Loading...
HomeMy WebLinkAbout16-7-596.01 (11-06-18) const. obs..pdf H P KU mAR 5020 County Road 154 Glenwood Springs, CO 81601 Geotechnical Engineering I Engineering Geology Phone: (970) 945-7988 Materials Testing I Environmental Fax: (970) 945-8454 Email: hpkglenwood@kumarusa.com Office Locations: Parker, Glenwood Springs, and Silverthorne, Colorado CONSTRUCTION OBSERVATION REPORT Client: Paragon Homes Project No.: 16-7-596.01 Day: Tuesday Attn: Ed Venerable Date: 11/6/18 6460 S. Quebec St. #400 Page: 1 of 1 Centennial, Colorado 80111 Project: Proposed Residence, Lots 14A and 14B, Bighorn Fifth Addition, 4872 Meadow Lane, Vail, Colorado Weather: Cloudy, calm, dry Temperature: 25°F at 8:30 am Construction Activities Observed: Equipment in Use: H-P/Kumar's Site Activities: We observed the formed footing areas. The footing subgrade areas were firm, not frozen and no groundwater seepage was observed. Verbal Communication: distribution: Paragon Homes-Ed Venerable(ed@paracionhomesdenver.com) Mountain Home Concrete—Jim Meehan(jmeehan-mhc@comcast.net) Vail Construction Group—Jay Nobrega(jay@vailconstructiongroup.com) Joe Benedict David A. Young, P.E. /Ijf Field Technician Reviewed By