Loading...
HomeMy WebLinkAboutB17-0040_A0.2.pdf -lee ii: IIIF J len 11° 03/ 9/17 -II 101 101 r I I■ISI■ISI Ti - VICTOR MARK DONALDSON BED #3 BED #3 1� D - II II II II II II -I !a' Ir, OPEN TO BELOW OPEN TO BELOW D - r 1 , r i— - T . , , 1 7 7 - oj(" i U =2 = 0 ARCHITECTURE _ CJI BE® #� BED #� �� ��p PLANNING BATH #� /1. BATH #3 INTERIORS �r o - o SINCE 1977�.1 /� ° � ARCHITECTS OPEN TO BELOW OPEN TO BELOW �� UN T ,__ =_____ 5 , . 0 , , 90 VI BENCHVARKROAD 0 i ' UN T ,_ = 4 STOR GE \/ = /\ CD e o = sTOR GE SUITE 2 0 7 ° UTILITY UTILITY0 /\ ° BOX 5300 AVON , CO 81620 ii BATH #5 cz z BATH #3 -./ � I-11_II 1 I �1 I 970 . 949 . 5200 ° D . D J@ o� — Chris vmda. com Z- \Dom- Vie' '.n © FAX 949 . 5205 } _14 /®2 X _ \ _ _/\ 0 0 /\ S' ' 4. ,r il0\\\ STORAGE = 0 e = STORAGE l UTILITY UTILITY o c VI':TGIF (7. \ rd ` A �� — j 1 I In it � G C \__@e�z C� \\\:N°4•L ..,,,,_ _4:() APN, :\ ❑ ❑ ❑ ❑ (0) 2ND , BEVEL DEVQ FLAN OM DEvOLITION <EY` NOTES SENERAL DEvIOLITION NOTES Z >_ REMOVE EXISTING GUARDRAILS THE FOLLOWING NOTES ARE TO ASSIST IN COORDINATION w " E j///�A. CONCRETE PAD, STRINGER 4 STEPS, OF CARE AND WITH BU I LD I NG INSURANCES�1NN PLACTO EMPLY WITH STANDARD 2 0 PREP FOR NEW w I m ~ B. i!i! -i!i! !1 REMOVE EXISTING STUCCO FRAME I. A SCHEDULE FOR DEMOLITION, IF REQUIRED BY VA IL LO (4 W D (1) BUILDING OFFICIAL SHALL BE SUBMITTED BY z WALL CONTRACTOR WITH A COPY TO OWNER $ ARCHITECT. NO J WORK SHALL BE COMMENCED UNTIL WRITTEN APPROVAL Q 0 = 0 00 G. -1 -I REMOVE CONCRETE SLAB, PREP FOR = 7 I r NEW 15 RECEIVED BY BUILDING OFFICIAL. Z CY W Q wp DU D. REMOVE SIDING, TIMBER BEAMS SUBSTRATE TO 2. MAINTAIN EXISTING MEANS OF EGRESS AS REQUIRED f J `Z 0 J BY BUILDING OFFICIAL. EXISTING STUDS, STUCCO REMAINS U.N.O. PREP FOR NEW a D CC 0 ; SUBSTRATE, RE: ELEVATIONS 3. WHERE REQUIRED FOR DEMOLITION OR OTHER CO PROJECT REQUIREMENTS, ALL SERVICE UTILITY, FIRE LLJ 1 E. REMOVE,6X6 POSTS, BEAMS AND ROOF PROTECTION 4 ANY POWER SHALL BE DISCONNECTED H J AND CAPPED IN STRICT ACCORDANCE WITH THE APPROVED REGULATIONS AND REQUIREMENTS OF UTILITY w F. CONCRETE SLAB TO REMAIN, PREP FOR STAMPED DISTRICTS AND ALL PERTINENT GODES. CONCRETE TOPPING 4. PROTECT ALL SURROUNDING WALL SEPARATION Q G. CONCRETE SLAB TO REMAIN, OWNER TO PROVIDE RATINGS FLOOR/GEILING ASSEMBLIES TO THEIR FULL STAIR TREADS AS REQUIRED INTEGRITY - ADVISE OWNER OF ANY CONGEALED BREACHES DISCOVERED I N THE PROCESS OF DEMOLITION H. DECKS TO REMAIN. 50 AS TO ACCOMMODATE COSTS THEREFORE. I. REMOVE ROOF, DOORS SIDING FROM ELECTRICAL 5. PROTECT ALL MECHANICAL DUCTS (RETURN $ SUPPLY- I D� I� I IIIHO ENCLOSURE, FRAMING TO REMAIN, PREP FOR NEW TENANT 4 BUILDING) FROM DUST, DEBRIS OR FOREIGN MATERIALS THAT COULD IMPEDE CURRENT OR FUTURE p) H J 11 iF J. REMOVE ALL GUARDRAILS / HANDRAILS, PREP FOR CLEAN AIR OR DISRUPT ADJACENT OPERATIONS. NEW /6. CONTROL 4 KEEP ALL COMMON AREAS, OUTDOOR K. BALUSTERS: ASSUME 50% TO BE REPLACED, PAINT TO AREAS PUBLIC AREAS FREE OF ALL DEBRIS, MATCH EXISTING MATERIALS FOR THE DURATION OF DEMOLITION 4 NEW ©COPYRIGHT Victor Mark CONSTRUCTION, EXCEPT IN AREAS DESIGNATED BY Donaldson OWNER Architects All Rights 1. PROPER TRASH REMOVAL SHALL BE COORDINATED Reserved WITH PROPERTY OWNER. S. MANAGE SALVAGE OF ALL MATERIALS FROM BUILDING REVISION INVENTORY4 CONSTRUCTION COMPONENTS FOR REUSE, AS NOTED I N THESE DOCUMENTS. 4. ALL CRAWLSPACE VENTS TO REMAIN. 10. REMOVE $ REPLACE ALL DRYER AND BATHROOM DATE 03/14/2017 VENTS, RE: SPEC. JOB NO. 1610 2ND LEVEL DEMO PLAN SHEET NO. AO .2