ANY MAJOR CONFLICTS OCCUR. 25. TEMPORARY HEATING DURING CONSTRUCTION: 1 S 1 _ •. THE DRAWINGS ARE DIAGRAMMATIC AND INTENDED TO SHOW SCOPE. •. MECHANICAL EQUIPMENT SHALL NOT BE UTILIZED FOR TEMPORARY Z N. THE CONTRACTOR SHALL COORDINATE HIS WORK WITH OTHER TRADES TO 16. COORDINATE LOCATIONS OF ALL ROOF AND EXTERIOR WALL OPENINGS WITH ALL HEATING. 0 W PROVIDE BEST ARRANGEMENT OF ALL DUCTS,PIPES,CONDUIT,ETC. RELEVANT TRADES,AND PROVIDE WATERTIGHT FLASHINGS WHEREVER b. GAS FIRED TEMPORARY HEAT SHALL BE PROVIDED BY THE GENERAL 0 PENETRATIONS OCCUR.EXACT LOCATIONS AND SIZES MAY BE DEPENDENT UPON CONTRACTOR. ri < W 10. CUTTING AND PATCHING: EOUIPMENT SELECTIONS;COORDINATE SIZES AND LOCATIONS OF ALL OPENINGS • ALL CUTTING AND PATCHING REQUIRED DF THE STRUCTURE(NEW OR WITH APPROPRIATE EQUIPMENT REQUIREMENTS. A EXISTING)SHALL BE PROVIDED UNDER OTHER SECTIONS OF THE WORK 0_ b. PROVIDE NECESSARY REOUIREMENTS TD THE PROJECT SUPERINTENDENT. e. X-RAY SLABS PRIOR TD CORING. Town ooFFicEf Vail .j 0 V o SEQUENCE OF OPERATION: OUTDOOR AIR VENTILATION (MECHANICAL/NATURAL) copir 1- z Lei. MM REQUIRED MN OVKIEDN MN REQUITED MPROVE D EF-t,EXISTING EXHAUST FANS,8 VENTILATION CONTROL SYSTEM' ROOM ROOM SIZE MIN AIRFLOW AR QUIP IN ARFWW MAX AIRFLOW AIRFLOW F).A DED REMARKS jSO.FT.) IRATE(CFAVSF) (CFM) (CFM) (CF/NSE) (CFM) z co EXHAUST FAN EF-1 SHALL OPERATE CONTINUOUSLY. AUTOMATIC OPERATION OF THE SYSTEM SHALL NOT REDUCE THE ireG RAGE 10,730 005 517 520 0.75 7,718 &.`.120 VENTILATION AIRFLOW BELOW MBJMUM REQUIRED AIRFLOW STATED HERE THE(2)EXISTING EXHAUST FANS TO REMAIN SHALL BE INTERLOCKED WITH CO/NO2 VHJILATON RATES BASED ON SECTION 404 OF 2211 WTI3•MTONAL11r5HO CAL mC SENSORS.UPON A DETECTION OF HIGH GAS LEVELS VIA THE CO/NO2 SENSOR,THE EXISTING FANS SHALL ENGAGE.AS WELL THE MOTORIZED DAMPER ON THE AIR INTAKE LOUVER SHALL OPEN.THE FANS SHALL RUN UNTIL GAS LEVELS,MEASURED BY THE EXHAUST FAN SCHEDULE OR EQUIVALENT SENSOR,REACH A SAFE LEVEL. ELECTRICAL DATA NOISE ' UNIT MFG SODER SERVICE LOCATION TWE TOTAL FAN ESP(IN) LEVEL OPER. REMARKS THE VENTILATION SYSTEM SHALL ALSO BE PROVIDED WTH MANUAL OVERRIDE SWITCH TAG NUMBER CFM RPM POWER V LRH/I4 ONES)WT.(LBS) . . 1- v`d' AEC PROJECT it: 18042.01 DHICHAMPS ENGAGES.THE(2)EXISRIDGWITCHEXHAUST FANS AND OPENS THE HOT TIMER D EE i CORN GARAGE MN. SEE PLANS INURE 520 7823 0.5 725 W 120/1/BO B 55 PROVIDE LL EDAMPEN AND FAN SPEED CONTROL. E V I E W D FOR C V D E DATE: ISSUE: DAMPER.AS WELL THE OVERRIDE SWITCH SHALL BE PROVIDED WITH A TIMER TO 100 SON 75 D VENTILATION UNIT SHALL OPERATE CONTINUOUSLY ALLOW THE OWNER TO ENGAGE THE SYSTEM DURING TIMES WHEN THERE IS NOT A ppA{A' 09-21-18 PERMIT CALL FROM THE COMO2 SENSORS AT NO TIME SHALL THE OVERRIDE ALLOW SHUT • G Y I P L F A N C E DOWN OF THE SYSTEM WHEN THERE ISA CALL FROM THE CO/NO2 SENSORS. fate. /0 - Zs—•1d'• By. _ Dram Sr, Ce.d.* Code: /...5" CAT TOC _a. MECH. SPEC'S, LEGEND, SEQUENCE, & 4__ SCHEDULES O M1 .0 �_ 1 of 2 =•ffMOu,1111 MP1•L'W 0011110 MUMS.tO (V 0 N 0 GENERAL NOTES: SHEET DETAIL NOTES: Q EXISTING STATIONARY AIR INTAKE LOUVER AND ASSOCIATED m MOTORIZED DAMPER TO REMAIN.MOTORIZED DAMPER CONTROL V) O SHALL BE UPGRADED,RE SEQUENCE OF OPERATIONS ON SHEET M7.D. V N T.ALL DUCTWORK DIMENSIONS ARE SHOWN INSIDE TO INSIDE. CONNECT NEW 25028 EXHAUST DUCTWORK TO MATCH EXISTING. 52 .(t'N I.!T T O EXISTING EXHAUST FAN,ASSOCIATED DUCT TRANSITIONS,AND DUCT O EXISTING EXHAUST FAN TO REMAIN. 2.ALL DUCTWORK SHALL BE RUN TIGHT TO UNDERSIDE OF STRUCTURE CONNECTIONS IN THIS AREA TO BE REMOVED. ? N O C co )N U WHERE IT EXISTS UNLESS OTHERWISE NOTED OINSTALL NEW EXHAUST FAN EF-1 PER MANUFACTURERS INSTALLATION Cook Ol O' 3.COORDINATE ALL ACCESS PANEL LOCATIONS HATH THE ARCHITECT. INSTRUCTIONS.PROVIDE VIBRATION ISOLATION TO ACCOMMODATE EXISTING CONDITIONS AS REQUIRED. N L- Q N C O 3 INSTALL COINO2 SENSORS PER MANUFACTURER'S INSTALLATION �- CS co U WITH INSTRUCTIONS AND INTERLOCK GARAGE VENTILATION CONTROL SYSTEM.CONFIRM REQUIRED QUANTITIES WITH MANUFACTURER C m er_ N-- BASED UPON ACCEPTABLE COVERAGE AREA OF SELECTED DEVICES. y^'C5 NUMBER OF SENSORS SHOWN HERE FOR REFERENCE ONLY.MORE OR J Q N 0)6 co co LESS SENSORS MAY BE REOUIRED. W I- -- °0 0..a) Q) ' to cl9 ctC .13 2W wi-,7,} 15 JST 6 W£DF_ .O w - 7. _ _ O(E)91 U `u_m w Loo r43 ,'rr '�' r`�ro�'p1E,iE t ® — L, �— ---------------------- �¢ 288-EX 288-EX / 1 `——'�----_ -- O] .1 .1 / i -_-_ o / % a CCOS s •*.-' E,.f II r ;"� � A 0\d r r I r W I r Q rn ti r V r Z0. ,LL..11�� I oes Q o C� 0 J 0_ W J OD0°, z - p O Jw Oa Qw, H > a- Q V, J O 0 H F' Zcc LL ZDco W 2 � 0 O AEC PROJECT*: 18042.01 DATE: ISSUE: 09-21-18 PERMIT Owen By- Chocked 9A CAT TOC OVERALL HVAC PLAN NORTH SCALE 3/16"=1'-0" OVERALL HVAC PLAN SCALE:3/Ir=,Tl M2•0 2 of 2 =0 Odin 00lo Ina ePluNi O69l0B IC- PANEL L-1 PROJECT:VAIL POLICE STATION ENGINEER: SOH PROJECT#: 14020 VOLTAGE: 120/208V, 3P,4W MOUNTING: SURFACE MAINS: 150A MLO TYPE; EXISTING _ AIC: 10K PHASE PHASE DESCRIPTION A B C BKR P CIR CIR P BKR A B C DESCRIPTION IT ROOM OUTLETS 1000 20 1 1 2 1 20 1000 GENERATOR BLOCK HEATEF IT ROOM OUTLETS 1000 20 1 -3 4 1 20 1000 BENERATOR BATTERY CHAP IT ROOM OUTLETS 1000 20 1 5 6 1 20 1000 GENERATOR UNIT HEATER 1 BOILER ROOM 500 20 1 7 8 1 20 360 GENERATOR ROOM OUTLET LTG/EF CONTROL/GARAGE E 1385 20 1 9 10 1 20 1000 GENERATOR UNIT HEATER HEAT TAPE ENTRY, EAST GA 500 20 1 11 12 1 20 0 SPARE FOR EAST PARKING I. SOUTH GARAGE UNIT HEATE 1000 20 1 13 14 1 20 2000 COMPUTER OUTLET 30 AMP EAST PARKING LOT 1000 20 1 15 16 2 30 2500 IT RM AC CUH-1 1000 20 1 17 18 2500 STAIRWAY SOFFIT LIGHTS 1000 20 1 19 20 2 30 2500 ELEC ROOM AC TIMECLOCKS 100 20 1 21 22 2500 EXHAUST FAN 667 15 3 23 24 1 20 1000 NORTH GARAGE LIGHTS 667 25 26 1 20 1000 SW GARAGE LIGHTS 667 27 28 1 20 1000 SE GARAGE LIGHTS TEMP CONTROL COMPRESS 667 15 3 29 30 1 20 0 SPARE FOR EAST PARKING I " 667 31 32 1 20 1000 ROOM 1,5,7,3 LIGHTS 667 33 34 1 20 1000 ROOM S-9 OUTLETS LANDSCAPE LIGHTS 1000 20 1 35 36 1 20 1000 ROOM 166 OUTLETS _ CONFERENCE ROOM LIGHT:1000 20 1 37 38 1 20 0 SPARE SPRINKLER ROOM CONFERENCE ROOM COOK" 1000 20 1 39 40 1 20 1000 UNIT HEATERS GARAGE UNIT HEATER 1000 20 1 41 42 1 20 1000 SPRINKLER COMPRESSOR LOAD CALCULATION SUMMARY TEMPORARILY,ADD NEW GARAGE EXHAUST FAN"EF-1", 125W, 120V TO EXISTING CIRCUIT EM2-9. THE EXISTING CIRCUIT HAS (14)2 LAMP LED FIXTURES,2 RECEPTACLES AT DETOX&EXISTING EF CONTROL. CALCULATED POWER FACTOR: THE EXISTING CIRCUIT WOULD HAVE A TOTAL LOAD OF 14 X 50W+ 360+200+ 125= 1385 W. 0.91 FINAL CIRCUIT INSTALLATION WILL BE SET IN NEW PANEL EM-A WHEN SET WITHIN A MONTH. CONNECTED LOAD CONNECTED AMPS DEMAND LOAD DEMAND AMPS ,, .. .0 kFr LIGHTING/CONTINUOUS 8700 24 10875 30 ; 'd o k., 1f7q RECEPTACLES 9020 25 9020 25 _�* � �, 5. MECHANICAL 24125 79 25375 83 • -""''''"'b •• KITCHEN 0 0 0 0 ', s c* es TOTAL 41845 128 45270 138 `,s,{,,�A{EaF' 10/25/2018