HomeMy WebLinkAboutB16-0029 Revised DIA.pdf (°:)TOWN OF VAIL
Community Development
75 South Frontage Road West
Vail, CO 81657
970.479.2139
LETTER OF CREDIT DEVELOPER IMPROVEMENT AGREEMENT
Instructions: This page should be given to your lender/bank and returned
with your letter of credit.
Project Name: Vail Spa Condominiums
Project Number: PRJ15-0607
Permit Number: B16-0029
Planner: Chris Neubecker
Letter of Credit Number: 4460203633
Issuing Bank: Alpine Bank
S:\Community DevelopmenttFORMS\Planning\DIA credit format_011516.doc Page 1 of 6
IRREVOCABLE LETTER OF CREDIT FORMAT
Legal Description: Lot 1 Block 2
Subdivision:Vail Lionshead Filing 3
TOWN 0 F VA I L Address: 710 W. Lionshead Circle
Developer:Vail Spa Condominiums HOA
Project Number:PRJ15-0607
Permit Number:B16-0029
Improvement Completion Date: November 30, 2019
Letter of Credit Expiration Date:January 1, 2020
DEVELOPER IMPROVEMENT AGREEMENT
THIS AGREEMENT, made and entered into this 1st day of November , 2018
by and among Vail Spa Condominiums HOA (the "Developer"), and the Town of
Vail (the "Town") and Alpine Bank (the "Bank").
WHEREAS, the Developer, as a condition of approval of the Temporary Certificate of
Occupancy for Vail Spa Condominiums-Exterior Renovations-South Sidewalk Addition
(address and legal description) wishes to enter into a Developer Improvement Agreement; and
WHEREAS, the Developer is obligated to provide security or collateral sufficient in the
judgement of the Town to make reasonable provisions for completion of certain improvements set
forth in the attached estimated bid(s) in accordance with the approved plans and specifications
filed in the office of the Community Development Department of the Town of Vail; and
WHEREAS, the Developer wishes to provide security to guarantee performance of this
Agreement, including completion of all improvements referred to in this Agreement,
NOW THEREFORE, in consideration of the following mutual covenants and agreements,
the Developer and the Town agree as follows:
1. The Developer agrees, at its sole cost and expense, to furnish all equipment and
materials necessary to perform and complete all improvements referred to in this Agreement. The
Developer agrees to complete all improvements referred to in this Agreement on or before the
30th day of November , 2019 . The Developer shall complete, in a good
workmanlike manner, all improvements referred to in this Agreement, in accordance with all
approved plans and specifications filed in the office of the Community Development Department
of the Town of Vail, and to do all work incidental thereto according to and in compliance with the
following:
a. All said work shall be done under the inspection of, and to the satisfaction
of, the Town Planner, the Town Engineer, the Town Building Official, or
other official from the Town of Vail, as affected by special districts or
service districts, as their respective interest may appear, and shall not be
deemed complete until approved and accepted as completed by the
Community Development Department and Public Works Department of the
Town of Vail.
S:\Community Development\FORMS\Planning\DIA credit format_011516 doc Page 2 of 6
2. To secure and guarantee performance of the obligations as set forth herein, the
Developer agrees to provide security as follows:
Irrevocable letter of credit#4460203633 in the amount of
$ 174,830.00 (125% of the total costs of the attached estimated bid(s)
with Alpine Bank set to expire on the 1st day of January
, 2020 (not to expire less than 30 days after the date set forth in
Paragraph 1 of this Agreement) as the security for the—completion of all
improvements referred to in this Agreement, in the event there is a default under
this Agreement by the Developer.
3. The Developer may at any time substitute the security originally set forth above for
another form of security or collateral acceptable to the Town to guarantee the faithful completion
of those improvements referred to in this Agreement and the performance of the terms of this
Agreement. Such acceptance by the Town of alternative security or collateral shall be at the
Town's sole discretion.
4. The Town shall not, nor shall any officer or employee thereof, be liable or
responsible for any accident, loss or damage happening or occurring to the work specified in this
Agreement prior to the completion and acceptance of the same, nor shall the Town, nor any
officer or employee thereof, be liable for any persons or property injured by reason of the nature
of said work, but all of said liabilities shall and are hereby assumed by the Developer.
The Developer hereby agrees to indemnify and hold harmless the Town, and any of its
officers, agents and employees against any losses, claims, damages, or liabilities to which the
Town or any of its officers, agents or employees may become subject to, insofar as any such
losses, claims, damages or liabilities (or actions in respect thereof) that arise out of or are based
upon any performance by the Developer hereunder; and the Developer shall reimburse the Town
for any and all legal or other expenses reasonably incurred by the Town in connection with
investigating or defending any such loss. claim, damage, liability or action. This indemnity
provision shall be in addition to any other liability which the Developer my have.
5. It is mutually agreed that the Developer may apply for and the Town may
authorize a partial release of the security provided to the Town for each category of improvement
at such time as such improvements are constructed in compliance with all plans and
specifications as referenced hereunder and accepted by the Town. Under no condition shall the
dollar amount of the security provided to the Town be reduced below the dollar amount necessary
to complete all uncompleted improvements referred to in this Agreement.
6. If the Town determines, at its sole discretion, that any of the improvements
referred to in this Agreement are not constructed in compliance with the approved plans and
specifications filed in the office of the Community Development Department of the Town of Vail or
not accepted by the Town as complete on or before the date set forth in Paragraph) of this
Agreement, the Town may, but shall not be required to, draw upon the security referred to in this
Agreement and complete the uncompleted improvements referred to in this Agreement. Pursuant
to Section 12-11-8, Vail Town Code, the Temporary Certificate of Occupancy referred to in this
Agreement may be revoked until all improvements referred to herein are completed by the
Developer or the Town in accordance with this Agreement.
S:\Community Development\FORMS\Planning\DIA credit format_011516.doc Page 3 of 6
If the costs of completing the uncompleted improvements referred to in this Agreement
exceed the dollar amount of the security provided to the Town, the excess, together with interest
at twelve percent (12%) per annum, shall be a lien against the property and may be collected by
civil suit or may be certified to the treasurer of Eagle County to be collected in the same manner
as delinquent ad valorem taxes levied against such property. If the Developer fails or refuses to
complete the improvements referred to in this Agreement, such failure or refusal shall be
considered a violation of Title 12 (Zoning Regulations), of the Vail Town Code, and the Developer
shall be subject to penalties pursuant to Section 12-3-9 (Violations: Penalties) and Chapter 1-4
(General Penalty), Vail Town Code.
7. The Developer shall warranty the work and materials of all improvements referred
to in this Agreement located on Town property or within a Town right-of-way, pursuant to Chapter
8-3, of the Vail Town Code, for a period of two years after the Town's acceptance of said
improvements.
8. The parties hereto mutually agree that this Agreement may be amended from time
to time, provided that such amendments be in writing and executed by all parties hereto.
S:\Community Development\FORMS\Planning\DIA credit format_011516.doc Page 4 of 6
Dated the day and year first above written.
!/.A _ A A._ Alt
D: -toper
STATE OF )
) s•.
COUNTY OF )
Th,e foregoing Developer Improvement Agreementryas acknowled�ed before me this
flill4 Day of f`l6Ve VA' ( , 203LS by `\-PSS\c-_ \ 1G+V\S
Witness my hand and official seal.
SAMANTHA GERSTEIN
1 9NOTARY PUBLIC
My commission expires - STATE OF COLORADO
NOTARY ID#20064039872
MY COMMISSION EXPIRES JUNE 27. 2019
CA/MAV
. �AV/
Not Public
ki -'
Town nner
STATE OF COLORADO )
)ss.
COUNTY OF EAGLE )
The foregoing Developer Improvement Agreement was acknowledged before rrh�e this
114 Day of NOve.ti,,,6<.'-'- , 2019 by Cil L'i-A rk A A . ..4-�'-'ec-I .
Witness my hand and official seal.
My commission expires: r-Gi?,,,,t,1V' 1, ,, ,_;, ,,i,.1
Aer, ufiX-
Notary
DANIELLE COUCH
NOTARY PUBLIC
1 STATE OF COLORADO
1 NOTARY ID 20174006422
MY COMMISSION EXPIRES FEBRUARY 9,2021
S:\Community Development FORM S\Planning\DIA credit format_011516.doc Page 5 of 6
ATTACHED COPIES OF THE ESTIMATED BID(S1
S:\Community Development\FORMS\Planning1DIA credit format_011516.doc Page 6 of 6
r11 .NELSO March 25, 2016
.-•- . A BUILDING MOUNTAIN RESORT COMMUNHIrS
Vail Spa Condominiums - South Sidewalk Addition
Cost Estimate Summary
DESCRIPTION TOTAL
Cost of Work $118,609
Escalation Allowance $9,963
SUBTOTAL $128,572
General Liability Insurance $1,401
SUBTOTAL $129,973
2.00% Construction Contingency $2,599
SUBTOTAL $132,573
5.50% G.C. Construction Fee $7,292
ESTIMATED CONSTRUCTION COST $139,864
OTHER COST CONSIDERATIONS
Town of Vail Building Permit Fee By Owner
Town of Vail Plan Review Fees By Owner
Town of Vail Construction Use Tax By Owner
Design Contingency By Owner
e,Lq- 1 s
1 a'c)
r;, R.A.NELSON Standard Estimate Report Page 1
BUILDING MOUNTAIN COMMUNITIES Vail Spa-South Sidewalk 3/25/2016 8:07 AM
Total
Item Description Takeoff Qty Unit Cost Amount
001-0000 GENERAL REQUIREMENTS
001-3000 Admin.Requirements
3100 Project Manager 2.00 WKS 3,400.00 /WKS 6,800
3200 Project Superintendent 6.00 WKS 3,200.00 /WKS 19,200
Admin.Requirements 26,000
001-5000 Temporary Facilities
5400 Field Equipment&Supplies 1.00 LS 350.00 /LS 350
5500 Temporary Sanitary Facilities 1.50 MO 175.00 /MO 263
5600 Dumpster Charges 1.00 LS 1,500.00 /LS 1,500
5800 Temporary Barriers&Signs 1.00 LS 4,500.00 /LS 4,500
Temporary Facilities 6,613
001-7000 Execution Requirements
7200 Safety/First Aid/OSHA 1.00 LS 500.00 /LS 500
7300 Mobilize&Demobilize 1.00 LS 450.00 /LS 450
7500 Final Cleaning&Window Washing 1.00 LS 750.00 /LS 750
7700 Protection of Finishes 1.00 LS 1,500.00 /LS 1,500
Execution Requirements 3,200
GENERAL REQUIREMENTS 35,813
002-0000 SITE WORK
002-1000 Demolition&Hazmat
1100 Remove Sidewalks 245.00 SF 9.60 /SF 2,352
1100 Demo of Curb 40.00 LF 65.25 /LF 2,610
1100 Tree Removal 6.00 EA 175.00 /EA 1,050
Demolition&Hazmat 6,012
002-2000 Site Preparation
2100 Excavator Mobilize/Demobilize 1.00 LS 900.00 /LS 900
2200 Construction Surveying-Calcs/Set up 1.00 LS 450.00 /LS 450
2200 Construction Surveying-Site Trips 3.00 EA 750.00 /EA 2,250
2500 Excavation for Sidewalks 1,630.00 SF 2.93 /SF 4,776
2500 Prep for Sidewals 1,630.00 SF 3.29 /SF 5,363
2500 Prep for Stairs 25.00 SF 17.76 /SF 444
2500 Export 6.00 LOAD 285.00 /LOAD 1,710
2900 Erosion/Sediment Control 1.00 LS 750.00 ILS 750
Site Preparation 16,643
002-8000 Site Improvements
8100 Crosswalks 0.00 NIC
By Town of Vail
8500 Boulder Walls-Labor 80.00 LF 36.00 /LF 2,880
8500 Boulder Walls-Material 30.00 TN 200.00 /TN 6,000
Site Improvements 8,880
002-9000 Landscaping
9100 Landscaping Repair 1.00 LS 4,500.00 ILS 4,500
Landscaping 4,500
SITE WORK 36,035
R. N E L S O N Standard Estimate Report Page 2
I/'S. BUILDING MOUNTAIN COMMUNITIES Vail Spa-South Sidewalk 3/25/2016 8:07 AM
Total
Item Description Takeoff Qty Unit Cost Amount
003-0000 CONCRETE
003-3000 Exterior Concrete Slabs
3100 South Sidewalk Addition-Concrete&Pavers 1.00 LS 34,466.00 /LS 34,466
3100 Concrete Curb Replacement 40.00 LF 45.00 /LF 1,800
Exterior Concrete Slabs 36,266
CONCRETE 36,266
015-0000 MECHANICAL
015-6000 Snowmelt
6100 Snowmelt Tubing 1.00 LS 4,496.00 /LS 4,496
6100 Snowmelt Sensor 1.00 LS 2,500.00 /LS 2,500
6100 Snowmelt Start up&Balancing 1.00 LS 3,500.00 /LS 3,500
Snowmelt 10,496
MECHANICAL 10,496
016-0000 ELECTRICAL
016-7000 Site Lighting
7100 Site Lighting Electric 0.00 NIC
Assumed none
ELECTRICAL 0