HomeMy WebLinkAboutB18-0431 Fireplace Lentil KR!VI CONSULTANTS, INC. REC' OF ,
Z. ril,
P.O.Box 4572 • Vail,Colorado 81658 • 970-949-9391
A
efC 4.17
.470).1#
TO: Rollie Kjesbo 11/14/18
Ryan Boone
Nedbo Construction
(970)-977-0324
DATE: 11-07-2018 JOB NUMBER: 1810-06
PROJECT: 3988 Lupine A Fireplace Lentil
❑ RFI 171 MEETING NOTES ❑ RESPONSE ❑ CLARIFICATION/CHANGE
KRM Consultants Inc. was asked to the above mentioned site to observe the masonry construction at the
existing fireplace where a new fireplace will be inserted.
At the time of visit; the front face of masonry has been demolished keeping the masonry at the roof level
and above in place at the front face. The existing back wall of masonry will remain in place.
Place a new lentil above the new fireplace opening into the existing CMU wall at the roof level. The size of
the new lentil may be L4x4x114. The new lentil shall bear 4" into the existing CMU on each side.
Contact KRM Consultants Inc. with any questions, 970-949-9391.
SIGNED: COPY TO:
4 7 4—f ///7/I 8
Mark Newman
REVIEWED: — N,
tiG .�##
i 341 a i
Tim D. Hennum, P.E. rl,'p•oo/�, 7 J:
+w�F�SsY.�f�•.. •� ` s