HomeMy WebLinkAboutaction_form_drb_11-15-2018_5bedfe02b7023-0.pdf Design Review Board (DRB)
Department of Community Development
75 South Frontage Road West
TOWN F VA 1 L ACTION FORM Vail, CO 81657
Tel: 970-479-2139
www.vailgov.com
Project Name: Doubletree Hotel 2016 Application Number: DRB18-0560
Application Type: Change to Approved Date Applied: 11/05/2018
snowmelt system for flat roof area above kitchens and banquet room. heated
Project Description: from existing snowmelt system located in boiler room with new piping run about
10 ft. to roof.
CONTACTS
Contact Type: Applicant
Full Name: snow country services (kent zeltner)
Address: box 143 1801 crazy horse circle edwards, CO 81632 Phone: 9703901428
Contact Type: Property Owner
Full Name: TNREF III BRAVO VAIL LLC WIDEWATERS GROUP INC
Address: Phone: None
Project Address: 2211 N FRONTAGE RDW (210311415017) (210311415017)
Job Site Location:
No
Legal Description: Subdivision: VAIL DAS SCHONE FILING 3 Lot: 1 Block: Data
Parcel Number: 210311415017
BOARDS/STAFF ACTION
Motion By: Action: Staff Approved
Second By:
Vote: Date: 11/15/2018
Conditions:
- All exposed metal flashing, trim, flues, vents, and rooftop mechanical equipment shall be anodized, painted
(adjacent facade/roof material color or flat black), or capable of weathering so as to be non-reflective
pursuant to Section 14-10-5C, Building Materials and Design, Vail Town Code, pror to requesting final
inspections.
- Approval of this project shall lapse and become void one (1) year following the date of final approval, unless
a building permit is issued and construction is commenced and is diligently pursued toward completion.
- Design Review Board approval does not constitute a permit for building. Please consult with Town of Vail
building personnel prior to construction activities.
- Design Review Board approval shall not become valid for 20 days following the date of approval, pursuant
to the Vail Town Code, Chapter 12-3-3 Appeals.
- No changes to these plans maybe made without the written consent of Town of Vail staff and/or the
appropriate review committee(s).
- No additional rooftop mechanical equipment is approved with this application. Any new rooftop mechanical
equipment shall require an additional Design Review Board application, and may require shielding of
equipment.
Planner: Chris Neubecker