Loading...
HomeMy WebLinkAboutB18-0330 approved plans.pdf1 ~ ·~ -... I Clmt I 0 I (.-) " /. Bolton Remodel 2832 Kinnikinnick Road Unit C Vail Colorado, 81657 Construction Drawings WI{-"\..-----18'-6" ~ Scale 1/4"=1 '-0" ..-I<-~ v JS I I Notes: Demolition 1. Remove paint from and carpeting from garage flooring. 2. Demo drywall closet in NE corner of garage. New Construction 1. Miscellaneous drywall patching and repair. 2. Paint walls and ceiling. 3. Add built in overhead storage shelving. 4. Add overhead lighting and (2) 4 plex outlets per electrical plan. 5. Stairway replacement to be determined . Garage Plan Sheet6 .. ~·· ..... ·········· ................. . June 23, 2018 ... ~ ~ Town of Vall OFFICE COPY RECEIVED AUG 0 8 2018 Town of Vail REVI WED ROA CODE rownif Vail COM LIANC B;:e:., j u -.• ·r'l Co.de: J is : ' , ~ M ~ (~ ...... (LJ ' \ "' Sh~ 11 .... Cl> ct> ~ -c 0-Bolton Remodel 5'~" Closet -Wall Heater l~LQt----@~ 7'-0" /-··················· """" [] I ~~~-r(J ) \..L=.15 1'1 <r.-.)< ~ Demolition Notes: -,, .-~~ ~ ·' ~ ~· ,• 1. Demo existing vanity, countertop, sinks, faucets, shower, toilet,tub, tile and mirror. Demo partial closet. 2. Remove and dispose of trim and doors. 3. Open drywall into existing window in master bath. New Construction 1. Install new tile flooring, vanity, countertop, sinks, new faucets throughout, toilet, tub, shower. Reuse shower glass and door if possible. 2. Install new door and hardware in master bath entry. 3. Install new lighting throughout per electrical plan. 4. Install new trim throughout. 5. Add frosted glass to window in master bath. Drywall repair and finish. 6. Add 240v wall heater in closet wall. 7. Install electric heated floor mat under tile. 8. Add half wall between vanity and toilet. 9. Install carpet in master closet. 10. Paint walls and ceiling throughout. ~ Scale 1 /2"=11-011 2832 Kinnikinnick Road Unit C Vail Colorado, 81657 Construction Drawings Master Bath & Closet Plan Sheet9 ····-· June 23, 2018 r . I I J1cv1 E'lc(./t1.~u I Wvv-cC::: 0 ~ (,,.jf 1-=t~IJ/ Notes: 7'-6" \ Laundry/ ' Mechanical N I "" ; ........ . I "":101-10" Bolton Remodel E 5'-2" Co I Co Bath 2 (') 0 C/l ~ North Scale 1/4"=1'-0" 2832 Kinnikinnick Road Unit C Vail Colorado, 81657 Construction Drawings 14'-2" Bed 2 Bath 1 Bed 1 Demolition 1. Remove and dispose tile in entry, laundry/mechanical and hallway lo I ........ ' and closet. Tile under baler can remain. 2. Remove and dispose carpet on stairway. 3. Remove and dispose wood handrailing. ........ 4. Remove and dispose main entry door . 5. Remove and dispose of carpet in bed1 and bed2 and closets. 6. Remove and dispose sink, faucets and toilets in bath1 and bath2 7. Remove and dispose closet doors in bed1 and bed2 8. Remove and dispose of hot water tank in mechanical room. 9. Remove and dispose of all trim and doors. <o I ~ New Construction 1. Install new sinks, faucets and toilets in bath1 and bath2. 2. Change ovehead fans to new lighting fixture provided by Owner bed 1 and bed2. 3. Install wood flooring entry, hallway, closet and stairway. 4. Install new carpet in bed1 and bed2 and closets m 5. Install new front door and hardware. 6. Paint all walls and ceiling. Paint bifold doors into mechanical room. I 0 ........ 7. Install new hot water tank. 8. Drywall in wall between laundry/mechanical room and garage. 9. Install new doors throughout. 10. Install new trim throughout. 11. Install iron handrail both sides of stairway. 12. Install new tile in laundry and mechanical room. 13. replace existing can light trim with update per electrical plan. 1st Floor Plan Sheet 7 June 23, 2018 ·""!-"" I -I• I 1· '.• ~ . -· ' \ • • Powder 7'-0" Bolton Remodel / lII 2832 Kinnikinnick Road Unit C Vail Colorado, 81657 Construction Drawinas ~' Dining -$, @Y <o I °' ..-Liv~~ ,,... .. 14'-0" Master Bed ~ . {ff '----/ Notes: Demolition 1. Demo and dispose kitchen including cabinet, countertops, bar, appliances and tile flooring. 2. Demo and dispose of powder room vanity, countertop, sink, faucets and toilet. 3. Remove carpet in dining, living, master bed and master closet 4. Remove and dispose of all trim and doors. 5. Remove and dispose of fireplace stone facade. 6. Open drywall to existing window in master bath. 7. Demo and dispose master bath including vanity, countertop, mirrors, sinks, plumbing, toilet, tub and shower. Reuse glass shower enclosure if possible. New Construction 1. Install new kitchen cabinets, counter top, bar, appliances and wood flooring 2. Install new lighting throughout per electrical plan. 3. Install new pedastal sink and faucet, toilet, and wood flooring and exhaust fan in powder room. 4. Install new door and hardware in powder room, master bed entry, master bath entry. 5. Install wood flooring dining, living, and stairway. 6. Install new carpet in master bed and closet. 7. Install new trim throughout. 8. Wall mount TV. (TBD) 9. Install new stone around fireplace and wood mantel. 10. Paint walls and ceiling throughout. 11. Master bath new construction separate sheet. 12. Install tile under kitchen bar on vertical surface. 2nd Floor Plan <I North Scale 1/4"=1'-0" Sheet 8 June 23, 2018 , .... ~ ~ " ~